{"document":{"slug":"rec-20260716-4005","title":"Pre-filed Statement of Jacob Finkel, Deputy Secretary of Policy for Pennsylvania Governor Josh Shapiro's Office, for the PJM Governance and Stakeholder…","issued":"2026-07-16","accession":"20260716-4005","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PENNSYLVANIA DEPARTMENT OF POLICY","kind":"testimony","file":"sources/filings/text/20260716-4005_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4005","tier":"record","sha256":"f258d6be7d96dbc36eb913c825a60286e3079727f5786704200b6695a3484127","pages":10,"tokens":2990,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":331,"text":"1 \n \n \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n \n) \nTechnical Conference on PJM Governance and \n \n)  \nDocket No. AD26-7-000 \nStakeholder Reforms  \n \n \n \n \n) \n \n \n \n \n \n \n \n \n \n \nPre-Technical Conference Statement \nJacob Finkel, Office of Governor Josh Shapiro, Deputy Secretary of Policy \n \n \nThank you, Chairman Swett and Commissioners Rosner, See, Chang, and LaCerte, for \nconvening this important conversation on the future of PJM.  On behalf of the PJM Governors’ \nCollaborative,1 I was jointly nominated to this panel by Delaware Governor Matt Meyer, District \nof Columbia Mayor Muriel Bowser, Illinois Governor JB Pritzker, Indiana Governor Mike Braun, \nMaryland Governor Wes Moore, New Jersey Governor Mikie Sherrill, North Carolina Governor \nJosh Stein, Pennsylvania Governor Josh Shapiro, and Virginia Governor Abigail Spanberger. \n \nThis Technical Conference is necessary because of a fundamental gap that has emerged \nbetween those who are accountable for reliability and affordability in our region—the states and \nPJM’s Board of Managers—and those with significant authority over many of the solutions: the \nprivate Members.  Those Members have a responsibility to pursue their own financial interests, \nand to their credit they do so zealously, but their collective input has failed to produce optimal, or \noften even coherent, direction at a time when clear, principled leadership is urgently needed.  This \nfailure matters far beyond the halls of Valley Forge, because the outcomes at PJM deeply affect \nthe economic development of the PJM states and, even more importantly, if PJM stumbles, it \ndirectly threatens the health and safety of 67 million Americans. \n \n1 The PJM Governors’ Collaborative was constituted by the region’s governors in September 2025 at the \n“Summit on the State of PJM” technical conference in Philadelphia, PA.  It brings together the 13 PJM \ngovernors and the Mayor of the District of Columbia to jointly engage on, and share information about, \nissues of common importance across the PJM region.  In January 2026, the 13 Governors signed a \nStatement of Principles with the U.S. Secretaries of Energy and Interior on the immediate need to bolster \nPJM’s approach to resource adequacy."},{"page":2,"startToken":331,"endToken":624,"text":"2 \n \n \nTo address this, PJM’s governance structure—which has not been substantially revisited \nin the three decades since it became an ISO—must be updated to realign authority with \naccountability. \nFirst, PJM’s Board must be given the independence from its stakeholders necessary to \nenable clear and decisive action—and be charged with a renewed duty to act solely on behalf of \nthe common interest, not the private interest of any Member—while the stakeholder process is \nreformed to become more nimble and more appropriately focused on issues where in-depth \nstakeholder engagement lends itself to positive outcomes. \nSecond, the governance structure needs to incorporate meaningful input from PJM’s \nmost elemental regulatory partners, the PJM states, who have ultimate responsibility over \nresource adequacy and transmission siting in our region.   \nWithout these two elements, we have repeatedly seen PJM struggle to craft durable \nsolutions to the growing resource adequacy challenges our region faces.  Governance solutions \ncannot themselves deliver resource adequacy, but more effective governance is a necessary first \nstep to the development of suitable market reforms. \nThe PJM stakeholder process does serve to bring those with expertise and real-world \nunderstanding of how individual businesses and sectors work together for shared discussion.  \nThat input is necessary and it needs to continue in the right context.  However, the stakeholder \nprocess should not be expected to perform an executive role it cannot effectively serve.  Its \ncomplexity—which has grown to Byzantine proportions over the last three decades—renders it \nincapable of being an effective decision-making body for an organization that must tackle fast-\nmoving challenges. \n This should not be a surprise: no one should expect a diverse group of 1,146 self-interested \nMembers to make decisions rapidly or boldly.  That is why it is impossible to imagine any public"},{"page":3,"startToken":624,"endToken":1069,"text":"3 \n \n \ncorporation using such a process to make vital decisions.  Simply put, such leadership should be \nthe job of PJM’s Board2 and, in some areas of shared responsibility, of the PJM states. \nThis does not require wholesale elimination of the Members’ input, but rather, better \ndefining what role they can successfully play.  Members should not be expected or permitted to \ndetermine PJM’s strategic direction, but should help to perfect the solutions that the PJM Board \nand the states identify are necessary.  That realignment of authority and accountability is critical, \nbecause the private pecuniary interest of many Members will necessarily differ from the broader \npublic interest that PJM, as a creation of this Commission, should be expected to deeply respect.3  \nTracing back to Order 888, PJM’s raison d'être is emphatically not to maximize the profits of its \nindividual stakeholders.4  The core mission of PJM, and every RTO, remains “to promote \nefficiency in wholesale electricity markets and to ensure that electricity consumers pay the lowest \nprice possible for reliable service.”5  \nTo effectuate this necessary realignment in leadership, the PJM Governors’ Collaborative \n(“Collaborative”) supports increasing the independence of PJM’s Board, making common-sense \nimprovements to the mechanics of the stakeholder process, and providing the states with a \nmeaningful role in decisions that affect areas of shared responsibility.   \nThe Collaborative has worked closely with our State Commission colleagues in the \nOrganization of PJM States, Inc. (“OPSI”) to develop a closely aligned set of recommendations for \nreform.  Any set of solutions must include a strong and impactful role for both the Governors as \n \n2 Including the CEO, who sits as an ex officio non-voting member of the Board. \n3 See Xcel Energy Servs. Inc. v. FERC, 41 F.4th 548, 551 (D.C. Cir. 2022) (“The Federal Power Act gives \nthe Commission the authority to regulate ‘both the transmission and the wholesale marketing of \nelectricity in interstate commerce’ to protect the public interest.” (quoting Public Citizen, Inc. v. FERC, 7 \nF.4th 1177, 1182-83 (D.C. Cir. 2021)); Towns of Alexandria, Minn. v. FPC, 555 F.2d 1020, 1028 (D.C. Cir. \n1977) (describing a principal objective of the Federal Power Act as “the protection of consumers from \nexcessive rates and charges”) (quotation omitted)). \n4 See Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission \nServices by Public Utilities, Order 888, 61 Fed. Reg. 21,540 (FERC, May 10, 1996); Steve Isser, \nELECTRICITY RESTRUCTURING IN THE UNITED STATES: MARKETS AND POLICY FROM THE 1978 ENERGY ACT TO \nTHE PRESENT (2015) at 208-09 (explaining the core independence and financial conflict requirements of \nOrder 888). \n5 Regional Transmission Orgs., Order No. 2000, FERC Stats. & Regs. ¶ 31,089 at 30,993 (1999)."},{"page":4,"startToken":1069,"endToken":1364,"text":"4 \n \n \nelected executives and OPSI as the technical experts who oversee retail ratemaking and who are \nready to step up to shoulder new responsibilities similar to the other Regional State Committees \nacross the country.   \nIn seeking reasonable, implementable, and constructive solutions, the Collaborative \nsolicited input from a wide array of stakeholders, including representatives of every PJM sector \nand other engaged entities.  The Collaborative especially wants to acknowledge the selfless service \nto our region from the former Chairman of this Commission, the Honorable Pat Wood III, who \nagain answered the call to serve and offered his valuable time this summer to improve PJM. \nProposal for Reform \nCompetitive markets, designed properly, deliver real value to customers.  But experience \nin recent years has shown repeatedly that PJM’s current governance process is failing to deliver \non that promise.  As already noted, improved governance will not by itself stabilize confidence in \nPJM’s markets, nor will it spontaneously resolve the resource adequacy challenges we must \ncollectively address in short order.  But it would be self-defeating to attempt to modify those \nmarkets without first addressing the governance shortcomings that led us to this juncture.   \nFor that reason, the Collaborative strongly supports this Commission’s focus on \ngovernance, not as the end goal, but as a necessary first step to ultimately improving market \nconfidence and function.  Two interconnected governance reforms are necessary: PJM must be \nempowered to act more decisively and the states must have a larger role in reaching decisions of \nshared importance.  \n \n1: Empowering PJM to Lead \nToday, PJM faces challenging real-world conditions, including from large load additions, \nyet the PJM Board has too often been unwilling to act decisively, even in areas where it possesses \nthe authority to do so.  In order for the Board to provide effective leadership, its independence"},{"page":5,"startToken":1364,"endToken":1633,"text":"5 \n \n \nmust be bolstered, the transparency of its decisions improved, and the function of the stakeholder \nprocess streamlined and more clearly defined. \n• \nThe Board’s independence must be safeguarded, while becoming more \naccessible and transparent.   \n1. The Board members’ terms should be extended to five or more years, with service \nnormally capped at ten or less years.  This is needed to insulate Board members \nfrom considerations of retention when weighing difficult decisions. \n2. Today strict limits exist on whom the Board may communicate with, including \nrestricting conversations with the states, making PJM staff the Board’s primary \nsource of information.  Those well-meaning restrictions serve in practice to \nhamper the Board’s engagement with a wider range of perspectives.  The \nappearance and reality of undue influence can be avoided, as it is in other RTOs, \nwithout such stringent limitations.  The Board should have more regular and \nstructured contact with Members and other stakeholders, avoiding backroom \nconversations while gaining more in-depth understanding from all sides. \n3. That increased contact should be accompanied by improved transparency, \nincluding full reporting and disclosure of any stakeholder meetings, Board \nmeetings being opened to the public, published Board votes, and minutes \ncontaining the Board’s decision-making rationale for key votes.  \n4. There should be a preference, but not a requirement, that Board members reside \nwithin the PJM region, adjusting conflict of interest rules to encourage the \nselection of qualified Board members who have direct experience with the \nconsequences of decisions facing PJM.  At the same time, new conflict restrictions \nshould bar Board members from seeking employment with PJM Members for at \nleast one year following their term on the Board."},{"page":6,"startToken":1633,"endToken":1915,"text":"6 \n \n \n5. Section 7.2 of the Operating Agreement delineates seven categories of required \nexperience for Board members.  Those limited requirements—narrowly focused on \nspecific financial, technical, and professional expertise—no longer matches the \nscope of PJM’s responsibilities.  This represents a blind spot in the Board’s outlook \nand undermines its independence by unduly prioritizing Board members with \nexperience that matches the interests of the private Members.  These requirements \nshould be updated to require at least one Board member with past experience in \npublic service and at least one with direct exposure to the impact of RTO decisions \non the 67 million customers PJM serves. \n6. PJM benefits from excellent in-house counsel, but to maximize independence, the \nBoard should retain its own non-conflicted counsel.  The Board should entrust that \ncounsel with any negotiations that affect its authority, including with the Members \nand the states. \n7. Finally, alongside these measures to bolster its independence, the Board’s duty \nshould be clearly defined for the first time.  The Board should be expressly charged \nwith acting to benefit the public interest of the region as a whole—as the Board \nchooses to conceive of it—not to advance the private interest of any individual \nMember. \n• \nThe stakeholder process should be reformed to be more effective and \nefficient in providing clear input to the Board.  This means ensuring that \nvoting rules provide a consistent neutral framework throughout the process by using \nsector-weighted voting throughout the stakeholder process and eliminating affiliate \nvoting at the lower level.  Voting thresholds should be reduced to encourage more ways \nto get to “Yes.”  Alongside these improvements, voting on all matters of substance \nthroughout the process—including at the lower-level committees—should be entirely"},{"page":7,"startToken":1915,"endToken":2251,"text":"7 \n \n \ntransparent with each vote recorded and publicly disclosed, while retaining the \nexisting limits on verbatim meeting recordings to preserve candor and open dialogue.  \n \n2: A Meaningful State Role \nThe Collaborative embraces the need, as PJM CEO David Mills recently publicly \nrequested, for states to assume more responsibility for resource adequacy decisions, and \naccordingly for those decisions to be shared to a greater degree between the states and PJM \ngoing forward.6  For this deeper collaboration to occur successfully—and its success is vital to the \nentire region and all market participants—the states must first be given real authority in the PJM \nprocess that accords with their unique role as sovereign partners.  Specifically:  \n• \nFor matters of shared responsibility, PJM should agree to file an alternative \nstate proposal when the RTO intends to submit a 205 filing.  In every other multi-\nstate RTO (i.e., ISO-NE, MISO, SPP), states have means to influence aspects of shared \njurisdiction through the exercise of the RTO’s 205 filing rights under certain \ncircumstances.  In order to build a durable partnership with the states on issues of shared \nresponsibility, PJM should agree to utilize the rights it holds under section 205 of the \nFederal Power Act when a supermajority of OPSI members prefer an alternative to a \nproposal that PJM intends to file.  In those cases, PJM should voluntarily file that OPSI \nproposal alongside its own (a so-called “jump ball” filing).  This jump-ball capability is a \nvital tool to foster a more collaborative process between the states and their RTO.  \nExperience in each of PJM’s sister multi-state RTOs has shown that such arrangements \nare effective in producing more collaborative state/RTO partnerships and that, in practice, \nalternative filings are rarely necessary because state input is afforded respect as RTO \n \n6 Letter From David E. Mills, PJM President and CEO (May 6, 2026), at 3, \nhttps://www.pjm.com/media/DotCom/library/reports-notices/special-reports/2026/20260506-\npowering-reliability-through-market-design.pdf (“Those choices belong to the people and institutions \nwith democratic accountability for their consequences . . .”)."},{"page":8,"startToken":2251,"endToken":2542,"text":"8 \n \n \nproposals are developed, enabling superior coordination with the states and reducing \nregulatory uncertainty.  The PJM states are the least well-equipped in this regard of any \nstates in the nation and our region suffers as a result. \n• \nPJM’s tariff should recognize and fund the PJM Governors’ Collaborative, \nrepresenting the 13 governors and the Mayor of the District of Columbia.  The \nGovernors’ proper role should be big-picture: working with the Board to establish the \nlong-term strategic direction of the RTO, communicating preferences that serve the public \ninterest, and encouraging action, agreement, and forward progress, not to block \nideas.  This complements the technical expertise of OPSI’s utility regulators—making \nOPSI the best-suited state entity to exercise jump-ball filing rights—and the more \nnarrowly focused residential ratepayer advocacy of the Consumer Advocates of the PJM \nStates.  The Collaborative must be provided sufficient funding in the PJM tariff to serve \nthree primary functions. \n1. Develop and bring problem statements and issue charges directly to the PJM Board, \navoiding the need to receive supermajority support from PJM Members to initiate \nstakeholder processes on issues that are important to the states.  If the Board elects to \naccept an idea, it may be developed through a standard or expedited process like the \nCritical Issue Fast Path (CIFP). \n2. On occasions when the Members are unable to reach consensus and no stakeholder \nproposal receives a supermajority vote in the Members Committee, the Board may \nsolicit a timely indicative vote by the Collaborative.  This would be a non-binding \nexpression of the states’ preferences on a given subject—not limited to the areas where \nOPSI would hold jump-ball filing rights, as described above—and would be offered to \nthe Board at the Collaborative’s discretion in those instances when Members cannot \nagree."},{"page":9,"startToken":2542,"endToken":2851,"text":"9 \n \n \n3. Represent the \nstates in \nthe \nPJM \nBoard \nof \nManagers \nselection \nprocess by appointing three members to the PJM Board Nominating Committee—for \na total of 10 voting members.  Absent exceptional circumstances, a Board candidate \nshould receive support from at least one of those three state appointees for the \nNominating Committee to recommend that candidate to the Members.   \no The private interests of the Members dominate the Nominating Committee with \nfive seats (representing each Member sector), while the independent interests of \nPJM as an organization hold only two seats (both voting Board members).  This \nmakes it necessary to provide at least three seats to represent the public interest of \nthe region as a whole in order for the possibility of balance to emerge for the first \ntime: if the three state appointees were to join with the two independent Board \nmembers, they would collectively be capable of matching the influence of the five \nMember appointees.  This is a necessary precondition for neutral and independent \nBoard selections.  The existing slanted numbers underscore the deep bias of the \nprocess that exists today whereby Members hold effectively unchecked control \nover both the Nominating Committee and the eventual confirmation of Board \nmembers by the Members Committee (a confirmation process that would remain \nunchanged).  This systemic advantage held by financially self-interested Members \nin selecting the Board must be addressed. \no The Collaborative commits to establish binding internal rules that will ensure its \nthree appointees represent the diverse perspectives of the 14 PJM jurisdictions \n(e.g., representing importing and exporting states, restructured and vertically \nintegrated states).  Those three Collaborative appointees would observe the same \nrules of conduct as the other Nominating Committee members and, in the event of \na 5-5 tie, the Nominating Committee Chair, a member of the Board of Managers \nwho normally holds an ex officio non-voting seat, would break the tie."},{"page":10,"startToken":2851,"endToken":2990,"text":"10 \n \n \nConclusion \nThe challenges that PJM faces today cannot be solved by the RTO or the Members \nalone.  Both have crucial roles to play, but only by working collaboratively with the states can \nthese issues be coherently addressed.  Simply put, durable solutions are impossible without \nbetter alignment of authority with accountability, which means a more independent Board, a \nmore nimble stakeholder process directed at the right type of engagement, and greater \ninvolvement from the states in PJM’s decision-making processes.  Such durable solutions are \nneeded, and needed quickly. \nThe Governors’ Collaborative seeks near-term action to address these issues so that we \ncan collectively move forward in improving the resource adequacy situation of our region.  To \neffectuate that, the Collaborative looks forward to engaging vigorously with the Commission, the \nMembers, and PJM itself in this important conversation in the days ahead."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":10,"endAt":8,"startToken":0,"endToken":2852},{"p":10,"at":8,"title":"Conclusion","method":"printed heading","endPage":10,"endAt":946,"startToken":2852,"endToken":2990}]}
