{"document":{"slug":"rec-20260720-5201","title":"The Indicated PJM Transmission Owners submit Request for Rehearing and Clarification of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5201","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"rehearing request","file":"sources/filings/text/20260720-5201_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5201","tier":"record","sha256":"21ef018113f709101a9ca9b45f1e16c9fbd7723521947fc5d375c6d282813203","pages":23,"tokens":7116,"emptyPages":[],"textThemes":["colo","flex","cost","study"]},"pages":[{"page":1,"startToken":0,"endToken":65,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al.\n) \nDocket No. EL25-49-002 \n) \nDocket No. EL25-49-000 \n) \nLarge Loads Co-Located at Generating Facilities \n)  \nDocket No. AD24-11-001 \n) \nConstellation Energy Generation, LLC \n) \nv. \n)  \nDocket No. EL25-20-001 \nPJM Interconnection, L.L.C.  \n)  \n(Consolidated) \n) \nPJM Interconnection, L.L.C.  \n)  \nDocket No. ER26-1479-000 \nREQUEST FOR REHEARING AND CLARIFICATION \nOF THE \nINDICATED PJM TRANSMISSION OWNERS"},{"page":2,"startToken":65,"endToken":535,"text":"2 \nPursuant to Section 313 of the Federal Power Act (“FPA”)1 and Rule 713 of the Rules of \nPractice and Procedure of the Federal Energy Regulatory Commission (“Commission”),2 the \nIndicated PJM Transmission Owners (“PJM Transmission Owners”)3 respectfully request \nrehearing of the Commission’s June 18, 2026 order in this proceeding (“June 18 Order”).4\nAs discussed below, the Commission should grant rehearing or provide clarification of the \nJune 18 Order, as follows: \n\nThe Commission erred in concluding that co-located load and generation interconnected \nand synchronized with the transmission system should be exempt from any minimum \ncharge, such as the Grid Reliance Charge proposed by the PJM Transmission Owners.  \nThe Commission failed to address the substantial evidence provided by the PJM \nTransmission Owners regarding the need for such a charge. \n\nThe Commission erred by failing to address the substantial evidence provided by the PJM \nTransmission Owners regarding justness and reasonableness of the Grid Reliance Charge \nmethodology for calculating such charge.  \n\nThe Commission erred in rejecting the PJM Transmission Owners’ proposal to set the \nmaximum rate for Non-Firm Contract Demand Transmission Service at the rate for Firm \nContract Demand Service.  The Commission failed to provide an adequate reason for \nrejecting PJM Transmission Owners’ proposal, in particular distinguishing the \nCommission’s precedent regarding non-firm point-to-point transmission service and \naddressing the PJM Transmission Owners’ explanation that further analysis and study \nregarding the use of these new services would be necessary before determining the \n1\n16 U.S.C. § 825l(a). \n2\n18 C.F.R. § 385.713 (2025). \n3\nThe PJM Transmission Owners are: American Electric Power Service Corporation on behalf of its affiliates, \nAppalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power \nCompany, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP \nIndiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission \nCompany, Inc., and AEP West Virginia Transmission Company, Inc.; The Dayton Power and Light Company d/b/a \nAES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion \nEnergy Virginia; Duke Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy Ohio, Inc.; \nDuquesne Light Company; East Kentucky Power Cooperative, Inc.; Exelon Corporation on behalf of its affiliates \nAtlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, \nCommonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and \nPotomac Electric Power Company; FirstEnergy Service Company, on behalf of its affiliates American Transmission \nSystems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, The \nPotomac Edison Company, Monongahela Power Company, Keystone Appalachian Transmission Company, and \nTrans-Allegheny Interstate Line Company (collectively, the “FirstEnergy Companies”); PPL Electric Utilities \nCorporation; and Rockland Electric Company. \n4\nPJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026) (“June 18 Order”)."},{"page":3,"startToken":535,"endToken":1009,"text":"3 \nappropriate level of discount to offer for Non-Firm Contract Demand Transmission \nService.  That further study and analysis is to determine, in accordance with the principles \nof Order No. 888, the economically appropriate and efficient rate at the point of receipt  \nthat maximizes the use of the transmission system or signals the need to add capacity.  \nAs long as that rate is posted and offered in a non-discriminatory manner, it comports \nwith existing precedent.  Thus, the Commission’s decision is arbitrary and capricious.5\n\nThe Commission erred in rejecting PJM Interconnection L.L.C.’s (“PJM”) proposal to \ndefine Co-Located Load based on facilities located on the customer’s side of the Point of \nChange of Ownership, rather than the Point of Interconnection.  The Commission’s \nexplanation that PJM’s proposal was barred for failure to seek rehearing of the December \n18 Order is arbitrary and capricious and fails to account for the substantial evidence \nprovided by PJM and the PJM Transmission Owners regarding the flaws of utilizing the \nPoint of Interconnection to define Co-Located Load. \n\nThe Commission erred in rejecting PJM’s proposal to require Co-Located Load to take \nsufficient transmission service to cover its entire gross load.  PJM’s proposal is a just and \nreasonable means to ensure that Co-Located Load can be served reliably and does not \nthreaten the integrity of the transmission system. \n\nThe Commission should clarify its ruling regarding the ability to require control \ntechnologies and/or protection systems on both the customer and Transmission Owner \nsides of the Point of Interconnection.  The Commission should clarify that PJM and the \nPJM Transmission Owners will be permitted to require protection on both the customer \nand Transmission Owner sides of the Point of Interconnection, to the extent that a study \ndetermines that such protection is necessary and appropriate.   \nI.  \nBACKGROUND \nOn December 18, 2025, the Commission issued an order in the show cause proceeding in \nDocket Nos. EL25-49-000, et al., pursuant to section 206 of the FPA, finding PJM’s Open Access \nTransmission Tariff (“Tariff”) unjust and unreasonable because it does not contain provisions \naddressing with sufficient clarity or consistency the rates, terms, and conditions of service that \napply to generators serving Co-Located Load and Eligible Customers taking transmission service \n5\nSee Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. By \nPub. Utils.; Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs.\n¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), on reh’g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048\n(cross-referenced at 78 FERC ¶ 61,220), on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), on reh’g, Order No.\n888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom., Transmission Access Policy Study Grp., v. FERC,\n225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom., N.Y. v. FERC, 535 U.S. 1 (2002)."},{"page":4,"startToken":1009,"endToken":1380,"text":"4 \non behalf of Co-Located Load.6  The December Order defined the Tariff as PJM’s Open Access \nTransmission Tariff, the Amended and Restated Operating Agreement of PJM, and the Reliability \nAssurance Agreement Among Load Serving Entities in the PJM Region.7\nThe Commission directed PJM to file, within 60 days of the date of issuance of the \nDecember Order, a compliance filing to revise its Tariff to set forth specific terms and conditions \nthat an Interconnection Customer in PJM seeking to serve Co-Located Load must follow to \neffectuate a Co-Location Arrangement.8  In addition, the Commission directed PJM to submit in \nits compliance filing revisions to its Tariff to require that the Eligible Customer taking transmission \nservice on behalf of the Co-Located Load takes one of three transmission services:  (1) Network \nIntegration Transmission Service (“NITS”), including a new interim, non-firm transmission \nservice available until all Network Upgrades necessary to provide the requested NITS are complete \n(“Interim NITS”), (2) a new Firm Contract Demand (“Firm Contract Demand”) transmission \nservice, or (3) a new Non-Firm Contract Demand (“Non-Firm Contract Demand”) transmission \nservice.  The Commission also established a paper hearing to determine the just and reasonable \nrates, terms, and conditions for these new transmission services.9\nVarious parties filed requests for rehearing and clarification of the December Order.  On \nFebruary 23, 2026, in Docket No. ER26-1479-000, PJM filed its second compliance filing as \ndirected by the December Order.  On February 23, 2026, in Docket Nos. EL25-49-000, et al., PJM \n6\nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 2 (2025) (December Order). \n7\nDecember Order at P 1. \n8\n“Co-Location Arrangements” refers to both the Co-Located Load and the associated generator.  See \nDecember Order at n.2 (citing PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at P 3 & n.4 (2025)). \n9\nDecember Order at PP 2, 194, 219.  The Commission also found the Behind the Meter Generation (“BTMG”) \nrules in the Tariff to be no longer just and reasonable, and the Commission directed PJM to submit in its compliance \nfiling revisions to its Tariff to revise the retail BTMG netting rules and to implement a transition process for existing \nBTMG participants.  Id. at PP 2, 179, 186, 221-224."},{"page":5,"startToken":1380,"endToken":1702,"text":"5 \nand the PJM Transmission Owners each submitted an initial brief to address the Commission’s \npaper hearing questions with respect to the new transmission services.  On March 25, 2026, and \non April 24, 2026, various parties submitted response briefs and reply briefs, respectively. \nIn the June 18 Order, the Commission addressed the requests for rehearing and clarification \nof the December Order, PJM’s second compliance filing, and the paper hearing on the new \ntransmission services.  The Commission found that PJM’s compliance filing partially complied \nwith the directives of the December Order.  Accordingly, the Commission accepted in part and \nrejected in part PJM’s proposed Tariff revisions, and directed a further compliance filing.10\nFinally, the Commission established as just and reasonable certain rates, terms, and \nconditions for the new transmission services directed in the December Order in response to the \nrecord developed in the paper hearing.  The Commission directed PJM and the PJM Transmission \nOwners to file, within 60 days of the date of issuance of the June 18 Order, compliance filings to \nrevise the Tariff. \nII. \nREQUESTS FOR REHEARING AND CLARIFICATION \nA.  \nStatement of Issues and Specification of Errors \nThe PJM Transmission Owners submit the following Statement of Issues and Specification \nof Errors pursuant to Rules 713(c)(1) and 713(c)(2) of the Commission’s Rules of Practice and \nProcedure.11\n\nThe June 18 Order’s conclusion that co-located load and generation interconnected \nand synchronized with the transmission system should be exempt from any \nminimum charge is arbitrary and capricious, does not reflect reasoned decision-\nmaking, and is unsupported by substantial evidence in violation of the \nAdministrative Procedure Act (“APA”).  Motor Vehicle Mfrs. Ass’n v. State Farm \nMut. Auto Ins. Co., 463 U.S. 29, 43 (1983) (an agency “must examine the relevant \ndata and articulate a satisfactory explanation for its action including a ‘rational \n10\nJune 18 Order at P 8. \n11\n18 C.F.R. § 385.713(c)(1), (c)(2)."},{"page":6,"startToken":1702,"endToken":2286,"text":"6 \nconnection between the facts found and the choices made’”) (citation omitted) \n(“State Farm”); Consol. Edison Co. of N.Y. v. FERC, 45 F.4th 265 (D.C. Cir. 2022); \nConsol. Edison Co. of N.Y. v. FERC, 347 F.3d 964, 972 (D.C. Cir. 2003); PJM \nInterconnection, L.L.C., 161 FERC ¶ 61,252 (2017); Fla. Gas Transmission Co. v. \nFERC, 604 F.3d 636, 639 (D.C. Cir. 2010) (quoting Pac. Gas & Elec. Co. v. FERC, \n373 F.3d 1315, 1319 (D.C. Cir. 2004)) (“Fla. Gas”); PJM Interconnection, L.L.C., \n119 FERC ¶ 61,318 (2007); Midwest Indep. Transmission Sys. Operator, Inc., 117 \nFERC ¶ 61,113 (2006) (“Midwest ISO”). \n\nThe June 18 Order’s rejection of the PJM Transmission Owners’ proposed Grid \nReliance Charge does not reflect reasoned decision-making, and is unsupported by \nsubstantial evidence in violation of the APA.  State Farm, 463 U.S. at 43 (an agency \n“must examine the relevant data and articulate a satisfactory explanation for its \naction including a ‘rational connection between the facts found and the choices \nmade’”) (citation omitted); Consol. Edison Co. of N.Y. v. FERC, 45 F.4th 265; \nConsol. Edison Co. of N.Y. v. FERC, 347 F.3d at 972 ; PJM Interconnection, L.L.C., \n161 FERC ¶ 61,252; Fla. Gas, 604 F.3d at 639 (quoting Pac. Gas & Elec. Co. v. \nFERC, 373 F.3d at 1319); PJM Interconnection, L.L.C., 119 FERC ¶ 61,318; \nMidwest ISO, 117 FERC ¶ 61,113. \n\nThe June 18 Order’s rejection of the PJM Transmission Owner’s proposal to set the \nmaximum rate for Non-Firm Contract Demand transmission service at the rate for \nFirm Contract Demand transmission service, subject to discount, is arbitrary and \ncapricious, does not reflect reasoned decision-making, and is unsupported by \nsubstantial evidence in violation of the APA.  State Farm, 463 U.S. at 43 (an agency \n“must examine the relevant data and articulate a satisfactory explanation for its \naction ‘including a rational connection between the facts found and the choices \nmade’”) (citation omitted); Consol. Edison Co. of N.Y. v. FERC, 45 F.4th 265; \nConsol. Edison Co. of N.Y. v. FERC, 347 F.3d at  972; PJM Interconnection, L.L.C., \n161 FERC ¶ 61,252; Fla. Gas, 604 F.3d at 639 (quoting Pac. Gas & Elec. Co. v. \nFERC, 373 F.3d at 1319); PJM Interconnection, L.L.C., 119 FERC ¶ 61,318 \n(2007); Midwest ISO, 117 FERC ¶ 61,113; lll. State Chamber of Commerce v. EPA, \n775 F.2d 1141 at 1147 (“[The agency] is entitled to change its policy, but it must \ndo so on the basis of a reasoned analysis.”) (7th Cir. 1985). \n\nThe June 18 Order’s rejection of PJM’s proposal to define Co-Located Load based \non facilities located on the customer’s side of the Point of Change of Ownership, \nrather than the Point of Interconnection, is arbitrary and capricious, does not reflect \nreasoned decision-making, and is unsupported by substantial evidence in violation \nof the APA.  State Farm, 463 U.S. at 43 (an agency “must examine the relevant \ndata and articulate a satisfactory explanation for its action including a ‘rational \nconnection between the facts found and the choices made’”) (citation omitted);\nConsol. Edison Co. of N.Y. v. FERC, 45 F.4th 265; Consol. Edison Co. of N.Y. v. \nFERC, 347 F.3d at 972; PJM Interconnection, L.L.C., 161 FERC ¶ 61,252; Fla. \nGas, 604 F.3d at 639 (quoting Pac. Gas & Elec. Co. v. FERC, 373 F.3d at 1319);"},{"page":7,"startToken":2286,"endToken":2626,"text":"7 \nPJM Interconnection, L.L.C., 119 FERC ¶ 61,318; Midwest ISO, 117 FERC ¶ \n61,113. \n\nThe June 18 Order’s rejection of PJM’s proposal to require Co-Located Load to \ntake sufficient transmission service to cover its entire gross load is arbitrary and \ncapricious, does not reflect reasoned decision-making, and is unsupported by \nsubstantial evidence in violation of the APA.  State Farm, 463 U.S. at 43 (an agency \n“must examine the relevant data and articulate a satisfactory explanation for its \naction including a ‘rational connection between the facts found and the choices \nmade’”) (citation omitted); Consol. Edison Co. of N.Y. v. FERC, 45 F.4th 265; \nConsol. Edison Co. of N.Y. v. FERC, 347 F.3d at 972; PJM Interconnection, L.L.C., \n161 FERC ¶ 61,252; Fla. Gas, 604 F.3d at 639 (quoting Pac. Gas & Elec. Co. v. \nFERC, 373 F.3d at 1319); PJM Interconnection, L.L.C., 119 FERC ¶ 61,318; \nMidwest ISO, 117 FERC ¶ 61,113. \nB.  \nArguments \n1.\nThe Commission Erred in Concluding That Co-Located Load and \nGeneration Interconnected and Synchronized With the Transmission \nSystem Should be Exempt From any Minimum Charge, and Rejecting \nthe PJM Transmission Owners’ Proposed Grid Reliance Charge. \nIn the June 18 Order, the Commission rejected the PJM Transmission Owners’ proposed \nGrid Reliance Charge, concluding that the record does not adequately substantiate the need for an \nadditional charge for co-located load at this time or how such a charge should be calculated and \nassessed.12  The Commission indicated that it will consider such a charge after more experience \nwith the actual use of the new transmission services.13  The Commission should reverse this finding \non rehearing. \na. \nA Minimum Charge Such as the Grid Reliance Charge is \nNecessary to Ensure That Co-Located Loads pay Their Fair \nShare of System Costs. \nThe Grid Reliance Charge or some other minimum charge is a necessary component of the \nnew transmission services required under the Commission’s December Order.  The PJM \n12\nJune 18 Order at P 455. \n13\nId. at P 456."},{"page":8,"startToken":2626,"endToken":2973,"text":"8 \nTransmission Owners developed the Grid Reliance Charge partially in response to Commissioner \nChang’s guidance that a just and reasonable replacement rate for the new transmission services \nshould reflect “some form of minimum transmission service charge, which would protect other \ncustomers against cost shifts resulting from Co-Located Loads that rely upon the transmission \nsystem but do not directly or meaningfully contribute to its costs via transmission service \npayments.”14  The Grid Reliance Charge achieves this goal by reflecting the costs of using the \ntransmission system to deliver black start and regulation services, as well as the costs of providing \nthe inherent benefits that all customers, including Contract Demand customers, receive as a result \nof their synchronization to and reliance on the grid.   \nAs the PJM Transmission Owners explained in their evidentiary submissions, even if a Co-\nLocated Load customer is not procuring transmission service for its entire on-site load, being \nconnected to the grid provides benefits in terms of the ability to access resources that are not co-\nlocated with load if necessary, backing up co-located generation, and providing critical ancillary \nservices to Co-Located Load, such as regulation and black start.  These grid benefits also include \ndelivering ancillary services and essential reliability services, such as frequency support, inertia, \nvoltage stability, fault current capability, ride-through and protection coordination, and providing \nsufficient short-circuit capability.15  No party provided any evidence rebutting the nature of these \nbenefits. \nThe purpose of a Grid Reliance Charge is not merely to recover the costs associated with \nthe delivery of ancillary services.  Rather, its purpose is to ensure that Co-Located Load customers \n14\nDecember Order, Chang Concurrence at P 9.   \n15\nSee PJM Transmission Owners Initial Brief, Docket Nos. EL25-49-000, et al., Exhibit No. PTO-0001, Direct \nJoint Testimony of Peter Blazunas, Lance Schafer, and Hanhan Hammer at 18 (Feb. 23, 2026) (“Blazunas, Schafer, \nand Hammer Direct Testimony”); see also PJM Transmission Owners Reply Brief, Joint Rebuttal Testimony of Peter \nBlazunas, Lance Schafer, and Hanhan Hammer, Docket Nos. EL25-49-000, et al., Exhibit No. PTO-0005 at 16 (Apr. \n24, 2026) (“Blazunas, Schafer, and Hammer Rebuttal Testimony”)."},{"page":9,"startToken":2973,"endToken":3289,"text":"9 \npay their fair share of the transmission system and the associated benefits that it provides to all \ninterconnected customers, including essential reliability services, such as frequency support, \ninertia, voltage stability, fault current capability, ride-through and protection coordination, and \nsufficient short-circuit capability.16  Even if a Co-Located Load customer never “pulls energy from \nthe grid,” and only relies on black start and regulation service, it receives the inherent benefits that \ncome with grid interconnection, which requires transmission infrastructure, investment and \nexpense.  A Grid Reliance Charge appropriately captures, with reasonable precision, the costs \nassociated with these inherent benefits by calculating the portions of annual depreciation and \noperation and maintenance expenses that constitute a reasonable proxy for the costs of providing \nthose benefits.  \nThe June 18 Order fails to meaningfully consider and address these points.  The only \nrationale provided was that the record contains “insufficient description of the potential nature or \nmagnitude of the cited benefits or the potential costs that transmission providers or owners may \nincur when providing these benefits to . . . Co-Located Loads.”17  The PJM Transmission Owners \ndisagree that the record is insufficient in this regard.  At a minimum, Co-Located Load will utilize \nthe transmission system to receive black-start and regulation ancillary services, which the \nCommission has already concluded are used by the entire on-site load of a Co-Located Load \nfacility.18  The Commission’s finding that Co-Located Load will receive the benefits of black-start \nand regulation ancillary services cannot be squared with the rejection of a minimum charge such \nas the Grid Reliance Charge.  These findings amount to the unduly discriminatory, arbitrary, and \n16\nPJM Transmission Owners Reply Brief, Blazunas, Schafer, and Hammer Rebuttal Testimony at 31.   \n17\nJune 18 Order at P 455. \n18\nDecember Order at P 209 (stating that all Co-Located Load rely on regulation and black start services to be \nserved regardless of whether they are drawing energy from the transmission system)."},{"page":10,"startToken":3289,"endToken":3763,"text":"10 \ncapricious conclusion that Co-Located Load can receive these services, as provided by the \ntransmission system, at no charge, while all other customers must bear those costs.  Therefore, at \na minimum, some additional charge is warranted to account for Co-Located Loads’ use of the \ntransmission system to receive these services.   \nIn addition to providing black-start and regulation services, the PJM Transmission Owners \ndescribed the other specific benefits that Co-Located Load receives from being interconnected and \nsynchronized to the transmission system.19  If the Commission believes that additional precision \nis necessary to determine the costs associated with these benefits, and what portion of those costs \nshould be allocated to Co-Located Load, then the appropriate solution would be to direct further \nbriefing or other procedures to obtain such evidence.  It is, however, arbitrary and capricious to \nsimply reject the adoption of any minimum charge under these circumstances.  Doing so will shift \ncosts from Co-Located Load customers to other transmission ratepayers, costs which will \nultimately be borne by retail ratepayers.  Such a subsidy is unjust and unreasonable and \ninconsistent with fundamental principles of cost allocation.20\n19\nPJM Transmission Owners Initial Brief at 14-15. \n20\nSee Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. By \nPub. Utils.; Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs.\n¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), on reh’g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048\n(cross-referenced at 78 FERC ¶ 61,220), on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), on reh’g, Order No.\n888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom., Transmission Access Policy Study Grp., v. FERC,\n225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom., N.Y. v. FERC, 535 U.S. 1 (2002); Preventing Undue Discrimination \n& Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, order on reh’g, Order No. 890-A, 121 FERC\n¶ 61,297 (2007), order on reh’g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-C, 126\nFERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009); Transmission Plan. & Cost \nAllocation by Transmission Owning & Operating Pub. Utils., Order No. 1000, 136 FERC ¶ 61,051 (2011), order on \nreh’g, Order No. 1000-A, 139 FERC ¶ 61,132, order on reh’g & clarification, Order No. 1000-B, 141 FERC ¶ 61,044 \n(2012), aff’d sub. nom. S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41 (D.C. Cir. 2014); Bldg. for the Future Through\nElec. Reg’l Transmission Planning & Cost Allocation, Order No. 1920, 89 FR 49280 (June 11, 2024), 187 FERC ¶ \n61,068, order on reh’g, Order No. 1920-A, 89 FR 97174 (Dec. 6, 2024), 189 FERC ¶ 61,126 (2024), order on reh’g, \nOrder No. 1920-B, 191 FERC ¶ 61,026 (2025); see also 16 U.S.C. § 824o(b)."},{"page":11,"startToken":3763,"endToken":4066,"text":"11 \nThe Commission’s commitment to consider a Grid Reliance Charge after more experience \nwith the actual use of the new transmission services21 is not sufficient.  As discussed above, the \ncase for the Grid Reliance Charge is sound and the need for some minimum charge is imminent.  \nWith the Commission’s goal of “speed to market” for Co-Located Loads, it is reasonable to expect \nthat customers will begin using the new transmission services that the Commission has required \nas soon as feasible.  Without a Grid Reliance Charge or other minimum charge to accompany the \nimplementation of these new services, Co-Located Load customers will enjoy the inherent benefits \nof the PJM transmission system without providing any contribution to the costs of those benefits, \nwhich is unduly preferential to Co-Located Load customers and unfair to the rest of customers \nwho will be responsible for bearing those costs. \nb. \nThe Proposed Grid Reliance Charge Methodology is Just and \nReasonable. \nIn addition to granting rehearing on the need for a minimum charge in the first instance, \nthe Commission should also grant rehearing and find that the Grid Reliance Charge proposed by \nthe PJM Transmission Owners represents a just and reasonable methodology for implementing \nsuch a charge.  The Grid Reliance Charge is grounded in sound ratemaking and cost causation \nprinciples.  It represents an appropriate balance between fairly estimating the grid reliance benefits \nto Co-Located Load and the need to ensure the rate can be practically implemented.  Practicality \nconcerns are particularly pertinent here given the Commission’s desire to expedite the \ninterconnection of data center loads.  This approach is also fully consistent with longstanding \nCommission precedent holding that cost allocation rules do not require exacting precision as long \nas they represent a comparison of the costs assessed to a party against the burdens imposed or \n21\nJune 18 Order at P 456."},{"page":12,"startToken":4066,"endToken":4376,"text":"12 \nbenefits drawn.22  The PJM Transmission Owner’s Grid Reliance Charge proposal meets this \nstandard.  \nThe PJM Transmission Owners provided substantial evidence supporting the calculation \nof the Grid Reliance Charge, as set forth in expert witness testimony provided by Concentric \nEnergy Advisors.23  By including certain publicly-available costs and excluding others, the Grid \nReliance Charge methodology achieves the goal of developing a cost-based, transparent, and \npractically implementable calculation.24  First, by intentionally limiting the Grid Reliance Charge \nto specific depreciation and operations and maintenance accounts and excluding return on rate \nbase and associated income taxes, the Grid Reliance Charge methodology produces a conservative \nresult focused on allocating a reasonable share of those costs most directly related  to the ongoing \noperation and use of the grid, rather than investment return.25  Second, a Grid Reliance Charge \navoids the need to relitigate each utility’s rate base, return, or tax components and eliminates the \nneed for company-specific (or project-specific) engineering judgment and allocations.26  Third, by \nestablishing the Grid Reliance Charge as a percentage of the total transmission revenue \nrequirement, the Grid Reliance Charge scales proportionally with each utility’s size and cost \nstructure.27  Lastly, averaging the calculated Grid Reliance Charge percentages across all PJM \n22\nSee, e.g., Ill. Commerce Comm’n v. FERC, 576 F.3d 470, 477 (7th Cir. 2009); Transmission Plan. & Cost \nAllocation by Transmission Owning & Operating Pub. Utils., Order No. 1000, 136 FERC ¶ 61,051, at P 504 and \nnn.393, 435, 453 (2011) (citing to Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361 at 1369, 1371 (D.C. \nCir. 2004) (explaining that cost causation “does not require exacting precision in a ratemaking agency’s allocation \ndecisions.”)). \n23\nPJM Transmission Owners Reply Brief at 21-30. \n24\nBlazunas, Schafer, and Hammer Rebuttal Testimony 27. \n25\nBlazunas, Schafer, and Hammer Direct Testimony at 24-25. \n26\nId. at 25. \n27\nId."},{"page":13,"startToken":4376,"endToken":4669,"text":"13 \ntransmission owners smooths out variations and reduces volatility.28  The Commission failed to \nconsider and address the merits of the Grid Reliance Charge methodology at all, and this failure \nwas arbitrary and capricious and resulted in a decision not supported by substantial evidence. \n2.\nThe Commission Erred in Rejecting the PJM Transmission Owners’ \nProposal to set the Maximum Rate for Non-Firm Contract Demand \nTransmission Service at the Rate for Firm Contract Demand \nTransmission Service, Subject to Discount. \nIn the June 18 Order, the Commission found that the PJM Transmission Owners’ proposal \nto set the maximum rate for Non-Firm Contract Demand transmission service equal to the rate for \nFirm Contract Demand transmission service was not just and reasonable.29  In the Commission’s \nview, Non-Firm Contract Demand transmission service is an inferior service to Firm Contract \nDemand transmission service and NITS, making it unjust and unreasonable to charge Non-Firm \nContract Demand customers the same maximum rate as Firm Contract Demand and NITS \ncustomers.30  The Commission should reverse this finding on rehearing. \nContrary to the Commission’s conclusion, the PJM Transmission Owners’ proposal is fully \nconsistent with Order No. 888, as embodied in the provisions of the Tariff addressing the \navailability of firm and non-firm Point-to-Point Transmission Service.  Rather, it is the June 18 \nOrder that departs from Order No. 888 and related precedent.  In Order No. 888, the Commission \nrejected arguments that there is no cost-of-service principle justifying charging non-firm rates at \nthe same rate as firm service, making clear that it is important to allow pricing flexibility, and that \nnon-firm service can be priced at the same level of firm service under appropriate circumstances.31\n28\nId.  \n29\nJune 18 Order at P 402. \n30\nId.\n31\nOrder No. 888 at 31,780."},{"page":14,"startToken":4669,"endToken":4948,"text":"14 \nIn Order No. 888-A, the Commission emphasized that non-firm transmission prices should \n“promote efficient use of the transmission system, subject to [the firm service] price cap.”32  In \norder to allow for the ability to set rates based on efficient system use, including accounting for \nthe amount of available capacity, the Commission permitted transmission providers to offer \ndiscounts to the maximum rate, so long as such discounts are offered equally to affiliates and non-\naffiliates, and are made transparent by posting on OASIS.33\nThis is precisely the approach the PJM Transmission Owners have proposed here.  In \ndirecting the implementation of Non-Firm Contract Demand transmission service, the \nCommission has required an entirely new transmission service for a customer class of unknown \nscope and magnitude, with corresponding unknown demand and availability.  The PJM \nTransmission Owners will only charge the maximum firm rate for Non-Firm Contract Demand \ntransmission service to the extent it is consistent with the efficient use of the transmission system, \ni.e., when there is scarce or no excess capacity available for use by Co-Located Load customers.  \nCharging the maximum rate under these circumstances is just and reasonable and entirely \nconsistent with Commission precedent insofar as the appropriate price signal should convey such \nscarcity, thereby indicating that customers may need to procure a firmer level of service.  However, \nif there is additional capacity available to accommodate requests for Non-Firm Contract Demand \ntransmission service, then the PJM Transmission Owners, in coordination with PJM, will offer an \nappropriately discounted rate based on extant conditions, such as the demand for non-firm service \nand availability of capacity.   \n32\nOrder No. 888-A at 30,272. \n33\nOrder No. 888 at 31,780."},{"page":15,"startToken":4948,"endToken":5288,"text":"15 \nThis is the process contemplated and explicitly permitted in Order No. 888 and its progeny.  \nThe Commission’s objection that the PJM Transmission Owners’ commitment to offer appropriate \ndiscounts “at some undefined time in the future” is “counterintuitive” cannot be squared with this \nprecedent. It is obvious that a discount based on future system conditions cannot be determined \nand stated now, but offering a commitment to provide future discounts complies with Order No. \n888, which emphasized the need for pricing flexibility based on the efficient use of the system.  \nThe illogical nature of the objection here is reinforced by the fact that the June 18 Order provides \nno directives or guidance as to what a just and reasonable initial discount should be, simply \ninstructing the PJM Transmission Owners to propose some discount.  Moreover, there is nothing \n“counterintuitive” about assessing the efficiency of system use, including the demand for non-firm \nservice and the availability of excess capacity, upon implementation of an entirely new service.  \nAgain, this is entirely consistent with the discounting approach that the Commission adopted in \nOrder No. 888.  If, for instance, there is unused capacity after the implementation of the new \nContract Demand services that might otherwise be efficiently utilized by Co-Located Load \ncustomers, then an appropriate discount will be offered and implemented.34  If the Commission \nwishes to deviate from its precedent with respect to the pricing of Non-Firm Contract Demand \ntransmission service, then it must provide a rational explanation for doing so.  The June 18 Order \nfails to even acknowledge this departure, much less provide such an explanation, and it is therefore \narbitrary and capricious. \nThe  Commission’s concern that the PJM Transmission Owners are under no obligation to \nlower rates in the future and provide no transparency as to how such a decision would be made is \n34\nThe Commission’s reasoning here is also inconsistent with the explanation offered for denying the \nimplementation of a minimum charge to Co-Located Customers, namely, that additional data is necessary before \ndetermining the nature and magnitude of such a charge."},{"page":16,"startToken":5288,"endToken":5602,"text":"16 \nalso unconvincing and at odds with Order No. 888 precedent.35  In accordance with the \nrequirements of Order No. 888 and the Tariff, any offer of discount made by the Transmission \nProvider will be announced to all Eligible Customers by posting on OASIS, and any customer-\ninitiated requests for discounts will also be posted on OASIS.  Once a discount is determined, the \ndetails will immediately be posted on the OASIS.  Moreover, any discount agreed upon for service \non a path or at a point(s) of receipt will be offered by the Transmission Provider for the same time \nperiod to all Eligible Customers on all unconstrained transmission paths that go to the same \npoint(s) of receipt on the Transmission System.  If the Commission believes that this process, \nwhich has been in place for over thirty years now, is somehow unjust and unreasonable as applied \nto Non-Firm Contract Demand transmission service, then the Commission must acknowledge the \nrelevant precedent and provide a rational reason for its decision to depart from that precedent.  \nHaving failed to do so renders the June 18 Order arbitrary and capricious. \n3. \nThe Commission Erred in Rejecting PJM’s Proposal to Define Co-\nLocated Load Based on Point of Change of Ownership Rather Than \nPoint of Interconnection. \nIn the June 18 Order, the Commission rejected PJM’s proposed definition of Co-Located \nLoad based on the Point of Change of Ownership, and instead required the use of Point of \nInterconnection.36  The Commission failed to consider the merits of PJM’s proposal, as well as the \nevidence offered by the PJM Transmission Owners in support thereof, rejecting the proposal based \nsolely on the rationale that no party sought rehearing of the definition of Co-Located Load \ncontained in the December Order.37  The Commission should reverse this holding on rehearing. \n35\nJune 18 Order at P 407. \n36\nId. at P 307.  \n37\nId."},{"page":17,"startToken":5602,"endToken":5880,"text":"17 \nNowhere in the December Order did the Commission indicate that PJM was prohibited \nfrom proposing modifications to the definition of Co-Located Load if such a change was consistent \nwith or superior to the definition set forth in that order.  This narrow and cramped reading of the \nDecember Order is particularly problematic here, given the novel and unique nature of the services \nthat the Commission has directed in this proceeding.  Under these circumstances, it is \nunderstandable that upon considering the details of implementing these new services, PJM \ndetermined that a modification to the definition of Co-Located Load was necessary and \nappropriate.  Contrary to the Commission’s findings, both PJM and the PJM Transmission Owners \nprovided abundant explanation as to how this modification complied with the December Order, \nand indeed, that absent this change, the definition of Co-Located Load would fail to satisfy the \ngoals and purpose of the December Order.38  To wit, defining Co-Located Load based on the Point \nof Change of Ownership, instead of the Point of Interconnection, is consistent with or superior to \nthe December Order’s directive because it provides additional clarity to interconnection parties, is \neasier to administer, and eliminates the potential for gaming.  If the definition of Co-Located Load \nwere to rely on Point of Interconnection for purposes of eligibility for the new transmission \nservices, that could open the door to potential gamesmanship by customers taking advantage of \nCo-Located Load arrangements based on the inclusion or use of Transmission-Owner-owned \nfacilities.  The Commission’s decision to ignore this evidence is arbitrary and capricious and \nshould be reversed.   \n38\nSee, e.g., PJM Transmission Owners Request for Rehearing or Clarification, Docket No. ER26-1088-000 \n(filed May 18, 2026)."},{"page":18,"startToken":5880,"endToken":6172,"text":"18 \n4. \nThe Commission Erred in Rejecting PJM’s Proposal to Require Co-\nLocated Load to Take Sufficient Transmission Service to Cover its \nEntire Gross Load. \nIn the June 18 Order, the Commission rejected PJM’s proposal to require that the Eligible \nCustomer taking transmission service on behalf of a Co-Located Load must take sufficient \ntransmission service to account for the entire gross demand of the Co-Located Load.39  The \nCommission determined that PJM’s proposal did not comply with the December Order and would \nfundamentally alter the nature of Firm Contract Demand and Non-Firm Contract Demand \ntransmission services.40  On rehearing, the Commission should reverse this finding. \nPJM proposes to require that the Eligible Customer taking transmission service on behalf \nof a Co-Located Load must take sufficient transmission service to account for the entire gross \ndemand of the Co-Located Load.  An Eligible Customer taking service on behalf of a Co-Located \nLoad must request Non-Firm Contract Demand transmission service equal to the MW level of the \nCo-Located Generator dedicated to serving the Co-Located Load.  Any portion of the gross \ndemand of the Co-Located Load not served by the Co-Located Generator must be covered by Firm \nContract Demand transmission service.  This arrangement would tie the amount of Firm Contract \nDemand and Non-Firm Contract Demand transmission services that an Eligible Customer can \nrequest to the size of the Co-Located Generator, rather than allowing the Eligible Customer to \nselect any amount, including 0 MW for Non-Firm Contract Demand transmission service.   \nRequiring that an Eligible Customer on behalf of a Co-Located Load must take sufficient \ntransmission service to account for the entire gross demand of the Co-Located Load is just and \nreasonable to ensure reliable operation of the transmission system. \n39\nJune 18 Order at P 342. \n40\nId."},{"page":19,"startToken":6172,"endToken":6480,"text":"19 \nTo ensure reliability, PJM’s studies examine the transmission service requests for the Co-\nLocated Load and the Co-Located Load’s impact on the transmission system.  These studies must \ncapture the effects of any unscheduled energy withdrawals by the Co-Located Load, even if \ninadvertent or limited in duration, and confirm that any such withdrawals will not jeopardize \nsystem reliability.  Thus, there cannot be any unstudied portion of the Co-Located Load that is not \nsubject to either:  (i) Firm Contract Demand transmission service; or (ii) dedicated generation, \nwhich must be backed up by Non-Firm Contract Demand transmission service.  Without this sort \nof arrangement, PJM will not have visibility into situations that may jeopardize grid reliability, \nincluding load taking service beyond levels for which PJM has properly studied and planned.  A \nlack of visibility will expose the system to risk of equipment damage, unintended relay operations, \nand cascading outages.  The Commission’s disregard of those concerns was arbitrary and \ncapricious. \nMoreover, because a Co-Located generating facility will not always be available, any \nportion of the load not covered by Firm Contract Demand transmission service must be covered \nby Non-Firm Contract Demand transmission service.  The Non-Firm Contract Demand \ntransmission service will act as a backup to allow the Co-Located Load to meet its full demand, if \nthe Co-Located generating facility is on outage and unable to provide energy.  A Co-Located Load \nthat typically supplies a portion of its load from the co-located generator without using the \ntransmission system may rely on Non-Firm Contract Demand transmission service when the co-\nlocated generator is unavailable or operating at a reduced capacity, to enable the Co-Located Load \nto substitute energy from the system for the energy provided by the Co-Located Generating \nFacility.  This provides the Co-Located Load with greater flexibility to mix and match between \nFirm Contract Demand, on-site generation and Non-Firm Contract Demand, provided the"},{"page":20,"startToken":6480,"endToken":6752,"text":"20 \ncombination of the two transmission services covers the entire gross demand of the Co-Located \nLoad. \n5. \nThe Commission Should Clarify its Ruling Regarding Requirements \nfor Control Technologies and Protection Systems. \nIn the June 18 Order, the Commission rejected the PJM Transmission Owners’ proposal \nthat the Tariff should specify that control technologies and/or protection systems may be required \non both the customer and PJM Transmission Owner sides of the Point of Interconnection.41  The \nCommission held that the location and number of devices required should be based on engineering \njudgment of PJM and the PJM Transmission Owners.42  Consistent with this ruling, the \nCommission should clarify that PJM and the PJM Transmission Owners will be permitted to \nrequire protection on both the customer and Transmission Owner sides of the Point of \nInterconnection, to the extent that a study determines that such protection is necessary and \nappropriate.   \nAs a general matter, requiring control technologies and/or protection systems on both the \nCo-Located Load customer’s and the PJM Transmission Owner’s side of the point of \ninterconnection provides much needed redundancy.  On every other element of the bulk electric \nsystem in PJM, there is an expectation for redundancy for protection systems that are primarily \nresponsible for fault clearing.  In the case of Co-Located Load, the failure to adequately curtail \nload or generation can adversely impact the transmission system just as significantly as a fault, \nespecially if there are no limitations on the size of the load and generation connected in one facility.  \nWithout protection system redundancy, the transmission system and the millions of customers that \n41\nJune 18 Order at P 488. \n42\nId."},{"page":21,"startToken":6752,"endToken":6968,"text":"21 \nrely on it will face significant risks that cannot be addressed effectively through operating \nprocedures, relaying, and remote tripping capability. \n Moreover, cost is not a meaningful barrier to implementing this level of redundancy.  The \noverall cost of implementing protection systems at a given facility is driven primarily by personnel \ntime for engineering, construction, and subsequent maintenance, rather than by significant material \ncosts.  In any event, the benefits of requiring control technologies and/or protection systems on \nboth the Co-Located Load customer’s and the PJM Transmission Owner’s side of the point of \ninterconnection far outweigh the minimal cost of the protection system equipment, particularly \nwhen compared to other costs associated with the development and interconnection of Co-Located \nLoad.  Further, it is best to address system reliability concerns upfront before the Co-Located Load \nfirst comes online because it is less expensive to install protection systems as part of initial \nconstruction rather than retrofit the site after initial construction. \nFor these reasons, if the Commission declines to clarify its ruling as stated above, it should \ngrant rehearing so as to allow PJM and the PJM Transmission Owners to require protection on \nboth the customer and PJM Transmission Owner sides of the Point of Interconnection when the \nrelevant study determines that such protection is necessary to provide adequate redundancy."},{"page":22,"startToken":6968,"endToken":7037,"text":"22 \nIII.  \nCONCLUSION \nFor the foregoing reasons, the PJM Transmission Owners respectfully request that the \nCommission grant rehearing of the June 18 Order. \nRespectfully submitted, \n/s/ Michael Kunselman\nMichael Kunselman \nRichard P. Sparling \nNicholas J. Cicale \nJonathan Namazi \nDavis Wright Tremaine LLP \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nCounsel for the FirstEnergy  \n  Companies \nOn behalf of the Indicated PJM  \n  Transmission Owners \nDated: July 20, 2026"},{"page":23,"startToken":7037,"endToken":7116,"text":"CERTIFICATE OF SERVICE \nUnder Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § \n385.2010 (2025), I hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service lists compiled by the Secretary in these proceedings.  \nDated at Washington, D.C., this 20th day of July 2026.  \n/s/ Daniel Klein \nDaniel Klein  \nDavis Wright Tremaine LLP  \n1301 K Street NW  \nSuite 500 East  \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":1929,"startToken":0,"endToken":830},{"p":3,"at":1929,"title":"I. BACKGROUND","method":"printed heading","endPage":5,"endAt":1146,"startToken":830,"endToken":1554},{"p":5,"at":1146,"title":"II. REQUESTS FOR REHEARING AND CLARIFICATION","method":"printed heading","endPage":5,"endAt":1193,"startToken":1554,"endToken":1560},{"p":5,"at":1193,"title":"A. Statement of Issues and Specification of Errors","method":"printed heading","endPage":7,"endAt":928,"startToken":1560,"endToken":2449},{"p":7,"at":928,"title":"B. Arguments","method":"printed heading","endPage":22,"endAt":4,"startToken":2449,"endToken":6969},{"p":22,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":23,"endAt":0,"startToken":6969,"endToken":7037},{"p":23,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":23,"endAt":474,"startToken":7037,"endToken":7116}]}