{"document":{"slug":"rec-20260716-4002","title":"Pre-filed Statement of Pamela Quinlan, Principal at GQS New Energy Strategies, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-16","accession":"20260716-4002","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"GQS NEW ENERGY STRATEGIES","kind":"testimony","file":"sources/filings/text/20260716-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4002","tier":"record","sha256":"4bc2617a30cfe412650e6001bea7988c992e2f68258ffbeed62b5734e60e46a9","pages":18,"tokens":7235,"emptyPages":[],"textThemes":["adequacy","study"]},"pages":[{"page":1,"startToken":0,"endToken":352,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms  \n \n \n        Docket No. AD26-7-000 \n \nPRE-FILED STATEMENT OF PAMELA QUINLAN \n PRINCIPAL, GQS NEW ENERGY STRATEGIES \n \nPreserving the Regional Compact: Governance, Accountability, and Resource Adequacy in \nPJM's Next Phase of Evolution \nChairman Swett and Commissioners Rosner, See, Chang, and LaCerte: \nThank you for the opportunity to participate in this technical conference. I appreciate the \nCommission's decision to convene this discussion at a time when PJM is confronting some of the \nmost significant operational, market, and reliability challenges in its history. \nMy name is Pamela Quinlan. I am a Principal and Co-Founder of GQS New Energy Strategies. I \nam participating today in my personal capacity, and the views expressed in this statement are my \nown and do not reflect the views of my clients. \nI have participated on PJM matters from a number of different perspectives for the past two \ndecades. I first became involved in PJM in 2005 while working for one of the early competitive \ndemand response providers. I later represented Rockland Electric Company as a voting member \nof PJM's Transmission Owner Sector. I subsequently served at the Federal Energy Regulatory \nCommission as an Energy Industry Analyst, Technical Advisor to Commissioner Rich Glick, as \nwell as Chief of Staff. During my time at the Commission, I worked on numerous rulemakings, \nproceedings and technical conferences involving various aspects of PJM's market design, \ntransmission planning, and resource adequacy. Today, as a consultant, I advise a broad range of \nmarket participants—including utilities, transmission developers, generation developers, storage \ndevelopers and large electricity customers investing billions of dollars across the PJM footprint. \nThose experiences have provided a unique vantage point from which to observe PJM's evolution. \nThey have also led me to one consistent conclusion: every constituency believes PJM's \ngovernance process is not working for them. \nSuppliers have argued that stakeholder processes move too slowly to respond to changing market \nconditions. Consumer advocates have argued that markets fail to adequately protect customers. \nStates have expressed frustration that regional institutions are insufficiently responsive to state \npolicy objectives. Transmission owners, public power entities, large end use customers,"},{"page":2,"startToken":352,"endToken":777,"text":"environmental organizations have all, at different times, concluded that PJM's governance \nstructure is contributing to the challenges confronting the region. \nThe consistency of those criticisms is striking. When every constituency believes the system is \nworking against it, the natural instinct is to conclude that the governance model itself is broken. \nI am not convinced that is the correct or complete diagnosis. \nPJM unquestionably faces serious challenges. It was slow to modernize its generation \ninterconnection process, slower than many of its peers to embrace forward-looking transmission \nplanning, and unprepared for the unprecedented pace of large-load growth now reshaping the \nregion. Those shortcomings contributed directly to today's resource adequacy concerns, even as \nPJM has more recently undertaken significant reforms to address them.  \nAt the same time, electricity demand is increasing at a pace not experienced in decades, while the \ninfrastructure necessary to support that growth has become increasingly difficult and time-\nconsuming to develop. Importantly, the region's greatest constraint today is not a lack of \ncommercial interest or private capital. Billions of dollars are prepared to be invested in new \ngeneration, transmission, storage, and large load development.  \nThe defining constraint on the electric system today is infrastructure: our collective ability to site \nit, permit it, interconnect it, finance it, and build it quickly enough to maintain reliability. \nNo governance reform, market design, or resource adequacy construct will succeed unless the \ninstitutions responsible for planning and developing that infrastructure are capable of working \ntogether effectively. Those challenges deserve the Commission's attention, and governance \nreform can undoubtedly improve how PJM responds to them. But governance is only part of the \nstory. \nIncreasingly, the decisions that create new reliability obligations are made by institutions outside \nPJM's direct control, while PJM remains responsible for maintaining reliability across one of the \nlargest synchronized electric systems in the world. The recent resource adequacy challenges \nconfronting PJM did not cause this disconnect. They revealed it. The institutions creating new \nreliability obligations are increasingly different from the institutions responsible for ensuring \nthose obligations can be met. State legislators, Governors and commissions make policy \ndecisions that either advance or halt new load, generation, supply, and transmission. Governance \nreforms can improve PJM’s decision-making, but they cannot, by themselves, resolve that \ngrowing disconnect. In my view, aligning authority, responsibility, and accountability across the \nregional compact is the central challenge confronting PJM today.  \nThe objective of this proceeding, therefore, should not simply be to improve PJM's governance. \nIt should be to preserve and strengthen the regional compact that has made PJM one of the \nnation's most successful electric institutions."},{"page":3,"startToken":777,"endToken":1176,"text":"Regional coordination remains one of the greatest achievements of modern electricity policy. \nThrough coordinated system operations, regional transmission planning, competitive wholesale \nmarkets, and security-constrained economic dispatch, PJM has delivered substantial economic \nand reliability benefits to the 67 million consumers across thirteen states and the District of \nColumbia. Those benefits become even more valuable as electricity demand accelerates, resource \nportfolios diversify, and the bulk power system grows more complex. \nUltimately, the purpose of preserving the regional compact is to preserve the reliable and \naffordable electric service those institutions were created to deliver. Reliability and affordability \nare too often treated as competing objectives when durable affordability depends upon \nmaintaining a reliable electric system supported by adequate infrastructure and timely \ninvestment. Consumers bear the costs of inadequate planning and resource shortages just as \nsurely as they bear the costs of unnecessary investment. The challenge before the Commission is \nto ensure that the institutions supporting the regional compact can deliver both.  \nMeeting that challenge requires more than governance reform alone. It requires stronger \ninstitutional leadership, a more clearly defined partnership between PJM and the states, and a \nrenewed focus on aligning responsibility for creating reliability obligations with accountability \nfor meeting them.  \nThis statement offers six principal observations. \n1. The regional compact remains fundamentally sound and should be strengthened rather \nthan weakened. \n2. Many of PJM's recent challenges were preceded by failures of strategic long-term \nplanning and institutional adaptation rather than defects inherent in the governance model \nitself. \n3. PJM does not principally lack legal authority. It lacks the institutional confidence to \nexercise the authority it already possesses. Governance reform should therefore focus less \non expanding legal authorities and more on empowering an independent Board to \nestablish priorities, manage the stakeholder process, make difficult decisions, and \nexercise its expert judgment when consensus cannot be achieved.  \n4. States should be recognized as institutional partners, not merely stakeholders, with a \ndefined role in the development of long-term planning and resource adequacy initiatives. \nStates occupy a unique constitutional and regulatory role. They determine where \ngeneration and transmission facilities may be built, regulate the utilities responsible for \nserving retail customers, and increasingly shape the economic development and resource \npolicy decisions that drive future reliability needs. That partnership should begin earlier, \nbe more strategic, and be supported by the technical resources necessary for states to \nparticipate effectively, while allowing each state to determine how it wishes to be \nrepresented."},{"page":4,"startToken":1176,"endToken":1578,"text":"5. The next evolution of resource adequacy should better align responsibility for serving \nload with responsibility for demonstrating that sufficient accredited resources exist to \nsupport that load.  \n6. Finally, governance reform should be evaluated not by whether it redistributes influence \namong stakeholders, but by whether it strengthens the regional institutions that \nconsumers increasingly depend upon.  \nThe recommendations that follow are offered in that spirit. \n \nPreserving the Regional Compact \nThe debate over PJM's future should begin with a simple question: Why does the regional \ncompact exist in the first place?  Recent discussions have understandably questioned whether \nPJM has become too large, too complex, or too difficult to govern effectively. Those concerns \ndeserve careful consideration. But they should not cause us to lose sight of the extraordinary \nbenefits that regional coordination has delivered, or assume that today's challenges demonstrate \nthat the regional model itself has reached its limits.  \nPJM was never intended to replace the authority of states, utilities, or private investment. Rather, \nit was created because certain functions are performed more cost-effectively at a regional scale \nthan they can be by individual utilities or states acting alone. Its success has always depended on \neach institution performing the responsibilities that only it can perform. Operating an \ninterconnected bulk power system, dispatching generation economically across multiple \njurisdictions, planning transmission over a broad geographic footprint, and administering \ncompetitive wholesale markets all produce benefits that no single state or utility could achieve \nindependently. \nEvery day, PJM coordinates the operation of generating units across thirteen states and the \nDistrict of Columbia. Through security-constrained economic dispatch, it continuously selects \nthe lowest-cost combination of available resources capable of serving demand while respecting \nthe physical limitations of the transmission system. Regional transmission planning recognizes \nthat reliability challenges do not stop at state boundaries, allowing infrastructure to be developed \nwhere it provides the greatest overall benefit rather than where individual jurisdictions happen to \nexercise authority. Competitive wholesale markets likewise benefit from regional scale by \nsupporting greater liquidity, broader competition, and more efficient investment than would be \npossible in a collection of fragmented balancing authorities. \nThe scale of PJM is therefore not an accident. It is one of its greatest strengths. A larger footprint \nallows operators to share reserves across a wider geographic area, dispatch a broader and \nincreasingly diverse resource portfolio, respond more effectively to extreme weather, and \nmaintain reliability at lower overall cost than would otherwise be possible. As electricity demand"},{"page":5,"startToken":1578,"endToken":2031,"text":"accelerates, weather patterns become more volatile, and resource portfolios continue to diversify, \nthose regional benefits become increasingly important. \nNone of that means PJM should operate exactly as it did twenty years ago. The electric system \nhas changed dramatically. Load is growing at rates not seen in decades. Data centers and other \nlarge industrial facilities are developing on timelines that frequently outpace traditional utility \nplanning cycles. Generation, transmission, and natural gas infrastructure take longer to permit, \ninterconnect, and construct. States are pursuing increasingly diverse policy objectives, while new \ntechnologies are transforming both the supply and demand sides of the electric system. Those \nchanges require the institutions supporting the regional compact to evolve. \nThat need for institutional evolution, however, should not be mistaken for evidence that regional \ncoordination itself has failed. Quite the opposite. The more dynamic and interconnected the \nelectric system becomes, the greater the value of regional coordination. The question before the \nCommission is therefore not whether PJM is too large to function. It is whether the institutions \nsupporting the regional compact have evolved quickly enough to govern a much larger, faster-\nmoving, and more complex electric system. In my view, they have not. But that is an argument \nfor strengthening the regional compact, not abandoning it. The challenge is not that regional \nmarkets have outlived their usefulness. It is that governance, planning, accountability, and \ninstitutional coordination have not kept pace with the profound changes occurring across the \nelectric sector. The sections that follow explain why I believe stronger Board leadership, a more \nmeaningful partnership with the states, and clearer accountability for resource adequacy provide \na more durable path than weakening the regional model that has served consumers so well for \nmore than two decades.  \n \nHow PJM Fell Behind \nNone of this is to suggest that PJM has not made important mistakes. It has. Acknowledging \nthose mistakes is important because they contributed directly to many of the challenges \nconfronting the region today. At the same time, it is equally important to distinguish between \nthose mistakes and the broader institutional questions now before the Commission. Better \ngovernance alone would not necessarily have prevented them, nor will correcting them alone \nprepare PJM for the electric system that is emerging. \nThe common thread running through many of PJM's recent challenges is not poor governance, \nbut delayed institutional adaptation. As the electric system changed, PJM was often slower than \nthe pace of that change. Three examples illustrate the point. \nFirst, PJM waited too long to modernize its generation interconnection process. While other \nregional transmission organizations transitioned earlier to cluster studies and more forward-\nlooking queue management, PJM continued to rely on a serial interconnection process that \nbecame increasingly unworkable as project volumes accelerated. By the time comprehensive"},{"page":6,"startToken":2031,"endToken":2473,"text":"reforms were adopted, the backlog had grown so large that PJM ultimately paused new \ninterconnection requests for several years while implementing a new framework. That pause \noccurred at precisely the moment electricity demand began accelerating, delaying the \ninterconnection and availability of new resources when they were becoming most needed. The \nregion continues to feel the effects of that delay. \nSecond, PJM was slower than many of its peers to fully embrace long-term, forward-looking \nplanning. Historically, its planning processes excelled at identifying and correcting discrete \nreliability violations on the existing system in the near-term. As the electric sector evolved, \nhowever, planning increasingly required anticipating where the system was heading rather than \nsimply responding to where it had been. PJM is in the midst of substantial progress through \ncapacity expansion modeling, Order No. 1920 adoption, and more comprehensive assessments of \ntransmission and generation needs. Those reforms represent meaningful progress, but they \narrived only after the underlying trends had already begun reshaping the region. \nFinally, the explosive growth in large electricity demand exposed shortcomings in PJM's \nforecasting assumptions. No forecasting process will perfectly anticipate disruptive change, but \nthe warning signs surrounding accelerating data center development and other large industrial \nloads emerged over a number of years. Earlier recognition of those trends could have prompted \nearlier transmission planning, earlier consideration of resource adequacy reforms, and earlier \ncoordination among PJM, the states, utilities, and market participants. PJM's recent reforms, \nincluding independent validation of large-load forecasts and more rigorous review of utility \nsubmissions, are important improvements that should significantly strengthen planning going \nforward. \nThese were meaningful mistakes, and they deserve acknowledgment. But I do not believe they \nfully explain PJM's current predicament, nor do I believe different governance alone would \nnecessarily have prevented them. Institutions often struggle to recognize structural change while \nit is occurring, particularly when that change accelerates rapidly. \nThe recent surge in electricity demand did not create the disconnect now confronting PJM. It \nrevealed it. For many years, relatively stable demand growth and comfortable reserve margins \nallowed the region to absorb institutional misalignment without immediate reliability \nconsequences. Today's resource adequacy challenges have exposed that those margins no longer \nexist. Increasingly, questions involving governance, planning, market design, and stakeholder \nprocesses are all converging on a single structural issue: who is ultimately responsible for \nensuring that sufficient infrastructure and accredited resources exist to serve future load. \nThat is the challenge the remaining sections of this statement seek to address. They focus less on \ncorrecting yesterday's mistakes than on preparing PJM for tomorrow's electric system by \nstrengthening institutional leadership, creating a more meaningful partnership with the states, \nand restoring clearer accountability for resource adequacy. None of those recommendations"},{"page":7,"startToken":2473,"endToken":2904,"text":"requires abandoning the regional compact. To the contrary, each is intended to strengthen it by \nensuring that every institution performs the responsibilities it is uniquely positioned to carry out. \n \nWhat Governance Can—and Cannot—Fix \nThe Commission has convened this technical conference to consider whether reforms to PJM's \ngovernance and stakeholder processes are necessary. I believe that question is both timely and \nimportant because governance matters. The way institutions make decisions affects not only the \nquality of those decisions, but whether they are made early enough to avoid crises. Good \ngovernance cannot guarantee good outcomes, but it can improve an institution's ability to \nrecognize change, establish priorities, and act before emerging challenges become reliability \nproblems. \nThat is particularly important today because the defining challenge facing the electric system is \nno longer simply attracting investment. It is ensuring that the infrastructure necessary to support \nthat investment is planned, permitted, interconnected, and constructed before reliability needs \narise. Markets remain extraordinarily effective at allocating capital. They are far less effective at \novercoming delays in permitting, siting, transmission development, and interconnection. Those \nchallenges require earlier planning, stronger institutional coordination, and clearer accountability \nacross the regional compact. \nGovernance has an important role to play in meeting that challenge, but it should not become a \ncatch-all explanation for every challenge confronting the region. Good governance should \nproduce institutions that anticipate change rather than react to it. It should encourage long-term \nplanning instead of crisis management, establish clear priorities, and provide decision-makers \nwith the confidence to act before reliability is threatened. It cannot, however, eliminate the \nphysical, economic, and jurisdictional realities that ultimately determine whether sufficient \ninfrastructure can be developed to meet future demand. \nMany of the decisions that shape future reliability occur outside PJM. Utilities undertake new \nobligations to serve load. States establish resource policies and promote economic development. \nLocal governments determine whether transmission and generation infrastructure can be sited \nand permitted. Private developers decide when projects move forward. PJM must then forecast \ndemand, plan transmission, administer markets, and maintain reliability after many of those \ndecisions have already been made. Governance can improve how PJM responds to those \nrealities. It cannot substitute for earlier planning, stronger institutional coordination, or clearer \naccountability for the decisions that create future reliability obligations. \nViewed through that lens, the challenge confronting PJM is not simply that decisions take too \nlong. It is that the pace of change affecting the electric system has begun to outstrip the \ninstitutional mechanisms through which those changes are identified, evaluated, and acted upon. \nThe answer is therefore not to abandon stakeholder governance, nor to centralize every important"},{"page":8,"startToken":2904,"endToken":3312,"text":"decision within the PJM Board. It is to ensure that governance is used for the purpose for which \nit is best suited: establishing strategic direction, identifying emerging risks early, aligning the \ninstitutions responsible for reliability, and enabling timely action before reliability challenges \nbecome crises. \nThat naturally leads to the next question: if governance is intended to provide strategic leadership \nrather than solve every operational challenge, how should responsibility be shared between the \nBoard and the stakeholder process? \n \nLeadership, Consensus, and the Role of the Board \nMuch of the discussion surrounding PJM governance has focused on two related questions: Has \nthe stakeholder process become too slow? And should the Board exercise greater authority? Both \nare appropriate questions, but I do not believe they fully capture the issue confronting PJM \ntoday. The more fundamental question is whether PJM is using the right governance process for \nthe type of decision it is trying to make. \nOne of PJM's greatest institutional strengths has always been its commitment to an open, \ntransparent, consensus-based stakeholder process. Few organizations are able to bring together \nthe breadth of operational, engineering, market, regulatory, and commercial expertise that exists \nwithin PJM's membership. That collaborative process has consistently produced better tariffs, \nstronger implementation, and more durable reforms than would likely emerge from a purely top-\ndown regulatory approach. It should remain one of PJM's defining characteristics. \nAt the same time, not every issue benefits from the same governance model. Technical questions \ninvolving Manuals, market mechanics, operational procedures, and implementation details \nbenefit enormously from extensive stakeholder engagement because the objective is to improve \nthe quality of implementation. Strategic questions are different. Decisions involving resource \nadequacy, transmission planning, market design, and emerging reliability risks require balancing \ncompeting public interests, establishing institutional priorities, and determining how much risk \nthe region is willing to accept. Those are not simply technical questions, nor are they questions \nthat can always be resolved through negotiation among stakeholders whose commercial interests \nare directly affected by the outcome.  \nThat distinction explains why consensus and leadership serve different, but complementary, \npurposes. Consensus is exceptionally effective at improving solutions. Leadership defines the \nproblem to be solved, establishes the objectives that must be achieved, and determines when \naction is necessary.  \nIt should therefore not be surprising that consensus becomes increasingly difficult when \nstakeholders are asked to redesign the very markets in which they participate. That is not \nnecessarily a failure of the stakeholder process. Rather, it reflects the reality that stakeholders"},{"page":9,"startToken":3312,"endToken":3764,"text":"with fundamentally different interests will not always agree on questions involving the allocation \nof costs, risks, and opportunities. Those are precisely the circumstances in which Board \nleadership becomes most important.   \nRecognizing those distinct roles, I believe the Board should lead on direction while stakeholders \nshould lead on design. The Board should define the problem requiring resolution, establish the \nobjectives any solution must satisfy, set an appropriate timeframe for action, and identify where \nstakeholder expertise is most valuable. Stakeholders should then do what they do best: improve \nproposals, evaluate alternatives, identify operational concerns, and build consensus wherever \nconsensus can reasonably be achieved.  \nThis distinction also informs the current discussion regarding Section 205 filing rights. \nConsiderable attention has been given to whether PJM should possess broader Section 205 \nauthority, whether the Board should have additional filing rights over matters currently governed \nby the Operating Agreement, or whether states should possess greater authority to initiate \nCommission action. These are thoughtful questions, and there may well be merit in considering \ntargeted changes over time. I am not persuaded, however, that they address PJM’s principal \nchallenge. \nThe region's most pressing challenge today is resource adequacy. Yet the Board already \npossesses broad Section 205 authority over the capacity market and many of the reforms \nnecessary to address that challenge. Where the Board concludes that changes are needed in areas \nwhere PJM does not possess unilateral Section 205 filing authority, it retains the ability to seek \nrelief from this Commission under Section 206 when it believes existing tariff provisions have \nbecome unjust, unreasonable, or unduly discriminatory. The limiting factor has therefore not \nbeen the absence of legal authority. It has been the willingness to exercise the authority that \nalready exists.  \nOver time, stakeholder consensus has increasingly come to be viewed as a prerequisite for action \nrather than an important input into institutional judgment. Consensus should remain the preferred \noutcome wherever it can reasonably be achieved because reforms developed collaboratively are \noften stronger, more durable, and easier to implement. But consensus is a means of improving \ndecisions; it should not become a prerequisite for exercising judgment. \nAn independent Board is valuable only if its independence produces leadership. The purpose of \nan independent Board is not to insulate its members from disagreement or controversy. It is to \nenable them to exercise their expert judgment when consensus cannot be achieved and difficult \ndecisions nevertheless must be made.  \nOnce the Board concludes that action is necessary to preserve reliability or maintain just and \nreasonable rates, it should be prepared to exercise the authorities already available to it. \nConsensus should remain the preferred outcome, but it should not become a justification for \ninaction. When meaningful stakeholder engagement has occurred and the Board concludes that"},{"page":10,"startToken":3764,"endToken":4146,"text":"change remains necessary, exercising its existing authority—including seeking Commission \naction under Section 206 where appropriate—is not a failure of the stakeholder process. It is the \ngovernance model functioning as intended. \nRecent Board elections suggest that stakeholders increasingly express dissatisfaction with \nsubstantive policy outcomes through the election process. Accountability to stakeholders remains \nan important feature of PJM's governance, but accountability should not come at the expense of \nindependence. PJM should therefore consider whether longer Board terms, coupled with the \nexpectation that Board members generally serve a single term, would better balance \naccountability with the independence necessary to exercise expert judgment. \nTwenty years ago, waiting another six months for consensus often carried relatively modest \nconsequences. Today's system is fundamentally different. Infrastructure takes longer to develop, \nelectricity demand is growing more rapidly, reserve margins are tighter, and the margin for error \nhas narrowed considerably. As the cost of institutional delay continues to rise, the value of an \nindependent Board lies not simply in its independence, but in its willingness to exercise \nindependent judgment. That is the form of leadership the next era of regional coordination will \nrequire. \n \nThe States as Partners in Reliability \nThe Commission has appropriately asked whether states should play a larger role in PJM's \ngovernance and whether additional procedural rights or filing authorities are necessary to ensure \nthat regional markets remain responsive to state priorities. In my view, the more important \nquestion is not whether states should have greater influence within PJM's governance structure. \nIt is whether the institutions responsible for solving the region's most pressing reliability \nchallenges are working together early enough, and with sufficient shared accountability, to \ndevelop durable solutions. \nStates are fundamentally different from other PJM stakeholders. They are sovereign governments \nexercising authorities that PJM neither has nor should have. States determine where generation \nand transmission facilities may be built. They regulate the utilities responsible for serving retail \ncustomers. They oversee resource planning in many jurisdictions and increasingly influence \nwhere new economic development—including large industrial facilities and data centers—\noccurs. Those decisions directly shape both electricity demand and the infrastructure available to \nmeet it. \nPJM's responsibility is equally unique. It must forecast those developments, determine what \ninfrastructure and resources will be required, operate the regional transmission system reliably, \nand administer wholesale markets that support efficient investment."},{"page":11,"startToken":4146,"endToken":4554,"text":"This division of responsibilities is not new. It is the foundation of the cooperative federalism \nupon which organized wholesale markets have always depended. \nWhat has changed is the environment in which those responsibilities are exercised. \nFor much of PJM's history, the region benefited from relatively modest load growth, stronger \nreserve margins, and sufficient flexibility within the system that imperfect coordination among \ninstitutions could often be absorbed without immediate reliability consequences. Today, we are \noperating under very different conditions. Electricity demand is increasing at rates not \nexperienced in decades. Infrastructure takes significantly longer to permit and construct. Reserve \nmargins are tighter, and the consequences of inaccurate planning or delayed investment are felt \nmuch more quickly. \nAs the margin for error narrows, coordination among institutions becomes substantially more \nimportant. \nResource adequacy provides perhaps the clearest example. Reliable service depends on \ncompetitive markets producing efficient investment signals. It depends on timely development of \ngeneration and transmission infrastructure. It depends on utility planning, state permitting and \nsiting decisions, and economic development policies that recognize the infrastructure necessary \nto support new load. No single institution controls all of these decisions, yet each institution \ninfluences the outcome. \nThis also requires recognizing the relationship between affordability and investment. \nStates quite appropriately seek to protect consumers from unnecessary cost increases. PJM \nappropriately relies on competitive markets to signal when additional resources are needed. Both \nobjectives are legitimate. But they cannot be pursued in isolation. Markets cannot be expected to \nattract the investment necessary to address resource shortages if scarcity prices are consistently \nmoderated without corresponding actions to accelerate the infrastructure needed to relieve those \nshortages. Likewise, stronger market signals alone cannot solve reliability challenges if new \ninfrastructure cannot be sited, permitted, or constructed in a timely manner. \nThe answer is not to choose between affordability and investment, or between state authority and \nregional markets. The answer is to better integrate those decisions before they become crises. \nThat is why I believe the relationship between PJM and the states should evolve beyond \nconsultation toward shared accountability for those initiatives that inherently require both \nregional and state action. \nToday, the states already engage regularly with PJM through the Organization of PJM States, Inc. \n(OPSI). Those discussions are valuable and should continue. The issue is not that the states lack \naccess or that PJM is unwilling to listen. Rather, the governance structure does not adequately \nrecognize that success on many of today's most important issues ultimately depends on actions"},{"page":12,"startToken":4554,"endToken":5001,"text":"that only the states can take. Influence alone is not enough when implementation requires shared \nownership of the solution. \nAccordingly, I believe major initiatives involving long-term transmission planning, resource \nadequacy, and other issues that directly implicate state authorities should be developed by PJM \nin collaboration with a standing committee of state representatives before entering the \nstakeholder process. I do not believe the Commission or PJM should prescribe who represents \neach state. That decision should remain with the states themselves. Depending on the issue, a \npublic utility commission, governor's office, energy office, or another designated entity may be \nthe most appropriate representative. \nIf states are expected to assume a more strategic role, they must also have the institutional \ncapacity to fulfill it. These issues are extraordinarily technical, requiring expertise in engineering, \neconomics, market design, and transmission planning. Other regions have recognized this need \nby providing states with the budget for independent technical support.1 PJM should consider \nsimilar approaches so that states have the professional resources necessary to participate as \neffective partners in developing long-term regional strategies. \nNone of this should diminish PJM's responsibility or the authority of its Board. PJM must remain \nwholly responsible for determining what reliability requires and for making the regional \ndecisions necessary to preserve the integrity of the interconnected system. Shared accountability \ndoes not mean shared veto authority. It means recognizing that regional strategies are more likely \nto succeed when the institutions responsible for implementing them help develop them from the \noutset. \nViewed through that lens, the question is not whether states should have a larger seat at the table. \nIt is whether the institutions whose decisions collectively determine reliability are organized in a \nway that allows them to solve increasingly complex problems together. As the electric system \ncontinues to evolve and the margin for error continues to narrow, I believe the answer must \nincreasingly be yes. That partnership should not end with consultation. Its purpose is to restore \naccountability for resource adequacy by aligning the institutions that create new reliability \nobligations with those responsible for ensuring they can be met.  \n \nRestoring Accountability for Resource Adequacy \nThe discussion above ultimately points to what I believe is the central institutional question \nconfronting PJM. If resource adequacy is increasingly shaped by decisions made across multiple \ninstitutions, then the question is no longer simply how PJM procures capacity. The question is \n \n1 New England States Comm. on Elec. (NESCOE), 2026 Budget 1–4 (2025), https://www.iso-ne.com/static-\nassets/documents/100026/1a_nescoe_2026_budget.pdf (setting forth NESCOE’s annual operating budget, including \nfunding for professional staff and technical, legal, and consulting support provided on behalf of the New England \nstates in regional electricity matters)."},{"page":13,"startToken":5001,"endToken":5433,"text":"whether responsibility for creating new reliability obligations remains aligned with responsibility \nfor ensuring those obligations can be met.  \nThe Reliability Pricing Model provides a useful illustration of why the region's resource \nadequacy framework must evolve. RPM was developed during a period of relatively stable \ndemand growth, shorter infrastructure development timelines, and a market in which the Base \nResidual Auction was intended to function largely as a residual procurement mechanism. \nBilateral contracting, self-supply, and other forward procurement activities were expected to \nsatisfy much of the region's resource adequacy needs, with the auction procuring only the \nremaining capacity necessary to maintain reliability. \nThat is no longer how the market functions. \nToday, the overwhelming majority of capacity clears through the centralized auction. More \nimportantly, the auction has increasingly become the institution expected to reconcile decisions \nmade by others. New wholesale load is added through utility service obligations and competitive \nretail arrangements without any corresponding requirement that the entity undertaking that \nobligation demonstrate how it intends to secure the accredited resources necessary to serve that \nload. States likewise make decisions regarding economic development, environmental policy, \nand the future composition of the generation fleet pursuant to their own statutory responsibilities. \nThose decisions are entirely appropriate exercises of state authority. But they also have direct \nimplications for regional resource adequacy. If a state encourages significant new electricity \ndemand or adopts policies that accelerate the retirement of existing resources, there should also \nbe a credible strategy for ensuring that sufficient replacement resources and supporting \ninfrastructure will be available when they are needed.  \nEven if scarcity prices were allowed to fully reflect market conditions, price signals alone cannot \nsolve what has become fundamentally a planning and accountability challenge. Scarcity pricing \nmay indicate that additional resources are needed, but it cannot shorten permitting timelines, \naccelerate transmission construction, resolve interconnection delays, or eliminate the uncertainty \nassociated with developing major infrastructure. Generation, transmission, and natural gas \ninfrastructure frequently require five to ten years—or longer—to finance, permit, interconnect, \nand construct. By contrast, the Base Residual Auction provides a single year of revenue \nguaranteed only a few years before delivery. That mismatch between investment timelines and \nmarket timelines has become increasingly significant. \nThe issue, therefore, is not whether competitive markets have failed. It is that we have \nincreasingly asked the centralized capacity market to solve problems it was never designed to \nsolve. \nAt its core, this reflects a broader shift in the nature of the resource adequacy challenge. When \nRPM was developed, the principal question was whether markets would produce sufficient \ninvestment in new generation. Today, the greater challenge is whether the infrastructure"},{"page":14,"startToken":5433,"endToken":5895,"text":"necessary to support that investment can be planned, permitted, interconnected, and constructed \nbefore reliability needs arise. Competitive markets remain highly effective at allocating capital \namong competing resources. They are far less capable of coordinating the planning, permitting, \nsiting, and long-term infrastructure development that increasingly determine whether those \nresources can reach commercial operation when they are needed. Resource adequacy has \ntherefore become as much an infrastructure and institutional coordination challenge as it is a \nmarket challenge.  \nThat shift has also placed increasing pressure on PJM's governance. As long as the region \ncontinues to rely on the centralized capacity market to reconcile structural issues that originate \nelsewhere, participants will continue to debate market rules in an effort to solve problems whose \nroot causes lie outside the market itself. The stakeholder process has increasingly become the \nforum for debating broader questions of resource adequacy, economic development, \ninfrastructure planning, transmission development, and state policy. That is not because those \nissues are fundamentally questions of market design, nor because stakeholder negotiations are \nthe appropriate forum for resolving them. Rather, it is because no institution has been clearly \naccountable for addressing those issues before they reached PJM.  \nBy restoring clearer accountability for resource adequacy, much of that structural tension can be \nremoved from the stakeholder process. PJM's markets can then focus on what competitive \nmarkets do exceptionally well: discovering efficient prices, facilitating competition, and \nallocating investment among competing resources. Likewise, stakeholders can return to what the \nprocess has always done best: improving implementation, refining market design, and applying \ntheir collective technical expertise to produce better solutions, rather than attempting to resolve \nbroader institutional questions that markets alone cannot answer. \nThis is the central institutional reform PJM now requires. The objective is not to replace \ncompetitive markets with centralized planning. It is to reconnect the obligation to serve load with \nthe obligation to ensure that adequate resources exist to serve that load. Governance reforms can \nimprove how decisions are made, but reconnecting responsibility for creating reliability \nobligations with responsibility for meeting them addresses why so many governance debates \nhave become increasingly difficult in the first place. For more than twenty years, resource \nadequacy has largely been treated as something PJM procures on behalf of the region. I believe \nthe next evolution of organized markets should instead treat resource adequacy as a shared \ninstitutional responsibility, with clearer accountability placed on the entities creating new \nreliability obligations. \nThe guiding principle is straightforward: every decision that predictably creates a future \nreliability obligation should be accompanied by a credible plan for meeting that obligation. That \nprinciple begins with wholesale load-serving entities because they undertake the obligation to \nserve load. Before undertaking the obligation to serve load, an LSE should demonstrate a \ncredible path for satisfying the resource adequacy requirements associated with that service."},{"page":15,"startToken":5895,"endToken":6347,"text":"Importantly, this is not simply a new obligation on LSEs. It also creates a stronger connection \nbetween wholesale resource adequacy and the state regulatory decisions that increasingly shape \nthe future resource mix. \nThis approach also clarifies the respective responsibilities of PJM, the states, and load-serving \nentities. PJM should remain responsible for determining the region's resource adequacy \nrequirements. Given the size, complexity, and interconnected nature of the PJM system, no other \ninstitution is capable of performing the regional analysis necessary to determine how much \naccredited capacity is required, where it is needed, and when it must be available. States should \ncontinue to determine how the utilities and competitive suppliers they regulate satisfy those \nobligations, whether through long-term contracts, utility-owned resources, bilateral purchases, \nself-supply, or other market-based approaches. The obligation of the load-serving entity is to \ndemonstrate that sufficient accredited resources will be available to serve the load it has \nundertaken to supply. \nPJM's role should not end with establishing the reliability requirement. It should also verify that \nentities undertaking wholesale load obligations have demonstrated a credible path toward \nsatisfying those obligations over an appropriate planning horizon. As the delivery year \napproaches, those demonstrations should become increasingly rigorous. By the delivery year, the \nobligation should be clear: an LSE should either demonstrate that it has secured sufficient \naccredited resources to serve its load or bear consequences. Those consequences should include \nmeaningful financial penalties that compensate other market participants for the reliability and \nscarcity costs imposed by the shortfall, together with operational consequences designed to \nprotect system reliability and reinforce accountability.   \nThis framework also reinforces the partnership between PJM and the states discussed above. It \ndoes not assign new legal responsibilities to the states or diminish their authority over resource \npolicy, utility regulation, or economic development. Today, a state may appropriately encourage \nsignificant economic development, approve new large electricity customers, or adopt policies \nthat accelerate the retirement of existing generation. Those decisions remain matters of state \nauthority. But if the utilities or competitive suppliers serving that load are also responsible for \ndemonstrating compliance with PJM's resource adequacy requirements, those same decisions \nwill naturally be accompanied by planning for the resources needed to support them. Rather than \nasking PJM's centralized capacity market to reconcile those decisions after they have been made, \nresponsibility begins moving upstream to the institutions creating the new reliability obligation.  \nImportantly, this framework works equally well in both traditionally regulated and competitive \nretail markets. The obligation attaches to the entity undertaking wholesale load service, not to a \nparticular retail market structure. States remain free to determine how that obligation is satisfied, \nwhether through vertically integrated utilities, competitive suppliers, bilateral contracting, self-\nsupply, or other market-based approaches. The objective is not to prescribe procurement"},{"page":16,"startToken":6347,"endToken":6713,"text":"decisions or diminish competition. It is to align authority, responsibility, and accountability while \npreserving competitive markets.  \nViewed from that perspective, this evolution strengthens rather than diminishes PJM's role. PJM \nshould continue doing what only a regional transmission organization can do: establish regional \nand locational resource adequacy requirements, administer transparent competitive markets, plan \nthe transmission system, operate the bulk electric system, evaluate emerging reliability risks, and \nenforce compliance with regional reliability requirements. Reliability should no longer be treated \nas something PJM delivers on behalf of everyone else. It should become a shared obligation of \nthe institutions whose decisions determine the future needs of the system.  \n \nFive Principles for Strengthening the Regional Compact \nThe recommendations in this statement can be distilled into five practical principles. None \nrequires abandoning competitive markets or fundamentally restructuring PJM. Together, \nhowever, they would better align governance with the realities of today's electric system while \npreserving the regional compact that has served consumers well for more than two decades. \n1. Empower the Board to Lead \nThe Board should clearly define strategic priorities, establish the objectives stakeholder \nprocesses are intended to achieve, set reasonable timelines for action, and be prepared to exercise \nits independent judgment when consensus cannot be reached. Consensus should remain the \npreferred outcome, but it should not become a prerequisite for leadership. That independence \nshould also be reflected in Board structure. PJM should consider longer Board terms, coupled \nwith an expectation that members generally serve a single term, to ensure that Board members \ncan exercise independent judgment without concern that difficult but necessary decisions may \naffect their continued service. \n2. Institutionalize State Partnership \nThe most significant planning initiatives, particularly those involving transmission planning and \nresource adequacy should be developed by PJM in collaboration with a standing committee of \nstate representatives before entering the stakeholder process. States should determine how they \nare represented, and they should have access to the technical resources necessary to participate as \neffective partners. \n3. Align Responsibility for Resource Adequacy \nThe obligation to serve wholesale load should be accompanied by a demonstrated plan for \nmeeting the resource adequacy obligations that accompany that load with increasingly rigorous \ndemonstrations as the delivery year approaches. This approach does not require re-regulation or"},{"page":17,"startToken":6713,"endToken":7096,"text":"diminish competitive markets. Rather, it better aligns responsibility for creating new reliability \nobligations with responsibility for ensuring those obligations can be met. \n4. Plan Earlier Because Infrastructure Takes Longer \nThe defining challenge of the next decade is no longer attracting capital. It is ensuring that \ngeneration, transmission, and other critical infrastructure can be planned, permitted, \ninterconnected, and constructed before reliability needs arise. Every institution participating in \nthe regional compact should evaluate its decisions through that lens. Better planning cannot \neliminate infrastructure challenges, but it can ensure the region begins solving them before \nreliability is threatened. \n5. Let Markets and Stakeholders Do What They Do Best \nCompetitive markets should be responsible for allocating investment among competing \nresources, not for correcting planning failures or reconciling decisions made outside the market. \nLikewise, the stakeholder process should focus on improving implementation and market design, \nnot on resolving structural questions of resource policy, infrastructure development, and \neconomic growth that require broader institutional leadership. By restoring accountability for \nresource adequacy and engaging the right institutions earlier, PJM can free both the market and \nthe stakeholder process to perform the functions they were designed to perform. \n \nConclusion \nThe questions before the Commission extend well beyond the governance of a single regional \ntransmission organization. They concern the future of regional coordination itself. \nFor more than two decades, PJM has demonstrated that states can retain authority over their own \nenergy policies while participating in regional institutions that improve reliability, lower costs, \nand support efficient wholesale markets. That achievement should not be taken for granted. It \nremains one of the most important institutional accomplishments in modern electricity policy. \nThe pressures confronting PJM today are real, but they are not evidence that the regional model \nhas failed. They reflect an electric system that has changed more rapidly than the institutions \ndesigned to support it. The answer, therefore, is not to weaken the regional compact. It is to \nstrengthen it. \nThat means a Board with the confidence to provide strategic leadership while remaining \ninformed by stakeholder expertise. It means a more meaningful partnership between PJM and the \nstates. It means planning earlier because infrastructure now determines the pace at which \nreliability can be maintained. And it means reconnecting the obligation to serve load with \naccountability for ensuring that sufficient accredited resources exist to serve it."},{"page":18,"startToken":7096,"endToken":7235,"text":"If we can restore that alignment, many of the governance debates now consuming PJM will \nbecome more manageable because the market, the stakeholder process, the Board, and the states \nwill each be focused on the responsibilities they are uniquely positioned to perform.  \nUltimately, preserving the regional compact is not about changing who has the loudest voice in \nthe stakeholder process. It is about ensuring that every institution entrusted with responsibility \nfor the electric system has the authority, accountability, and confidence to fulfill the role only it \ncan perform. \nIf we accomplish that, we will do more than improve PJM's governance. We will preserve one of \nthe nation's most successful regional institutions while ensuring it is prepared for the challenges \nof the next generation of the electric system. \nThank you, and I look forward to participating in the Commission's discussion."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":17,"endAt":1429,"startToken":0,"endToken":6902},{"p":17,"at":1429,"title":"Conclusion","method":"printed heading","endPage":18,"endAt":907,"startToken":6902,"endToken":7235}]}