{"document":{"slug":"rec-20260716-5052","title":"Supplemental Comments of Persistence Analytics Group LLC in response to FERC’s Third Supplemental Notice of Commission-Led Technical Conference re PJM…","issued":"2026-07-16","accession":"20260716-5052","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260716-5052_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-5052","tier":"record","sha256":"2362590bb723bfb422779c4d03e19e21bafff47f3b5e693f7a87ad1f1cfa2ad8","pages":4,"tokens":829,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":91,"text":"BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION\nDocket No. AD26-7-000\nVERIFY THE LOAD\nPersistence Analytics Group LLC / United Grid\nNational Security & Infrastructure Risk Analytics\nPJM Governance and Stakeholder Reforms\nDocket No. AD26-7-000\nSupplemental Comment of\nPersistence Analytics Group LLC / United Grid\nRegarding PJM Governance, Large-Load Verification,\nand Ratepayer Protection\nSubmitted by\nPersistence Analytics Group LLC / United Grid\nFounder\nNeil P. Osnato\nFocus\nDemand Durability | Grid Stress | Load Integrity\nSubmission\nSupplemental Comment prior to Commission-led Technical Conference\nTrust the reliability mission.\nVerify the load.\nAudit the governance.\nProtect the ratepayer.\nSubmitted: July 2026"},{"page":2,"startToken":91,"endToken":375,"text":"PERSISTENCE ANALYTICS GROUP LLC / UNITED GRID\nFERC Docket No. AD26-7-000\nSupplemental Comment - PJM Governance, Large-Load Verification, and Ratepayer Protection\nPage 2\nPJM Governance and Stakeholder Reforms\nDocket No. AD26-7-000\nSupplemental Comment of Persistence Analytics Group LLC / United Grid Regarding\nPJM Governance, Large-Load Verification, and Ratepayer Protection\nPersistence Analytics Group LLC / United Grid respectfully submits this supplemental comment in Docket No.\nAD26-7-000 in response to the Commission's Third Supplemental Notice of Commission-Led Technical\nConference regarding PJM Governance and Stakeholder Reforms.\nThe Commission's notice frames the technical conference around concrete, actionable reforms to improve PJM\nInterconnection, L.L.C.'s ability to address operational and market needs in a timely and efficient manner. That is\nthe correct focus.\nHowever, PJM governance reform should not be limited to stakeholder voting rules, committee structure,\ndocument architecture, or internal process mechanics.\nThe deeper issue is that infrastructure assumptions are being converted into market outcomes and ratepayer\nobligations before those assumptions are sufficiently verified.\nCore Infrastructure Assumptions at Issue\n- large-load growth;\n- data-center demand durability;\n- resource adequacy;\n- capacity-market scarcity;\n- interconnection timing;\n- transmission need;\n- cost allocation;\n- demand response and distributed energy resource performance;\n- state authority; and\n- ratepayer exposure.\nResponse to Panel 1 Questions 1 and 3: PJM Board Accountability and Governance\nReform\nThe PJM Board's role should include ensuring that major planning, market, and reliability decisions are supported\nby decision-grade evidence before they create durable financial obligations for ratepayers.\nGovernance reform should therefore include a formal Infrastructure Assumption Verification requirement for\nmajor PJM actions involving large-load additions, capacity-market design, transmission planning, and cost\nallocation.\nAt minimum, PJM should be required to identify:\n- What load is being treated as durable?\n- What evidence supports that load?\n- What evidence is missing?\n- Which dependencies must hold?"},{"page":3,"startToken":375,"endToken":662,"text":"PERSISTENCE ANALYTICS GROUP LLC / UNITED GRID\nFERC Docket No. AD26-7-000\nSupplemental Comment - PJM Governance, Large-Load Verification, and Ratepayer Protection\nPage 3\n- Which infrastructure costs are caused by specific customers or customer classes?\n- Which costs are proposed to be socialized?\n- Who benefits if the assumption is correct?\n- Who bears downside if the assumption fails?\nWithout this verification layer, governance reform risks improving process speed without improving decision\nquality.\nResponse to Panel 1 Question 2: State Role\nStates must have access to decision-grade evidence when PJM decisions affect retail affordability, economic\ndevelopment, public policy, reliability, and state-regulated utilities.\nState participation should not be limited to consultation after market or planning assumptions have already\nhardened. States should be able to review the underlying assumptions driving:\n- large-load forecasts;\n- data-center demand;\n- transmission need;\n- capacity-market exposure;\n- cost-causation findings;\n- resource adequacy risk; and\n- ratepayer impacts.\nA stronger state role should include structured access to the evidence supporting PJM's major assumptions, not\nmerely access to stakeholder debate.\nResponse to Panel 2 Questions 2, 5, 7, and 8: Transparency, Stakeholder Process,\nDelay, and Fast-Path Review\nTransparency reform should include more than meeting access, voting records, and committee process.\nPJM should disclose, in a structured and usable format, the assumptions behind major decisions and the evidence\nsupporting those assumptions.\nFor high-importance topics, including large-load integration, data-center growth, capacity-market scarcity,\ntransmission expansion, and ratepayer exposure, PJM should use a time-bound review process that requires an\nassumption-verification screen before costs are imposed or market outcomes are treated as unavoidable.\nA fast-path process should not mean faster cost socialization. It should mean faster identification of:\n- unverified load;\n- weak cost-causation evidence;\n- ratepayer exposure;\n- implementation dependencies;\n- demand-side alternatives; and\n- risks that should not be shifted to customers without proof.\nRecommended Concrete Reform"},{"page":4,"startToken":662,"endToken":829,"text":"PERSISTENCE ANALYTICS GROUP LLC / UNITED GRID\nFERC Docket No. AD26-7-000\nSupplemental Comment - PJM Governance, Large-Load Verification, and Ratepayer Protection\nPage 4\nThe Commission should require PJM governance reform to include an independent implementation-verification\nlayer for major actions affecting reliability, markets, transmission, and ratepayer exposure.\nThat layer should include:\n1. Independent verification of large-load and data-center demand assumptions;\n2. Transparent cost-causation review before cost socialization;\n3. Ratepayer-protection screens before new obligations are imposed;\n4. Minimum evidence standards for demand durability and load integrity;\n5. State access to decision-grade planning evidence;\n6. Review of demand-side alternatives before infrastructure obligations harden;\n7. Time-bound review for critical issues without bypassing evidence quality; and\n8. Accountability for failed assumptions.\nTrust the reliability mission.\nVerify the load.\nAudit the governance.\nProtect the ratepayer.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid\nNational Security & Infrastructure Risk Analytics\nDemand Durability | Grid Stress | Load Integrity\nneil@persistenceanalyticsgroup.com\n609-464-9055\nhttps://persistenceanalyticsgroup.com/\nSAM.gov Registered Vendor\nUEI: D3VYU39H6DX9 | CAGE: 19T34\nD-U-N-S: 142849930"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":4,"endAt":1382,"startToken":0,"endToken":829}]}