{"document":{"slug":"rec-20260722-5113","title":"Comments of the PJM Cities and Communities Coalition re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-22","accession":"20260722-5113","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Cities and Communities Coalition","kind":"comments","file":"sources/filings/text/20260722-5113_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5113","tier":"record","sha256":"10146b11ede3c77e5600c14fa6725007415d467a1ddd026b0f3ab96f76aad2a7","pages":19,"tokens":6564,"emptyPages":[19],"textThemes":["adequacy","study"]},"pages":[{"page":1,"startToken":0,"endToken":353,"text":"UNITED STATES OF AMERICA ​\nBEFORE THE ​\nFEDERAL ENERGY REGULATORY COMMISSION  \nCommission-Led Technical Conference on PJM Governance and Stakeholder Reforms​\nDocket No.  AD26-7-000 \nCOMMENTS OF THE PJM CITIES AND COMMUNITIES COALITION \nThe PJM Cities and Communities Coalition respectfully submits these written \ncomments in connection with the Commission-led technical conference on PJM \nGovernance and Stakeholder Reforms in Docket No. AD26-7-000.  We applaud the \nCommission’s focus on governance issues within PJM, and we hope to aid the \nCommission’s investigation into these matters via the comments below.  \nAbout PJMCCC \nThe PJM Cities and Communities Coalition (PJMCCC) is a group of 21 local \ngovernments representing ~15% of the population within PJM's territory. Our members \nare energy managers and sustainability staff of large municipal end-users. \nAs local governments, PJMCCC members are both large end-use consumers of \nenergy and public-sector entities responsible for the health and well-being of our \ncommunities. This dual role places us in a unique position: we are affected by the \nimpacts of PJM’s energy market decisions on our bills while being directly accountable \nto our approximately ten million residents who depend on reliable and affordable \nelectricity. Furthermore, local government policy goals depend in part on consideration \nin PJM’s planning and decision-making so that the technologies and strategies needed \nto meet our mandates and goals are appropriately valued by markets.   \nPJMCCC’s interests are unique and are not fully represented by any other \nstakeholder group, making our coalition a valuable partner in planning for PJM. For \nexample, we are currently collaborating with PJM’s State Policy Solutions team to \nshape the development of the local policy portal to support PJM’s compliance with \nFERC Order 1920. We have been helping inform the policy fields to be used for \naggregating local government policies, goals, siting opportunities, and siting restrictions. \nAdditionally, we submitted local building and vehicle electrification objectives to PJM’s \nLoad Analysis Subcommittee that were used in the 2024 load forecast. \nPJM is at a critical juncture, and decisions made now will be felt for decades to \ncome. We strongly believe that local government policies and perspectives are crucial \nfor ensuring that the future energy system is reliable, affordable, and sustainable."},{"page":2,"startToken":353,"endToken":721,"text":"PJMCCC members’ experience with PJM \n \nPJMCCC’s members’ experience attempting to interface with the PJM board via \nPJM staff has been, at best, a struggle.  While PJMCCC members have had an \noccasional successful encounter with PJM staff, these seem to be driven mostly by \nregulatory requirements rather than genuine efforts to facilitate constructive dialogue.  \nPJMCCC did have a successful on-site meeting with PJM staff in 2023, but since then \nPJM staff has shown limited receptivity to outreach from PJMCCC.   \nPJM staff have been difficult to get hold of when requesting tours at PJM \nheadquarters in Pennsylvania, for example.  Routine difficulties getting hold of PJM \ncustomer service presented themselves. Once we did get in contact with staff over the \nphone, they mentioned that the email information on PJM’s website was inaccurate.  \nWhere PJM staff have opted to engage with PJMCCC members, it has primarily \nbeen where they are required to do so – for example, to facilitate PJM’s compliance with \nOrder No. 1920.  PJM staff have contacted PJMCCC sporadically with asks for \nengagement and assistance on Order No. 1920 implementation.  One PJMCCC \nmember aptly characterized the relationship to PJM as “don’t call us, we’ll call you.” \nThe realm of the possible: FERC authority, State authority, and \nPJM politics \nPJMCCC is excited to see FERC take proactive steps toward exercising its \nauthority over RTO/ISO governance, particularly with respect to PJM. While FERC has \nlong held authority over RTO/ISO governance, many issues with RTO/ISO governance \nhave persisted without FERC action.1  The time for FERC to use its authority to address \npervasive issues in RTO/ISO governance, particularly within PJM, is nigh. \n \nFERC established minimum “independence” standards for RTO governance in \nOrder No. 20002 and Order No. 719.3  As Travis Kavulla writes, “Independence” has \nbeen defined by FERC as having an ultimate decision-making body within an RTO that \n3 Federal Energy Regulatory Commission; “Wholesale Competition in Regions with Organized Electric \nMarkets;” (October 17, 2008) Docket Nos. RM07-19-000, AD07-7-000. \n2 Federal Energy Regulatory Commission; “Order No. 2000: Regional Transmission Organizations;” \n(December 20, 1999) Docket No. RM99-2-000.  \n1 Kavulla, T.; “Problems in Electricity Market Governance: An Assessment;” R Street Policy Study No. \n180; August 2019; \nhttps://www.rstreet.org/research/problems-in-electricity-market-governance-an-assessment/"},{"page":3,"startToken":721,"endToken":1171,"text":"is not beholden to “market participants.”4  A major test of FERC’s assertion of the \nauthorities it has via its independence criterion came when FERC attempted to find \nCAISO’s board selection process to be insufficient for meeting FERC’s independence \ncriterion. FERC’s main premise for this was that California law required the governor of \nCalifornia to approve candidates for the CAISO board and that the state of California \nwas also a major participant in CAISO markets.   \n \nHowever, the DC Circuit for the Court of Appeals rejected FERC’s attack on \nCAISO’s board selection process, writing that FERC had no authority to prescribe how a \nCAISO selects its board.5  While the DC Circuit preserved FERC’s authority over \ngovernance - noting that FERC could legitimately revoke an RTOs’ certification as an \nRTO on governance independence grounds - the DC Circuit found that FERC had \noverreached with regards to CAISO.  The DC Circuit noted that FERC’s arguments had \nno limiting principle, meaning these arguments could imply that FERC has authority \nover matters as minute as how CAISO procures office furniture.  While the DC Circuit \nleft the door open for FERC to pursue further governance actions in CAISO, FERC \ndeclined to do so. \n \nDespite CAISO v FERC, FERC has used its rates authority to assert authority \nover governance.  FERC used its rates authority to reject revisions to ISO-NE’s \ngovernance, specifically ISO-NE’s membership rules in the stakeholder process, stating \nthat “stakeholder processes are a practice affecting rates.”6   FERC’s order on this was \nunchallenged.   \n \n​\nThat FERC’s authority over governance has been left unchallenged is a good \nthing, given the plethora of governance problems pervasive in PJM and the current \nmarket crisis that has resulted.  PJM’s governance structure itself has multiple problems \nthat compromise its ability to meet FERC’s independence standards for RTOs.  A key \nissue with PJM is that its board is not truly independent from its members, who are also \nmarket participants.  PJM’s board is selected by its members, which limits the \nindependence of the board from the outset.  Further, even if the PJM board tries to be \nindependent, PJM members have so much influence that they can stifle action from the \nPJM board.  PJM members can effectively nullify any independent action that the board \n6 Order Rejecting Revisions, New England Power Pool Participants Committee, Docket No. \nER18-2208-001, Jan. 29, 2019, p. 19. https://elibrary.ferc.gov/idmws/file_list.asp?document_id=14740301 \n5 California Independent System Operator v. Federal Energy Regulatory Commission, 372 F.3d 395, 403 \n(D.C. Cir. June 22, 2004); https://caselaw.findlaw.com/court/us-dc-circuit/1344700.html \n4  Kavulla, T.; “Problems in Electricity Market Governance: An Assessment;” R Street Policy Study No. \n180; August 2019; \nhttps://www.rstreet.org/research/problems-in-electricity-market-governance-an-assessment/"},{"page":4,"startToken":1171,"endToken":1586,"text":"tries to take through the voting process and through the stakeholder issue \nagenda-setting process.  This is a serious problem for the PJM board, to the extent that \nthe PJM board can’t arguably be said to control what happens in PJM.  \n \nA further governance challenge is that PJM’s stakeholder process has become \ncompromised as well.  As law professor Shelly Welton explains, the congressional \nrepeal of the Public Utility Holding Companies Act (PUHCA) has allowed for swaths of \nmergers within the utility industry.7 This has resulted in merging together entities that \nonce represented different sides of a transaction - creating problems for the balances of \ninterests that RTO governance might intend to create.  When a “load” stakeholder is \nowned by the same entity as a “generation” stakeholder, neither is truly representative \nof its interests in an RTO stakeholder process. As professor Welton writes, these \nmergers “...create challenges by concentrating economic and political power in a small \nnumber of companies—not least for theories of RTO governance, which rely upon \ninternal industry checks to legitimate RTO decision-making.  These internal checks \npresume opposing interests that do not exist because holding companies have \nconsolidated across demand- and supply-side affiliates.”8  Professor Welton’s \ncross-RTO assessment of this issue holds true for PJM.  \n \nAs such, FERC’s authority over governance can be usefully deployed at this \ncritical moment to resolve serious issues in PJM - and FERC should feel empowered to \ndo so.  While there might be potential naysayers regarding FERC action toward PJM \ngovernance, FERC’s clear authority and rebuttals to these naysayers is neatly \nsummarized in the following paragraph from law professor Ari Peskoe:  \n \n“Should FERC impose governance reforms, opponents would likely argue that \nRTO governance is too ‘remote’ to directly affect rates, and that the [Supreme \nCourt] did not hold that FERC’s authority extends beyond ‘rate structures.’ FERC \ncould respond that the CAISO panel held only that FERC ‘does not have the \nauthority to reform and regulate the governing body of a public utility.’ This \nholding is strictly limited to the facts of that case and does not limit FERC’s \njurisdiction over governance matters that directly affect rates. FERC can also \npoint to its orders about unduly discriminatory regional IOU alliances, as \n8 Welton, S.; “Rethinking Grid Governance for the Climate Change Era;” (2021) California Law Review; \nVol. 109; pp. 237; \nhttps://www.californialawreview.org/print/rethinking-grid-governance-for-the-climate-change-era \n7 Welton, S.; “Rethinking Grid Governance for the Climate Change Era;” (2021) California Law Review; \nVol. 109; pp. 234-237; \nhttps://www.californialawreview.org/print/rethinking-grid-governance-for-the-climate-change-era"},{"page":5,"startToken":1586,"endToken":1979,"text":"summarized in part IV, to argue that there is nothing ‘unheralded’ or \n‘transformative’ about its regulation of RTO governance.”9  \n \nProfessor Peskoe even goes further to suggest that FERC could challenge and \noverturn the D.C. Circuit’s findings in CAISO v FERC: \n \n“FERC could also argue that the CAISO court’s policy arguments are irrelevant. \nThe D.C. Circuit feared that if it upheld FERC’s order firing CAISO’s board, FERC \nmight use that authority to hire and fire IOU board members.  The panel \nobserved that other agencies, such as the Securities and Exchange Commission, \nregulate corporate governance, and that FERC authority over corporate boards \nwould be redundant or even conflicting. But no such overlap would exist for RTO \ngovernance. FERC’s assertion over internal RTO decisionmaking structures and \nprocesses would not extend to analogous processes at IOUs. IOUs do not have \n‘members’ engaged in similar decisionmaking processes that directly affect \nFERC filings. Moreover, no other regulator can claim authority over RTO \ngovernance. This would be a winnable case for FERC.”10  \n \n​\nTo aid FERC’s deployment of its governance authority, there is fortunately an \nabundance of literature suggesting a wide variety of reforms regarding RTO governance \ngenerally.11  Many of these reforms would be good solutions for PJM governance in \nparticular.  This literature also includes recommendations for FERC to perform a more \nholistic revisitation of RTO/ISO governance, including explications of governance \nprinciples implicit in its prior orders and expansions of the governance principles FERC \nrequires RTOs/ISOs to implement.12  Underscoring the need for governance reform, this \nliterature also includes empirical demonstration that the governance structure of RTOs \n12 Simeone, C.E.; “Reforming FERC’s RTO/ISO Stakeholder Governance Principles;” The Electricity \nJournal, Vol 34 (2021); \nhttps://www.sciencedirect.com/science/article/pii/S1040619021000452?via%3Dihub \n11 See e.g. Lenhart, S., and Fox, D.; “Participatory Democracy in Dynamic Contexts: A Review of \nRegional Transmission Organization Governance in the United States;” Energy Research & Social \nScience; vol. 83 (2022); \nhttps://www.sciencedirect.com/science/article/pii/S2214629621004369?via%3Dihub  \n10  Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume \n44.3, pp.612; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf \n9  Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume 44.3, \npp.611-612; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf"},{"page":6,"startToken":1979,"endToken":2340,"text":"can have profound impacts on market outcomes, specifically PJM’s governance \ncapacity market.13  \n \nIn these comments, we attempt to focus only on literature that suggests reforms \nrelevant to PJMCCC’s experience with PJM.  We note that other reforms beyond these \nmight be valid and helpful, but we rely on other commenters to offer those reforms.  \n \nResponses to Panel Questions \nPlease find our responses to the panel questions below.  \nPanel 1: PJM Governance Mechanics – Board Authority, States’ Role, Filing \nRights, and Document Architecture \n1.​ What is the PJM Board’s role in ensuring that PJM is sufficiently tackling the \nregion’s operational and market challenges?  How does the Board evaluate its \neffectiveness in that role?  How often, and under what circumstances, does the \nBoard act unilaterally, and should this change? \n \nPJMCCC believes that the PJM board’s role is to make responsible decisions for \nthe entire PJM region, including all stakeholders, rather than simply reflecting the \npreferences of member utilities. As such, PJMCCC believes that the PJM board should \nbe made more representative of regional stakeholders and their interests. However, the \nPJM board is unlikely to become representative in this way under the current process \nused to select PJM board members. Under the current process, only PJM members \nvote to decide who sits on the PJM board - a process that can only guarantee that the \nPJM board will only represent PJM members and, more specifically, PJM member \nutilities that have the most voting power. This in turn sets up PJM to be led by a board \nthat prefers policies favoring member utilities’ interests over other stakeholders and the \npublic interest.  \n \nSolution: \nPJM’s board selection process should be re-organized to require participation \nfrom stakeholders other than PJM Members.  PJM’s board selection process should \ninclude input from states, consumer advocates, and other stakeholders so as to deliver \na board that is representative not only of PJM member utilities but of the region’s many \nother stakeholder sectors as well.  This would deliver a board that is both representative \n13 Blumsack, S., and Yoo, K.; “RTO Governance Structures Can Affect Capacity Market Outcomes;” \nProceedings of the 53rd Hawaii International Conference on System Sciences, 2020; \nhttps://hdl.handle.net/10125/64119"},{"page":7,"startToken":2340,"endToken":2762,"text":"of, and responsive to, the region’s needs.  PJMCCC agrees with Jacob Finkel’s \ncomments on behalf of the PJM Governors’ Collaborative, which provide more useful \ndetails on issues with independence of the PJM board and solutions to make the PJM \nboard more independent.14 \n \nWho would do it, under what authority, and how: \nFERC could facilitate change to PJM’s board selection process by issuing an \norder to show cause requiring PJM to demonstrate how its board selection process \nmeets FERC’s independence requirements for RTOs.  FERC could preliminarily find \nthat, by restricting the board selection process to member votes, PJM fails to retain its \nindependence from market participants.  FERC could argue that literature \ndemonstrating the vulnerability of PJM’s board to its members’ influence creates \ngrounds for preliminarily finding that PJM’s board is not sufficiently independent to meet \nOrder No. 2000’s requirements. However, in proposing a just-and-reasonable remedy, \nFERC should not mandate an alternative selection process for PJM’s board; instead, \nFERC could propose to reconsider whether PJM should keep its status as an RTO. \n \nFERC’s potential action here would accommodate the D.C. Circuit’s finding in \nCAISO v FERC (2004).15  Since board selection processes have been squarely \nidentified by the D.C. Circuit as a practice that FERC cannot control under the Federal \nPower Act, FERC should avoid attempting to dictate a new process to PJM (even if PJM \nneeds one).  Instead, FERC should take the path identified by the D.C. Circuit as \nsquarely within its jurisdiction - challenging an RTO’s compliance with FERC’s \nstandards for independence.  This avoids the challenge of establishing a new limiting \nprinciple for FERC’s authority over governance via its authority over rates. \n \nAlternatively, PJM could file with FERC under Federal Power Act section 205 to \nvoluntarily re-organize its board selection process into one that allows votes from \nnon-member stakeholders.  Models exist from which PJM could borrow, such as the \nRegional Organization for Western Energy (ROWE)’s process for board selection.16  \nROWE is being developed by western stakeholders to provide new governance for the \n16 See West-wide Governance Pathways Initiative; “Launch Committee Step 2 Final Proposal;” pages \n57-61;  \nhttps://www.westernenergyboard.org/wp-content/uploads/Pathways-Initiative-Step-2-Final-Proposal.pdf \n15 California Independent System Operator v. Federal Energy Regulatory Commission, 372 F.3d 395, 403 \n(D.C. Cir. June 22, 2004). https://caselaw.findlaw.com/us-dc-circuit/1344700.html. \n14 “Pre-Technical Conference Statement: Jacob Finkel, Office of Governor Josh Shapiro, Deputy \nSecretary of Policy;” (July 16, 2026) Docket No. AD26-7-000. \nhttps://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4005&optimized=false&sid=140709\n8d-e46c-4292-acf1-eb7310602cdc"},{"page":8,"startToken":2762,"endToken":3128,"text":"Western Energy Imbalance Market (WEIM) and Extended Day-ahead Market (EDAM).17 \nIn that selection process, regulators from state public service commissions have an \ninput on what candidates are chosen to serve on the ROWE board.  This allows for \nbetter representation of the ROWE’s regional stakeholders and, as such, has much \ngreater potential to deliver good policymaking. \n \n2.​ How should states, through the Organization of PJM States, Inc. (OPSI) or other \nstructures, interface with the Board to enable the region to meet operational \nand market challenges while respecting PJM’s independence?  \n \nA better PJM governance structure would include mandatory, regular, and \nresponsive check-ins with the states and other stakeholders on a broader variety of \npolicy topics.  PJMCCC believes that PJM should have a dedicated and regular forum \nto allow non-member stakeholders to provide input on PJM policy issues.  PJMCCC \nbelieves that FERC is asking the right question when inquiring if states’ input should be \nreaching the PJM board, and FERC should ask a broader question about how other \nstakeholders reach the board as well.  \n \nAs with board selection, an example of how best to do broader stakeholder \nengagement from which PJM should borrow is that of the ROWE.  ROWE’s structure \nrequires the ROWE board to consult with states and other non-utility stakeholders \nregularly.  PJM’s governance structure would benefit from a similar structure and a \ndirect line of contact between the PJM board, on the one hand; and states and other \nstakeholders in the region, on the other hand. \n \nWho would do it, under what authority, and how \nFERC has a variety of options to initiate this kind of restructuring in the PJM \nstakeholder process.  FERC could direct the PJM board to hold such talks with states \nand other stakeholders under its general power to direct convenings (e.g. this tech \nconference, the FERC+states collaborative, etc.).  However, this approach is likely to \nput significant strain on FERC resources, especially considering the rapidly growing \nplethora of issues facing PJM.  As a less-intensive alternative, FERC could also employ \n17 The WEIM and EDAM are currently governed jointly by the California Independent System Operator \n(CAISO) and the Western Energy Market (WEM) governing board. See generally \nhttps://www.westernenergymarkets.com/governance/governing-body"},{"page":9,"startToken":3128,"endToken":3485,"text":"a Federal Advisory Committee process to convene PJM board members with other \nstakeholders and discuss relevant issues.18   \nAs a third alternative, FERC could issue a show-cause order against PJM \narguing that its tariffs are unjust and unreasonable for lack of better engagement with \nnon-member stakeholders.  As with its uncontested order on ISO-NE’s membership \nrequirements, FERC could assert that PJM’s stakeholder processes are a practice \naffecting rates.19  FERC could then preliminarily find that PJM’s stakeholder processes, \nparticularly their lack of regular engagement with broader stakeholders, are leading to \nunjust and unreasonable rates.  FERC could refer to ample literature on incumbency \nbias created by governance structures like PJM’s as grounds for this finding.20  As a \njust-and-reasonable remedy, FERC could propose that PJM adopt more regular \nengagement with a broader array of stakeholders, such as the engagement processes \nproposed for the ROWE.  \n  \n3.​ What governance reforms would best improve accountability and \nresponsiveness? \n \n​\nPJMCCC believes that improving the accountability and responsiveness of PJM \ngoes beyond the PJM board selection process and engagement with the states.  \nPJMCCC sees further opportunity with the PJM stakeholder process to improve PJM’s \nresponsiveness.  As noted by professor Peskoe, “In PJM, the board now routinely calls \nfor staff-driven processes that bypass standard committee-led deliberative processes.”21  \nMoreover, empirical analysis has found that PJM culture has changed over time to rely \nmore heavily on these fast-track processes that circumvent the deliberative stakeholder \n21 Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume 44.3, \npp.616; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf \n20 See generally.  Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law \nJournal, Volume 44.3; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf \n19 Order Rejecting Revisions, New England Power Pool Participants Committee, Docket No. \nER18-2208-001, Jan. 29, 2019, p. 19. https://elibrary.ferc.gov/idmws/file_list.asp?document_id=14740301 \n18 For examples from other agencies’ use of this process - notably CFTC’s - see Kavulla, T.; “Problems in \nElectricity Market Governance: An Assessment;” R Street Policy Study No. 180; August 2019; \nhttps://www.rstreet.org/research/problems-in-electricity-market-governance-an-assessment/"},{"page":10,"startToken":3485,"endToken":3822,"text":"processes.22  Legal scholars have offered a simple solution to this issue that is well \nwithin FERC’s authority.  \nThe solution \n \nAs articulated by professor Peskoe, FERC could require PJM to provide \nnon-member stakeholders with the authority to initiate deliberative stakeholder \nprocesses within PJM’s existing structure.  This would allow issues that reflect regional \nstakeholder concerns to be put on the PJM stakeholder agenda, instead of issues that \nonly the member utilities believe is important.  FERC could require this change under its \ngeneral authority over governance processes as a practice affecting rates, as described \nelsewhere in these comments.  \n \n4.​ How does the division of Federal Power Act section 205[1] filing rights among \nPJM, Transmission Owners, and the Members Committee affect PJM’s ability to \nact effectively and quickly, when warranted, to address operational and market \nneeds? \n \nPJMCCC believes 205 filing rights are a key component of making PJM more \nresponsive to regional stakeholders’ concerns.  The allocation of 205 filing rights \ncurrently stifles PJM board action and mainly facilitates a meager level of independence \nand responsiveness through the PJM board’s ability to file a 206 investigation against \nPJM itself.  This is obviously less than ideal for facilitating PJM reforms and also reflects \nthe failure of PJM’s governance structure to create pathways for the PJM board to be \nresponsive to regional stakeholders’ concerns.  \nThe solution \n \nPJMCCC believes that FERC should broaden the allocation of 205 filing rights in \nline with professor Peskoe’s recommendations.23 After the Atlantic City v FERC \ndecision, FERC promised to investigate the allocation of 205 filing rights if utilities use \nthose rights in a way that compromises RTO independence or causes undue \n23 Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume 44.3, \npp.614-616; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf \n22Johnson, N., Lenhart, S., and Blumsack, S.; “The Evolution of Participatory Policymaking for Regional \nPower Grids;” Energy Law Journal; Vol. 44; pp. 533-546 (2023). \nhttps://scholarworks.boisestate.edu/cgi/viewcontent.cgi?article=1169&context=pubadmin_facpubs"},{"page":11,"startToken":3822,"endToken":4214,"text":"discrimination.24  On that note, law professor Joshua Macey has noted that “Utilities use \ntheir filing rights both to propose favorable market rules and to design governance \nstructures that allow them to control the multi-member organizations that plan grid \ninfrastructure and ensure resource adequacy.”25  Given issues with the responsiveness \nand independence of RTOs generally and PJM in particular, and the role that filing rights \nhave played in that unresponsiveness, FERC could now follow through on its \npost-Atlantic promise. \n \nPJMCCC believes that FERC should consider broadening the allocation of 205 \nfiling rights. FERC could consider giving the PJM board independent 205 filing authority \nover topics like regional cost allocation and local planning. FERC could also consider \nallocating 205 filing rights to state regulators, who are ultimately responsible for setting \nthe retail rates through which all investments are ultimately recovered.  State regulators \nwith 205 filing rights could help represent the interests of broader stakeholders in PJM \ntariff changes.  It is worth noting that state regulators in MISO and SPP already have \n205 filing rights over transmission cost allocation and resource adequacy.  Given PJM’s \nstruggles with resource adequacy, as evidenced by its extreme capacity market prices \nin recent years, giving 205 filing rights over resource adequacy to PJM state regulators \nis well worth FERC’s consideration.   \n \nPJMCCC believes it would also be helpful for FERC to consider another remedy \noffered by professor Peskoe - requiring PJM to create a new stakeholder group \ncentered around innovation and new technologies.26  FERC could then grant that \nstakeholder group 205 filing rights in order to empower the PJM governance process to \nmake tariff reforms that facilitate innovation and new technologies.  PJMCCC agrees \nwith professor Peskoe that enabling PJM to be more self-improving in this regard could \nbe an even better path than the rulemaking processes FERC has engaged in thus far to \naccommodate new technologies.  \n \n26  Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume \n44.3, pp.615-616; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf \n25 Macey, J; “Outsourcing Electricity Market Design;” University of Chicago Law Review, Vol 91, pp. \n1243:1330, https://chicagounbound.uchicago.edu/uclrev/vol91/iss5/1/ ​\n \n24 Atlantic City Elec. Co., et al. v. FERC, 295 F.3d 1, 9‒11 (D.C. Cir. \n2002).https://law.justia.com/cases/federal/appellate-courts/F3/295/1/597196/"},{"page":12,"startToken":4214,"endToken":4505,"text":"5.​ To what extent do provisions in PJM’s Operating Agreement, Transmission \nOwner Agreement, Open Access Transmission Tariff, Reliability Assurance \nAgreement, or Manuals impede timely decision-making by PJM?  \n \nWhile PJMCCC leaves it to others to comment on opportunities to reform PJM’s \ngoverning documents, PJMCCC believes that such reforms would add more value if \nsuggested actions for FERC described elsewhere in these comments were adopted.  \n \n6.​ Recognizing regional differences, are there lessons from other regional \ntransmission organization/independent system operator (RTO/ISO) governance \nstructures that PJM could reasonably adopt to improve its responsiveness to the \nregion’s operational and market challenges? \n \nPJMCCC recommends that FERC and PJM should consider the new ROWE \ngovernance model being promulgated by western stakeholders as an example of best \npractices for improving PJM’s responsiveness to the region’s challenges.27  The \nROWE’s governance model includes several provisions that will make the ROWE more \nresponsive to regional issues and stakeholder concerns, including: \n \n●​ ROWE board member selection by a wide array of stakeholders, including state \nregulators \n●​ A thorough process and structure for stakeholder engagement, including \nrequirements for the ROWE board to conduct engagement with state regulators \nand consumer advocates \n●​ A balance of voting power that gives no stakeholder sector veto power over \nROWE board decisions, making the ROWE boards actions truly independent \n●​ Concentration of 205 filing rights within the ROWE board  \n​\nPJMCCC encourages FERC to consider requiring PJM to enact some or all of \nthe ROWE’s governance design features, many of which are specifically recommended \nelsewhere in these comments in response to the Commission’s particular questions.  \nThese features will lead PJM to be more responsive to the region’s challenges \n \n27 See generally West-wide Governance Pathways Initiative; “Launch Committee Step 2 Final Proposal;” \npages 57-61;  \nhttps://www.westernenergyboard.org/wp-content/uploads/Pathways-Initiative-Step-2-Final-Proposal.pdf"},{"page":13,"startToken":4505,"endToken":4817,"text":"Panel 2: PJM Stakeholder Process – Design, Transparency, and Decision-Making \n1.​ Do sector-weighted voting and existing voting thresholds strike the right \nbalance between achieving consensus and taking timely action?  \n \nPJMCCC believes that non-utility stakeholders like local governments are \nunderrepresented in the PJM’s stakeholder process.  Even if PJMCCC could become a \nmember and vote in the process, PJMCCC would not have hardly any influence due to \nbroader structural issues with PJM’s voting structure.  As described above, professor \nWelton explains how mergers and acquisitions have made the stakeholder sector \ndefinitions muddied when it comes to actually representing public interests.28   \n \nThe solution \n \nFERC should direct PJM to develop more cohesive sector formation and stricter \nrequirements that a member must meet to join a sector, as well as a broader variety of \nsectors in order to represent stakeholder that currently aren’t eligible to become \nmembers.  In developing prescriptions for PJM’s stakeholder sector requirements, \nFERC could draw upon ROWE’s Stakeholder Representatives Committee design.  \nROWE’s design defines specific sectors and requirements that a member must have in \norder to vote with that sector.  Moreover, the sectors in ROWE’s design are broadly \nrepresentative of a variety of stakeholders that PJM’s governance should aspire to \nrepresent as well.  \n \nWho would do it, under what authority, and how \nAs described for similar changes to the PJM stakeholder process, FERC could \nrequire PJM to make these changes under its own assertion that stakeholder processes \nare a practice affecting rates.  PJM could of course also voluntarily make these changes \nitself. \n \n2.​ What transparency reforms would improve the quality of PJM’s stakeholder \nprocess and increase stakeholder confidence in its decision-making? \n \n​\nProfessor Peskoe articulates that a general improvement in transparency, \nthrough a new FERC transparency principle, would improve RTO governance.  \n28 Welton, S.; “Rethinking Grid Governance for the Climate Change Era;” California Law Review; Vol. 109; \n209;275; 2021; \nhttps://www.californialawreview.org/print/rethinking-grid-governance-for-the-climate-change-era"},{"page":14,"startToken":4817,"endToken":5199,"text":"PJMCCC agrees that this principle would improve PJM governance specifically.  As \nprofessor Peskoe identifies, confidential information-sharing between PJM and \ninvestor-owned utility members about routine rule changes benefits those utilities in \nFERC proceedings and “may forge inappropriate relationships between RTO staff and \nIOU members.”29 \nThe solution \n \n​\nOne potential implementation of this transparency principle would be for FERC to \ndirect PJM to make board meetings transparent and make all meetings open to \nnon-members.  As Travis Kavulla writes, “PJM’s board meets privately; important \ncommittee meetings are open only to members.”30  FERC could require PJM to reverse \nthis through the authority it has asserted over stakeholder processes as a practice \naffecting rates.  Alternatively, PJM could of course do this of its own volition. PJMCCC \nagrees with Jacob Finkel’s comments on behalf of the PJM Governors’ Collaborative, \nwhich provide more useful details on issues with transparency of the PJM board and \nsolutions to make the PJM board’s meetings and decisions public to stakeholders.31 \n \n3.​ Are there structured opportunities in the stakeholder process for state \nparticipation (e.g., defined consultation windows, joint technical sessions) to \nprovide input on topics that are of interest to the states? \n \nPJMCCC believes that local governments need more structured opportunities in \nthe PJM stakeholder process. As highlighted by Dworkin and Goldwasser, “smaller \norganizations, regulatory representatives, and public interest groups have less money to \nparticipate and see more diluted benefits, so it is harder for them to meaningfully \nengage.”32  Moreover, as professor Welton writes, participation of such stakeholders \n32 Dworkin, M.A., and Goldwasser, R.A.;  “Ensuring Consideration of the Public Interest in the Governance \nand Accountability of Regional Transmission Organizations.” Energy Law Journal, Vol. 28, pp. 543-601: \nhttps://www.eba-net.org/wp-content/uploads/2023/02/10-Governance_of_RTOs.pdf \n31 “Pre-Technical Conference Statement: Jacob Finkel, Office of Governor Josh Shapiro, Deputy \nSecretary of Policy;” (July 16, 2026) Docket No. AD26-7-000. \nhttps://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4005&optimized=false&sid=140709\n8d-e46c-4292-acf1-eb7310602cdc  \n30 Kavulla, T.; “Problems in Electricity Market Governance: An Assessment;” R Street Policy Study No. \n180; August 2019; pp.11 \nhttps://www.rstreet.org/research/problems-in-electricity-market-governance-an-assessment/ \n29 Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume 44.3, \npp. 613-614; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf"},{"page":15,"startToken":5199,"endToken":5592,"text":"with experiential knowledge of the effects of PJM’s policies and actions is educational \nfor decision-makers like PJM’s board and PJM staff.33  \n \nShowing the courage of our convictions, PJMCCC has made efforts to achieve \nthe kind of engagement with PJM that we would like to see become PJM’s standard \npractice. We are currently collaborating with PJM’s State Policy Solutions team to shape \nthe development of the local policy portal to support PJM’s compliance with FERC \nOrder 1920. We have been working closely to help inform the data fields to be used for \naggregating local government policies, goals, siting opportunities, and siting restrictions. \nAdditionally, we submitted local building and vehicle electrification objectives to PJM’s \nLoad Analysis Subcommittee that were used in the 2024 load forecast.    \n \n​\nPJMCCC has also engaged with PJM’s Transmission Expansion Advisory \nCommittee (TEAC), which has recently taken promising actions toward the kind of \nengagement necessary for all of PJM.  The leadership of PJM’s TEAC has taken \ncommendable steps such as recently expanding the discussion time at TEAC meetings \nto allow more time for public stakeholders to raise questions and discuss issues in PJM \ntransmission planning.  The TEAC leadership has also provided helpful details in \nresponse to questions about utilities’ local projects (i.e. supplemental projects).   \n \nImportantly, the leadership of PJM’s TEAC has made considerable efforts to keep \nthe scope of discussion at TEAC meetings narrowed to PJM transmission planning, \nbecause stakeholders in the PJM region have many topics to discuss.  It is a fair \nassessment that stakeholders sometimes introduce topics that are outside the scope of \nTEAC meetings, but this is only a strong indication that PJM needs to expand its regular \nengagement with non-member stakeholders into other topic areas.  PJM should develop \norganizational routines and structures for similar engagement on all policy issues \nundertaken by PJM. \n \nThe solution \n \nSimilar to the reforms to create required, regular, and responsive meetings with \nPJM engagement states that are offered earlier in these comments, PJM should create \nstructured opportunities for engagement with PJMCCC members and similarly situated \nnon-member stakeholders who are neither states nor members.  PJM could borrow \nfrom the ROWE’s designs for stakeholder engagement for this purpose, particularly the \n33 Welton, S.; “The Citizen and the Energy Regulatory Process;” University of Pennsylvania Journal of \nLaw and Public Affairs (2023), Vol. 8, No. 1; pp.31-36; \nhttps://repository.law.upenn.edu/Documents/Detail/96471"},{"page":16,"startToken":5592,"endToken":5851,"text":"Office of Public Participation (OPP), the states’ policy committee, and the Consumer \nAdvocate Organization.  FERC could require PJM to do this, or PJM could do this \nvoluntarily. \n \n4.​ Do existing governing document provisions (e.g., Operating Agreement, \nManuals) impede stakeholder decision-making and what changes could be \nmade to address them? \n \nAs indicated elsewhere in these comments, PJMCCC leaves it to other entities to \nopine on the opportunities for improving stakeholder decisions via the governing \ndocuments.  PJMCCC believes that such improvements would be exponentiated if \ncombined with the reforms suggested elsewhere in these comments. \n \n5.​ What reforms to the stakeholder process could ensure PJM can meet the \nregion’s challenges? \n \n​\nBeyond the reforms outlined elsewhere in these comments, a further useful step \nwould be for FERC to direct PJM to undertake the creation of an independent \ntransmission monitor.34  An independent transmission monitor would be useful for \nproviding review of the local transmission projects that are proposed by PJM utilities, \nwhich currently have no review and fall through a regulatory gap.  An independent \ntransmission monitor would also be useful for ensuring consideration of \nnon-transmission alternatives, like advanced transmission technologies, that would \nimprove the overall efficiency of the PJM grid while also improving the affordability of \nelectricity for PJM residents.   \n \n6.​ What near-term reforms to stakeholder representation could PJM and its \nMembers take to improve speed in decision-making while preserving \nstakeholder input? \n \n34 Konidena, R.; “Why FERC Should Mandate an Independent Monitor at PJM;” (November 27, 2023) \nhttps://www.renewableenergyworld.com/solar/utility-scale/why-ferc-should-mandate-an-independent-moni\ntor-at-pjm/; See also \nhttps://acadiacenter.org/planning-the-future-electric-grid-the-need-for-an-independent-transmission-monit\nor/"},{"page":17,"startToken":5851,"endToken":6170,"text":"As indicated elsewhere in these comments, PJMCCC strongly believes that \nstakeholder input needs to be expanded at this juncture, rather than merely “preserved.”  \nPJMCCC views a lack of effort on PJM’s part to gather and respond to non-member \nstakeholder input as a key factor in getting the PJM region into the crisis it faces today.  \nMuch of the contemporary discourse on PJM issues focuses on the PJM capacity \nmarket.  Empirical research has found that PJM governance influences PJM capacity \nmarket outcomes.35  So the assertion that PJM’s unresponsive governance has led to \nthe capacity market crisis facing the region should come as no surprise.   \n \nAs such, PJMCCC believes that the crisis will be resolved primarily through \nexpanding stakeholder input rather than expediting decisions.  To that end, PJMCCC \nrefers the Commission to its recommendations elsewhere in these comments as to how \nstakeholder input and engagement could be expanded.  In addition, the PJMCCC refers \nthe Commission to its earlier recommendations to reform the PJM board as a means of \nachieving both faster and more responsive decision-making from PJM.   \n \n7.​ Are there elements of PJM’s committee structure that routinely contribute to \ndelays?  Are there stakeholder processes or issues that could be expedited or \nchanged to provide greater focus on key issues and allow faster or more \nunilateral action on others? \n \n​\nPJMCCC refers the Commission to the reforms outlined elsewhere in these \ncomments.  PJMCCC appreciates FERC’s attention to the delays and desire to expedite \nPJM decisions.  PJMCCC believes that expanding non-member stakeholder input will \nbe just as useful as expediting PJM decision-making, to the resolution of PJM’s current \nchallenges, if not moreso.​\n \n8.​ Should PJM increase the use of fast-path or time-bound review procedures to \nexpedite committee action on high-importance topics? \n \n35 Blumsack, S.; and Yoo, K.; “RTO Governance Structures Can Affect Capacity Market Outcomes;” \n(2020) Proceedings of the 53rd Hawaii International Conference on System Sciences. \nhttps://pure.psu.edu/en/publications/rto-governance-structures-can-affect-capacity-market-outcomes/"},{"page":18,"startToken":6170,"endToken":6564,"text":"PJMCCC notes that PJM has increasingly used fast-path procedures to address \nrecent issues.36  However, In some cases those procedures have failed to deliver \nconsensus and timely decision-making, such as the large load interconnection CIFP \nproceeding in which no proposal received enough votes to pass.37  As such, PJMCCC \nviews the use of fast-path procedures as creating a strong risk of failing to resolve the \nunderlying problems with PJM governance.  PJMCCC believes that the use of fast-path \nprocedures goes against developing successful strategies for improving PJM \ndecision-making in the way that the Commission’s questions indicate would be \ndesirable.  PJMCCC encourages FERC to consider the reforms outlined elsewhere in \nthese comments as better alternatives for addressing issues in PJM, rather than \nencouraging PJM to increase its use of fast-path procedures.   \n \n9.​ Recognizing regional differences, are there lessons from other RTO/ISO \nstakeholder processes that PJM could reasonably adopt to improve speed in \nvoting processes and stakeholder representation? \n \nAs indicated elsewhere in these comments, PJMCCC believes that the ROWE’s \nnewly proposed independent regional governance structure would be a valuable model \nfor PJM.  The ROWE’s governance structure builds on lessons learned from other forms \nof regional market governance and develops robust processes for avoiding some of the \nfailures seen in those other forms.  The ROWE’s structure moves away from a \nutility-centric governance model and toward one that gives more power to states, \nratepayer advocates, and other public interest groups to influence market policies.  \nFERC should consider the governance features of the ROWE and require PJM to adopt \nsome of them, as outlined elsewhere in these comments.  \n \nConclusion \nAgain, we applaud the Commission’s focus on governance issues within PJM, and we \nhope these comments will be of use to the Commission’s investigation into these \nissues.  We thank the Commission for the opportunity to comment, and we look forward \nto the Conference and to hearing remarks from both the panelists and Commissioners.  \n37 https://www.utilitydive.com/news/pjm-stakeholders-data-center-interconnection-cifp/806009/ \n36 See generally, Johnson, N., Lenhart, S., and Blumsack, S.; “The Evolution of Participatory Policymaking \nfor Regional Power Grids;” Energy Law Journal; Vol. 44; pp. 533-546 (2023). \nhttps://scholarworks.boisestate.edu/cgi/viewcontent.cgi?article=1169&context=pubadmin_facpubs; See \nalso Peskoe, A.; “Replacing the Utility Transmission Syndicate’s Control;” Energy Law Journal, Volume \n44.3, pp.616; \nhttps://eelp.law.harvard.edu/wp-content/uploads/2024/10/Replacing-the-Utility-Transmission-Syndicates-\nControl-FINAL.pdf"},{"page":19,"startToken":6564,"endToken":6564,"text":""}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":18,"endAt":1805,"startToken":0,"endToken":6433},{"p":18,"at":1805,"title":"Conclusion","method":"printed heading","endPage":19,"endAt":0,"startToken":6433,"endToken":6564}]}