{"document":{"slug":"rec-20260722-5167","title":"Pre-Technical Conference Comments of PPL Electric Utilities Corporation re the PJM Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5167","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PPL Electric Utilities Corporation","kind":"comments","file":"sources/filings/text/20260722-5167_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5167","tier":"record","sha256":"e91b74e8c24d6dd30fbbe2f3867b89703e851bb0192a10ff56372b7006ebf3ad","pages":27,"tokens":8224,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":230,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Governance and Stakeholder \nReforms \nDocket No. AD26-7-000 \n \nPRE-TECHNICAL CONFERENCE COMMENTS  \nOF PPL ELECTRIC UTILITIES CORPORATION \n \nIn this docket, the Federal Energy Regulatory Commission (FERC or Commission) in-\nvites comments from interested parties related to PJM Interconnection, L.L.C.’s (PJM) govern-\nance and stakeholder processes, focusing on potential reforms to improve PJM’s ability to ad-\ndress operational and market needs in a timely and efficient manner.1 PPL Electric Utilities, Inc. \n(PPL Electric) thanks the Commission for raising these important questions and responds as fol-\nlows: \nI. \nBACKGROUND AND NEED FOR REFORM \nPPL Electric was founded in 1920 as the Pennsylvania Power & Light Company. PPL \nElectric is a Pennsylvania corporation and wholly owned indirect subsidiary of PPL Corporation \n(PPL). It owns and operates transmission and distribution facilities in 29 counties in eastern and \ncentral Pennsylvania. PPL Electric was a founding member of PJM in 1927. PPL Electric has ac-\ntively participated in every version of PJM, from an early power pool to a regional transmission \norganization. It is a signatory to the PJM Consolidated Transmission Owners Agreement \n(CTOA), PJM Operating Agreement (OA), and PJM Reliability Assurance Agreement (RAA). \nPPL Electric remains deeply committed to the integrated regional transmission network, owning \n \n1 See PJM Governance and Stakeholder Reform, Notice of Commission-Led Technical Conference, \nDocket No. AD26-7 (May 12, 2026)."},{"page":2,"startToken":230,"endToken":572,"text":"2 \n \nmore than 5,000 miles of transmission lines, representing more than $7 billion in capital invest-\nment, under PJM’s operational control. PPL Electric’s more than 1.5 million customers also rely \non the PJM markets for wholesale power supply.  \nAlthough, as discussed below, PPL Electric and the other transmission owners believe \nthere are appropriate reforms to PJM governance related to transmission, the pressing need for \nchange is on the markets side. There, the resource adequacy crisis is undermining confidence in \nthe energy markets and driving this conversation. As prices have risen, PPL Electric’s customers \nshare in the pain. Its average residential retail bills have gone up more than $20 per month as a \nresult of the capacity market price increases since the 2024/25 auction. This money flows di-\nrectly to incumbent power generators. None goes to the utility and none is spent on improving \nservice to customers. Under the state’s deregulation laws, PPL Electric and the other Pennsylva-\nnia utilities are no longer able to build and own electric generation resources under the jurisdic-\ntion of the Pennsylvania Public Utilities Commission (PA PUC). This makes the failure of the \nPJM capacity market to adequately incentivize new generation resources the single biggest risk \nto reliable electric service in PPL Electric’s service territory. Other than as an extreme minority \nvoter in the PJM stakeholder process (where its vote constitutes approximately 1/12th of the \ntransmission owner sector’s 20% vote, barely 1% of the overall sector-weighted vote), PPL Elec-\ntric is entirely powerless to close this gaping hole in its ability to provide reliable service.  \nTo the extent PJM governance reform leads to beneficial changes in the energy markets, \nPPL Electric applauds the effort and stands ready to assist. However, a note of caution is war-\nranted: The Commission and the participants in this docket should be sober about the limited \nability of governance reform to address resource adequacy and should embark on this process \nwith eyes open toward the real risk that things can get worse. PJM manages one of the largest"},{"page":3,"startToken":572,"endToken":925,"text":"3 \n \nand most important power markets in the world. They support hundreds of millions of customers, \nattract hundreds of billions of dollars of investment, and enable trillions of dollars of economic \nactivity. Each of the more than one thousand PJM Members and all fourteen PJM states (includ-\ning the District of Columbia) has a deeply held opinion on how the markets should be man-\naged—sometimes more than one within a given organization—and many are willing to spend \nsignificant legal fees defending embedded rights all the way to the United States Supreme Court. \nAny change imposed from the outside—even one that seems inconsequential—will almost cer-\ntainly lead to years of expensive litigation. This litigation will further reduce certainty in the mar-\nkets that already face a crisis—and crisis is understating it—of underinvestment.  \nThus, the Commission should be cautious and approach this effort with an eye toward in-\ncremental change focused on the real problem to be solved: resource adequacy and the need to \nget generation built now. This requires a focus on the states, particularly the deregulated states. \nAs PPL’s Wendy Stark told the Commission at a different technical conference last year, “[f]un-\ndamental reform to address resource adequacy must be focused on the states.”2 Deregulation stat-\nutes have prevented the utilities from responding to the clear and direct need for more generation \ncapacity in the region caused primarily by the growth in large load data centers, making them en-\ntirely reliant on failing market constructs. In a vertically integrated state, the public utilities \nwould already be building large dispatchable baseload generators to meet the anticipated de-\nmand—and would have started years ago—under the regulatory supervision of their state com-\nmissions and following an integrated resource planning process. It follows that the real solution \nto the crisis PJM faces lies in facilitating appropriate changes to state law that facilitate real \n \n2 Meeting the Challenge of Resource Adequacy in Regional Transmission Organization and Independent \nSystem Operator Regions, Pre-Conference Statement of Wendy Stark on Behalf of PPL Corporation, \nDocket No. AD25-7 (May 16, 2025) at 2."},{"page":4,"startToken":925,"endToken":1216,"text":"4 \n \nresource planning. Any focus on PJM governance changes, including expanding the role of the \nstates, such as in nominating Board members, should advance that goal. \nII. \nINTRODUCTORY COMMENTS \n \nPJM is a large and complex organization, with an equally complex governing structure. \nAt an extremely high level, it is divided into two components: transmission planning/operations \nand energy markets. PPL Electric’s primary focus as a transmission owner has always been on \nthe former. There, it works directly with PJM through the PJM Tariff and Manuals, including but \nnot limited to planning, interconnections, cost allocation, rates and rate design, and operations. \nGovernance issues are certainly relevant on the transmission side, and reforms are necessary in \ncertain areas. For example, PPL Electric and the other PJM transmission owners recently put for-\nward a major effort to empower the PJM Board to propose changes to the Regional Transmission \nExpansion Planning Protocol, where the existing status quo gives a minority of PJM members \nveto power over any change to the planning rules.3 This effort was unsuccessful on other \ngrounds, but PPL Electric remains committed to removing this impediment to rational, independ-\nent regional transmission planning, and hopes that such a change will be part of any package of \nreforms to come from this process.  \n \nOn the energy markets and resource adequacy side of the house, PPL Electric’s interest \nas a “poles and wires” transmission and distribution utility has historically been more indirect, \nbut is nonetheless critically important. PPL Electric’s customers are reliant on the PJM markets \nto provide the capacity, energy, and ancillary services needed to keep the lights on. Approxi-\nmately half of PPL Electric’s customers shop through Pennsylvania’s deregulated retail market, \n \n3 See Duquesne Light Company, Docket No. ER24-2338 (Jun. 21, 2024)."},{"page":5,"startToken":1216,"endToken":1540,"text":"5 \n \nwith their Electric Generation Supplier (EGS)4 procuring wholesale power products at PJM. The \nother half take default service from PPL Electric, which is also entirely reliant on the PJM mar-\nkets for these products. To put it very simply, the wholesale markets are failing these customers. \nWhile PPL Electric believes the solution lies more in changes to state policy rather than PJM \ngovernance, certain reforms may be appropriate and helpful.  \nA. \nThe Board of Managers and Filing Rights \n \nNo change to PJM governance can succeed without recognizing the essential role of the \nindependent Board of Managers. PJM is a public utility under FERC jurisdiction pursuant to the \nFederal Power Act.5 It directs the operation of both the country’s largest transmission grid and \ngeneration fleet. It is under constant pressure from both market participants and political actors. \nIt must have independent executive power to make decisions without being controlled by or be-\nholden to outside parties with their own agendas. As such, the PJM Board should have full con-\ntrol over all elements of the RTO delegated to PJM in the CTOA. This starts with filing rights. \nAlthough such rights are much sought after, federal law is clear: they are unambiguously granted \nto the owners of FERC-jurisdictional assets and can only be transferred voluntarily by those \nowners.6 The modern version of PJM started with such a grant. In the CTOA, the PJM transmis-\nsion owners collectively agreed to transfer to PJM, exclusively and unilaterally, operational con-\ntrol over their billions of dollars of transmission assets, as well as their right under federal law to \nestablish and make changes to the terms and conditions of transmission service in a FERC Tariff, \n \n4 66 Pa. C.S. § 2803.  \n5 16 U.S.C. § 824(e).  \n6 Atl. City Elec. Co. v. FERC, 295 F.3d 1, 9–11 (D.C. Cir. 2002) (“Atlantic City”), enforced, 329 F.3d 856 \n(D.C. Cir. 2003)."},{"page":6,"startToken":1540,"endToken":1869,"text":"6 \n \nretaining limited authority for themselves over certain matters, primarily rates and rate design.7 \nPJM is not free to further delegate filing rights to third parties; nor can the Commission require \nthat they be surrendered to any other entity. However, to the extent that any other PJM governing \ndocuments purport to limit the PJM Board’s exercise of control over powers delegated to it by \nthe transmission owners, that limitation can and should be removed.  \n \nAs to the specifics of how the Board is selected and how it exercises power in PJM, \nFERC’s role is also limited. The courts have generally not allowed the Commission to reach into \nthe internal governance of the public utilities under its jurisdiction, including the RTOs.8 That \nsaid, it is entirely appropriate to use this forum to share ideas from other regions and discuss best \npractices that may be included in a package of appropriate reforms. For example, PPL Electric \ngenerally believes that it has become too difficult to find potential Board members who (1) have \nthe relevant experience and expertise, (2) are willing to serve in an increasingly fraught role, and \n(3) qualify under PJM’s onerous independence rules. It supports changes to the OA that would \nease the Board selection process and attract larger numbers of qualified candidates for a difficult \njob. These reforms may include changes to term and tenure (extending it to increase independ-\nence), reducing certain restrictions on affiliation with market participants that has pushed away \nexperienced personnel from the region (in fact, a qualified preference for geographic proximity \nmay be appropriate), and changes to ex parte communication rules that have been interpreted to \nrestrict Board member access to information or member opinion outside highly structured formal \nmeetings. In short, reforms should address PJM rules and processes that hinder intelligent and \ninformed Board decision-making.  \n \n7 CTOA §§ 4.1, 6.3.2, 7.5.1.  \n8 See California Independent System Operator Corp. v. FERC, 372 F. 3d 395, 403 (2004)."},{"page":7,"startToken":1869,"endToken":2169,"text":"7 \n \nB. \nThe PJM Members and the Stakeholder Process \n \nIn addition to the PJM Board, PJM has a large and active Membership that has retained \nsignificant control, formally and informally, over the organization. When PJM was established, \nfiling rights over the OA were placed in the hands of the Members Committee, and PJM practice \nhas been to respect that allocation even when the Board would prefer a different allocation of re-\nsponsibility. At heart, the OA governs the organization itself akin to corporate bylaws, including \nkey questions like Board selection and the stakeholder process. Again, FERC’s authority over \nsuch matters of internal governance is relatively minimal, but it can advocate for common sense \nsolutions like the Board recommendations discussed above. It can also recommend an advisory \nstakeholder process as is common elsewhere in the country.   \n \nPPL Electric’s core transmission-related concerns are of course associated with the stake-\nholder process and are located in substantive schedules to the OA, particularly Schedule 6 gov-\nerning transmission planning. Because these are not related to PJM’s internal governance or or-\nganizational design, FERC’s authority is clearer and the need for change more direct. FERC \nshould work to facilitate the movement of these substantive provisions to the PJM Tariff where \nthey will be under Board control.9 Beyond these issues, PPL Electric supports changes to the \nstakeholder process that will streamline its own decision-making and increase accountability. \nIdeas include reducing the number of sectors from five to three (transmission owners, power sup-\npliers, and customers) to more closely match interest alignment and investment in the system.  \n \n9 PPL Electric commits to work with the other PJM transmission owners to make necessary changes to \nthe CTOA to facilitate this change. It will also continue to pursue related and non-controversial changes \nto update and modernize that agreement."},{"page":8,"startToken":2169,"endToken":2531,"text":"8 \n \nC. \nThe Role of the States \n \nFinally, because addressing resource adequacy will require the deregulated states to come \nto the table with changes to their energy policies, it is appropriate to address the elephant in the \nroom: what should the role of the states be in PJM?  \n \nPPL Electric’s strong view remains that “the deregulated states must exercise more au-\nthority over generation planning and investment than they have in the past.”10 At a minimum, \nthis will require coordination between the states and PJM beyond the level that has occurred in \nthe past. Such coordination is essential to ensure the success of the state energy policies within \nthe federally regulated market construct. The worst possible outcome would be for the states to \nmake a good faith effort to expand generation, but then see that effort stymied through uncoordi-\nnated PJM market rules or inconsistent federal policy. PPL Electric continues to support this in-\ncreased coordination and is open to efforts to deepen it, including more formal roles for OPSI, \nstate executives, and other officials where appropriate.  \n \nOn the resource adequacy technical conference panels last year, many voices went fur-\nther, calling for a more direct and potentially controlling role for the states in PJM.11 At the time, \nPPL’s response called this effort a mistake for three reasons:  \n \n10 See Meeting the Challenge of Resource Adequacy in Regional Transmission Organization and Inde-\npendent System Operator Regions, Docket No. AD25-7, Pre-Conference Statement of Wendy Stark on \nBehalf of PPL Corporation (May 16, 2025) at 3.    \n11 See, e.g., Meeting the Challenge of Resource Adequacy in Regional Transmission Organization and In-\ndependent System Operator Regions, Technical Conference Transcript Volume 1, Docket No. AD25-7 \n(Jun. 4, 2025) at 184:4–185:5 (Chair Thompson stating “the states … need to have more rights and more \nsay in what that capacity construct looks like”); 186:12–187:14 (Mr. Finkel stating “you don’t have … \nsufficient or, you know, comparatively really any state opportunity for engagement at PJM in a formal \nway”); 188:12–18 (President Guhl-Sadovy stating “[w]e certainly do need more of a role in the resource \nadequacy planning conversation at PJM”)."},{"page":9,"startToken":2531,"endToken":2882,"text":"9 \n \n• \nWho speaks for the state? There are practical difficulties in securing a single \nvoice to speak for the states collectively, or even any individual state. PJM’s re-\ncent experience is that governors and their staffs, public utility commissions (and \nindividual commissioners) and their staffs, siting boards, consumer advocates, \nlegislators, and others have all attempted at times to speak on behalf of the state.  \n• \nPJM does not need more gatekeepers. PJM’s process is already largely bogged \ndown and adding an additional layer of approval risks making the problem worse. \nEven the most constructive process can evolve for the worse over time. Adding to \nthe mix 14 additional potential chokepoints, each promoting distinct (and often \ncontradictory) energy policies, is at best a challenge.  \n• \nStates are sovereigns and not § 205 rights holders. The Federal Power Act is clear \nin reserving a sovereign role for the states.12 They are not given authority to file \nfor rate changes or tariff terms under § 205.13 \nPPL Electric expects to hear many of the same arguments at the upcoming technical conference, \nlikely refined into more specific requests for state control over PJM, perhaps including a request \nfor state filing rights over the PJM Tariff. PPL Electric approaches these questions with an open \nmind, but reiterates the points it made earlier doubting the legal and practical arguments for state \ncontrol of the RTO. It also recognizes that these types of fights get ugly quickly and can lead di-\nrectly to increased uncertainty in the energy markets. It’s worth saying again: the core problem \n \n12 16 U.S.C. § 824(b)(1) (disclaiming federal jurisdiction “over facilities used for the generation of elec-\ntric energy or over facilities used in local distribution or only for the transmission of electric energy in in-\ntrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the trans-\nmitter”).  \n13 16 U.S.C. § 824d. See also Meeting the Challenge of Resource Adequacy in Regional Transmission Or-\nganization and Independent System Operator Regions, Post-Technical Conference Comments of PPL \nCorporation, Docket No. AD25-7 (Jul. 7, 2025) at 12–13."},{"page":10,"startToken":2882,"endToken":3188,"text":"10 \n \nPJM faces in 2026 is underinvestment in generation. Only state policy changes can solve this. \nPJM must deepen its coordination with the states, but must focus on steps that will increase in-\nvestment in generation. This requires it to also remain independent of state control.  \nIII. \nRESPONSES TO QUESTIONS \n \nPPL Electric provides responses to the questions being discussed at the technical confer-\nence below:    \nA. \nResponses to Potential Questions: Panel 1 \n1. \nWhat is the PJM Board’s role in ensuring that PJM is sufficiently tackling \nthe region’s operational and market challenges? How does the Board eval-\nuate its effectiveness in that role? How often, and under what circum-\nstances, does the Board act unilaterally, and should this change? \n \nPJM’s Board sits at the center of nearly all the relevant questions facing PJM and the re-\ngion. First, the PJM Board controls PJM Tariff terms and conditions. This authority was dele-\ngated by the PJM transmission owners in the CTOA. Specifically, among other delegated re-\nsponsibilities, the PJM transmission owners granted the Board the power to (1) direct the opera-\ntion and coordinating the maintenance of their transmission facilities,14 (2) administer the PJM \nTariff and provide transmission service thereunder,15 (3) conduct certain regional transmission \nplanning,16 and (4) conduct transmission billing and payments.17 The PJM Board must act con-\nsistent with (A) safe and reliable operations, (B) a robust, competitive electric power market, and \n(C) protecting against undue influence over operations.18 It embodies PJM’s core responsibility \nto ensure reliable service and just and reasonable rates.  \n \n14 CTOA, §§ 4.1.2, 4.8, 6.3.1.  \n15 CTOA, §§ 4.1.1, 4.1.3, 6.3.2.  \n16 CTOA, §§ 4.1.4, 6.3.3, 3.4.  \n17 CTOA, § 6.3.6.  \n18 PJM Operating Agreement, § 7.7(i); CTOA, § 6.3.1."},{"page":11,"startToken":3188,"endToken":3485,"text":"11 \n \n \nPJM’s practice has been for the Board to act in concert with its stakeholders where possi-\nble. On the transmission side, PJM should certainly continue to work with its transmission own-\ners, who have collectively invested tens of billions of dollars in the system and who have their \nown concurrent obligations to ensure reliability and just and reasonable rates. On the market \nside, acting by consensus, or at least with strong majority support, strengthens the Board’s hand. \nA successful stakeholder process provides legitimacy for the Board’s decisions, increasing the \ndurability of market rule changes and reducing the friction to their acceptance at the Commis-\nsion. However, the Board must also be able to act without stakeholder support in appropriate \ncases. This is certainly true in emergent or emergency situations, unfortunately becoming more \ncommon as the region’s surplus generation margin continues to tighten. But it is also true where \nthe Board reasonably determines that a lack of support stems not from concerns over reliability, \nbut from parochial stakeholder interests or a misguided desire to affect short-term prices at the \nexpense of long-term reliability and price stability.  \n \nAlthough the current Board has acted without stakeholder support at times, this level of \nindependence is difficult to sustain given the structural restraints on the Board built into the OA. \nMoving to an advisory stakeholder process would reduce these constraints and empower the \nBoard to take actions it sees as necessary, while retaining the ability of Members to advocate for \ntheir position and persuade the Board to change course. Of course, no set of governance rules can \nlimit interested parties’ statutory right to advocate at the Commission under § 205 and § 206 of \nthe FPA and Commission rules, rights highly relevant to those on the losing end of a Members \nCommittee vote."},{"page":12,"startToken":3485,"endToken":3811,"text":"12 \n \n2. \nHow should states, through the Organization of PJM States, Inc. (OPSI) or \nother structures, interface with the Board to enable the region to meet op-\nerational and market challenges while respecting PJM’s independence? \n \nBecause much of the current discussion around PJM governance reform is focused on the \nrole of the states, it may be worthwhile to start with a caveat: PJM and the other RTOs are feder-\nally (FERC) regulated public utilities. They provide interstate transmission service and wholesale \npower sales. They do not provide retail service or generation planning, which are reserved to the \nstates under the FPA.19 Thus, the role of the states is simply more limited than in those areas \nwhere they have direct jurisdiction. That said, the states have an important role at PJM—espe-\ncially the deregulated states, which are not doing integrated resource planning. This role has not \nalways been well-defined. Now that the deregulated states face a crisis of generation planning \nand resource adequacy that will take serious public policy changes to address, it is absolutely ap-\npropriate to seek clarity and refinement in their interactions with PJM.  \n \nEven without changes, state participation at PJM is already robust. The PJM Tariff pro-\nvides for—with funding from PJM customers—two broad advocacy groups for state participa-\ntion in the stakeholder process and other PJM functions:  \n• \nThe Consumer Advocates of PJM States, Inc. (CAPS) consists of the state con-\nsumer advocates from each of the PJM states. CAPS is funded through the PJM \nTariff20 and is an active participant in the stakeholder process, as are many of the \nconsumer advocates themselves. Consumer advocates are also PJM Members, \nparticipating (i.e., voting) in the End Use Customer sector.21  \n \n19 See § 824(b)(1), Note 12, supra.  \n20 PJM Tariff, Schedule 9-CAPS, available at https://agreements.pjm.com/oatt/26422. \n21 Other state entities are also PJM Members. For example, many municipalities participate in the Electric \nDistributors sector."},{"page":13,"startToken":3811,"endToken":4137,"text":"13 \n \n• \nThe Organization of PJM States, Inc. (OPSI) consists of representatives from each \nof the state public utility commissions. It is also funded through the PJM Tariff22 \nand is an active participant in the PJM stakeholder process. Although OPSI mem-\nbers are not PJM Members and cannot vote in the Members Committee, OPSI \nmeets privately with the PJM Board pursuant to a Memorandum of Understand-\ning23 and has § 206 rights to intervene in FERC proceedings. OPSI is highly influ-\nential in setting PJM policy.  \nIn addition to these formal methods, the PJM states also interact with PJM informally through \npublic interactions, private meetings and other communications, and various industry forums.24 \nEven these preliminary and informal interactions have already led to immediate and significant \nimpacts on the PJM markets.25  \n \nThere are now proposals for an additional structure for PJM to interact with the states \nthrough their governors’ energy offices. It should go without saying that the governors are key \nconstituents of PJM. As elected executives, governors are responsible for public safety, eco-\nnomic development, and emergency response coordination in their states, each directly con-\nnected to PJM’s mission. PPL Electric applauds the governors’ attention to PJM and is \n \n22 PJM Tariff, Schedule 9-OPSI, available at https://agreements.pjm.com/oatt/4417.  \n23 Memorandum of Understanding between PJM Interconnection, L.L.C., and the Organization of PJM \nStates, Inc. (Jun. 1, 2005), available at https://opsi.us/wp-content/uploads/2020/02/OPSI_PJM_MOU_ex-\necuted_June_8_2005-1-1.pdf.  \n24 See PJM Governors’ Collaborative, Joint Statement of Intent, available at https://www.pjm.com/-/me-\ndia/DotCom/about-pjm/who-we-are/public-disclosures/2025/20250925-pjm-governors-collaborative-\njoint-statement-of-intent.pdf (identifying functions including “strategic engagement of PJM staff”).  \n25 See Commonwealth of Pennsylvania v. PJM Interconnection, L.L.C.¸ Order Accepting Tariff Revisions \nand Dismissing Complaint, 191 FERC ¶ 61,066, Docket Nos. ER25-1357, EL25-46 (Apr. 21, 2025) (ac-\ncepting settlement establishing capacity market price collar after complaint from Pennsylvania Governor \nShapiro)."},{"page":14,"startToken":4137,"endToken":4417,"text":"14 \n \ncommitted to working toward a structure for this interaction that empowers them and makes \nsense for the region. \n \nAlthough there has been limited detail publicly provided, PPL Electric understands the \nPJM governors are working on a model based on the New England State Committee on Electric-\nity (“NESCOE”). As the governors develop this concept, PPL Electric proposes some considera-\ntions to keep in mind:  \n• \nMore formality and structure is better. Rather than purporting to speak for a state \nor “the states” generally, this new entity should transparently lay out who it \nspeaks for and under what authority. This will avoid confusion, especially given \nother organizations like OPSI also participate in PJM on behalf of state govern-\nment. Ultimately the region may have to decide if it makes sense to have two sep-\narate organizations speaking for the states.  \n• \nState entities should be very clear as to their authority under state law. Each of the \nPJM states has its own constitution and each allocates power differently within its \nexecutive branch. For example, in Pennsylvania, the governor appoints the PUC \ncommissioners, but not the consumer advocate.26 State governments should clar-\nify what powers they delegate to interstate organizations like OPSI or a new state \n“governor committee.” It may also be advisable to limit positions in such commit-\ntees to officers of state government—selected by an elected official and con-\nfirmed by a legislature pursuant to state law—rather than informal advisors.  \n• \nThe states must be extremely careful not to mix their sovereign regulatory role \nwith their advocacy roles in the federally regulated markets. As discussed above, \n \n26 66 Pa. C.S. § 301(a); 71 P.S. § 732‑201(b)."},{"page":15,"startToken":4417,"endToken":4720,"text":"15 \n \nthe states have formal roles as regulators and public policymakers separate from \ntheir advocacy positions on federal issues. PJM is a federally regulated utility and \nshould be extremely cautious about mixing roles or giving authority to entities \nthat are not entitled to it under federal law.  \n• \nAny role for the states must respect the rights and obligations of public utilities \nunder the Federal Power Act. As noted earlier, efforts to require these rights be \nsurrendered to other entities have been soundly rejected by the courts.27  \nWith these considerations, PPL Electric applauds efforts to increase state participation in PJM \nand hopes that the Commission can identify proposals that will work for the region.  \n3. \nWhat governance reforms would best improve accountability and respon-\nsiveness? \n \nAs discussed above, PPL Electric supports limiting the Members to an advisory role, as \nwell as certain changes to the PJM Board rules that would facilitate its independence and lead to \nthe selection of more qualified candidates. PPL Electric is open to further discussions of matters \nsuch as resource adequacy filing rights and state involvement in PJM governance—particularly if \nthe deregulated states amend their energy policies and need to coordinate generation planning \nwith the PJM markets—but is cautious about proposing deep changes to PJM governance that \nwill lead to litigation and uncertainty in the energy markets.  \n4. \nHow does the division of Federal Power Act section 205 filing rights \namong PJM, Transmission Owners, and the Members Committee affect \nPJM’s ability to act effectively and quickly, when warranted, to address \noperational and market needs? \n \nThe PJM transmission owners retained filing rights over a limited set of matters in the \nPJM Tariff, notably rates and rate design. This division of authority has stood the test of time \n \n27 See Atlantic City, 295 F.3d 1, Note 6 supra."},{"page":16,"startToken":4720,"endToken":5103,"text":"16 \n \nsince initially negotiated more than 20 years ago.28 Although the substance of transmission rates \nand cost allocation are frequently (exhaustively) litigated,29 this merely reflects the significant \ninvestments made in regional transmission facilities rather than a problem with transmission \nowner filing rights. When the states have shown an interest in more direct involvement in trans-\nmission rates, they have been able to assert their influence even without filing rights.30 There is \nsimply no need for a change here and no legal ability for the Commission to order one.  \n \nThe PJM Transmission Owners delegated their filing rights over Tariff terms and condi-\ntions to PJM through the Atlantic City settlement and the CTOA.31 Unfortunately that settlement \nonly extended to filing rights over the PJM Tariff and did not reach key PJM functions, including \ntransmission planning and energy and capacity market administration, governed by the OA. As \ndiscussed above, the OA purports to require stakeholder approval before it can be amended \nthrough a § 205 filing. With the benefit of hindsight, placing substantive provisions under this \ngovernance structure was clearly a mistake. These provisions should be moved to the Tariff and \nplaced under the control of the PJM Board. For example, the well-documented failure of PJM to \ncontrol the Planning Protocol, located in Schedule 6 of the OA, has impeded necessary \n \n28 Pennsylvania-New Jersey-Maryland Interconnection, 105 FERC ¶ 61,294 (2003), appeal dismissed sub \nnom., Old Dominion Elec. Coop. v. FERC, 171 F. App’x 862 (D.C. Cir. 2005). \n29 See, e.g., Consolidated Edison Co., et al., Order on Remand, Complaint, Rejecting Tariff Proposal and \nSettlement, Directing a Compliance Filing, and Establishing Paper Hearing Procedures, 194 FERC \n¶ 61,179, Docket Nos. EL15-18, et al. (Mar. 6, 2026) (non-final order on seven open PJM cost allocation \ndockets dating back to 2014).  \n30 See PJM Interconnection, L.L.C., Offer of Settlement, Docket No. EL05-121-009 (filed June 15, 2016); \nPJM Interconnection, L.L.C., 163 FERC ¶ 61,168 (2018), order on clarification and reh’g, 169 FERC ¶ \n61,238 (2019), aff’d sub nom, Long Island Power Auth. v. FERC, 27 F.4th 705 (D.C. Cir. 2022). The \nstates were instrumental in bringing to a close more than eleven years of litigation over cost allocation in \nPJM. \n31 See PJM CTOA, § 7.5.1(a)."},{"page":17,"startToken":5103,"endToken":5445,"text":"17 \n \ntransmission planning.32 Non-transmission-owning stakeholders with various business interests \nin discouraging transmission development were accidentally gifted a major veto point—one they \nhave been extremely reluctant to give up.33 Notwithstanding the recent failure of the transmission \nowner / PJM attempt to remedy this situation through a FERC decision which did not determine \nwhether transferring the Planning Protocol to the Tariff was just and reasonable,34 this change \nremains a top priority. \n \nTo summarize: the correct principles governing the allocation of filing rights are found in \nthe CTOA. All filing rights that a FERC-regulated public utility would have, that were not re-\ntained by the transmission owners, should be delegated to PJM and exercised by the Board. This \nincludes administering the power markets and conducting resource planning (to the extent per-\nmitted by law). Everything transmission owners retain should be exercised by them, individually \nor collectively pursuant to the CTOA.  \n5. \nTo what extent do provisions in PJM’s Operating Agreement, Transmis-\nsion Owner Agreement, Open Access Transmission Tariff, Reliability As-\nsurance Agreement, or Manuals impede timely decision-making by PJM? \n \nAs discussed above, PJM should transition the stakeholders to an advisory role on sub-\nstantive issues. This should include moving the substantive schedules from the OA to the Tariff. \n \n32 See Duquesne Light Company, Docket No. ER24-2338, Note 3 supra, at Exhibit C (unrebutted Declara-\ntion of Mr. Pulin Shah, highlighting how PJM’s inability to independently propose changes to the Plan-\nning Protocol severely limited its ability to address system needs through planning).  \n33 See Supplemental Voting Results, PJM Members Committee (May 6, 2024), available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2024/20240506-annual/mc-\nvoting-results---item-08---proposed-oa-and-tariff-revisions-effectuating-the-transfer-of-the-regional-\ntransmission-expansion-planning-protocol.ashx at 3 (reporting vote against moving Planning Protocol to \nTariff despite overwhelming transmission owner support).   \n34 See PJM Transmission Owners, et al. v. FERC, No. 25-1064, 2026 WL 1617585 (D.C. Cir. June 5, \n2026) (upholding denial of CTOA amendments because FERC could have reasonably found proposed \namendment allowing transmission owners to delay PJM § 205 filing was unjust and unreasonable)."},{"page":18,"startToken":5445,"endToken":5752,"text":"18 \n \nAs proposed in Docket No. ER24-2336 and related dockets, this will require amendments to the \nCTOA, OA, and Tariff. It may also require amendments to the RAA.  \n \nPJM should also amend the portions of the OA necessary to effect the changes to Board \ntenure and selection, as discussed above.  \n \nFinally, PJM should consider changes to its stakeholder process Manuals to streamline \nthe stakeholder process. These changes do not require FERC approval, but are worth briefly ex-\nplaining here: PJM’s stakeholder process was designed to allow maximum openness and trans-\nparency. While these are important considerations and should not be casually disregarded, they \ncan sometimes come at a real cost in terms of timeliness and efficiency. In recent years, the num-\nber of consequential issues considered in the stakeholder process has risen. This has attracted \nmore attention and increased the time and cost of participating—costs which are passed on to \ncustomers. This increased issue valence has also attracted participation of non-PJM Members, \nwho run the gamut from academics proposing detailed changes to the energy markets to land-\nowners whose primary interest is protecting their real estate values and viewsheds. PJM may \nneed to propose changes to its Manuals such as firm timelines on action. Limiting participation \nin certain meetings to Members therefore makes sense.  \n6. \nRecognizing regional differences, are there lessons from other regional \ntransmission organization/independent system operator (RTO/ISO) gov-\nernance structures that PJM could reasonably adopt to improve its respon-\nsiveness to the region’s operational and market challenges? \n \nDifferent RTOs and ISOs evolved at different times and with different underlying rea-\nsons. The Commission is right to caution that they may thus require different approaches to the \ncommon problems of RTO/ISO governance. However, there are always benefits to information \nsharing and comparing best practices with others. Through its 2022 acquisition of The"},{"page":19,"startToken":5752,"endToken":6019,"text":"19 \n \nNarragansett Electric Company,35 now doing business as Rhode Island Energy, PPL is also a par-\nticipant in the ISO-NE and NEPOOL stakeholder processes. It has gathered some lessons in New \nEngland that may be applicable in the PJM region as well:  \n• \nA work plan provides valuable structure and guidance to the stakeholder process. \nISO-NE crafts an annual work plan, where each sector can suggest two to three \npriorities for the coming year, with the final work plan ultimately decided upon by \nISO-NE. This allows for a give-and-take on strategy before diving into any given \n(contentious) issue. It avoids some, but certainly not all, ambiguity about where \nthe region intends to change direction. \n• \nAn advisory stakeholder process lowers the temperature and allows clear guid-\nance to ISO-NE. Like most other regions (other than PJM), the stakeholder pro-\ncess in New England is largely advisory. ISO-NE and NEPOOL members work to \nachieve consensus. Rather than an arbitrary voting rule falsely conveying an au-\nthoritative decision, the stakeholder process usually culminates in an advisory \nvote where ISO-NE and its Board can observe which sectors (or sometimes indi-\nvidual companies) support or oppose an initiative. While the ISO-NE Board pro-\nvides valuable input and oversight, unlike the PJM Board, it does not frequently \nvote on major filings and initiatives. \n• \nLimiting attendance to some meetings facilitates give and take. NEPOOL meeting \nattendance is limited to ISO-NE employees, NEPOOL members (generators, \ntransmission owners, customer representatives, and others), ISO-NE Board \n \n35 See PPL Corporation et al., Order Authorizing Disposition of Jurisdictional Facilities, 176 ¶ FERC \n61,175, Docket No. EC21-87 (Sep. 23, 2021)."},{"page":20,"startToken":6019,"endToken":6322,"text":"20 \n \nmembers, and approved guests. Because almost everyone is an experienced player \nand understands the “rules” of participating, there is more frank, honest discus-\nsion that leads to better outcomes than in the PJM stakeholder process.  \n• \nMore informal meetings foster personal connection. NEPOOL sector meetings are \nheld throughout the year with policymakers, ISO-NE senior staff, and ISO-NE \nBoard members. This also allows for personal connections and more open dia-\nlogue than regularly occurs in PJM.  \nB. \nResponses to Potential Questions: Panel 2 \n1. \nDo sector-weighted voting and existing voting thresholds strike the right \nbalance between achieving consensus and taking timely action? \n \nThe PJM Members Committee rules require a weighted supermajority to act. This pro-\nvides formal limits on PJM’s ability to amend the OA, including its substantive schedules. PJM \npractice is to follow Members Committee direction in most circumstances where it is not re-\nquired as well, providing an informal but real check on its ability to amend Tariff terms and con-\nditions, Manuals, and the RAA. This gives veto power to a relatively small set of stakeholders.36 \nThe stakeholder voting threshold was made deliberately high to require an effort to reach consen-\nsus. It has prevented both good and bad filings, although until fairly recently, PJM was generally \nable to navigate the process despite the restriction.  \n \nMore recently, it has become apparent that changes need to be made to PJM governance, \nincluding at least some change to Member voting. Such changes should focus on making the \nstakeholder process advisory overall, reducing the ability of minority stakeholder coalitions to \nveto actions, but also reducing the ability of majority coalitions to ram through bad policies over \n \n36 See PJM OA, § 8.4 (defining Members Committee voting structure and requiring 2/3 majority of \nweighted vote to act, thus allowing 1/3 to block)."},{"page":21,"startToken":6322,"endToken":6648,"text":"21 \n \nPJM’s objection. Everyone will of course still retain the ability to provide information and argu-\nment for why their preferred policy is best, and to participate fully at FERC, but PJM and its \nBoard will be empowered to make a decision as to what to file.  \n \nOther potential changes, in addition to or perhaps instead of, a move to advisory voting \ncan also be considered. For example, the five sectors of the Members Committee (transmission \nowners, generation owners, distributors, end-use-customers, and other suppliers) are largely arbi-\ntrary and reflect overlapping interests with an overemphasis on customer voting that is not con-\nsistent with the FPA’s overall regulatory scheme (where utilities have unilateral power to file at \nFERC and customers and other stakeholders are given significant rights in the regulatory process \nitself). A more streamlined model, still a compromise from the statutory scheme, would reduce \nthe membership to three sectors (transmission owners, power suppliers, and customers), better \nreflecting the real dynamics of PJM and providing clearer guidance to the Board as to how a \ngiven policy will be received.37  \n \nOther more afield ideas include dividing the Tariff into subject areas with different stake-\nholders having more or less influence over those areas depending on interest or investment level. \n(TOs would continue to have more say over transmission issues, generators more say over the \npower markets, etc.) This is more complex and will likely be difficult to implement, so it may \nnot be the optimal path to begin with.  \n \n37 This change is best imagined in an advisory stakeholder process where the actual voting power of any \ngiven sector is less relevant, but may be even more necessary if the Members Committee retains its exist-\ning veto points. It is highly destabilizing for customers (who do not own any jurisdictional assets) to be \nable to unilaterally veto a proposed change to the Tariff without having to persuade a regulator the change \nis not just and reasonable."},{"page":22,"startToken":6648,"endToken":7022,"text":"22 \n \n2. \nWhat transparency reforms would improve the quality of PJM’s stake-\nholder process and increase stakeholder confidence in its decision-mak-\ning? \n \nTransparency is a useful metric for an organization as important as PJM, but increased \ntransparency is unlikely to lead to an improvement in the quality of the process or increased con-\nfidence in the decision-making. When FERC created ISOs in Order 88838 (and later refined the \nconcept in an RTO in Order 2000),39 it placed great emphasis on creating an independent organi-\nzation that nevertheless was open to input from its many stakeholders and largely operated in a \ntransparent process.40 With 25 years of experience, PJM’s processes have been shown to be very \nopen and transparent, with the current risk being too many “cooks in the kitchen” to produce a \nviable product. Instead of forcing additional openness that may impact the ability to have tough \nconversations and incentivize appropriate stakeholder compromises, PJM should focus on its \ngoals of reliability and just and reasonable rates. PJM governance reform should be deemed a \nsuccess if we achieve better outcomes on those metrics, rather than seeking additional transpar-\nency for its own sake.  \n3. \nAre there structured opportunities in the stakeholder process for state par-\nticipation (e.g., defined consultation windows, joint technical sessions) to \nprovide input on topics that are of interest to the states? \n \nAs discussed above in response to Panel 1, Question 2 (incorporated herein by reference), \nthere are already numerous formal structures for state participation in PJM. State Consumer Ad-\nvocates and municipalities participate directly in the stakeholder process as Members, and some \n \n38 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. by \nPub. Utils.; Recovery of Stranded Costs by Pub. Utils. & Transmitting Utils., Order No. 888, FERC Stats. \n& Regs. ¶ 31,036 (1996), aff’d in relevant part sub nom. Transmission Access Policy Study Grp. v.  \nFERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. FERC, 535 U.S. 1 (2002). \n39 Reg’l Tran. Orgs., Order No. 2000, FERC Stats. & Regs. ¶ 31,089 (1999).  \n40 Although transparency is not actually named as an RTO characteristic in Order 2000 and we should be \ncareful about imputing it as a requirement where it is not."},{"page":23,"startToken":7022,"endToken":7313,"text":"23 \n \nhave customer-funded organizations like CAPS to further facilitate this participation. Likewise, \nOPSI provides a similar service (again funded by PJM customers) for the state public utility \ncommissions, including meetings with the PJM Board. OPSI also has direct access to the PJM \nBoard via its Memorandum of Understanding.41  \n4. \nDo existing governing document provisions (e.g., Operating Agreement, \nManuals) impede stakeholder decision-making and what changes could be \nmade to address them? \n \nStakeholder decision-making is not the goal. The goal is reliable operations at just and \nreasonable prices.   \n \nAs to the details of the governing documents and how stakeholders can act to influence \npolicy, there is likely no perfect solution. PJM’s consensus-based issue resolution (CBIR) pro-\ncess was designed by experts in the field and has been continuously refined over many years to \nmaximize opportunities for input. Over time, as stakeholders have formalized their participation, \nthey have rationally become more firmly set in their opinions and unwilling to compromise on \npositions—which are based on the very real financial interests of their companies. Many issues \nin the stakeholder process simply come down to issues where no consensus can reasonably be \nreached: should prices be high or low? Should the region prioritize transmission investment or \ngeneration investment? Should the region favor state-specific clean energy programs that are not \nendorsed by other states in the region? No process document, no matter how refined, can elimi-\nnate the disagreements that exist over these issues or the interest of Members in advocating their \npositions. \n \nInstead, the Members should select an impartial Board to make the hard decisions neces-\nsary to operate a public utility and energy market as large and as complex as PJM. Members and \n \n41 See OPSI MOU, Note 23, supra at 3."},{"page":24,"startToken":7313,"endToken":7612,"text":"24 \n \nother stakeholders would remain free to advocate their positions to this Board, through whatever \nformal or informal processes exist. And they can provide significant expertise in the details of \nimplementation and market design. But asking a diverse set of stakeholders with directly com-\npeting interests to decide major important questions is simply setting the region up for stagnation \nand ultimately failure.  \n5. \nWhat reforms to the stakeholder process could ensure PJM can meet the \nregion’s challenges? \n \nFirst and foremost, the stakeholder process that currently hamstrings many PJM decisions \nshould be made advisory. The Board of Managers should run the organization, with the stake-\nholders providing input and expertise, but not deciding major questions.  \n \nOther questions, like who participates in the stakeholder process, what questions are pre-\nsented to it, how long everyone can speak, how long the process overall can continue, etc. are \nimportant details that do not need to be dictated by the Commission and may be initiated via a \nseparate PJM-initiated stakeholder process reform effort following these proceedings. These de-\ntails will follow if the Board is able to exert its independence over critical decisions through the \nOA and RAA.   \n6. \nWhat near-term reforms to stakeholder representation could PJM and its \nMembers take to improve speed in decision-making while preserving \nstakeholder input? \n \nSpeed in decision-making is not the goal. PJM’s mission is reliable operations at just and \nreasonable prices. To the extent PJM needs to speed its decision-making process, that largely \nfalls on the Board who is ultimately responsible for the RTO.  \n \nTo the extent the Board is hindered by the stakeholder process, reforms should remove \nthat hinderance by making the stakeholders advisory. Other reforms, like reducing the number of \nsectors, are discussed above. There are certain formal changes to the OA that are necessary for"},{"page":25,"startToken":7612,"endToken":7931,"text":"25 \n \nsuch changes, but ultimately PJM’s culture needs to change to allow more independent action by \nthe Board where necessary.  \n7. \nAre there elements of PJM’s committee structure that routinely contribute \nto delays? Are there stakeholder processes or issues that could be expe-\ndited or changed to provide greater focus on key issues and allow faster or \nmore unilateral action on others? \n \nPJM’s lower committees have been rendered largely irrelevant because the voting rules at \nthe Senior Standing Committees (Markets and Reliability Committee and Members Committee) \nhave different voting structures. Stakeholders who are more empowered by the MRC/MC rules \noften refuse to engage in the lower committees, where they will be out-voted due to affiliate vot-\ning rules, and instead save their substantive participation for the end of the process where they \nhave more influence. The result is an extended stakeholder process, with detailed issue charges, \nproblem statements, stakeholder education, interest identification, package design, and compro-\nmise voting—all of which takes significant time and investment—being thrown out after months \n(sometimes, years) of work and replaced by the preferred outcome of the working stakeholder \nmajority. The result is a lengthy and inefficient process that does not result in a viable product, \nbecause PJM or key stakeholders cannot accept the majority package which is the result of the \narbitrary Members Committee voting rules rather than reasoned decision-making.  \n \nAgain, the details can always be improved to speed the process and create better out-\ncomes, but the fundamental problem is the veto points built into the Members Committee voting \nrules. If the PJM Board were the ultimate decider, the process would simply work differently. In-\nstead of trying to reach a winning vote in an arbitrary process, the stakeholders would instead fo-\ncus on honing their market designs (or other proposed tariff changes) with an eye toward per-\nsuading an independent decision-maker (first the PJM Board, and ultimately the Commission)."},{"page":26,"startToken":7931,"endToken":8166,"text":"26 \n \n8. \nShould PJM increase the use of fast-path or time-bound review procedures \nto expedite committee action on high-importance topics? \n \nYes, where appropriate. These processes are an important tool and should remain in the \ntoolbox. They have developed something of a stigma in the stakeholder process because they are \nlooked at as an “end-run” around the more deliberative “proper” process. But in many cases, \nthey are the only way for PJM to arrive at a decision fast enough to respond to market needs.  \n \nAgain, the better solution is to empower the Board to act independently and convert the \nstakeholder process into an advisory process. When the stakeholders know the Board will make a \ndecision on a given timeline, they work toward the deadline to advocate and educate and will be \nless incentivized to use the stakeholder process to strategically delay action.  \n9. \nRecognizing regional differences, are there lessons from other RTO/ISO \nstakeholder processes that PJM could reasonably adopt to improve speed \nin voting processes and stakeholder representation? \n \nAs discussed above in response to Panel 1, Question 6 (incorporated herein by reference), \nthe ISO-NE and NEPOOL stakeholder processes work in a different context that cannot be di-\nrectly translated to PJM, but nevertheless there are some lessons that can be drawn from them, \nincluding creating a work plan, moving to an advisory stakeholder process, limiting attendance \nto certain meetings, and increasing opportunities for informal discussion."},{"page":27,"startToken":8166,"endToken":8224,"text":"27 \n \nIV. \nCONCLUSION \n \nPPL Electric thanks the Commission for raising these important topics and asks that its \ncomments be considered part of the record.  \n \nRespectfully submitted,  \n \nSteven M. Nadel \nSenior Counsel \nPPL Services Corp.  \n645 Hamilton Street, Suite 601 \nAllentown, PA 18101 \nTel. 610.774.4775   \nSMNadel@pplweb.com \n \nCounsel for PPL Electric Utilities Corp. \nJuly 22, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":692,"startToken":0,"endToken":98},{"p":1,"at":692,"title":"I. BACKGROUND AND NEED FOR REFORM","method":"printed heading","endPage":4,"endAt":170,"startToken":98,"endToken":951},{"p":4,"at":170,"title":"II. INTRODUCTORY COMMENTS","method":"printed heading","endPage":5,"endAt":455,"startToken":951,"endToken":1288},{"p":5,"at":455,"title":"A. The Board of Managers and Filing Rights","method":"printed heading","endPage":7,"endAt":5,"startToken":1288,"endToken":1870},{"p":7,"at":5,"title":"B. The PJM Members and the Stakeholder Process","method":"printed heading","endPage":8,"endAt":5,"startToken":1870,"endToken":2170},{"p":8,"at":5,"title":"C. The Role of the States","method":"printed heading","endPage":10,"endAt":286,"startToken":2170,"endToken":2928},{"p":10,"at":286,"title":"III. RESPONSES TO QUESTIONS","method":"printed heading","endPage":27,"endAt":6,"startToken":2928,"endToken":8167},{"p":27,"at":6,"title":"IV. CONCLUSION","method":"printed heading","endPage":27,"endAt":394,"startToken":8167,"endToken":8224}]}