{"document":{"slug":"rec-20260720-4000","title":"Pre-filed Statement of Dr. Joseph Bowring, President of Monitoring Analytics and the Independent Market Monitor for PJM, for the PJM Governance and…","issued":"2026-07-20","accession":"20260720-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"MONITORING ANALYTICS, LLC","kind":"testimony","file":"sources/filings/text/20260720-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-4000","tier":"record","sha256":"e8a8d4efe0e9c6df19c946628cc10b2b8e8618a451ba8ab98c3e818048efcddd","pages":13,"tokens":3722,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":279,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms \n) \n) \n) \n \n \nDocket No. AD26-7-000 \nCOMMENTS OF THE INDEPENDENT MARKET MONITOR FOR PJM \nPursuant to the third supplemental notice issued in this proceeding, July 16, 2026, Dr. \nJoseph Bowring, President of Monitoring Analytics, LLC, and the Independent Market \nMonitor for PJM, submits this statement prior to the Technical Conference. Answers to the \nspecific questions for Panel 2 are included at the end of this statement. A one page summary \nis also included at the end of this statement. \nThank you for the opportunity to participate in this Technical Conference addressing \nPJM governance and stakeholder processes. PJM governance and stakeholder processes \ndirectly affect the extent to which the PJM market design creates effective competitive market \nrules that allow PJM markets to achieve the goal of just and reasonable rates. \nThe Commission’s stated purpose in this Technical Conference (at 1) is “to discuss \nPJM Interconnection, L.L.C.’s (PJM) governance and stakeholder processes, with a particular \nfocus on identifying and evaluating concrete, actionable reforms to improve PJM’s ability to \naddress operational and market needs in a timely and efficient manner.”  \nThe underlying premise is that decisions made in the PJM process should not only be \ntimely and efficient but also that decisions should be made with the goal of serving the public \ninterest in providing wholesale power at the lowest possible price. The decision making \nprocess should be open and transparent to provide confidence to the customers of PJM in \nthat decision making process. Serving the public interest means meeting the needs of PJM’s \ncustomers. PJM’s customers are not PJM’s members. PJM’s customers are all the residential,"},{"page":2,"startToken":279,"endToken":627,"text":"- 2 - \ncommercial and industrial users of power in the PJM footprint. The process should be \nevaluated primarily based on whether it facilitates achieving the goals of Order No. 2000.1 \nThe PJM stakeholder process needs to be strengthened and PJM’s role in that process \nneeds to be significantly clarified in order to ensure that the process results in timely \nrecommendations to the Commission that are consistent with providing reliability through \ncompetitive markets. \nAny discussion of the PJM decision making process needs to address the underlying \nincentives and interests of all the stakeholders, both individually and by sector, and the \nunderlying incentives and interests of the key decision makers including the PJM Board and \nPJM staff if it is to be successful in meeting the Commission’s objectives.2 \nThe Commission stated the “Basic Independence Principle” in Order No. 2000 (mimeo, \nat 193–194): \nIn the NOPR, we repeated our earlier statement that ‘the principle \nof independence is the bedrock upon which the ISO must be built’ \nand emphasized that this principle must apply to all RTOs, whether \nthey are ISOs, transcos or variants of the two. We also stated that \n‘[a]n RTO needs to be independent in both reality and perception.’ \nWe reaffirm both principles in the Final Rule.  \nIn applying these principles in the context of ISOs, we have stressed \nthe importance of a decision making process that is independent of \ncontrol by any market participant or class of participants. This, in \nturn, required that we pay considerable attention to governance \n(e.g., voting shares and voting rules). \nIn order to ensure an efficient and effective decision making process, it must be \nensured that the PJM Board is independent of the members of PJM and acts independently \n \n1  \nRegional Transmission Organizations, Order No. 2000, 89 FERC ¶ 61,285 (1999), order on reh’g, Order \nNo. 2000-A, 90 FERC ¶ 61,201 (2000), aff’d sub nom. Pub. Util. Dist. No. 1 of Snohomish County, \nWashington v. FERC, 272 F.3d 607 (D.C. Cir. 2001). \n2  \nThe term PJM staff is defined here to include decision making staff at PJM."},{"page":3,"startToken":627,"endToken":955,"text":"- 3 - \nin the interests of competitive markets, effective market power mitigation and just and \nreasonable rates. \nIn order to ensure an efficient and effective decision making process, it must be \nensured that PJM staff is independent of the members of PJM and acts independently in the \ninterests of competitive markets, effective market power mitigation and just and reasonable \nrates. \nThe current structure of incentives has affected decision making by PJM and \ncontributed to the issues identified by Chairman Swett and the Commission. \nAny analysis of decision making at PJM must directly address the fact that the \nTransmission Owners (TOs) have the unique ability to leave PJM and potentially bring an \nend to PJM as it currently exists. That reality is well known by the PJM Board and PJM staff \nand PJM members. That reality gives the TOs a unique ability to affect the decision making \nof the PJM Board and PJM staff. \nThat reality affects the independence of the PJM Board and PJM staff. \nAny analysis of decision making at PJM must directly address the fact that the current \nrules provide that a nominating committee, comprised of a majority of members, selects \npotential candidates for Board membership and that members may vote to overturn those \ndecisions and deny Board membership. The current rules also permit a vote of the PJM \nmembers to vote out existing Board members when they are renominated for an additional \nterm. \nThese facts affect the independence of the PJM Board. \nAny analysis of decision making at PJM must directly address the incentives of PJM \nstaff. Historically, the salaries of senior staff were directly linked to the results of PJM’s survey \nof its members. PJM staff performance should not be measured based on PJM member \nsatisfaction. Many decisions that PJM takes (both operational and market design) can have a \nnegative impact on the profitability of PJM members that PJM perceives as customers. PJM \nstaff must have the freedom to act independently consistent with reliability through"},{"page":4,"startToken":955,"endToken":1320,"text":"- 4 - \ncompetitive markets without concern about retaliation or impacts on compensation because \ntheir actions may not be aligned with the wishes of one or more of PJM’s perceived customers. \nTo the extent that this, or any similar incentives are still in place, this affects the \nindependence of PJM staff. \nThere are some straightforward reforms that could address these underlying \nstructural factors that affect the independence of the PJM Board and of PJM staff and that \ntherefore affect the decision making process. \nThe proposal in the Pre-Technical Conference Statement of Jacob Finkel on behalf of \nthe PJM Governors’ Collaborative would help address some of the issues related to the \nindependence of the PJM Board. Specifically, the proposal to add three state representatives \nto the Nominating Committee would be an appropriate and significant change that would \nhelp support the independence of the Board. But that proposal does not go far enough. \nThe ability to vote out existing Board members when they are renominated should \nalso be directly addressed. The recommendation by the PJM Governors’ Collaborative to \nextend the tenure of Board members while restricting Board members to one term is one way \nto accomplish that. Another approach would be to add a requirement that a Board member \ncannot be voted out when renominated without the agreement of a majority of the two Board \nmembers and the three state representatives on the nominating committee. \nThe structural power of the TOs to leave should be addressed. When the Commission \nis reviewing any proposal by a TO to leave PJM, the Commission should apply the just and \nreasonable standard and a consistent with the public interest standard to any such decision \nin a manner fully consistent with the goals of the Federal Power Act. States also have the \nindependent authority to require TOs to remain in PJM. Some states have used that authority \nin specific cases. \nThe independence of PJM management should be strengthened by a specific \nrequirement that the sole goal of PJM management is to further the public interest regardless \nof the interests of any specific group of PJM members. That requirement should provide that \nPJM management should not support a proposal that advances the private interests of"},{"page":5,"startToken":1320,"endToken":1665,"text":"- 5 - \nmembers if it is inconsistent with competitive markets and the public interest. All PJM \ncorporate goals, including those that affect PJM staff and management compensation, should \nbe made public, discussed publicly in the stakeholder process, and approved by the Board \npublicly. \nPJM Board meetings and all PJM stakeholder meetings should be public with the \nexception of human resource and confidential security issues. Media should be permitted to \nobserve and report without restrictions. Improved transparency is essential to the confidence \nof stakeholders and to the confidence of PJM customers who ultimately pay the bills. There \nis no reason that PJM market participants and the PJM Board should not be willing to express \ntheir opinions publicly. Transparency helps ensure accountability and confidence. \nThe Board’s ex parte rules should remain in place. There is no reason that there should \nbe confidential conversations in which PJM market participants attempt to influence Board \ndecisions. All such discussions and positions should be public and transparent. The assertion \nthat private discussions contribute to the efficiency or effectiveness of Board decision making \nare unsupported and inconsistent with transparency. The combination of extending Section \n205 rights to the entire OATT and eliminating the ex parte rules would encourage and \nfacilitate an inappropriate expansion of backroom influence and undermine independence \nwhen exactly the opposite is called for. \nJust and reasonable rates and the public interest include a market design that results \nin the lowest possible costs to customers but no lower.  The no lower condition requires that \nprices result in just compensation to investors in PJM markets. The responsibility of the PJM \nBoard and of PJM management to promote competition based on economic fundamentals \nand free from the exercise of market power to produce just and reasonable rates should be \nclearly and concisely stated in a way that is verifiable and enforceable. \nAs the Commission stated in Order No. 2000 (mimeo at 1): “The Commission's goal is \nto promote efficiency in wholesale electricity markets and to ensure that electricity consumers \npay the lowest price possible for reliable service.” The Commission further stated (mimeo at"},{"page":6,"startToken":1665,"endToken":2042,"text":"- 6 - \n3): “Competition in wholesale electricity markets is the best way to protect the public interest \nand ensure that electricity consumers pay the lowest price possible for reliable service.” \nThere is no reason to modify the existing structure of FPA Section 205 and Section 206 \nfiling rights. The extension of 205 filing rates to the entire OATT would make the stakeholder \nprocess purely advisory. There is nothing about the requirements related to Section 205 and \nSection 206 that makes filing under Section 205 more efficient. The PJM Board can make a 206 \nfiling at its own discretion at any time, and could, along with greater clarification of its \nresponsibilities, be encouraged by the Commission to make more use of Section 206 filings. \nUnder Section 206 filings, the requirements for the Commission’s review are stronger, \nincluding that the current tariff provision be deemed not just and reasonable and that the \nproposed change be not only just and reasonable but also be determined by the Commission \nto be the best of the proposed options. Section 206 filings appropriately put the responsibility \nfor making significant policy decisions with the Commission. \nThe standards applicable to Section 205 proceedings, such as the extraordinary \ndeference to such filings, the inability of the Commission to efficiently address deficiencies \nin such filings, and the ability to degrade market rules without rigorous review are significant \nproblems and are all reasons to not further extend Section 205 rights. Section 205 was not \ndesigned to handle significant and complex market rules and their associated policy \nimplications. Section 205 was designed to allow regulated utilities to change cost of service \nrates. PJM is not a utility in the sense that any regulator prior to the introduction of wholesale \npower markets would have recognized as a regulated utility. Rather than further extend \nSection 205 rights to the entire tariff, PJM should not continue to have Section 205 rights over \nthe capacity market. There has been no demonstrated increase in efficiency or effectiveness \nin producing just and reasonable outcomes resulting from PJM’s Section 205 rights over the \ncapacity market. \nIf PJM wants to make a filing without a stakeholder supermajority, then it is \nreasonable to require that PJM first identify the existence of a market design flaw, as Section \n206 requires."},{"page":7,"startToken":2042,"endToken":2351,"text":"- 7 - \nThe PJM Board has the authority to file any proposal under Section 206. There is no \nevidence that any good proposal failed to receive the required supermajority to file under \nSection 205 but was not filed under Section 206. \nRules in PJM Manuals are frequently not written or discussed until long after the tariff \nrules have been reviewed and approved by the Commission. When the details are finally \ndiscussed in the drafting of manuals, significant details of the rules can change and deviate \nfrom the intention or understanding of stakeholders and the Commission from the time of \nthe stakeholder process and Commission proceedings on the tariff changes. Substantive \nissues should not be decided in PJM Manuals, but included in the OATT subject to \nCommission review. \nThe role of the states at PJM should be enhanced, but always based on the preferences \nof the states separately and jointly. Governors and public utility commissions and public \nadvocates represent the 67 million people living in all or parts of 13 states and the District of \nColumbia that comprise the PJM footprint, and incorporate the technical expertise to address \nPJM issues. The existing authorities of the states related to transmission, generation and \npublic policy should be recognized in the PJM decision making process. Recognizing those \nauthorities, the states should be incorporated into PJM policy formation at the early stages so \nthat states can clarify their objectives for PJM and PJM can recognize those objectives. This \nenhancement includes funding the Governors’ Collaborative for the reasons stated in Jacob \nFinkel’s Statement. \nI. PANEL 2 \nAnswers to the Potential Questions:  \n1. Do sector-weighted voting and existing voting thresholds strike the right \nbalance between achieving consensus and taking timely action? \nAnswer: There is no reason to change the current sector weighted voting structure. \nThe voting structure does not limit taking timely action. The voting structure does"},{"page":8,"startToken":2351,"endToken":2668,"text":"- 8 - \nnot allow any single sector to unduly affect the outcome of votes. Speed to voting \nis not the goal. Speed to good decisions is the goal.  \nEvaluated solely as a process, the PJM stakeholder process is, with the exception of \nthe Liaison Committee, an open, transparent process that permits open and \nsubstantive debate on key policy issues facing the PJM markets without permitting \nany one sector to dominate voting. There is no reason to change the current sector \nweighted voting structure. The voting structure does not limit taking timely action. \nThe voting structure does not allow any single sector to unduly affect the outcome \nof votes. Speed to voting is not the goal. Speed to good decisions is the goal. \n2. What transparency reforms would improve the quality of PJM’s stakeholder \nprocess and increase stakeholder confidence in its decision-making?  \nAnswer: PJM Board meetings and all PJM stakeholder meetings should be public \nwith the exception of human resource and confidential security issues. Media \nshould be permitted to observe and report without restrictions. Improved \ntransparency is essential to the confidence of stakeholders and to the confidence of \nPJM customers who ultimately pay the bills. There is no reason that PJM market \nparticipants and the PJM Board should not be willing to express their opinions \npublicly. Transparency helps ensure accountability and confidence. \nThe Board’s ex parte rules should remain in place. There is no reason that there \nshould be confidential conversations in which PJM market participants attempt to \ninfluence Board decisions. All such discussions and positions should be public and \ntransparent. The assertion that private discussions contribute to the efficiency or \neffectiveness of Board decision making are unsupported and inconsistent with \ntransparency. The combination of extending Section 205 rights to the entire OATT \nand eliminating the ex parte rules would encourage and facilitate an inappropriate \nexpansion of backroom influence and undermine independence when exactly the \nopposite is called for."},{"page":9,"startToken":2668,"endToken":2959,"text":"- 9 - \n3. Are there structured opportunities in the stakeholder process for state \nparticipation (e.g., defined consultation windows, joint technical sessions) to \nprovide input on topics that are of interest to the states? \nAnswer: Yes. In addition to the identified processes which are important \nopportunities to express input, the states should also have identified voting rights \non the nominating committee for the PJM Board and on a committee to review \nBoard member retention. In addition, more formal input from states, consistent \nwith the comments of the Governors’ Collaborative and the comments on that topic \nby Pat Wood, would be a positive addition. \n4. Do existing governing document provisions (e.g., Operating Agreement, \nManuals) impede stakeholder decision-making and what changes could be made \nto address them? \nAnswer: No. The PJM Board has the authority to file any proposal under Section \n206. There is no evidence that any good proposal failed to receive the required \nsupermajority to file under Section 205 but was not filed under Section 206. \nRules in PJM Manuals are frequently not written or discussed until long after the \ntariff rules have been reviewed and approved by the Commission. When the details \nare finally discussed in the drafting of manuals, significant details of the rules can \nchange and deviate from the intention or understanding of stakeholders and the \nCommission from the time of the stakeholder process and Commission \nproceedings on the tariff changes. Substantive issues should not be decided in PJM \nManuals, but included in the OATT subject to Commission review. \n5. What reforms to the stakeholder process could ensure PJM can meet the region’s \nchallenges?  \nAnswer: Voting in the stakeholder process should include sector weighted voting \nat all committee and subcommittee levels. There is no reason to permit those"},{"page":10,"startToken":2959,"endToken":3220,"text":"- 10 - \nmembers with multiple affiliates to serve as a filter for items that can be voted at \nthe higher level committees. \n6. What near-term reforms to stakeholder representation could PJM and its \nMembers take to improve speed in decision-making while preserving \nstakeholder input? \nAnswer: PJM could implement a process that includes representatives of each \nsector who are authorized to discuss and develop proposals to bring to the broader \nstakeholder committees. \nPJM staff could take input and hear presentations from all sectors in public sessions \nprior to developing proposals and positions on a question. \n7. Are there elements of PJM’s committee structure that routinely contribute to \ndelays?  Are there stakeholder processes or issues that could be expedited or \nchanged to provide greater focus on key issues and allow faster or more \nunilateral action on others? \nAnswer: PJM could implement a process that includes representatives of each \nsector who are authorized to review and prioritize issues to bring to the broader \nstakeholder committees. Speed to action and unilateral action are not the goals. \nMore efficient management of priorities and more efficient management of the \nprocess with the goal of speed to good decisions is the goal. \n8. Should PJM increase the use of fast-path or time-bound review procedures to \nexpedite committee action on high-importance topics?  \nAnswer: No. Stakeholders generally, and correctly, oppose fast path proposals \nbecause there is not adequate time to explain and understand the proposals. Some \nproposals that have been brought as fast path items turn out to have much broader \nimplications than represented by those bringing the fast path items."},{"page":11,"startToken":3220,"endToken":3298,"text":"- 11 - \n9. Recognizing regional differences, are there lessons from other RTO/ISO \nstakeholder processes that PJM could reasonably adopt to improve speed in \nvoting processes and stakeholder representation? \nAnswer: The temptation to move to the lowest common denominator rules across \nRTOs and ISOs should be resisted. The goal should be to use the best practices as \nwidely as possible. PJM is closer to realizing the Commission’s goals in Order No. \n2000 than most or all other RTOs/ISOs."},{"page":12,"startToken":3298,"endToken":3387,"text":"The Market Monitor respectfully requests that the Commission afford due \nconsideration to this statement as the Commission resolves the issues raised in the technical \nconference to convene on July 23, 2026. \nJoseph E. Bowring \nIndependent Market Monitor for PJM \nPresident \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8051 \njoseph.bowring@monitoringanalytics.com \nRespectfully submitted, \n \nJeffrey W. Mayes \n \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8053 \njeffrey.mayes@monitoringanalytics.com \nDated: July 17, 2026"},{"page":13,"startToken":3387,"endToken":3722,"text":"SUMMARY OF STATEMENT OF JOSEPH BOWRING PRIOR TO TECHNICAL \nCONFERENCE IN AD26-7 \nAny discussion of the PJM decision making process needs to address the underlying \nincentives and interests of all the stakeholders, both individually and by sector, and the \nunderlying incentives and interests of the key decision makers including the PJM Board and \nPJM staff. \nIn order to ensure an efficient and effective decision making process, it must be \nensured that the PJM Board and PJM staff are independent of the members of PJM and act \nindependently in the interests of competitive markets, effective market power mitigation and \njust and reasonable rates. \nAny analysis of decision making at PJM must directly address the fact that the \nTransmission Owners (TOs) have the unique ability to leave PJM and potentially bring an \nend to PJM as it currently exists. That reality gives the TOs a unique ability to affect the \ndecision making of the PJM Board and PJM staff. \nThat reality affects the independence of the PJM Board and PJM staff. \nAny analysis of decision making at PJM must directly address the fact that the current \nrules provide that a nominating committee, comprised of a majority of members, selects \npotential candidates for Board membership and that members may vote to overturn those \ndecisions and deny Board membership. The current rules also permit a vote of the members \nto vote out existing Board members when they are renominated for an additional term. \nThese facts affect the independence of the PJM Board. \nAny analysis of decision making at PJM must directly address the incentives of PJM \nstaff. PJM staff performance should not be measured based on member satisfaction. PJM staff \nmust have the freedom to act independently consistent with reliability through competitive \nmarkets without concern about retaliation or impacts on compensation because their actions \nmay not be aligned with the wishes of one or more of PJM’s perceived customers. \nTo the extent that this, or any similar incentives are still in place, this affects the \nindependence of PJM staff."}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1320},{"p":5,"at":0,"title":"Pages 5 to 8","method":"page range","endPage":9,"endAt":0,"startToken":1320,"endToken":2668},{"p":9,"at":0,"title":"Pages 9 to 12","method":"page range","endPage":13,"endAt":0,"startToken":2668,"endToken":3387},{"p":13,"at":0,"title":"Page 13","method":"page range","endPage":13,"endAt":2087,"startToken":3387,"endToken":3722}]}
