{"document":{"slug":"rec-20260721-5216","title":"Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-21","accession":"20260721-5216","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Ohio Federal Energy Advocate","kind":"comments","file":"sources/filings/text/20260721-5216_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260721-5216","tier":"record","sha256":"53296796b605daf31a959601a3346081f90bccdbebd31a0f72086b61da9173c8","pages":8,"tokens":2068,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":228,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n  \nPJM Governance and Stakeholder Reforms                )                          Docket No. AD26-7-000 \n                       \n \n \n \n \nCOMMENTS OF THE PUBLIC UTILITIES COMMISSION OF OHIO’S \nOFFICE OF THE FEDERAL ENERGY ADVOCATE \n \nOn May 12, 2026, the Federal Energy Regulatory Commission (Commission or FERC) \nannounced a Commission-led technical conference in this proceeding to be held on July 23, \n2026. The purpose of the technical conference is to discuss PJM Interconnection, L.L.C.’s (PJM) \ngovernance and stakeholder process, with a focus on identifying and evaluating actionable \nreforms to improve PJM’s ability to address system needs in a timely and efficient manner. The \nPublic Utilities Commission of Ohio’s Office of the Federal Energy Advocate (Ohio FEA), \nfulfilling its statutory duty to advocate on behalf of Ohio’s retail electricity consumers,1 offers \nthe following comments for the Commission’s consideration. \nI. \nIntroduction \nFERC’s consideration of PJM governance at this critical time for our region is important. \nIt is undisputed that the current energy landscape in PJM is driven by historic demand, primarily \nfrom data centers. That historic demand, combined with tightening supply from resource \nretirements, stalled new generation projects, and significant uncertainty over future \nsupply/demand conditions, is the central issue facing the region. The heightened scrutiny of \nPJM’s governance is a byproduct of that energy landscape. A robust governance structure, that is \n \n1 Ohio Revised Code 4928.24."},{"page":2,"startToken":228,"endToken":554,"text":"2 \ntransparent and accountable, will be vital as PJM, its Members, and the states collaboratively \nwork together to move the region from where we are today to where we need to be tomorrow. \nAs a restructured state and the largest load in PJM, Ohio seeks to be a constructive \npartner in working with the Commission and PJM to find solutions that address the energy \ndemands of the region. Ohio relies on PJM to ensure resource adequacy and reliability at least \ncost. While restructured states have a role in the partnership and are responsible for protecting \nretail customers, PJM’s competitive markets must deliver the generation resources necessary to \nmeet load across the region. Ohio is doing its part to facilitate a competitive environment for \nproject developers to build new generation resources here.  \nIn 2024, Governor DeWine identified the need for more dispatchable generation to be \nstudied and connected by PJM quickly. Ohio supported both PJM’s Reliability Resource \nInitiative and subsequent Expedited Interconnection Track to enable PJM to respond quickly to \nshovel-ready projects. In 2025, the Ohio General Assembly passed Substitute House Bill 15, \nsetting a pathway for new generation in Ohio. This bill shortens generation siting processes, \noffers tax incentives for new generation equipment, and expands opportunities for behind-the-\nmeter generation, which serves as an important tool for data centers to begin operations without \nimpacting the regional grid. Governor DeWine also announced the creation of the Energy \nOpportunity Initiative, a $100 million fund to provide grants and low-interest loans over a five-\nyear period to help offset costs related to natural gas and nuclear power production in Ohio. \nOhio has already seen positive impacts. We are encouraged and excited by energy project \ndevelopment across Ohio that will benefit the region. Since January 2025, more than 17,000 MW \nof natural gas projects have been announced, filed applications, or were approved at the Ohio \nPower Siting Board. Nuclear is also playing an increasingly important role in meeting growing"},{"page":3,"startToken":554,"endToken":827,"text":"3 \ndemand, with three projects announced in Ohio totaling more than 3,500 MW. Ohio will \ncontinue to support efforts to bring new resources online to serve new loads and ensure grid \nreliability.  \nIn January, Governor DeWine joined the National Energy Dominance Council and the \nother PJM governors in signing a “Statement of Principles Regarding PJM,” which provides a \nframework for achieving our shared goal of reliable and affordable energy, including providing \nrevenue certainty to new generation and allocating costs to data centers. The Statement of \nPrinciples is indicative of the type of joint and collaborative engagement Ohio is prepared to \nprovide to ensure three things: 1) the success of PJM’s competitive markets; 2) affordability, as \nwe grow the grid responsibly and protect other ratepayers from costs associated with data \ncenters; and 3) grid reliability. Each of these are regional concerns that require regional dialogue \nlike never before.  \nII. \nComments \nA. \nPJM Board and Filing Rights  \nNotwithstanding the significant challenges currently facing the region, the Ohio FEA \nacknowledges the consistent effort of the PJM staff to maintain open communication with the \nstates as well as other stakeholders. Additionally, the relatively recent formation of PJM’s State \nPolicy Solutions group meaningfully increased regular dialogue between PJM staff and state \ncommission staff as well as other stakeholders. In any conversation on PJM’s going forward \norganizational structure, the vital expertise of PJM staff on the highly complex and technical \nmatters related to the electric grid must be maintained.  \nThe Ohio FEA encourages the Commission to take a pragmatic view on the role of the \nPJM Board. Like other corporations, the PJM Board should set the organizational direction,"},{"page":4,"startToken":827,"endToken":1143,"text":"4 \nserve as a check on upper management, act in the best interest of its members and the public, and \nbe responsive to external constituents.  \nThe Ohio FEA strongly supports the ability of the PJM Board to act independently when \nnecessary and encourages the Commission to position the PJM Board similarly to other \nRTO/ISOs across the country in this regard. Specifically, as other commenters in this docket \nhave highlighted, the PJM Board does not have authority to act on every governing document \nrelated to the grid enterprise it administers. For example, the PJM Board could act on matters \nrelated to the capacity market because the capacity market rules are contained in sections of \nPJM’s Tariff and Reliability Assurance Agreement where filing rights under section 205 of the \nFederal Power Act (FPA) are held by PJM. Conversely, other components of PJM governance \nsuch as the energy and ancillary services markets, emergency procedures, and regional \ntransmission planning are contained in PJM’s Operating Agreement (OA) where filing rights \nunder section 205 of the FPA are held by the PJM Members. As a result, the PJM Board cannot \nact independently to change components of the OA without a threshold of 2/3 support from the \nPJM Members.  \nThis limitation on the independence of the PJM Board must be remedied. It greatly \nhampers the ability of the Board to act on substantial portions of PJM’s governing documents, \nincluding areas of concern to Ohio like the scope of PJM’s regional transmission plan. With \nvirtually every aspect of transmission in the region, including local projects, controlled solely by \nthe transmission owners, there is no way for the PJM Board, or the states, to have any \nmeaningful input. For example, the 2025 Regional Transmission Expansion Plan approved \napproximately $1.04 billion in supplemental projects in Ohio that are not required for reliability, \neconomic efficiency, or operational performance. These projects receive limited review, with"},{"page":5,"startToken":1143,"endToken":1458,"text":"5 \nPJM’s study focused only on ensuring that there will be no adverse impact to the grid, rather than \nconsidering factors such as the cost or need for the project. This is unacceptable and we would \nask that PJM be directed to address this issue, in collaboration with the states and transmission \nowners.  \nConstraints on the PJM Board are magnified by the difficulty the PJM Members have in \nfinding consensus on certain issues. Currently, if the PJM Members do not reach supermajority \nsupport on changes to the OA, no changes are proposed to the Commission. The PJM Board \nshould have the authority to independently and unilaterally propose changes to the OA under \nsection 205 of the FPA.  \nFurther, the Ohio FEA agrees that the states should have an expanded role in PJM \ngovernance and an ability to bring proposed solutions before the Commission, whether through \n“jump ball” rights like ISO New England or other means. As the need for difficult policy \ndecisions across the region increases, it is incumbent on the states to collaborate with PJM and \nbring state resources and engagement to bear in tackling the road ahead. Giving states an avenue \nto advance proposals to the Commission without compromising PJM’s authority to do so could \nbe beneficial in driving the PJM stakeholder process to timely and durable solutions to the \ncritical matters at hand. The Ohio FEA views state filing authority on resource adequacy and cost \nallocation as a tool to be applied in limited circumstances and emphasizes its opinion that the \nOrganization of PJM States, Inc. (OPSI), as the states’ technical experts, act upon such authority \nonly when strong support of its member states is achieved. As an alternative approach, the Ohio \nFEA also agrees with Pat Wood’s recommendation that PJM consult with OPSI before it submits \na section 205 filing and that the filing include OPSI’s vote and load weighted positions."},{"page":6,"startToken":1458,"endToken":1765,"text":"6 \nB. \nPJM Stakeholder Process  \nJust as a robust governance structure is important to meet the moment, so too is a \ntransparent and collaborative stakeholder process. However, something is not working if PJM’s \nstakeholder process is not reaching consensus or able to determine a course of action on pressing \nissues in a timely manner. The current process suffers under its own weight with many private \ninterests involved and no timeframe or deadline for action. The Ohio FEA agrees that efforts to \nstreamline PJM’s stakeholder process in reasonable ways, such as by establishing timeframes or \ndeadlines for action could, if combined with PJM Board and state filing rights, assist \nstakeholders in more readily moving solution packages to the Board for consideration. We also \nagree with Pat Wood’s recommendation that the Commission should consider whether to \ntransition to an advisory role for PJM Members. Although the Members provide valuable input \nin the stakeholder process, the PJM Board should be able to render independent decisions on the \nmatters before it, as is the case in other RTO/ISOs. \nC. \nAdditional State Input \nSeparately, the Ohio FEA supports and stands ready to work with the newly formed \nGovernors’ Collaborative. There is no question that the states in the PJM region are diverse, and \nthe challenge of regional decision making will not go away. It is our hope that the Governors’ \nCollaborative, as collective representatives of the diverse PJM region, will limit individual state \npolitical and policy preferences from entering the energy equation, which will improve the noted \nchallenges with PJM’s stakeholder process and enhance the future of regional coordination and \nwell-functioning markets. The Ohio FEA views a critical opportunity in the creation of the \nGovernors’ Collaborative: to facilitate regional dialogue and consensus-building, which, in turn, \nshould facilitate PJM’s ability to return to its core mission of providing reliability at least cost."},{"page":7,"startToken":1765,"endToken":1975,"text":"7 \nThe Ohio FEA feels strongly that any formal actions of the Governors’ Collaborative should, at a \nminimum, represent the diverse political and energy characteristics of the PJM states. In addition \nto the formal recognition of the Governors’ Collaborative, the organization should be vested with \nthe authority to bring issue charges and problem statements to the PJM Board, to provide state \nperspectives directly to the Board when Member consensus cannot be reached, and to appoint \nthree members to the PJM Board Nominating Committee.  \nIII. \nConclusion \nThe Ohio FEA appreciates the Commission’s leadership and the ability to offer \ncomments on the important topic of PJM governance and stakeholder reform. Ohio depends on a \nstrong partnership with PJM, and on its competitive markets to deliver abundant, affordable, and \nreliable energy supplies. Ohio is ready to collaborate with FERC, PJM, and our fellow states to \nachieve these goals. \nRespectfully submitted,  \nD. Andrew Wilson \nOhio Attorney General  \n \nJohn H. Jones  \nSection Chief \n \n \n \n \n \n \n/s/ Thomas G. Lindgren  \nThomas G. Lindgren  \nAssistant Attorney General  \nPublic Utilities Section  \n30 East Broad Street, 16th Floor  \nColumbus, Ohio 43215-3414  \n614.644.8768 (telephone)  \n866.818.6152 (facsimile)  \nThomas.Lindgren@OhioAGO.gov  \n \nOn Behalf of the Public Utilities  \nCommission of Ohio’s Office of the  \nFederal Energy Advocate  \nJuly 21, 2026"},{"page":8,"startToken":1975,"endToken":2068,"text":"8 \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have on this date caused a copy of the foregoing document to be \nserved on each person included on the official service list maintained for this proceeding by the \nCommission’s Secretary, by electronic mail or such other means as a party may have requested, \nin accordance with Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § \n385.2010.  Dated this the 21st day of July 2026, at Columbus, Ohio. \n \n/s/ Thomas G. Lindgren  \nThomas G. Lindgren  \nAssistant Attorney General"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1021,"startToken":0,"endToken":139},{"p":1,"at":1021,"title":"I. Introduction","method":"printed heading","endPage":3,"endAt":969,"startToken":139,"endToken":702},{"p":3,"at":969,"title":"II. Comments","method":"printed heading","endPage":3,"endAt":984,"startToken":702,"endToken":704},{"p":3,"at":984,"title":"A. PJM Board and Filing Rights","method":"printed heading","endPage":6,"endAt":3,"startToken":704,"endToken":1459},{"p":6,"at":3,"title":"B. PJM Stakeholder Process","method":"printed heading","endPage":6,"endAt":1111,"startToken":1459,"endToken":1633},{"p":6,"at":1111,"title":"C. Additional State Input","method":"printed heading","endPage":7,"endAt":543,"startToken":1633,"endToken":1848},{"p":7,"at":543,"title":"III. Conclusion","method":"printed heading","endPage":7,"endAt":976,"startToken":1848,"endToken":1912},{"p":7,"at":976,"title":"D. Andrew Wilson","method":"printed heading","endPage":8,"endAt":3,"startToken":1912,"endToken":1976},{"p":8,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":8,"endAt":550,"startToken":1976,"endToken":2068}]}