{"document":{"slug":"rec-20260722-5054","title":"Pre-Technical Conferences Comments of ENGIE North America Inc. re the PJM Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5054","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"ENGIE North America Inc.","kind":"comments","file":"sources/filings/text/20260722-5054_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5054","tier":"record","sha256":"c29994b50b748f745962cee240e4ba21d4d9a6744d2e9b61796020932e60b6c2","pages":10,"tokens":2444,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":298,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \nPJM Governance and Stakeholder Reforms   ) \n \n \nDocket No. AD26-7-000 \n   \n \n) \n \n \n  \n \nPRE-TECHNICAL CONFERENCES COMMENTS OF  \nENGIE NORTH AMERICA, INC.  \n \n(July 22, 2026) \n \nENGIE North America, Inc.1 (“ENGIE”) commends the Federal Energy Regulatory \nCommission’s (“FERC”) leadership for convening this technical conference to explore the \nfundamental issues and key policy considerations necessary to ensure the long-term success of \nthe PJM Interconnection (“PJM”). We respectfully submit these comments and look forward to \nfollowing the discussion on July 23 and to future engagement with the Commission and \nstakeholders.  \nENGIE encourages reforms that strengthen confidence in PJM’s governance and stakeholder \nprocesses while preserving the critical role that PJM’s competitive wholesale markets play in \nmaintaining reliability, supporting investment, and promoting affordability across the region.  \nMore specifically, we propose reforms that: \n• Reaffirm the criticality of the PJM wholesale markets to regional reliability, economic \ninvestment and affordability in the PJM footprint; \n \n• Refocus the PJM Board role on governance;  \n \n• Allow for a framework for state executive-level electricity policy discussions outside of \nthe PJM stakeholder process, such as the New England States Committee on Electricity \n(“NESCOE”), to enhance states’ interactions with PJM, Board and stakeholders; and  \n \n1 ENGIE North America (“ENGIE”) is a subsidiary of ENGIE SA, a global energy company and one of the world’s largest \nproducers of energy.  With roots that trace back 180 years, we own and operate 110 GW of power generation, including 46 GW \nof natural gas generation, 6 GW of nuclear generation, and 57 GW of renewable generation – with 11 GW in North America. \nENGIE operates the largest natural gas distribution network in Europe, owns 2,485 miles of transmission lines, is a global leading \nenergy supplier to commercial and industrial customers, and is a significant supplier of U.S. produced LNG to Europe."},{"page":2,"startToken":298,"endToken":543,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 2 \n \n2 \n \n \n• Accelerate the stakeholder decision-making process and enhance meaningful stakeholder \ninput through both procedural and substantive changes.  \n \nI. \nCOMMENTS \n \na. PJM markets are critical to regional reliability, economic investment, and \naffordability in the PJM footprint. \n \nPJM has brought significant value to customers in the region during its 30 years as a \nregional transmission organization (“RTO”), including improved reliability, lower system costs, \nmore efficient transmission planning, and improved investor certainty.  \nConsequently, the prospect of PJM’s disaggregation is counterproductive. If ‘speed to \npower’ is the principal regional and national priority, then disassembling PJM in favor of a yet –\nto-be determined framework through an undefined transition design and timeline will not satisfy \nthat objective. The foundation of PJM is sound, but some reforms may be needed to regain \nstakeholder confidence and ensure market competitiveness, while providing consumers with \naffordable energy. \nb. Proposed Reforms on Governance \n \n1. The PJM Board should focus on governance. \n \nStakeholders advise; PJM manages; and the Board governs. These principles of an \nindependent board include objective oversight, uncompromised integrity, and the protection of \nlong-term stakeholder value. ENGIE supports a Board independent from outside and special \ninterests, and that is responsive and willing to engage with regional stakeholders on topics of \nstrategic importance.  \nThe PJM Board should focus on the traditional and essential matters of governance: \nproviding strategic oversight, ensuring accountability, managing risk, and promoting PJM’s \nlong-term success. The Board should not be excessively involved in the tactical stakeholder"},{"page":3,"startToken":543,"endToken":824,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 3 \n \n3 \n \nprocess. It is an inefficient use of time and resources for the Board to participate directly in \nstakeholder decision-making exercises, such as evaluating a matrix of many complex and \ncompeting choices. The Board should instead be advised of and consulted on major reforms so \nthat Board members are appropriately informed, remain accountable and, in turn, can hold the \nPJM organization responsible for implementation of market design and other changes.  \nBecause implementing this change will necessarily require both increased interaction \nbetween PJM leadership and the Board and decreased direct Board interaction with stakeholders,   \nin the inevitable transition period, it is important that regional stakeholders are reassured that the \nBoard will continue to keep stakeholder interests in mind in the long term. PJM stakeholders \nshould have regular, formal and informal opportunities to meet with the Board to discuss items \nof interest. For example, market participants in New England meet with the ISO-NE Board twice \na year in meetings with their New England Power Pool (“NEPOOL”) sectors. The Board also \nengages through other regional opportunities such as with the ISO-NE Consumer Liaison Group \nand the New England Conference of Public Utilities Commissioners and are generally responsive \nto individual market participant outreach.  \nRefocusing the PJM Board on strategic governance matters will affect the role of senior \nleadership, which will be required to take a more singular role in managing stakeholder relations \nand making final decisions on market reforms. With PJM leadership taking on a more decisive \nrole in final decision-making PJM leadership must be increasingly available to stakeholders both \nwithin and outside of the stakeholder process to demonstrate their understanding and \ncommitment to stakeholder requests and inquiries."},{"page":4,"startToken":824,"endToken":1074,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 4 \n \n4 \n \n2. Improve states’ ability to engage with PJM and stakeholders \nthrough an independent framework for executive-level electricity \npolicy discussions.  \n \nENGIE supports a robust, collaborative, and communicative relationship between the \nPJM member states, the PJM Board and PJM leadership and market participants. States are \nimportant customers and policymakers, and their decisions can have significant consequences on \nthe wholesale markets. We offer some observations based on our experience in PJM and other \nregions.  \nGenerally, in regions where there are mediating institutions outside of the RTO/ISO \nstakeholder process that facilitate state collaboration on electricity issues states have an enhanced \nopportunity to communicate and collaborate before engaging with the ISO/RTO and market \nparticipants. States can discuss differences, identify areas of common interest, and where \npossible develop consensus positions before engaging with ISO/RTO leadership, the Board, and \nstakeholders.  \nWhile the Organization of PJM States (“OPSI”) provides one arena for states to \ncommunicate concerns, ENGIE recommends further developing a consensus-driven framework \nfor executive level state engagement outside of the PJM stakeholder process. States should \nconsider forming a new organization that represents the PJM governors on electricity issues to \nfacilitate state executive level collaboration. The template we have in mind is NESCOE, who \nrepresents the collective perspective of the six New England governors on regional electricity \nmatters. NESCOE is effective in the NEPOOL stakeholder process, and with ISO-NE and the \nISO-NE Board and works in collaboration with the New England Conference of Public Utilities \nCommissioners (“NECPUC”)."},{"page":5,"startToken":1074,"endToken":1359,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 5 \n \n5 \n \nSuch an organization would be instrumental in facilitating collaborative discussions \nbetween the states and PJM leadership and the PJM Board. It could allow PJM leadership to \nengage regularly with the governors and their representatives on major market reforms, increase \nengagement on reliability assessments and planning assumptions, allow formal opportunities for \nstate input before major tariff filings, and convene regular meetings with the PJM Board. The \nPJM Board should, likewise, consider assigning individual Board members to interact with states \nto increase communication between the Board and the states, as is done in New England.  \nInstituting an independent framework for better organizing and representing governors in \nthe PJM footprint, even when they disagree over policy, will permit the governors to better \nrepresent their views before the PJM Board, PJM leadership and with market participants. \nFurther, increased early collaboration amongst governors and PJM leadership and the Board \nshould help to streamline the governors’ role in the stakeholder process and reduce friction.  In \nturn, this would help streamline the overall PJM decision-making process.  \nc. Proposed Stakeholder Process Reforms \n \nENGIE believes that the existing stakeholder process has served PJM well for many \nyears by promoting broad stakeholder participation and some level of transparency. The primary \nchallenge today is ensuring the process can reach timely decisions. While some practices were \nintended to address critical issues quickly, the pace, scale, and uncertainty of load growth in the \nregion today has thwarted those practices and they may now prolong deliberation and delay the \nresolution of critical market design issues.  \nConsequently, a swift, thorough and inclusive stakeholder process in PJM is more critical \nthan ever. Durable solutions to the region’s resource adequacy challenges will require enhanced"},{"page":6,"startToken":1359,"endToken":1631,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 6 \n \n6 \n \ncollaboration, open dialogue, and a shared understanding among PJM, market participants, and \nthe states.  \nNone of our proposed changes should be construed to undermine the importance of \nmarket participants to the PJM markets and stakeholder process.  Market participants’ \ncommercial and operational experience is critical to adequately evaluate proposed market design \nreforms. Without the benefit of market participant experience, PJM reforms risk being practically \nor commercially infeasible or having adverse unintended consequences.  \nStates are also critical stakeholders and should have a voice in the stakeholder process. \nHowever, PJM’s markets must remain operationally independent and regionally focused. State \npolicies affect the resource mix, transmission development, electrification, and load growth, and \ntherefore should be communicated and considered during market design efforts. Building a voice \nfor the states includes more meaningful and earlier opportunities to shape discussions, \nparticularly where state policies affect resource development. \nFinally, ENGIE believes PJM staff have done a masterful job of facilitating collaboration \nand identifying differences across the diverse stakeholder interests. What ENGIE recommends \nfor faster decision-making is a mandate from FERC, the Board, and stakeholders to allow PJM \nsenior leadership to act more decisively in proposing final decisions on market reforms. \ni. \nAccelerate stakeholder decision-making through greater discipline and focus \nduring the stakeholder process. \n \nThe stakeholder process can be accelerated through greater discipline and focus at every \nlevel of the governance structure. As issues move from working groups to subcommittees, \ncommittees, and ultimately the Board, participants are often required to revisit the same \ndiscussions, presentations, and questions multiple times. While stakeholder engagement is \nessential, excessive repetition can slow decision-making, consume significant resources, and"},{"page":7,"startToken":1631,"endToken":1916,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 7 \n \n7 \n \ndelay outcomes on matters that are increasingly urgent for the region. A more disciplined \napproach should ensure that each level of the stakeholder process builds upon prior work rather \nthan revisiting issues that have already been evaluated.  \nPJM should also adopt stronger meeting management practices to ensure discussions \nremain productive and focused. Effective facilitation, coupled with active time management \nduring presentations and Q&A, can help curb repetitive or off-topic comments and keep \nproceedings moving forward. Implementing clear time limits for presentations, questions, and \nstakeholder comments would encourage concise, substantive participation while ensuring all \nperspectives are heard. These measures would improve the efficiency of the stakeholder process \nwithout diminishing transparency or inclusiveness. \nii. \nAccelerate stakeholder consideration of PJM proposals through greater \ntransparency in analytical assumptions and decision rationale.  \n \nData.  Data.  Data.  ENGIE believes that a core responsibility of an ISO/RTO is to \nprovide data, analysis methodology, and assumptions to market participants so they can reach \ntheir own conclusions and make commercial decisions accordingly. In general, surprises lead to \nconfusion, consternation at times, and detract from efficient and timely discovery and resolution \nof needed market reforms.  \nGreater transparency in both analytical assumptions made by PJM in its proposals as well \nas in its decision rationale when choosing to move forward with proposals would significantly \nimprove stakeholder understanding of the proposals and at the same time build credibility and \ngarner trust. Earlier publication of modeling inputs, more detailed documentation of sensitivity \nanalyses, better visibility into reliability and market benefit calculations, and discussion and \ndocumentation of tradeoffs considered by PJM staff and explanations of why PJM supports or \nopposes stakeholder proposals are essential to an improved stakeholder process. Stakeholders"},{"page":8,"startToken":1916,"endToken":2218,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 8 \n \n8 \n \nmay disagree on outcomes, but confidence increases when everyone understands the data, \nassumptions, and rational underlying a decision.  \nENGIE is particularly concerned with the lack of information and rigor in the stakeholder \nprocess when designing new market products. At times market participants have been assured \nthat new market products will not significantly alter market pricing but the products have instead \nled to significant price volatility. More upfront information and increased transparency in \nanalysis would improve market participants’ awareness and permit them to hedge risks \nappropriately.   \nGenerally, process reforms should focus on ensuring robust stakeholder input, improving \ntransparency of PJM proposals and transparency into decision-making rationale, combined with \nthe ability to make timely decisions that support reliability and efficient investment. We \nrecommend the Commission consider the following reforms to PJM’s stakeholder process: \n• Replace affiliate voting at lower levels with a ‘one company, one vote’ structure \nso that no one stakeholder has an outsized influence on the vote outcome; \n \n• Publish votes of all committees to promote transparency and accountability in \nstakeholder voting;  \n \n• Increase transparency of PJM proposals specifically in analytical assumptions \nwhich would improve stakeholder understanding of PJM proposals and increase \ncredibility and trust. PJM should focus on earlier publication of modeling inputs, \nmore detailed documentation of sensitivity analyses, and better visibility into \nreliability and market benefit calculations.  \n \n• Increase transparency in PJM staff and PJM leadership decision rationale through \nmore in-depth discussions and documentation of tradeoffs considered by PJM \nstaff and explanations of why PJM supports or opposes stakeholder proposals, \nespecially when PJM leadership selects one avenue when stakeholder views are \ndivided.  \n \n• Encourage the states to create a framework for governors to collaborate \nmeaningfully in the stakeholder process through an outside organization, such as \nNESCOE. PJM should engage regularly with the governors and focus on early"},{"page":9,"startToken":2218,"endToken":2372,"text":"ENGIE Comments  \nDocket No. AD26-07-000 \nPage 9 \n \n9 \n \nconsultation, education and opportunities to review significant rule amendments \nand/or other major undertakings. \n \nA thoughtfully reformed stakeholder process that incorporates these changes would build \non many of PJM’s strengths and improve decision-making efficiency, strengthen stakeholder \nconfidence, and enhance PJM’s ability to address pressing challenges while preserving \nmeaningful opportunities for stakeholder engagement and consensus-building.  \nII. \nCONCLUSION \nENGIE respectfully requests that the Commission consider these recommendations as it \nevaluates opportunities to strengthen PJM’s governance and stakeholder processes. The proposed \nreforms would improve decision-making, enhance transparency and accountability, restore \nstakeholder confidence, and better position PJM to address the reliability, affordability, and \ninvestment challenges facing the region without requiring disruptive structural changes to the \nexisting PJM markets. \n \nRespectfully submitted, \n \n \n/s/ Sarah Bresolin Silver \n \nSarah Bresolin Silver \nVice President  \nJeffrey Levine \nVice President \nGovernment and Regulatory Affairs \n1360 Post Oak Blvd.  \nHouston, TX 77056 \n(617) 717-4535 \nsarah.bresolin@engie.com"},{"page":10,"startToken":2372,"endToken":2444,"text":"CERTIFICATE OF SERVICE \n \n \nThe undersigned certifies that a copy of this pleading has been served this day upon each \nperson designated on the official service list compiled by the Secretary in this proceeding. \n \nDated at Boston, MA this 22nd day of July, 2026. \n \n \n \n \n \n \n \n \n \n \n \n/s/ Sarah Bresolin Silver \nSarah Bresolin Silver \nVice President  \nGovernment & Regulatory Affairs \nENGIE North America, Inc.  \n1360 Post Oak Blvd.  \nHouston, TX 77056 \n(617) 717-4535 \nsarah.bresolin@gmail.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":206,"startToken":0,"endToken":322},{"p":2,"at":206,"title":"I. COMMENTS","method":"printed heading","endPage":9,"endAt":518,"startToken":322,"endToken":2280},{"p":9,"at":518,"title":"II. CONCLUSION","method":"printed heading","endPage":10,"endAt":0,"startToken":2280,"endToken":2372},{"p":10,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":496,"startToken":2372,"endToken":2444}]}
