{"document":{"slug":"rec-20260722-5156","title":"Comments of Nikki Gerber in response to FERC's Notice of Technical Conference regarding PJM Interconnection, L.L.C.'s Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5156","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260722-5156_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5156","tier":"record","sha256":"f720ee9c17bcc8157f1acaab18994f01833f93217e71f07b3e545aba11c634c4","pages":3,"tokens":774,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":206,"text":"PUBLIC COMMENT SUBMISSION \nUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY \nREGULATORY COMMISSION \nDocket No. AD26-7-000 PJM Governance and Stakeholder \nReforms \nCOMMENTS OF Nikki Gerber/Conserve Ohio Committee \nMember/MoonDoggie LIVERee-Owner \nDate 7/22/2026(docket date 7/23/2026)   \nREGARDING PJM GOVERNANCE, TRANSPARENCY, AND \nPUBLIC-INTEREST MANDATES \nI.\nINTRODUCTION & INTEREST OF THE COMMENTER \nNichole Gerber/Owner of MoonDoggie LIVERee LLC./ Conserve Ohio Committee Member / \nAdams County, OH, submits these public comments in response to the Federal Energy \nRegulatory Commission  (FERC) Notice of Technical Conference regarding PJM \nInterconnection, L.L.C. (\"PJM\") Governance and Stakeholder Reforms under Docket No. \nAD26-7-000. \nAs a constituent and small business owner in Adams County, OH and as a Conserve Ohio \ncommittee member on a statewide Constitutional Amendment initiative, banning data centers \nlarger than 25MW,  within the PJM footprint in the Great State of Ohio, we witness firsthand \nhow PJM current governance structure ISOLATES LOCAL COMMUNITIES and state leadership \nwhile PRIORITIZING PRIVATE,MULTIBILLION-dollar corporate INTERESTS.  \nPJM decision-making frameworks directly impact our local electric reliability, regional water \nsecurity, and monthly utility bills, especially in the heavily targeted Ohio rural Appalachian \nregion for proposed data centers development.  \nII. COMMENTS ON PANEL  \n2: STAKEHOLDER PROCESS, TRANSPARENCY, AND DECISION-\nMAKING \n1.\nCodify an Explicit Public-Interest Mandate"},{"page":2,"startToken":206,"endToken":658,"text":"PJM  current five-sector voting model was designed for a slower-moving energy transition, not \nfor hyper-accelerated, speculative load growth from hyperscale data centers and artificial \nintelligence infrastructure. PJM board and stakeholder processes currently operate with a bias \ntoward legacy utilities and private corporate developers, leaving residential and agricultural \nrate-paying communities out of the equation for hike we are footing the bill for infrastructure \nFor proposed deals, rate increases, and future grid strains SOLELY IMPACTING US! \n  \n•\nRequested Reform: FERC must order PJM to amend its governance documents to \nexplicitly include a Public Interest Mandate. PJM must be legally bound to prioritize \nratepayer affordability, grid reliability, and state environmental/resource policies over \ncorporate capital expenditure goals. \n2. Eliminate Corporate Gridlock and \"Squeaky Wheel\" Lobbying \nThe current PJM stakeholder process routinely degenerates into procedural gridlock, where \nwell-funded private actors stall necessary reforms to defend hyper-specific business models. \nConversely, when regional state coalitions or consumer advocates push for ratepayer \nprotections such as forcing large-load developers to pay for 100% of their own transmission \nand substation upgrades corporate interests use procedural maneuvers to veto consensus.  In \nOhio protections are being proposed such as the ratepayer protection act and HB 970 but no \naction has been taken as they sit on the table.   \n•\nRequested Reform: Establish time-bound, transparent decision-making pathways for \nlarge-load interconnects that prioritize Ratepayer Insulation. Speculative data center \nprojects must not be granted queue access or capacity allocations without proving they \nbring their own generation capacity and bear 100% of their infrastructure footprint.  Make \nsure permits include that behind the meter power generation is provided before they \npower on and help to keep current clean air safeguards in place for the American People \nas you can.  \n3. Formalize State and Local Government Access \nState legislatures, county commissions, and consumer advocates are currently forced to react \nto PJM decisions from the \"outside looking in.\" When local counties face sudden grid \ninstability, industrial noise pollution, or depleted aquifers caused by uncoordinated large-load \ndeployments, PJM offers zero direct mechanisms for local public accountability. \n•\nRequested Reform: Grant the Organization of PJM States, Inc. (OPSI) and regional \nlocal official coalitions formal, elevated status within PJM board governance. If state utility \nregulators and local county governments broadly oppose a PJM market rule or \ntransmission cost-allocation proposal, FERC should establish a \"jump ball\" mechanism \nallowing state leadership to submit alternative proposals directly to FERC alongside PJM \nfilings. \n4. Mandatory Public Board Meetings and Decisional Transparency \nPJM Board of Managers currently makes key regional determinations behind closed doors \nwithout providing detailed roll-call votes, comprehensive meeting minutes, or clear evidentiary \norders justifying their actions. \n•\nRequested Reform: Mandate that all PJM Board meetings involving wholesale market \nrules, transmission expansion planning, or large-load queue management be open to"},{"page":3,"startToken":658,"endToken":774,"text":"public observation. The Board should be required to publish formal Decisional Orders \nexplaining the factual and public-interest basis for every major policy decision. \nIII. CONCLUSION \nPJM is currently failing the 67 million residents who rely on its grid for safe, affordable power. \nThe status quo” corporate entities dictate regional grid terms while shifting billions in \ntransmission costs onto rural and working-class families” is completely untenable. \nWe urge the Commission to use Docket No. AD26-7-000 to order structural, binding \ngovernance reforms that enforce public transparency, protect residential ratepayers, and hold \nPJM accountable to the communities it serves. \nRespectfully submitted, \nNikki Gerber Conserve Ohio.                     MoonDoggie LIVERee-owner \nManchester, Adams County, OH moondoggieliveree2020@gmail.com 513-713-5874 \nDated: July 23, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":360,"startToken":0,"endToken":47},{"p":1,"at":360,"title":"I. INTRODUCTION & INTEREST OF THE COMMENTER","method":"printed heading","endPage":1,"endAt":1411,"startToken":47,"endToken":189},{"p":1,"at":1411,"title":"II. COMMENTS ON PANEL","method":"printed heading","endPage":3,"endAt":169,"startToken":189,"endToken":681},{"p":3,"at":169,"title":"III. CONCLUSION","method":"printed heading","endPage":3,"endAt":879,"startToken":681,"endToken":774}]}