{"document":{"slug":"rec-20260723-4001","title":"Pre-Conference Comments of The PJM Legislators’ Collaborative re the PJM Governance and Stakeholder Reforms","issued":"2026-07-23","accession":"20260723-4001","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM LEGISLATORS' COLLABORATIVE","kind":"comments","file":"sources/filings/text/20260723-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-4001","tier":"record","sha256":"584dfdfda0e607ed969247ee1428392597a7123e871dd123a9bceeec286b504f","pages":55,"tokens":19990,"emptyPages":[],"textThemes":["registry","adequacy","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":427,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n1 \nBefore the Federal Energy Regulatory \nCommission \nPJM Governance and Stakeholder Reforms  \nDocket No. AD26-7-000 \nPRE-CONFERENCE COMMENTS OF THE PJM LEGISLATORS’ COLLABORATIVE \nThe PJM Legislators’ Collaborative (Collaborative) is a bipartisan coalition of state legislators \nrepresenting the 13 states and the District of Columbia within PJM's footprint. The Collaborative \nwas formed in 2025 in response to growing concerns over rapidly rising electricity costs, resource \nadequacy, and the unprecedented increase in electricity demand driven by large data centers and \nother emerging loads. As the Collaborative sought regional solutions to these challenges, PJM's \nexisting governance and stakeholder processes were unable to respond with the speed, \ntransparency, or accountability required. The issues surrounding data center load growth illustrate \nthese broader structural challenges and underscore the need for governance reform. \nIn preparation for this Technical Conference, the Collaborative surveyed states to identify areas of \ncommon concern regarding PJM governance and the extent to which its current structures continue \nto serve the public interest. While individual states differ in their specific policy priorities, \nresponses across the nine participating states revealed broad agreement that PJM's governance \nframework has not kept pace with the modern electric grid or evolving state energy policy. Across \nthe region, states expressed concerns that the current governance model does not provide sufficient \ntransparency, accountability, or meaningful opportunities for state participation, despite the fact \nthat state governments ultimately bear responsibility for utility regulation, consumer protection, \nenergy policy implementation, and responding to the ratepayer impacts of PJM's decisions.  \nMany states also pointed to specific experiences that illustrate these broader structural concerns. \nFor example, Illinois described a delay of more than four years in PJM incorporating the state's \nClimate and Equitable Jobs Act into regional planning, frustrating the implementation of duly \nenacted state law. Pennsylvania cited its successful efforts to establish a FERC-approved capacity \nmarket cap—which has already saved ratepayers approximately $45 billion—as evidence that \nstates can improve outcomes through active engagement. However, Pennsylvania emphasizes that \nsuch interventions are an inefficient substitute for meaningful participation in PJM decision-\nmaking. States also raised concerns regarding limited access to the data and analytical assumptions \nunderlying major planning decisions.   \nCollectively, these responses reflect a shared view that PJM's governance framework must evolve \nto better recognize the role of states as public institutions responsible for protecting affordability, \nreliability, and the public interest. Although participating states differ on certain implementation \ndetails, they expressed broad bipartisan agreement on five mutually reinforcing governance \nreforms that would strengthen public accountability, improve state participation, enhance \ntransparency, and better align PJM's governance with its public-interest responsibilities."},{"page":2,"startToken":427,"endToken":891,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n2 \nTogether, states in the Collaborative support establishing a governance framework that (1) clearly \ndefines PJM's public-interest mission, (2) gives states a meaningful institutional role, (3) \nstrengthens Board independence and accountability, (4) modernizes decision-making, and (5) \nimproves transparency and oversight. Specifically, the Collaborative recommends: \n  \n1. Establish a Public Interest Governance Mandate. FERC should direct PJM to \nrestructure its governance framework to operationalize the Board’s duty to serve the \nbroader public interest across the region.  This includes amending its foundational \noperating agreements to legally balance system reliability and affordability.  \n2. Create a Formal State Governance Role. There should be an independent regional state \ncommittee, composed of Governors, legislators, and regulators, funded through the RTO \ntariff and governed by state-appointed managers. This group should have \"jump ball\" or \ndirect filing rights to submit proposals to FERC regarding cost allocation and market rules \n– the same authorities available to states in many other RTOs. This committee should have \nexplicit authority to commission independent studies, paired with mandatory disclosure of \nPJM’s major planning assumptions and methodologies so external experts can evaluate \nthem. PJM should be required to undergo a formal reconciliation process with the state \ncommittee before submitting major filings to FERC.  \n3. Strengthen Board Independence and Accountability.  To better align the Board with \nstate and ratepayer interests, FERC should direct PJM to expand Board qualification \nrequirements to include experience in public service and expertise regarding consumer and \nratepayer impacts. FERC should also require formal, quantifiable performance metrics \nagainst which the Board is evaluated by FERC. In addition, the regional state committee \nshould have a formal role in nominating PJM Board members. \n4. Modernize the Stakeholder Process. PJM should enhance the Board’s ability to act when \nstakeholder processes reach deadlock and should extend weighted voting to prevent large \nfirms from dominating votes via affiliate voting. In addition, PJM should provide formal \ngovernance roles, as well as technical assistance and other resources to state representatives \nand consumer advocates.  \n5. Strengthen Transparency and Accountability.  PJM should record and archive all \nstakeholder and Board meetings, votes, and Board rationales in a searchable database.  PJM \nshould provide appropriate and secure access to raw data, planning assumptions, and \nstandardized, reproducible load-forecasting models for state utility commissions and \nconsumer advocates. FERC should designate an Independent Transmission Monitor to \nprovide impartial oversight of transmission planning, cost allocation, and speculative \ninterconnection.  \nThe recommendations reflect the overarching principles that should guide PJM governance \nreform: restoring accountability, improving responsiveness, and ensuring that PJM's decisions are \naligned with state policy priorities and the interests of ratepayers. Compared with other Regional \nTransmission Organizations (RTOs), PJM provides states with a more limited formal role in \ngovernance and key decision-making processes. The Collaborative's recommendations draw on \ngovernance structures that have been successfully implemented in other RTOs while reflecting"},{"page":3,"startToken":891,"endToken":1328,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n3 \nPJM's unique regional responsibilities. The following sections examine each major area of PJM \ngovernance in greater detail, outlining the specific reforms the Collaborative believes are necessary \nto modernize PJM's governance, strengthen the role of states, and promote a more transparent, \naccountable, and effective regional planning process. \n1. Institutional Governance Reform \n \nThe energy landscape in which PJM operates is undergoing fundamental changes, with the \nincrease in data center development and associated surge in demand, a shift in energy resources as \nolder coal and gas-fired facilities face retirement, and growing consumer affordability challenges. \nAt the same time, PJM has failed to address large load growth without radically increasing \ncustomer bills, which has created uncertainty about future resource adequacy, grid reliability, and \ncost management.  \n \nAcross the comments submitted by the Collaborative, states expressed broad agreement that PJM's \ncurrent governance structure is outdated and no longer capable of managing the modern energy \ntransition. Legislators consistently describe a governance model that responds too slowly to \nemerging challenges, is structurally incapable of adapting to a rapidly changing electric system, \nand increasingly forces states to intervene individually on issues such as resource adequacy, grid \nreliability, and consumer protection. Ohio emphasizes that PJM’s governance allows the \ngeneration portfolio to remain dominated by \"outdated, high-cost legacy generation\" despite \ncleaner projects being faster and easier to finance, directly harming affordability. Pennsylvania \ncharacterizes the growing disconnect between the pace of grid transformation and PJM's decision-\nmaking as a direct threat to residents, while Illinois emphasizes that state actions should \ncomplement PJM—not compensate for its inability to act.  \n \nStates also share a common concern that PJM's governance framework fails to adequately \nrepresent the public interest or the state authorities charged with protecting it. Multiple states note \nthat PJM's foundational documents impose no affirmative obligation on the Board to consider \naffordability, ratepayer impacts, or broader public policy objectives, leaving decisions to be \nprimarily driven by the interests of corporate market participants. At the same time, states argue \nthey are systematically excluded from meaningful governance despite bearing primary \nresponsibility for energy policy, resource adequacy, and consumer protection. Existing \nmechanisms such as the Organization of PJM States, Inc. (OPSI) remain advisory, with no \nrequirement that PJM incorporate state recommendations, leaving the organization insufficiently \naccountable to the 67 million ratepayers who ultimately fund the system. Maryland and \nPennsylvania suggest re-chartering PJM, LLC as an interstate compact public benefit entity. They \nuse the Port Authority of New York and New Jersey and the Delaware River Basin Commission \nas examples in which the federal government recognized that shared regional infrastructure could \nnot be managed by fragmented, competing jurisdictions."},{"page":4,"startToken":1328,"endToken":1782,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n4 \nRecommendations \n \n1. To address the institutional and structural PJM faces, the Collaborative recommends \nthe following reforms:  \n1.1 Codify a Public Interest Mandate: FERC should direct PJM to amend its foundational \ngoverning documents to legally mandate that the organization is accountable to the public \ninterest and balances system reliability and affordability.    \n1.2 Reconfigure the corporate structure of PJM: FERC should restructure the foundational \nmodel of PJM’s governance to ensure that there is accountability for the outcome of PJM’s \ndecisions and to ensure that accountability serves the public interest. Among the Collaborative’s \nmembers, a range of suggestions were put forth on what fundamental governance restructuring \nshould be. But overwhelmingly, consensus among states is that PJM’s current governance \nstructure cannot quickly and effectively respond to the current challenges of the evolving energy \nlandscape. Thus, the Collaborative does not prescribe a single structural model but recommends \nthat FERC ensure that a restructured governance model for PJM creates a grid operator that can \nbe flexible and adaptable to new challenges, can be held accountable for its decisions and \noutcomes, and can ensure that accountability serves the ratepayers who fund it. \nThese recommendations aim to create a modern governance framework in which PJM is both \nstructurally accountable to the public interest and institutionally capable of responding quickly, \ntransparently, and responsibly to the evolving challenges facing the regional grid. \n2. States Roles & Filing Rights \n \nUnder PJM’s current structure, states are limited in their role in PJM’s decision-making process. \nThe public utility commissions in each member state provide state representation through their \nmembership in OPSI, which is a non-voting member of PJM. \nAccording to PJM, OPSI should play a role in supporting a cooperative regional approach among \nthe states on PJM issues and in advising PJM on regulators’ concerns and viewpoints. PJM, \nhowever, is not legally mandated to incorporate any of OPSI’s recommendations. Instead, states \nin the Collaborative find that OPSI’s role at PJM falls more to that of a non-binding consultant, \nultimately leaving states with no formal authority within PJM’s governance structure.  \nMany states note that the decisions made by PJM ultimately impact the states. As an example, \nsome states discussed how PJM’s slowness to clear the interconnection queue backlog resulted in \nlost generation projects, which impacted job growth in the states and contributed to rate increases. \nThose who are impacted by PJM’s decisions - residents and businesses - look to the states to \nanswer for rising energy costs and grid reliability issues, not PJM. \nThe responses from PJM states demonstrate a clear, unified demand for formal, institutionalized \nauthority rather than the current model of non-binding consultation. Indiana, which is served by \nboth PJM and MISO, has direct experience with different regional governance models. They"},{"page":5,"startToken":1782,"endToken":2227,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n5 \nsuggest that at minimum, states should be able to participate in the PJM Board nomination process \nand receive early notice of major changes in load forecasts, reliability projections, or planning \nassumptions. Other states agree that as the entities responsible for protecting ratepayers and \nimplementing energy laws, they require a \"seat at the table\" that carries legal weight. \nRecommendations \n2. To establish a formal role for states in PJM’s decision-making process, the Collaborative \nrecommends the following reforms: \n2.1 Grant States a Role in Board Member Nominations: States should have a formal role in \nthe Board of Managers nomination or selection process. Maryland and Illinois suggest modeling \nthis after MISO, where representatives from the states sit directly on the Board Nominating \nCommittee. \n2.2 Mandate Administrative Reconciliation: Many states recommend that FERC require PJM \nto undergo a formal reconciliation process with states before submitting major filings to FERC. \nStates should also have the ability to request regular joint technical sessions with the PJM Board \nto ensure state policies are embedded in the planning process from the start. \n2.3 Establish a formal structure for state engagement: There should be established an \nindependent regional state committee, composed of Governors, legislators, and regulators, \nfunded through the RTO tariff and governed by state-appointed managers. In addition to the \nCollaborative, Pennsylvania points to the PJM Governors Collaborative as an example of \nstructured state engagement with PJM. Maryland highlights how the New England States \nCommittee on Electricity provides ISO-NE states the authority to engage with ISO-NE. \n2.4 Grant States Section 205 Filing Rights: FERC should provide states with \"jump ball\" or \ndirect filing rights to submit their own proposals to FERC regarding cost allocation and market \nrules. Illinois, Maryland, New Jersey, and Pennsylvania all explicitly call for states to have \nSection 205 direct filing rights. This would allow states to submit their own proposals to FERC \non matters like cost allocation and resource adequacy, rather than only reacting to PJM’s filings.  \nThese recommendations aim to embed states as formal, empowered partners in PJM’s governance \nstructure—ensuring that state policy priorities and ratepayer interests are integrated into PJM \ndecisions from the outset rather than treated as external commentary after the fact. \n3. Board Reform and Accountability \n \nThe PJM Board is intended to satisfy FERC’s directive that each RTO’s governance structure be \nindependent of financial or other conflicting interests in the RTO’s markets and stakeholder \ngroups. States in the Collaborative generally agree that the current Board lacks sufficient \naccountability to public interests, particularly the interests of the 67 million ratepayers who \nultimately bear the financial and reliability risks of Board decisions. Some states noted that the"},{"page":6,"startToken":2227,"endToken":2674,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n6 \nBoard’s primary fiduciary duty is directed toward its corporate market members, and question \nwhether this allows the Board to truly act independently of its stakeholders.  \n \nMany states note that there is no formal accountability structure, such as performance metrics or \nexternal review, for Board members or the Board as a whole. Pennsylvania and Maryland note that \nwhen markets fail or interconnection queues stall, there is no mechanism to compel the Board to \ntake immediate action to remedy the issues. In response, Maryland suggests that the PJM Board \nshould be granted independent Section 205 filing rights that do not rely on stakeholder consensus. \nSome states additionally note that the Board is beholden to the Members Committee for certain \nreforms, giving stakeholders de facto veto authority and blocking necessary action. Most \nresponding states also note that the Board’s decisions are frequently reactive to problems rather \nthan proactively improving efficiency or processes. This makes PJM unacceptably slow to respond \nto emerging issues.   \nRecommendations \n3. To address the issues with the Board’s independence and accountability, the \nCollaborative recommends the following reforms: \n3.1 State Representation: Nearly all specifically noted that they would like states to have a role \nin nominating or selecting board members, with some citing MISO as an example.   \n3.2 Require Diverse Expertise Requirements for Board Members: Many states note that the \nBoard lacks accountability to public interests, including ratepayer interests. Illinois and \nPennsylvania suggest that there should be a requirement for some Board members to have \nexperience in state regulatory commissions or consumer advocacy organizations.  \n3.3 Implement Binding Performance Metrics: Some states, including Pennsylvania and \nMaryland, noted in their response that there should be formal and quantifiable performance \nmetrics that the Board should be held accountable to. Maryland specifies load forecasting \naccuracy and queue execution speed as performance metrics. \nThese recommendations aim to strengthen Board accountability by ensuring states can shape \nBoard membership, require diverse public‑interest expertise, and hold PJM’s leadership to clear, \nmeasurable performance standards. \n4. Stakeholder Process & Voting Mechanics \n \nAcross participating states, there was broad agreement that PJM's stakeholder process is no longer \nfunctioning as an effective mechanism for regional decision-making. States consistently identified \nPJM’s stakeholder process as one of the principal barriers to timely and effective governance. \nWhile the process was designed to build consensus among market participants, many respondents \nbelieve it has instead resulted in a system in which it is increasingly difficult to implement reforms \nneeded to maintain reliability, address affordability, and respond to rapidly emerging challenges. \nRather than facilitating collaboration, the stakeholder process too often rewards maintaining the \nstatus quo, even when broad agreement exists that reforms are needed, according to participating \nstates."},{"page":7,"startToken":2674,"endToken":3045,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n7 \n  \nThe current voting structure allows relatively small coalitions of stakeholders to block proposals \nindefinitely, resulting in regulatory paralysis and making it difficult for PJM to modernize market \nrules or respond to changing grid conditions. The current governance model does not provide the \nBoard with sufficient flexibility to act in the broader public interest when the stakeholder process \nreaches an impasse. \n \nIn addition, the stakeholder process disproportionately reflects the interests of incumbent market \nparticipants while providing woefully insufficient representation for the 67 million residential \nratepayers who have paid into the system for generations. States are often left to pursue lengthy \nand resource-intensive proceedings before the Federal Energy Regulatory Commission when the \nstakeholder process fails to produce timely or appropriate reforms. \nMeaningful participation in PJM's committees requires substantial time, financial resources, and \ntechnical expertise, creating barriers for many non-industry stakeholders. Although hundreds of \norganizations are eligible to participate in PJM's voting process, relatively few actively do so, \nallowing well-organized stakeholder coalitions to exert outsized influence over outcomes. \n \nCollectively, these concerns reflect a broader view that PJM's governance structure has not kept \npace with the evolving responsibilities of states or the increasingly significant financial and \nreliability consequences of regional market decisions. \nRecommendations \n4. To better balance efficient decision-making with meaningful stakeholder participation, \nthe Collaborative recommends the following reforms: \n4.1 Strengthen States and Consumer Representatives: Provide formal governance roles and \ngreater influence over major decisions. \n4.2 Reduce Participation Barriers: Provide technical assistance and other resources for \nconsumer advocates and state representatives. \n4.3 Expand Sector-Weighted Voting: Extend weighted voting to all standing committees to \nprevent large firms from dominating via affiliate voting. \n4.4 Empower Board Flexibility: Enhance the ability for the Board to act when stakeholder \nprocesses reach deadlocks or fail to address urgent reliability or affordability concerns. \nThese recommendations aim to create a stakeholder system that is both faster and more \nrepresentative - one that preserves meaningful participation while giving PJM the flexibility, \nbalance, and structural support needed to act decisively in the public interest. \n5. Data Transparency & Independent Verification \n \nThe responses from the Collaborative reflect consensus: the current operational structure of PJM \nhas caused a structural transparency deficit that undermines regulators’ ability to protect ratepayers"},{"page":8,"startToken":3045,"endToken":3460,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n8 \nand ensure costs are incurred appropriately. Furthermore, the closed and opaque nature of \nstakeholder deliberations limits public confidence in PJM's decision-making and makes \nmeaningful oversight more difficult for state policymakers.  \n  \nStates are forced to rely on PJM’s internal conclusions for forecasts that represent billions of \ndollars in ratepayer costs without the ability to independently review them. Because PJM does not \nprovide access to the underlying data, models, or methodologies, states and consumer advocates \ncannot reproduce or validate the results that drive transmission spending, capacity accreditation \noutcomes, and long-term resource adequacy decisions. This dynamic leaves state officials \naccountable for costs they cannot meaningfully interrogate.  \n \nIn response, several PJM states have passed or introduced legislation requiring independent \nvalidation of utility load forecasts before they are submitted to PJM, yet PJM itself bears no \ncomparable transparency or accountability obligation for the forecasts that underpin regional \nplanning decisions despite the significant cost impacts of inaccuracy. Illinois notes that few, if any, \nPJM proposals have cost information before a vote and suggests it should be standard practice to \nevaluate the cost impacts of any proposal as part of the First Read at the Markets and Reliability \nCommittee/Members Committee. Indiana recommends that public record should show who \ncreated the need for each project, who benefits from it, whether competitive alternatives were \nconsidered, and how the costs will be assigned. \n \nStates also highlight that PJM’s stakeholder process compounds these transparency issues by \nprivileging well-resourced, fully staffed, commercial and industrial participants. This creates an \nuneven playing field for states and consumer advocates in which critical planning decisions are \nshaped without balanced representation. \nRecommendations \n5. To rebuild transparency, strengthen independent oversight, and ensure planning is \naccountable to those ultimately bearing the costs, the Collaborative recommends the \nfollowing reforms:  \n5.1 Independent Verification and Data Access: Provide appropriate and secure access for \npublic utility commissions and consumer advocates to raw data, planning assumptions, and \nforecasting models; establish a secure clearinghouse for confidential data; and create \nstandardized, reproducible load-forecasting processes. \n5.2 Governance Transparency: Record and archive all stakeholder meetings; publish all \ncommittee votes; and establish searchable archives of decisions, votes, and Board rationales. \nRequire cost impacts to be published with Board decisions. \n5.3 Enhanced State Communication: Require that PJM proactively communicate with relevant \nstates when decisions are being made which directly impact them. \n5.4 Independent Studies: The regional state committee should have explicit rights to \ncommission independent studies on affordability, reliability, and emerging load trends, paired"},{"page":9,"startToken":3460,"endToken":3774,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n9 \nwith mandatory disclosure of PJM’s major planning assumptions so external experts can \nevaluate them. \n5.5 Improve Transmission and Load-Forecasting Integrity: Create an Independent \nTransmission Monitor to provide impartial oversight of transmission planning and cost \nallocation, as well as eliminate opportunities for speculative interconnection and duplicate load \nsubmissions which undermine the accuracy of load forecasting. \n \nThese recommendations would establish a more transparent, accountable, and independently \nverifiable planning and decision-making process. They would provide states and consumer \nadvocates with meaningful access to the information, analytical tools, and oversight mechanisms \nnecessary to evaluate PJM's decisions, strengthen the integrity of transmission and load \nforecasting, and ensure that planning outcomes are subject to independent scrutiny before billions \nof dollars in costs are imposed on ratepayers. \n \nConclusion \n \nCollectively, these recommendations would transform PJM's governance from one driven \nprimarily by member dialogue into one that is accountable to the broader public interest, with \nmeaningful institutional roles for the states responsible for protecting consumers. Together, they \nwould establish a clear public-interest mandate, strengthen state participation and independent \noversight, enhance Board accountability, modernize decision-making, and improve transparency \nthroughout PJM's governance and planning processes. These reforms would better equip PJM and \nstates to address emerging challenges while restoring public confidence in regional decision-\nmaking. They would provide PJM, FERC, and states with the governance tools necessary to \nidentify problems earlier, resolve disagreements more effectively, and implement timely regional \nsolutions that better protect reliability, affordability, and the public interest. The Collaborative \nappreciates the opportunity to provide these comments and looks forward to the Technical \nConference on July 23. \n \nRespectfully Submitted, \n \nSenator Katie Fry Hester \nMaryland, District 9 - Howard and Montgomery Counties \nChair, Energy Subcommittee, Senate Education, Energy and Environment Committee \n304 James Senate Office Building, 11 Bladen Street \nAnnapolis, MD 21401 \n410-841-3671 \nKatieFry.Hester@senate.maryland.gov \n \nOn Behalf of the PJM Legislators’ Collaborative \nDated: July 22, 2026"},{"page":10,"startToken":3774,"endToken":4016,"text":"PJM LEGISLATORS’ COLLABORATIVE – EXECUTIVE SUMMARY \n \n10 \n \n \n \nAbout The PJM Legislators’ Collaborative  \n \nIn response to rising energy costs and the limited influence of states over PJM policies due to the \ncurrent governance structure, state legislators from across the region came together to form the \nPJM Legislators’ Collaborative. The Collaborative brings together state legislators from all 13 \nstates and the District of Columbia within the PJM footprint who share a bipartisan commitment \nto reliable, affordable energy for the ratepayers we represent. As legislators, we occupy a unique \nposition in the energy ecosystem: we enact the laws governing utilities, oversee state regulatory \nframeworks, and are directly accountable to the constituents affected by PJM and FERC decisions.  \nThe Collaborative has engaged directly with PJM to ensure that state perspectives are meaningfully \nincorporated into regional market reforms and other decisions with significant implications for \nreliability, affordability, and cost allocation.  Specifically, we have engaged as follows:  \n● Submittal of Protecting Ratepayers Proposal during the CIFP Process (November, 2025) \n● Letter in response to PJM's CIFP Proposal (November, 2025) \n● Letter regarding Reliability Backstop Procurement (RBP) Process (March, 2026) \n● Requested PJM to change the problem statement and issue charge, and include taking large \nloads out of the capacity market in the RBP process at their Markets and Reliability \nCommittee Meeting (April, 2026) \n● Attended the PJM Annual Meeting and met with PJM Board Members and FERC staff \n(May, 2026) \n● Letter regarding supported principles for the Connect and Manage and RBP Process (June, \n2026)"},{"page":11,"startToken":4016,"endToken":4374,"text":"DELAWARE - STATE COMMENTS \n11 \nDelaware - State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \nSen. Stephanie Hansen, Chair of Senate Environment, Energy and Transportation Committee, \nStephanie.Hansen@delaware.gov (lead author) \nRep. Frank Burns, Member of House Natural Resources and Energy Committee, \nFrank.Burns@delaware.gov  \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nDelaware is a deregulated state and a net energy importer. Delmarva Power is our largest and \nonly commission-regulated electric utility, followed by the Delaware Electric Cooperative, \nthen our nine municipal electric companies organized as members of the Delaware Municipal \nElectric Corporation. \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform. \n \nThere does not seem to be a formal way for states to make their issues known to the PJM \nBoard and then track any movement on those issues.  No one seems to be accountable to the \nstates.  There should be someone on the PJM Board that is selected or nominated by the states.  \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes.  \n \nThe states should have a role in either selecting or nominating a member to the PJM Board. \nThere should also be formal outreach to the states before filings to gather information relevant \nto the subject matter of the filing.  \n \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include \nstate-selected or state-nominated seats; establishing formal board performance metrics"},{"page":12,"startToken":4374,"endToken":4750,"text":"DELAWARE - STATE COMMENTS \n12 \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nThe states should have a role in either selecting or nominating a member to the PJM Board. In \naddition, as part of the decision-making process on matters before the Board, the issue of \nratepayer affordability should be an explicit consideration. \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority.   \n \nTransparency in the stakeholder voting process is lacking.  There should be some repository of \nitems (searchable) that have been voted upon, the vote made by each stakeholder, and the date. \nIn addition, the voting threshold should be lowered for the passage of proposals, perhaps \nemploying ranked choice voting when multiple options are presented. \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?  \n \nStates would benefit from improved access to PJM’s operational and market data, particularly \non resource adequacy and reliability risks. PJM should develop a searchable repository of this \ninformation. This should include stakeholder voting records and the rationale behind key \ndecisions by the Board.  \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?   \n \nPJM moves too slowly in coming to decisions on important, emerging issues.  More process is \nnot better when decision-making is time-sensitive."},{"page":13,"startToken":4750,"endToken":4795,"text":"DELAWARE - STATE COMMENTS \n13 \n \n7. OTHER: Please add any other comments or respond to the FERC technical \nconference panel questions specifically here:   \n \nThere should be a route for the states to directly intervene at FERC in addition to having better \ninput on PJM decision making."},{"page":14,"startToken":4795,"endToken":5232,"text":"ILLINOIS - STATE COMMENTS  \n14 \nIllinois - State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \nSen. Rachel Ventura \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nRestructured state; net exporter. Illinois is split between PJM and MISO, with the ComEd \nutility region (northern Illinois, including Chicagoland) in PJM. We have leading climate laws \nthat require a transition to a carbon-free electricity system by 2045.  \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nPJM states have the least formal input of any RTO/ISO. This has led to an untenable situation \nwhereby states are both responsible for fundamentals like resource adequacy but lack the \nability to meaningfully effectuate their own laws. While OPSI and the Independent State \nAgencies Committee (ISAC) provides input to PJM, it is non-binding and often easy to ignore. \nFor example, the ISAC submits a workbook of state policies that PJM should account for in its \nplanning each year. However, PJM is inconsistent in how it accounts for those policy effects. \nFor example, PJM did not begin accounting for our Illinois Climate and Equitable Jobs Act \n(passed in 2021) until the 2025 RTEP, and even then, it does not account for it holistically. For \nexample, CEJA creates priority zones for transmission, but PJM does not account for that in its \nlong-term planning. This frustrates the implementation of Illinois state laws.  \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes.  \n \n205 filing rights: At minimum, OPSI should have 205 “jump ball” filing rights to enhance \nstate input. This jump ball could be exercised with a majority vote of OPSI members and \napply to transmission cost allocation, market rules, and resource adequacy, similar to \nSouthwest Power Pool’s Regional States Commission. Given that states do not have a vote in \nthe PJM stakeholder process (which would inappropriately place states on even footing with \nother PJM Members), having jump ball filing rights is fundamental to giving states formal"},{"page":15,"startToken":5232,"endToken":5626,"text":"ILLINOIS - STATE COMMENTS  \n15 \ninput. 205 filing rights would also encourage OPSI members to come to agreement, since at \nleast a majority would need to share a position in order to exercise the filing rights.  \n \nOPSI input: it should be standard practice that the Board formally consults with OPSI prior to \nmajor filings. Some of this can be achieved by OPSI increasing its engagement at the \nMRC/MC.  \n \nLiaison Committee: Nowhere is it more clear than in the Liaison Committee that states are \nsystematically excluded from meaningfully engaging with the PJM process. See the West \nVirginia Commission’s litigation to join Liaison Committee, which was rejected by FERC. \nStates should be allowed to attend Liaison Committee.  \n \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include \nstate-selected or state-nominated seats; establishing formal board performance metrics \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nNominating Committee: States should have a role in selecting PJM Board members. The \nNominating Committee should have at least one seat designated for a representative of OPSI.  \n \nBoard makeup: The PJM Board has membership requirements for expertise, but does not \ninclude requirements for state representation. The Board should always include a past \nregulator and someone with consumer advocacy experience. \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority.   \n \nWe have a number of specific recommendations for improving the stakeholder process: \n \nRecord meetings: With more PJM meetings than days in the year, PJM should record \nmeetings—just as is standard practice in most state legislatures. The recordings need not be \nretained forever, but they should be available for a reasonable length of time. The issues \ndiscussed are highly technical and interested parties would benefit from reviewing recordings \neven if they attend the meetings live. \nVoting disclosure: Currently, only votes in the Members Committee are fully disclosed. All \nvotes of every committee, excluding the Nominating Committee, should be published with \nindividual firm votes."},{"page":16,"startToken":5626,"endToken":6042,"text":"ILLINOIS - STATE COMMENTS  \n16 \n \nSector-weighted voting at Standing Committees: affiliate voting can easily dominate a \ndecision at the Standing Committee level. For example, West Deptford (LS Power) alone \ncontrols 25 affiliate votes. The result is that decisions coming out of the Standing Committees \nare biased towards supply interests. The results can be balanced by extending sector-weighted \nvoting to the Standing Committees, which would also encourage a wider range of stakeholders \nto participate.  \n \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?  \n \nCost transparency: Few, if any, proposals have cost information prior to a vote. It should be \nstandard practice to evaluate the cost impacts of any proposal as part of the First Read at the \nMRC/MC. Even where transmission cost information is provided, it is incomplete or \ninaccurate, as detailed in this analysis by David Gardiner and Associates.  \n \nIndependent Transmission Monitor: just as PJM benefits from an Independent Market \nMonitor, who not only mitigates for market power but also provides cost information, PJM \nneeds an Independent Transmission Monitor. By improving transmission oversight, states may \nbe less likely to have concerns with individual lines.  \n \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?   \n \nPJM is structurally deficient to protect the public interest. Its voting membership is \noverwhelmingly the regulated community — a clear example of regulatory capture. There are \nonly 14 votes representing anything close to a state interest (consumer advocates). Nothing in \nPJM’s foundational documents compels the Board to prioritize or even consider affordability \nwhen making decisions. The Board is accountable only to PJM Members, who are \noverwhelmingly driven by profit interests. PJM membership and its accompanying sectors \nmust be restructured to represent the interests of the 67 million consumers in the PJM \nfootprint. Rather than looking to an existing RTO for guidance on this front, the West-Wide \nGovernance Pathways Initiative provides important perspective."},{"page":17,"startToken":6042,"endToken":6228,"text":"ILLINOIS - STATE COMMENTS  \n17 \nIt is worth noting that governance reform at PJM is nigh impossible to achieve internally, since \nit requires a vote of the Members who would, presumably, be ceding their own power. This \nextends from seemingly smaller changes like publishing vote results to larger changes, like \ncreating a new sector. The difficulty of making changes at PJM has forced states to consider \nwhether the RTO best serves them. \n \n7. OTHER: Please add any other comments or respond to the FERC technical \nconference panel questions specifically here:   \n \nWhile PJM has a government affairs team, it does not adequately consult with the states. For \nexample, PJM did not reach out to any Illinois stakeholders during the process of determining \nthat ComEd should be separated out into its own zone for the purposes of setting net CONE. \nOnce Illinois stakeholders became aware and asked for a delay in the process so they could \nengage, PJM refused. There should never be a case where a proposal targeting a specific state \nadvances without proactive outreach by PJM to state entities, including the Commission and \nstatutory consumer advocate(s)."},{"page":18,"startToken":6228,"endToken":6598,"text":"INDIANA - STATE COMMENTS  \n18 \nIndiana- State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document)  \n  \nRep. Sue Errington (HD34, Muncie) - errington@comcast.net   \n  \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):   \n  \nRegulated. Electricity – Net Exporter. Fossil Fuels – Net Importer.  \n  \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.   \n \nYes. PJM's decisions directly affect electric reliability and affordability in Indiana, yet state \nregulators and consumer advocates have little formal authority compared with voting market \nparticipants. We should support a stronger formal role for states in major planning, \ntransmission, and market decisions, including earlier access to forecasts and filings, regular \nconsultation with the PJM Board, and clear deadlines when the stakeholder process cannot \nreach a decision.  \n  \n2. \nSTATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, engaged in \njoint technical sessions with the PJM Board, in a formal consultation process, enhanced observer \nstatus, or information rights before major filings, participating in independent reviews of load \nforecasting accuracy and major planning assumptions, receiving early-warning reporting when \nmaterial changes occur in large-load forecasts, reliability assessments, or planning assumptions, \nand/or formally embedding state policy objectives into PJM's planning and market processes.   \n \nStates need a formal role in PJM because their residents ultimately bear the costs of its \nplanning and market decisions. We support regular consultation and joint technical sessions \nwith the PJM Board and early notice of significant changes in load forecasts or reliability \nprojections. The state is served by both PJM and MISO, giving it direct experience with \ndifferent regional governance models.   \n  \nAt minimum, states should be able to   \n1.Participate in the PJM Board nomination process.  \n2.Receive early notice of major changes in load forecasts, reliability projections, or planning \nassumptions.   \n  \n  \n3. \nBOARD: Is the current board authority and accountability effective? Please consider \nthe board’s ability to act unilaterally, reforming Board composition to include state-selected or \nstate-nominated seats; establishing formal board performance metrics and periodic external"},{"page":19,"startToken":6598,"endToken":6989,"text":"INDIANA - STATE COMMENTS  \n19 \naccountability reviews; exploring Independent Representative Stakeholder (RSC) Board model \nused at other RTOs.    \n  \nNo. PJM should consider board models used by other RTOs that provide states and stakeholders \nwith a more direct role by adding state-nominated and independent consumer representatives to \nthe Board, establishing public performance measures tied to reliability, affordability, and timely \ndecision-making. The Board should retain authority to act when urgent action is needed, but \nthose decisions should be transparent and subject to clear accountability.   \n  \n4. \nSTAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process accurately \nreflects the interests of those ultimately bearing reliability and affordability risk, particularly \nratepayers and emerging large-load customers? Please consider: modifying the voting structure, \nimproving transparency and information access, reviewing and refreshing filing rights, and/or \nstrengthening FERC's use of its Section 206 backstop authority.   \n  \nNo. PJM's current process gives established market participants too much ability to delay or \nblock needed changes. It has not produced timely answers on large-load interconnection, new \ngeneration, or other issues that directly affect reliability and customer bills. When PJM’s \nprocess cannot resolve urgent threats to affordability or reliability, FERC should be prepared to \nact under its existing authority.   \n  \n5. \nTRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have sufficient \naccess to reproduce and independently evaluate the forecasts, congestion analyses, and planning \nassumptions that ultimately influence ratepayer costs. Should states be able to request studies on \nemerging affordability and reliability issues? Can we expand independent analytical access to \nPJM data while preserving market-sensitive confidentiality?   \n  \nRegulators and consumer advocates need enough information to independently evaluate PJM’s \nforecasts, transmission plans, and cost assumptions. Receiving PJM’s final conclusions is not \nsufficient. The public record should show who created the need for each project, who benefits \nfrom it, whether competitive alternatives were considered, and how the costs will be assigned.   \n  \n  \n  \n6. \nSTRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient visibility into \nemerging risks, sufficient authority to act on them, and sufficient accountability for the \noutcomes. Is it sufficient regardless of the governance reform?  What recommendations do you \nhave for the future structure of PJM?"},{"page":20,"startToken":6989,"endToken":7151,"text":"INDIANA - STATE COMMENTS  \n20 \nPJM’s current structure is not keeping pace with rapid load growth, generation retirements, and \nthe time required to build replacement resources. Allowing major new loads to connect while \navailable capacity is already insufficient creates additional risk for existing customers.  \n  \nHigh-priority interconnection, reliability, and cost-allocation matters should follow mandatory \nschedules. When the normal stakeholder process reaches an impasse, a defined escalation \nprocess should allow action without eliminating public input or state oversight.   \n  \n7. \nOTHER: Please add any other comments or respond to the FERC technical \nconference panel questions specifically here:    \n  \nPJM should bring new renewable generation and battery storage onto the grid more quickly, \nrequire large-load customers to account for the new supply and infrastructure they require, and \nclearly identify the costs created by those customers.  \n  \nTransmission expenses caused primarily by data centers should not be spread across residential \ncustomers. Direct-connect facilities and related network upgrades should be identified and \nassigned to the customer creating the need whenever appropriate."},{"page":21,"startToken":7151,"endToken":7457,"text":"MARYLAND - STATE COMMENTS \n21 \nMaryland- State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \n● Senator Brian J. Feldman, Chair, Senate Education, Energy, and the Environment \nCommittee, District 15 (Montgomery County) — brian.feldman@senate.maryland.gov   \n● Senator Katie Fry Hester, State Senator, District 9 (Howard & Montgomery Counties) \n— katiefry.hester@senate.maryland.gov \n● Delegate Marc Korman, Chair, House Environment and Transportation Committee, \nDistrict 16 (Montgomery County) — marc.korman@house.maryland.gov    \n● Delegate David Fraser-Hidalgo, Chair, Energy Subcommittee (House Environment and \nTransportation Committee), District 15 (Montgomery County) — \ndavid.fraser.hidalgo@house.maryland.gov    \n● Delegate Lorig Charkoudian, State Delegate, District 20 (Montgomery County) — \nlorig.charkoudian@house.maryland.gov  \n● Delegate Linda Foley, State Delegate, District 15 (Montgomery County) \n● Delegate Teresa Woorman, State Delegate, District 16 (Montgomery County) \n● Delegate Kym Taylor, State Delegate, District 23 (Prince George’s County) \n● Delegate Anne Healey, State Delegate, District 22 (Prince George’s County) \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nMaryland operates a retail-restructured, deregulated electric market. The state is a \nsignificant net importer of electricity, a characteristic shared with a majority of \njurisdictions within the PJM footprint. This structural reliance on imported power leaves \nretail ratepayers directly exposed to wholesale PJM market dynamics and regional capacity \nprice volatility. Additionally, severe internal transmission constraints exist within major \nload centers, rendering regional grid coordination and objective cost-allocation \nmechanisms essential to ensuring state-level reliability and affordability.  \n \nLegal & Regulatory Framework \n \nAdministratively, Maryland’s utility oversight, ratepayer defense, and long-term energy \nstrategy are driven by a distinct statutory framework:  \n \n● The Maryland Public Service Commission (PSC): Serves as the state's independent \nutility regulatory authority, holding primary jurisdiction over retail utility rate \nstructures, service quality, and local grid certifications.  \n● The Maryland Office of People’s Counsel (OPC): Functions as the independent \nstatutory advocate representing the interests of Maryland's residential utility"},{"page":22,"startToken":7457,"endToken":7883,"text":"MARYLAND - STATE COMMENTS \n22 \nconsumers, legally intervening in rate cases, grid planning, and wholesale regulatory \nmatters.  \n● The Maryland Energy Administration (MEA): Acts as the state's dedicated \nexecutive energy office focused on deploying clean energy incentives, optimizing grant \nprograms, and managing state energy investments.  \n● The Strategic Energy Planning Office (SEPO): Operates as a standalone office \nestablished via the Energy Resource Adequacy and Planning Act to introduce \nadvanced data modeling, market auditing capabilities, and independent resource \nadequacy risk tools to the state's active defense framework.  \n \nExecutive Action & Gubernatorial Leadership \n \nOver the past year, the executive branch has pivoted toward interagency and regional \nsolidarity to address grid constraints and wholesale market accountability:  \n \n● The Governor's Energy Subcabinet: Established via Executive Order 01.01.2025.27, \nthis body coordinates a whole-of-government approach across executive agencies to \nalign state assets, tackle generation gaps, and keep consumer affordability at the center \nof regional grid discussions.  \n● The PJM Governors' Collaborative: Operating on a regional scale, the Governor \njoined a historic bipartisan coalition of all 13 PJM footprint executives. On January 15, \n2026, the coalition partnered with federal energy leaders to sign the landmark \nStatement of Principles Regarding PJM to freeze unjust capacity price hikes. Following \nup on this framework, the collaborative issued a formal joint position letter on April 9, \n2026, demanding strict cost-causation rules. The coalition firmly asserts that large-load \nentities driving explosive demand growth, such as commercial data centers, must \ndirectly pay for their own network footprints and backstop capacity requirements rather \nthan shifting massive infrastructure upgrades onto residential consumers \n \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nYes. The fundamental root of chronic delay and political pressure for affordability within \nPJM is its flawed governance system, which leaves the organization structurally blind to \nratepayer impacts unable to adapt quickly to rapid shifts in our regional energy mix. This \nslowness traps the region in a continuous cycle of volatile capacity price shocks where \ncaptive retail ratepayers bear the ultimate financial risk.  \n \nThis administrative gridlock is perfectly illustrated by PJM's handling of emerging grid \npressures. PJM initially launched a Critical Issue Fast-Track Process (CIFP) in the fall of \n2025, but this first attempt was completely punted. A replacement CIFP process to address \nthe urgent Reliability Backstop Procurement (RBP) mechanism and the Connect & \nManage (C&M) framework dragged on from January through June of 2026. Because this \ngovernance framework moves at a snail's pace, the Maryland General Assembly was"},{"page":23,"startToken":7883,"endToken":8373,"text":"MARYLAND - STATE COMMENTS \n23 \nforced to pass consumer protection legislation during its session purely in anticipation of \nPJM’s delayed regulatory outcomes, rather than coordinating with them in real time. \n \nA core part of the problem lies in the underlying motivating factors for the PJM Board. \nThe Board currently operates under a primary fiduciary commitment to its corporate \nmarket members and the organization itself, lacking a parallel, binding requirement to \nserve the public interest or shield retail ratepayers from market failures. When analyzing \ngovernance models across the country, PJM stands out structurally; while PJM functions \nas a non-profit entity, it describes and operates itself fundamentally as a private \nmembership organization. Conversely, other RTOs and ISOs are organized with explicit \npublic interest or ratepayer protections built directly into their foundational governing \ndocuments. For instance, the Midcontinent Independent System Operator (MISO) \nincorporates clear, enforceable public interest requirements within its operational design, \nwhile the Southwest Power Pool (SPP) balances its framework by utilizing a separate, \nformally defined state committee to give states a binding voice in the process.  \n \nFundamentally, PJM doesn’t have the appropriate constitutional form for governance, as \nthis Delaware LLC model no longer meets the needs of our region. Long term, a structural \noverhaul could include a shift from a private LLC to an interstate compact public benefit \nentity. This compact could provide a governance framework for the institution itself, \nincluding its mission, fiduciary duties, transparency, etc. In essence, this adds a \ngovernance constitution on top of FERC's existing regulatory framework and could be \nachieved through the passage of legislation across PJM states. For example, in the \nWMATA operates in this manner as does the Port Authority of NY NJ.  Although there are \nno national models for this, internationally, Australia has found success with this model \nwith the Energy and Climate Change Ministerial Council, created by legislation in 2022 \nwhich has oversight over the Australian Energy Market Commission (the rule maker and \nmarket development adviser) and the Australian Energy Market Operator (the system \noperator.) Near-term reforms can make PJM’s governance more visible; however, only re-\nchartering can make the organization accountable. \n \n1. \nAsks for FERC to Implement: \n1.1. \nCodify an Explicit Public Interest Mandate: FERC should direct PJM to \namend its foundational operating agreements to legally mandate that the \norganization balance system reliability and market efficiency with public \ninterest objectives, explicitly including ratepayer cost containment and state \npublic policy alignment.  \n1.2. \nReconfigure the Corporate Structure: FERC should order the transition of \nPJM away from its restrictive \"membership organization\" framework toward an \nindependent grid operator model with an explicit public utility mission, \nensuring management performance and corporate bonuses are tied to consumer \ncost-mitigation benchmarks rather than member satisfaction.  \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process,"},{"page":24,"startToken":8373,"endToken":8817,"text":"MARYLAND - STATE COMMENTS \n24 \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes.  \n \nStates need a formal, institutional role in PJM planning and governance that ensures a \nfair and balanced representation of state interests alongside industry participants. As \nthe directly elected representatives of retail customers who ultimately pay the bills, \nstates should have an equal voice to industry in the decision-making process. State \nregulators need clear information rights and a formal say in any major filings that go to \nFERC, not just an early warning or informational notice. We need to be part of \nindependent reviews of load forecasting, especially with the rapid growth of large-load \ncustomers like data centers that spike our regional costs. We should have joint \ntechnical sessions with the PJM Board so state policy objectives and realistic planning \nassumptions are built directly into the process from the start, rather than treated as an \nafterthought.  \n \nTo coordinate state-level input, the Organization of PJM States, Inc. (OPSI) was \nformed in 2005 as an inter-governmental non-profit corporation comprising the utility \nregulatory agencies across the 14 jurisdictions within the PJM footprint (13 states and \nthe District of Columbia).  However, the current Memorandum of Understanding \nbetween PJM and OPSI relies strictly on information sharing and non-binding \nconsultation, which therefore systematically fails to grant states a functional check on \noperational outcomes that directly impact retail ratepayers. Furthermore, given OPSI is \ncomposed of the regulatory agencies only, it omits the formal policy leadership from \nGovernors and Legislators in the PJM process. \n \n \n2. \nAsks for FERC to Implement: \n2.1. \nTransition to an Alternative Regional Structural Model FERC should direct \nPJM to adopt the model of state participation after the New England State \nCommittee on Electricity (NESCOE) model, creating an independent regional \nstate committee funded via an RTO tariff and governed by a board of managers \nappointed directly by state governors.  Under this model, state technical experts \nand energy managers have structured access to independent information to \nevaluate RTO data directly, while holding regular, mandatory joint technical \nsessions with the Board. In addition, EXPAND the NESCOE model's state \nlegal authority by providing these state committees with formal Federal Power \nAct Section 205 filing rights.  The state authority should also include formal \ninput mechanisms over regional planning assumptions, PJM’s load forecasting \nmodels, congestion analyses, and long-term transmission planning assumptions, \ntransmission cost allocation, and resource adequacy metrics, requiring a formal \nadministrative reconciliation process before major filings are submitted to \nFERC."},{"page":25,"startToken":8817,"endToken":9225,"text":"MARYLAND - STATE COMMENTS \n25 \n2.2. \nAlternatively, FERC could Optimize and Expand the Current OPSI \nFramework. FERC could direct PJM to expand OPSI’s institutional charter to \ntransition the body from a purely consultative liaison group into an entity with \nformal, defined authority over specific regional planning processes. This \nincludes expanding state legal authority by providing formal Federal Power Act \nSection 205 filing rights or structured input options during the filing process for \nspecific tariff revisions impacting resource adequacy and regional planning.  \n \n \n3. BOARD: Is the current board authority and accountability effective? Please consider \nthe board’s ability to act unilaterally, reforming Board composition to include state-\nselected or state-nominated seats; establishing formal board performance metrics and \nperiodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nNo, the current board structure lacks sufficient institutional accountability to the states and \nthe consumers who ultimately fund regional transmission system expansions and capacity \nprocurements. While the Board possesses the authority to act unilaterally, its interventions \nare frequently reactive rather than proactive, responding to structural crises after they \nmanifest in the marketplace.  \n \nFor example, the Board permitted the interconnection queue backlog to balloon to an over \neight-year average and generation supply to tighten; this prolonged administrative delay in \ntransitioning to a modernized framework directly caused the catastrophic consequence of \nregional capacity auction costs exploding from $2.2 billion to nearly $14.7 billion, forcing \na subsequent scramble to implement a cluster study process. Similarly, the Board failed to \nproactively modernize its tariff architecture to manage explosive large-load growth from \ncommercial data centers, leaving states vulnerable to massive cost-shifting.  \n \nAs a critical component of this integration, the governance framework must provide a \nformal, heightened platform for state-level technical experts and engineers who possess a \ngranular understanding of localized system constraints and regional operational nuances.  \n \nAs detailed in the preceding section, comprehensively optimizing and empowering OPSI \nor transitioning to an alternative regional state mechanism (such as an RSC or NESCOE \nmodel) is an absolute necessity. These structural state-level reforms are foundational to \nresolving PJM’s gridlock. Beyond those external governance adjustments, specific reforms \nto the PJM Board itself are required to ensure deep institutional accountability.  \n \n \n3. \nAsks for FERC to Implement \n3.1. \nCodify a State-Driven Regulatory Counterweight: FERC should formalize a \nstreamlined system of structural checks and balances. Under this framework, an \nupgraded state committee holds defined review authority or formal input \nmechanisms over regional planning assumptions, transmission cost allocation,"},{"page":26,"startToken":9225,"endToken":9646,"text":"MARYLAND - STATE COMMENTS \n26 \nand resource adequacy metrics, requiring a formal administrative reconciliation \nprocess before major filings are submitted to FERC.  \n3.2. \nMandate Structured State Participation in Board Nominations: FERC \nshould direct PJM to model its recruitment after the MISO framework, where \nstate regulatory representatives from the Organization of MISO States (OMS) \nparticipate directly as formal members of the Board of Directors Nominating \nCommittee, ensuring that public interest perspectives are structurally embedded \nin the recruitment and vetting of future independent board directors.  \n3.3. \nGrant Independent Board Section 205 Filing Rights: FERC should grant the \nPJM Board independent Federal Power Act Section 205 filing rights, separate \nand distinct from the Members Committee membership process. Granting the \nBoard independent filing authority—to be exercised in parallel with enhanced \nstate filing rights—will structurally insulate the Board from corporate \nmembership pressure, eliminate the industry's de facto veto power, and allow \nindependent leadership to respond swiftly to regional reliability crises \n3.4. \nDevelop a Formal Decision-Making Responsibility Matrix: FERC should \ndirect PJM to develop a comprehensive Responsible, Accountable, Consulted, \nand Informed (RACI) matrix mapping out all corporate and operational grid \ndecisions. This matrix must explicitly require formal consultation with state \nentities before major operational policies are advanced. \n3.5. \nEnforce Binding Public Interest Performance Metrics: FERC should \ncondition PJM's administrative outcomes and board evaluations on transparent, \nquantifiable metrics tailored to core deliverables like load forecasting accuracy \nand queue execution speed. These formal metrics must be linked directly to the \nnew foundational governance charters and interstate compact documents to \nguarantee that public interest metrics are permanently embedded in PJM's \nplanning framework. \n  \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, reviewing \nand refreshing filing rights, and/or strengthening FERC's use of its Section 206 backstop \nauthority.   \n \nNo, the existing stakeholder process is structurally defective and fails to accurately reflect \nthe interests of the states, consumer advocates, and the captive retail ratepayers who \nultimately bear the foundational financial and reliability risks. The current framework is \nheavily weighted toward corporate market participants with narrow financial interests \nrather than public interest goals. Specifically, PJM’s sector-weighted voting thresholds \nrequire high consensus supermajorities to pass rule changes, making it far too easy for \nvocal industry minorities or narrow segments to block critical updates, cause market"},{"page":27,"startToken":9646,"endToken":10061,"text":"MARYLAND - STATE COMMENTS \n27 \ndesign deadlocks, and delay essential regulatory modernization—such as the grid rules \nneeded for large-load data center interconnections.  \n \nThe operational realities of participating in PJM's committee structure also introduce \nsevere barriers to entry. Navigating the stakeholder process is a highly resource-intensive \nand expensive endeavor, which prevents meaningful and sustained participation from \nconsumer advocates, public interest groups, and emerging non-traditional market entrants. \nThis cost barrier contributes directly to a lack of representative democratic engagement: \napproximately two-thirds of the registered members who technically hold a vote within \nPJM's stakeholder committees have never actually cast a ballot. Because a large portion of \nthe electorate remains passive, highly organized corporate coalitions can \ndisproportionately leverage existing sector-weighted thresholds to preserve the status quo. \nThis structural inertia frequently stalls market and grid affordability reforms indefinitely, \nleaving states to rely on burdensome Federal Power Act Section 206 complaints where the \nlegal burden of proof is high and administrative relief is painfully slow.  \n \nTo maintain proper oversight, state policy influence should remain at the Governance \nLevel (per Sections 1 and 2) rather than establishing a separate voting bloc within the \nstakeholder membership.  \n \n \n4. \nAsks for FERC to Implement: \n4.1. \nLower the Cost of Participation: FERC should mandate the establishment of \nan RTO-administered technical support fund or formal technical liaison \npositions to offset the high costs of legal and engineering participation for \nconsumer advocates and state representatives, shifting the active voting pool to \nbetter reflect public interests.  \n4.2. \nEstablish an Empowered State Core: FERC should require that a newly \nrestructured, state-led committee (such as an empowered OPSI or a NESCOE-\nstyle board) is legally integrated into PJM's governance as a central point of \naction for reviewing, advising, and co-filing on high-priority grid issues, \nshielding public policy from private market deadlocks.  \n4.3. \nProactively Deploy FERC's Section 206 Authority: FERC should actively \nuse its Federal Power Act Section 206 backstop authority to issue region-\nspecific \"Show Cause\" orders—as it successfully executed at its June 18, 2026 \nOpen Meeting—finding RTO tariffs potentially unjust and unreasonable \nregarding large-load grid integration, thereby legally forcing RTOs and \ntransmission owners to increase cost transparency and demonstrate clear cost \nrecovery metrics.  \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient engagement \nwith independent information and transparency necessary to affect affordability?   \nPlease consider whether regulators and consumer advocates have sufficient access to \nreproduce and independently evaluate the forecasts, congestion analyses, and planning \nassumptions that ultimately influence ratepayer costs. Should states be able to request"},{"page":28,"startToken":10061,"endToken":10487,"text":"MARYLAND - STATE COMMENTS \n28 \nstudies on emerging affordability and reliability issues? Can we expand independent \nanalytical access to PJM data while preserving market-sensitive confidentiality?  \n \nNo, state regulators and consumer advocates do not have sufficient independent access to \nthe raw data, congestion analyses, and underlying forecasting models that ultimately drive \nup retail ratepayer costs. Relying entirely on PJM's internal conclusions without an \nindependent mechanism for verification is structurally insufficient. This level of \ntransparency is critical to ensure that market participants are paying their fair share of grid \nexpansion and network upgrade costs, rather than shifting those financial obligations onto \ncaptive retail ratepayers.  \n \nState-level technical staff and engineers are uniquely positioned to understand localized \nsystem nuances that heavily impact PJM’s broader regional planning assumptions. \nConsequently, these technical experts must have a structured seat and defined authority to \nevaluate data, address local system issues, and push back on flawed regional modeling \nassumptions. Utilizing open, high-quality data is the most reliable method to address \nemerging grid and market challenges. States require a clear, defined right to request \nindependent studies on emerging affordability issues, alongside analytical access to \nreplicate and evaluate PJM’s planning assumptions directly, while maintaining strict \nprotections for market-sensitive confidentiality.  \n \n5. \nAsks for FERC to Implement: \n5.1. \nEliminate Closed-Door Barriers and Mandate Public Streaming and \nArchiving: FERC should direct PJM to establish that all meetings across every \nlevel of the organization must be streamed live, allow public media \nparticipation, officially recorded, and archived online for permanent public \naccess. This reform must directly eliminate PJM's restrictive meeting \narchitecture, which currently requires specific group memberships to attend or \naccess sessions, removing these gatekeeping rules so that any public interest \nadvocate, consumer representative, or state entity can observe and audit the \ndecision-making process at any time.  \n5.2. \nMandate Universal Record Disclosure and Reporting Timelines: FERC \nshould require the immediate public disclosure of voting records, meeting \nminutes, and underlying technical workpapers across all subcommittees and \ntemporary task forces. Standardizing immediate reporting timelines will ensure \nthat private market coalitions cannot utilize lower-level technical spaces—\nwhere data access is entirely lacking compared to high-level committees—to \nquietly shape regional planning and load-forecasting assumptions before \nexternal oversight can intervene.  \n5.3. \nEstablish Independent Data Replication Protocols: FERC should mandate \nthe creation of secure, tariff-protected data clearinghouses that allow state \nregulatory commissions and designated consumer advocates to directly \nreplicate and evaluate PJM’s raw congestion data and load forecasts while fully \npreserving commercial confidentiality.  \n5.4. \nCodify State-Initiated Study Rights: FERC should grant states the explicit \nstatutory and tariff authority to compel PJM to perform independent,"},{"page":29,"startToken":10487,"endToken":10909,"text":"MARYLAND - STATE COMMENTS \n29 \nspecialized studies on emerging reliability risks, data center load spikes, and \nretail ratepayer affordability impacts.  \n5.5. \nImplement Mandatory Cost Allocation Verifications: FERC should direct \nPJM to align its data access rules with the Commission's June 18, 2026 Section \n206 \"Show Cause\" orders, explicitly requiring the elimination of unjustified \nwholesale cost-shifting and enforcing total transparency into large-load network \nupgrade costs. \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in today’s \nrapidly changing context?  Please consider whether PJM has sufficient visibility into \nemerging risks, sufficient authority to act on them, and sufficient accountability for the \noutcomes. Is it sufficient regardless of the governance reform?  What recommendations do \nyou have for the future structure of PJM?   \n \nNo, PJM’s operational structure is not aligned to meet the dual challenges of a rapid \nenergy transition and unprecedented large-load growth from data centers and \nelectrification. While PJM maintains technical visibility over broad system metrics, its \noperational model lacks the agility to respond proactively to rapid market shifts. PJM has \nhistorically claimed that it cannot control rapid large loads from coming onto the system, \nbut throwing its hands up completely directly contradicts the RTO's core reliability \npurpose. This operational abdication has resulted in reactive interventions and an \nunprecedented interconnection queue backlog that compromises regional resource \nadequacy.  \n \nThis structural dysfunction stems directly from PJM's institutional orientation as a private \nmembership organization. Because leadership remains primarily accountable to the \ngenerators, transmission owners, and market participants who vote within the committee \nsystem, the RTO—by its nature—routinely prioritizes narrow corporate financial interests \nover public interest mandates. Captive retail ratepayers—who bear 100% of the long-term \nreliability and affordability risks—are completely excluded from the core accountability \nloop. This creates a severe structural defect where market costs are systematically \nsocialized while profit metrics are privatized.  \n \nThe consequences of this structure are evident in recent regional transmission expansion \nplans, where legacy cost-allocation methodologies pass billions of dollars in regional \nnetwork upgrade costs down to neighboring states' ratepayers to serve localized, out-of-\nstate data center load growth. Forcing individual states to continually intervene at FERC or \npass defensive, uncoordinated state legislation to insulate their consumers from wholesale \nmarket failures creates an inefficient, fragmented regional network. True structural reform \nrequires establishing explicit public interest mandates and updating regional tariff \narchitecture to reflect strict cost-causation principles in the governing documents.  \n \nMany of the structural components related to governance, state role, board authority, and \nstakeholder defects are discussed above.  These are also relevant here and include the \nfollowing."},{"page":30,"startToken":10909,"endToken":11291,"text":"MARYLAND - STATE COMMENTS \n30 \n \n1. \nRTO Governance & Corporate Restructuring \n1.1. \nPublic Interest Mandate: Require PJM to legally amend its foundational \noperating agreements to balance grid reliability and market efficiency with \npublic interest objectives, specifically ratepayer cost containment and state \npolicy alignment. \n1.2. \nIndependent Operator Model: Shift PJM away from its restrictive \n\"membership organization\" framework toward an independent grid operator \nmodel with a public utility mission. Tie management performance bonuses \ndirectly to consumer cost-mitigation benchmarks rather than member \nsatisfaction. \n2. \nEnhancing the State Role \n2.1. \nThe NESCOE Model: Create an independent regional state committee (similar \nto New England's NESCOE) funded via an RTO tariff and governed by state-\nappointed managers. Expand this model by granting states formal FPA Section \n205 filing rights and requiring a formal reconciliation process on load \nforecasting, transmission planning, and resource adequacy before filings go to \nFERC. \n2.2. \nThe OPSI Model: Alternatively, optimize the current Organization of PJM \nStates (OPSI) by transitioning it from a consultative liaison group into an entity \nwith formal, defined authority and Section 205 filing or structured input rights \nover planning and resource adequacy tariffs. \n3. \nReforming Board Authority & Accountability \n3.1. \nState-Driven Balance: Formalize structured checks and balances by giving a \nstate committee defined review and reconciliation authority over regional \nplanning assumptions and cost allocations before major FERC submissions. \n3.2. \nBoard Nomination Input: Model recruitment after the MISO framework, \nallowing state regulatory representatives to sit directly on the Board of \nDirectors Nominating Committee to embed public interest perspectives into \ndirector vetting. \n3.3. \nIndependent Board Filing Rights: Grant the PJM Board independent FPA \nSection 205 filing rights separate from the stakeholder Members Committee. \nThis eliminates industry veto power and lets the Board act in parallel with \nenhanced state filing rights. \n3.4. \nRACI Decision Matrix: Implement a formal Responsibility Assignment \n(RACI) matrix mapping all corporate/operational decisions to explicitly require \nformal state consultation before major policies advance. \n3.5. \nBinding Performance Metrics: Link board evaluations and outcomes to \nquantifiable metrics (e.g., load forecasting accuracy, interconnection queue \nspeed) embedded in PJM’s foundational charters. \n4. \nOverhauling the Stakeholder Process \n4.1. \nLowering Participation Costs: Establish an RTO-administered technical \nsupport fund or liaison positions to offset legal and engineering costs for \nconsumer advocates and state representatives, balancing the active voting pool."},{"page":31,"startToken":11291,"endToken":11694,"text":"MARYLAND - STATE COMMENTS \n31 \n4.2. \nEmpowered State Core: Legally integrate a state-led committee into PJM's \narchitecture as a central body for reviewing, advising, and co-filing on high-\npriority grid issues to bypass private market deadlocks. \n4.3. \nProactive FERC Backstop (Section 206): Urge FERC to actively deploy its \nFPA Section 206 \"Show Cause\" authority—mirroring its June 18, 2026 Open \nMeeting actions—to force cost transparency and clear cost-recovery metrics \nregarding large-load grid integration. \nIn addition, because PJM's foundational framework is inextricably linked to market equity \nissues including the cost-allocation frameworks required to manage rapid large-load \ngrowth, the following are required. \n \n6. \n Asks for FERC to Implement: \n6.1. \nEnforce Direct Cost Recovery Agreements and Establish Federal Tariff \nPreemption: FERC should mandate a federal transmission-level backstop that \nexplicitly prohibits PJM from granting grid access or delivering wholesale \ntransmission capacity to a connecting utility until a binding 100% cost-recovery \nunderwriting contract is executed with the incoming large-load entity. This \nfederal requirement explicitly addresses and preempts the traditional retail \nutility position that local \"duty to serve\" mandates afford them no discretion or \nguardrails to delay or deny massive commercial load connections, providing \nnecessary regulatory air cover to protect captive residential ratepayers from \nstranded asset risks and localized distribution upgrade cost-shifting.  \n6.2. \nEliminate Regional Cost Socialization: FERC should direct PJM to update its \nregional transmission cost-allocation methodologies to ensure that baseline \nreliability and network expansion costs are directly assigned to the specific \nutility zones or jurisdictions where the load growth is generated, eliminating the \nupstream leakage of out-of-state infrastructure subsidies onto neighboring retail \ncustomers.  \n6.3. \nImplement Fast-Track Interconnection and Technology Tracks: FERC \nshould require PJM to restructure its tariff provisions to mandate the immediate \nevaluation of alternative transmission technologies—such as grid-enhancing \ntechnologies—to maximize existing system capacity rapidly while accelerating \nclean, lower-cost resource deployment without incurring redundant \ninfrastructure builds. \n \n \n7. OTHER: Please add any other comments or respond to the FERC technical \nconference panel questions specifically here:   \n \nThe purpose of this final section is to capture critical regulatory issues and operational \ngaps that fall outside the standard stakeholder definitions but are essential to answering the \ncore panel questions issued under FERC Docket No. AD26-7-000 (PJM Governance and \nStakeholder Reforms Technical Conference). Specifically, this response addresses panel \ninquiries regarding how the current division of Federal Power Act (FPA) Section 205 \nfiling rights impacts PJM's ability to act quickly, and whether the RTO's governing"},{"page":32,"startToken":11694,"endToken":12120,"text":"MARYLAND - STATE COMMENTS \n32 \ndocuments contain impediments that delay essential tariff updates. By examining these \nunderlying structural issues, this section establishes a comprehensive, forward-looking \npolicy position from the Maryland perspective.  \n \nA primary regulatory gap embedded within PJM's current Operating Agreement is the lack \nof a formal mechanism to reconcile the division of FPA Section 205 filing rights with state \npublic policy mandates. The current framework allows the PJM Board or private \nTransmission Owners (under the Consolidated Transmission Owners Agreement) to make \nunilateral wholesale filings at FERC that can quietly undermine or financially penalize \nstate-level consumer protection and clean energy laws. This division of rights means that \nthe very corporate entities profiting off massive grid expansions hold the legal keys to the \nregional tariff kingdom, bypassing state technical inputs entirely. This procedural gap \nforces individual jurisdictions into a reactive, litigious posture to protect their retail \nconsumers.  \n \nFurthermore, as PJM prepares its compliance filings for the June 18, 2026 Section 206 \n\"Show Cause\" orders regarding large-load grid integration, the RTO’s governing \ndocuments completely lack fast-track, time-bound review procedures to handle grid-\nstalling commercial interconnections without triggering massive wholesale cost-shifting \nonto residential rate bases.  \n \nThe Maryland Perspective \n \nMaryland faces distinct operational vulnerabilities because the state is a net energy \nimporter, similar to a majority of jurisdictions within the PJM footprint, relying on \nneighboring jurisdictions for approximately 40% of its electricity supply. Consequently, \nMaryland ratepayers are disproportionately exposed to upstream PJM market failures, \nunmitigated transmission congestion, and the socialization of out-of-state network upgrade \ncosts.  \n \nTo insulate its consumers, the state has actively deployed aggressive legislative and \nregulatory counter-strategies. The Maryland General Assembly enacted the Utility \nRELIEF Act of 2026 (Chapter 353 of the 2026 Laws of Maryland) to actively suppress \nunfair utility cost recovery, enhance consumer transparency, and lower the retail threshold \ndefinition of a \"large-load customer\" to 25 megawatts (MW) with a 60% load factor to \nforce incoming data centers into specialized utility tariff tracks.  \n \nFurthermore, through major legislative packages enacted across the 2025 and 2026 \nsessions, Maryland has systematically expanded incentives for in-state generation and \nresource adequacy to address looming capacity deficits. This includes championing \ncomprehensive target programs aimed at adding 4,000 MW of utility-scale and distributed \nsolar capacity, updating the Renewable Energy Certainty Act (Chapter 623 of the 2025 \nLaws of Maryland) to optimize the utility siting and deployment of resources, and \nmodernizing the state's portfolio standard through the Next Generation Energy Act \n(Chapters 625 and 626 of the 2025 Laws of Maryland) to make zero-emission nuclear \nenergy—including small modular reactors—eligible for compliance credits."},{"page":33,"startToken":12120,"endToken":12511,"text":"MARYLAND - STATE COMMENTS \n33 \n \nAdditionally, the state has established expedited regulatory pathways for dispatchable \nresources—including a fast-track review component for high-efficiency natural gas \ninfrastructure to bridge immediate capacity shortfalls—as well as both transmission-level \nand distribution-level energy storage systems, firmly positioning multi-tiered storage as a \ncore pillar of Maryland's resource adequacy strategy to proactively insulate Marylanders \nfrom backlogged RTO queue processes.  \n \nLooking forward, the newly enacted Strategic Energy Planning Office (SEPO) is legally \nmandated to begin issuing its comprehensive Wholesale Energy Markets and Bulk Power \nSystem Risk Report by September 2028. This report will serve as the mechanism to model \nPJM’s market-clearing flaws, audit resource adequacy, and design cost-effective reliability \nsolutions. PJM's regional framework must be structurally updated to accommodate, rather \nthan penalize, these active and upcoming state-level consumer protections.  \n \n7. \nAsks for FERC to Implement: \n7.1. \nImplement Strict Large-Load Anti-Aggregation Rules: FERC should direct \nPJM to revise its planning manuals to implement strict anti-aggregation rules \nthat prevent multi-facility data center developers from artificially splitting \nmassive campus footprints into sub-50 MW connection requests to bypass \nrigorous studies, while establishing formal pathways to harmonize regional data \nwith granular state-level retail thresholds like Maryland’s 25 MW definition.  \n7.2. \nEliminate Phantom Load Risks with Performance Milestones: FERC \nshould require PJM to enforce strict, use-it-or-lose-it capacity reservation \nmilestones to penalize speculative developers and stop them from hoarding \nvaluable grid interconnection capacity without active, near-term commercial \ndeployment.  \n7.3. \nMandate Cross-RTO Duplicate Load Tracking: FERC should order a \nmandatory cross-RTO information-sharing framework that requires PJM to \nactively track and identify instances where a developer has proposed the exact \nsame load footprint across different areas both inside and outside the PJM \nfootprint to prevent regional gaming and capacity double-counting.  \n7.4. \nExclude Speculative Requests from Regional Load Forecasting: FERC \nshould direct PJM to integrate only actual, contractually verified proposals into \nits official regional load forecasting, completely excluding speculative requests \nto ensure grid expansion planning is driven by real-world deployment rather \nthan artificial queue inflation.  \n7.5. \nImplement Fast-Path Review Procedures for Critical Issues: FERC should \nrequire PJM to formally amend the Operating Agreement to establish clear, \ntime-bound limitations within the PJM Senior Task Force architecture, ensuring \nany market rule or interconnection update directly tied to large-load data center \nintegration automatically bypasses lower-level committee deadlocks and \nadvances to a final board determination within 60 days."},{"page":34,"startToken":12511,"endToken":12773,"text":"NEW JERSEY - STATE COMMENTS \n34 \nNew Jersey - State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \n \nLead Authors: Senator Bob Smith and Assemblyman David Bailey \n \nAdditional Signatures on this document: \n \nSenate President Nicholas Scutari \nSenate Majority Leader Teresa Ruiz \nSenator John McKeon \nSenator John Burzichelli \nSenator Gordon Johnson \nSenator Angela McKnight \nSenator Vin Gopal \nSenator Linda Greenstein \nSenator Patrick Diegnan \nAssemblyman Clinton Calabrese \nAssemblyman Robert Karabinchak \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nNew Jersey is a deregulated state and a net importer of electricity. \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nYes. PJM is unable to respond to current challenges, including capacity procurement, \ninterconnection delays, and a host of other major issues. PJM’s inability to overcome obstacles \nhas resulted in an enormous financial burden on businesses and residents in New Jersey. \nBelow is the text of a Joint Resolution passed by both houses of the New Jersey Legislature \nand signed by former Governor Murphy in 2025 that details the Legislature’s position on \nPJM’s inability to resolve these issues.  \n \nSJR154 of the 2024-2025 Legislative session: \n \nJOINT RESOLUTION NO. 11 \n \nA Joint Resolution respectfully directing the Board of Public Utilities to investigate PJM \nInterconnection, L.L.C.’s Reliability Pricing Model; and directing the State of New Jersey to \ncollaborate with neighboring states to promote affordable energy practices and to urge PJM"},{"page":35,"startToken":12773,"endToken":13186,"text":"NEW JERSEY - STATE COMMENTS \n35 \nInterconnection, L.L.C. to implement market reforms and expeditiously review new electricity \ngeneration applications. \nWhereas, PJM Interconnection, L.L.C. (PJM) is the regional transmission organization \nresponsible for coordinating the movement of electricity and ensuring reliable and cost-\neffective energy distribution in New Jersey, several other states, and the District of Columbia; \nand \n \nWhereas, PJM’s Reliability Pricing Model, commonly referred to as PJM’s capacity market, \nis intended to ensure that adequate resources exist on the grid to maintain reliability at the \nlowest possible cost through a competitive auction; and \n \nWhereas, PJM, on behalf of New Jersey’s electricity customers, administers a capacity market \nauction to procure capacity for future years; and \n \nWhereas, In New Jersey, under the “Electric Discount and Energy Competition Act”, electric \npublic utilities are required to procure electricity for basic generation service at prices \nconsistent with market conditions and then provide basic generation service to customers who \nhave not switched to a third-party supplier; and \n \nWhereas, The rising cost of capacity in PJM’s capacity market auctions, which contributes to \nthe overall increase in electricity bills for ratepayers, raises concerns about the alignment of \ncapacity prices with the principles of affordability and transparency outlined in the “Electric \nDiscount and Energy Competition Act”; and \n \nWhereas, Energy demand is expected to grow by 2.3 percent annually over the next 10 years \nacross the region served by PJM and by 1.55 percent annually over the next 10 years across \nNew Jersey; and \n \nWhereas, In addition, delays in PJM’s interconnection queue have prevented new electric \ngeneration resources from becoming operational in a timely manner; and \n \nWhereas, As a result, these new resources that are required to maintain reliability at lower \ncosts will be unable to compete in PJM’s capacity market auctions in the near future; and \n \nWhereas, Energy price hikes disproportionately affect low-income families and vulnerable \npopulations, aggravating existing inequalities and creating additional financial hardships; and \n \nWhereas, The BPU, alongside utility agencies in other states, has sent multiple letters to the \nPJM Board of Managers since PJM’s June 2024 capacity market auction and has sent multiple \nfilings to the Federal Energy Regulatory Commission (FERC) on how to improve PJM’s \ncapacity market rules before the upcoming July 2025 auction; and \n \nWhereas, The State of New Jersey, through the BPU, has been working vigorously to \nincentivize the development of new generation sources to help meet the growing energy \ndemand and, thereby, help prevent increases in energy and capacity prices; and"},{"page":36,"startToken":13186,"endToken":13611,"text":"NEW JERSEY - STATE COMMENTS \n36 \nWhereas, The BPU has been actively working to protect ratepayers from price increases and \ncoordinating with other PJM states to push for capacity market reforms; and \n \nWhereas, The BPU’s initiatives, led by Governor Murphy, are accompanied by the actions of \nconsumer advocates, including the New Jersey Division of the Rate Counsel and  \nPennsylvania Governor Josh Shapiro, who have furthered the region’s efforts to reduce prices \nthrough additional complaints at FERC, which the BPU has pledged to support; now, \ntherefore, \n \n     Be It Resolved by the Senate and General Assembly of the State of New Jersey: \n  \n     1.    The Board of Public Utilities shall investigate whether PJM’s Reliability Pricing Model \nis serving its intended design to obtain resource adequacy at the lowest possible cost.  The \nboard shall report the results of this investigation to the Governor and the Legislature, pursuant \nto section 2 of P.L.1991, c.164 (C.52:14-19.1), no later than 12 months following the effective \ndate of this resolution. \n  \n     2.    The State of New Jersey shall work collaboratively with neighboring states within \nPJM’s jurisdiction to promote equitable practices, prioritize carbon-free energy sources, \nreduce the impacts of climate change on energy demand and costs, and to urge PJM to \nimplement market reforms that protect ratepayers from rising capacity prices and to \nexpeditiously review new electricity generation applications. \n  \n     3.    Copies of this resolution, as filed with the Secretary of State, shall be transmitted by \nthe Clerk of the General Assembly or the Secretary of the Senate to the Commissioners of the \nBoard of Public Utilities and to each member of the PJM Board of Managers, as the members \nare identified on PJM’s Internet website. \n  \n     4.    This joint resolution shall take effect immediately. \n  \n     Approved August 15, 2025. \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes. \n \nStates should have a formal and defined role in PJM’s structure and processes. States should \nhave information rights before all major filings. Additionally, states should have filing rights \nover core functions that directly impact states, particularly with respect to resource adequacy."},{"page":37,"startToken":13611,"endToken":13999,"text":"NEW JERSEY - STATE COMMENTS \n37 \nFinally, states should have more direct influence over the members and make up of PJM’s \nBoard of Managers, such as a reserved seat on the PJM Board’s Nominating Committee. \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include \nstate-selected or state-nominated seats; establishing formal board performance metrics \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.  \n \nThe current PJM Board’s authority and accountability is not effective, for the reasons stated in \nthe answer to Question 1 above. Additionally, there are legitimate concerns over the PJM \nBoard’s independence. States should have a role in determining the members of the PJM \nBoard, including potentially reserving a seat on the PJM Board’s Nominating Committee for a \nrepresentative from the states. PJM and FERC should additionally consider reforms that would \nincrease the independence of the PJM Board members, including critical examination of PJM \nBoard member terms and ex parte rules.  \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority. \n \nThe existing stakeholder process in PJM is structured to block action rather than to find and \nimplement solutions to issues. This has made PJM slow to respond to emergency issues and \nineffective in resolving the challenges facing the PJM region. Additionally, residential \nratepayers are not adequately represented through PJM’s current stakeholder process. PJM’s \nstakeholder process should be restructured to ensure that PJM is able to act quickly to protect \nreliability and affordability across the region.    \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?"},{"page":38,"startToken":13999,"endToken":14155,"text":"NEW JERSEY - STATE COMMENTS \n38 \nPJM should be working directly with states to ensure that states have the information they \nneed to advance policies and ratepayer relief within their jurisdictions to the maximum extent \npossible.  \n \nPJM should also consider implementing reforms to ensure transparency in their stakeholder \nmeetings. These reforms should include, at a minimum, that votes are made public and that \nrecordings of stakeholder meetings are made publicly available. \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?  \n \nPJM is not currently structured in a way that allows it to respond quickly to emergent \nchallenges, as noted in the answers to Questions 1 and 4 above."},{"page":39,"startToken":14155,"endToken":14571,"text":"OHIO - STATE COMMENTS \n39 \nOhio - State Comments\n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \nSenator Kent Smith (smith@ohiosenate.gov); Kaitlyn May, Senior Policy Advisor \n(kaitlyn.may@ohiosenate.gov)  \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nOhio has been a deregulated state since 1999. Due to heavy industry, the state is a net importer \nof energy. This is unlikely to change given the rapid expansion of data centers in Ohio, there \nare already over 200 data centers in the state with many more planned. The Ohio Power Siting \nBoard has exclusive jurisdiction for major utility facilities (generation over 50 MW, \ntransmission lines over 100 kV). The exception to this exclusive jurisdiction is wind and solar \nfacilities, Ohio townships and counties can ban wind and solar generation. Of Ohio’s 88 \ncounties, there is a wind or solar ban in at least 27—standing in direct opposition to the Ohio \nlegislature’s “all of the above” generation approach. With existing load and the expansion of \ndata centers, restricting one of the cheapest and fastest generation sources is counterproductive \nand inconsistent with a competitive energy marketplace. Finally, Ohio requires transmission \noperators to be a member of a FERC approved RTO.  \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nIf PJM’s current governance structure can allow more clean generation to enter the market, \nthen perhaps reforms may not be necessary. However, the reality is, even though wind, solar, \nand storage projects are the quickest generation to get to market, and it is easiest to finance, \nthe PJM generation portfolio is dominated by outdated, high-cost legacy generation. PJM’s \nfailures are harming the reliability and affordability of the grid that delivers power to Ohio \nresidents and businesses. Therefore, something must change.  \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes."},{"page":40,"startToken":14571,"endToken":15100,"text":"OHIO - STATE COMMENTS \n40 \nPJM must facilitate increased state involvement across every state within the RTO. Decisions \nmade at PJM have impacts on what state regulators do and decisions made by state regulators \nimpact transmission planning and the construction of generation. Though states should not \ndirectly control PJM, the organization should allow for states to have meaningful participation \nin the decision making process, meaningful participation for all states is important because of \nthe diverse policy goals of each state in the RTO. Unlike PJM, state governments have to \nanswer for rate increases. Given the significant impact within Ohio by decisions made by the \nPJM Board, Ohio would request any or all of the following: enhanced observer status, access \nto information before major filings, participating in independent reviews of load forecasting \naccuracy and major planning assumptions, and receiving preliminary reports when substantial \nchanges occur in large-load forecasts, reliability assessments, or planning assumptions. \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include \nstate-selected or state-nominated seats; establishing formal board performance metrics \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nThe Board must operate in the best interests of ratepayers, at this moment, it seems as though \nthey are not meeting that goal. Ohioans are promised affordable and reliable electric service, \nbut instead of this, they continually face rate increases with less reliable service. Under the \ncurrent system, there is no motive for the Board to change directions–but it is clear that this \ncurrent system does not work. Instead of acting to address the needs of all to provide \naffordable and reliable service, the Board serves the wants of a few by helping existing \ngeneration companies pad their pockets. Additionally, it seems that the Board takes far too \nlong in the decision making process, they could take a nod from Ohio’s recently passed HB 15 \nwhich implemented clear regulatory timelines for the Public Utilities Commission of Ohio. \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority.   \n \nThe existing stakeholder process is not serving ratepayers despite the fact that the ratepayers \nare the ones who the system should be designed to serve. Large-load customers, specifically \ndata centers, are one of the biggest issues facing the electric grid at this moment. Ohio created \na Select Committee on Data Centers where we heard from data centers, governments, and \ncitizens. In that committee, hyperscalers made it clear that they wanted to pay their fair share. \nWhile PJM has correctly taken the initiative to host this fall’s backstop auction, it will do little \nto help PJM ratepayers who saw their bills spike in 2024, 2025, and 2026. Ratepayers, \nespecially residential ratepayers, are the ones who need their interests to be fought for, but this"},{"page":41,"startToken":15100,"endToken":15574,"text":"OHIO - STATE COMMENTS \n41 \ngroup is all but left out of the process. Consumer representatives need a seat at the table, not \njust transmission and generation owners. \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?  \n \nTransparency is the most important reform that PJM could make. At a minimum, this should \ninclude the video recording and transcription of Board meetings. For far too long, utilities have \nfailed to disclose important and necessary information for the betterment of the grid under the \nguise of trade secrets. Standardizing what information must be disclosed so that regulators and \nconsumer advocates have appropriate information to ensure affordable and reliable electric \nservice is necessary. Specifically, reforms need to be made to make load forecasts transparent \nand standardized. Ratepayers should not be on the hook for unnecessary buildout of \ntransmission and generation if load never actually comes. Ohio is attempting to require our \nutilities to submit better and more accurate forecasts to PJM through the Electricity Forecast \nIntegrity Act. \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?   \n \nThe reality is that this is not the same electric grid that PJM was dealing with in the 1990s, but \nthat is no excuse for the lack of current action. PJM is well aware of the issues that are facing \nit–there is substantial load growth and that load growth is not being met with sufficient supply. \nWhile PJM was designed to look at generation and transmission, those two pieces do not \nhappen in a vacuum and the end user of this generation and transmission can no longer be \nignored given the immense demand of new users. Faster interconnection of renewable energy \nis necessary, there must be greater emphasis on new technologies to conduct upgrades to \nexisting transmission systems, and more adoption of existing demand response technologies. \nRatepayers are actively paying for PJM’s inaction and will continue to face rate increases and \nfaltering reliability. Legislators across PJM want to advocate for affordable and reliable \nenergy, we know that PJM and FERC share these goals. Ohio, and the legislators within the \nPJM footprint, look forward to charting a course of progress for the benefit of all current and \nfuture PJM ratepayers."},{"page":42,"startToken":15574,"endToken":15935,"text":"PENNSYLVANIA - STATE COMMENTS \n42 \nPennsylvania - State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \nRep. Danielle Friel Otten (HD155, Chester County) - dotten@pahouse.net \nRep. Arvind Venkat (HD30, Allegheny) - RepVenkat@pahouse.net \nRep. Christina Sappey (HD158, Chester) - CSappey@pahouse.net \nRep. Greg Scott (HD54, Montgomery) - gscott@pahouse.net \nRep. Perry Stambaugh (HD86, Perry/Juniata) - pstambaugh@pahousegop.com \nSen. Carolyn Comitta (SD19, Chester) - senatorcomitta@pasenate.com \nRep. Joe Webster (HD150, Montgomery) - jwebster@pahouse.net \nRep. Jim Prokopiak (HD140, Bucks) - Jprokopiak@pahouse.net \nSen. Maria Collett (SD12, Montgomery/Bucks) - senatorcollett@pasenate.com \nRep. Mary Isaacson, (HD175, Philadelphia) \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nDeregulated. Net exporter. Fossil fuel and legacy generation dominant. \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nYes. The gap between how fast the grid is changing and how fast PJM responds is a direct \nthreat to Pennsylvania families. Capacity prices have risen tenfold in two years. \nInterconnection queues remain a binding constraint on new supply. PJM's governance was not \nbuilt for this moment. Pennsylvania has had to act at the state level on grid reliability and \nratepayer protection because the regional process has not kept up. That is not a sustainable \ndivision of responsibility. \n \nThe cost consequences are real. Capacity prices rose from $28.92 per MW-day in 2024/2025 \nto $329.17 in 2026/2027, the FERC-approved cap. The Independent Market Monitor attributed \nroughly 63% of that increase to data center demand, equal to $9.3 billion in additional capacity \ncosts. The Natural Resources Defense Council projects average household bills will rise \napproximately $70 per month by 2028 without intervention. Governor Shapiro's legal action \nagainst PJM's flawed auction design, and the resulting price collar, has already saved PJM \ncustomers across the region an estimated $45 billion. That is what engaged state oversight \nproduces. But price suppression is not a solution. Downward pressure on capacity prices \nwithout fixing the underlying market failures, including phantom load and speculative data"},{"page":43,"startToken":15935,"endToken":16377,"text":"PENNSYLVANIA - STATE COMMENTS \n43 \ncenter demand in PJM's forecasts, creates the conditions for an even sharper price spike when \nthe collar comes off. Pennsylvania is not asking FERC to choose between short-term relief and \nlong-term reform. We are asking for both. \n \nSpeed alone is not the fix. A faster PJM that still cannot show its work on how costs get \nallocated will move problems downstream faster. Reform must pair timeliness with real \ntransparency, especially around the forecasting and planning assumptions that ultimately land \non customer bills. That is the standard Pennsylvania has set for itself. It is the standard we are \nasking FERC to set region wide. \n \nOur recommendations: require PJM to articulate a clear and legally recognized structure of \nownership and accountability; grant PJM states Section 205 filing rights equivalent to MISO \nand SPP states; and establish mandatory timelines for committee action on priority issues with \nclear escalation paths when deadlines are missed. \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes.  \n \nState legislators across the PJM footprint currently have no formal authority within PJM \ngovernance. The PJM State Legislators Collaborative was founded last fall because of that \ngap, beginning with the CIFP process on large load additions and now expanding to this \nbroader governance reform effort. That Collaborative exists because states needed an \norganized voice. A Collaborative is not a substitute for formal filing rights, structured \nconsultation, or data access. Those require FERC action. \n \nPennsylvania and other PJM states should receive Section 205 filing rights equivalent to what \nMISO and SPP states already hold. In MISO, the Organization of MISO States can force a \ncompeting submission to FERC on cost allocation. In SPP, the Regional States Commission \nholds direct authority over cost allocation, market rules and resource adequacy. PJM states \nreceived no equivalent authority at founding. We are asking for parity. \n \nThe PJM Governors Collaborative, formed after Governor Shapiro convened all thirteen PJM \ngovernors in 2025, is another example of what structured state engagement looks like when \nstates build it themselves. Pennsylvania supports formalizing that model at the legislative \nlevel, with defined consultation windows, joint technical sessions with the PJM Board, and \ninformation rights before major filings."},{"page":44,"startToken":16377,"endToken":16678,"text":"PENNSYLVANIA - STATE COMMENTS \n44 \n \nPennsylvania supports the following formal state participation rights: \n \n1. Receive major planning documents and forecasts before they are finalized. \n2. Request independent studies on affordability or reliability concerns specific to \nPennsylvania. \n3. Nominate or vote on PJM Board members. \n4. Participate in regular joint sessions with the PJM Board on key decisions. \n \n \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include \nstate-selected or state-nominated seats; establishing formal board performance metrics \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nNo. The consensus is clear across party lines and both chambers. \n \nThe PJM Board makes final calls on major decisions. Members are selected through an \nindustry-driven process, not by states or elected officials. There are no formal public \nperformance metrics. There is no external accountability review. When outcomes are poor, as \nin three consecutive capacity auctions clearing at or near the administrative cap, there is no \nmechanism to hold the board responsible. \nPennsylvania supports the following board reforms: \n \n1. The board should include independent consumer or ratepayer advocates. \n2. States should be able to nominate or approve at least some board members. \n3. Formal public performance metrics with periodic external accountability reviews.  \n4. PJM should look at how other grid operators structure their boards and adopt what works. \n \nStrengthening existing accountability tools should not wait on restructuring board \ncomposition. Pennsylvania supports pursuing both in parallel, with accountability reforms \ntreated as the immediate priority. \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider:"},{"page":45,"startToken":16678,"endToken":17097,"text":"PENNSYLVANIA - STATE COMMENTS \n45 \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority.   \n \nNo.  \n \nThe data behind this assessment is documented. Penn State University's Seth Blumsack and \nthe RTO Governance Research and Practice Network compiled voting records showing PJM's \nsector-weighted system, which requires 3.35 of 5 electoral votes for passage, routinely \nproduces blocking coalitions. Any two of five sectors can stop any proposal. In practice, \ngeneration owners and transmission owners have sufficient combined weight to block \nproposals that threaten their interests. \n \nThe consequences are not just procedural. The same blocking dynamic that prevented \nagreement on twelve large load interconnection options in 2025 applies to new supply \nreaching the grid at all. When incumbent generators hold effective veto power to overrule \nchanges, the process is structurally biased against innovation and toward the status quo. New \nresources, new technologies and new market structures face a higher barrier than existing \nones. That is not a feature of a well-functioning market. It is a symptom of governance that \nserves its current members rather than the region. Deregulation has produced industry-\ncontrolled processes that are status-quo oriented and resistant to innovation. Pennsylvania asks \nFERC to consider how governance reform creates space for new supply and new solutions to \nreach the grid, not just faster process refinement within the current structure. \n \nA structural inequity compounds this problem. Residential ratepayers are folded into the same \nstakeholder sector as large commercial and industrial customers, who have the staff and \nresources to work the PJM process full-time. That leaves the people with the least ability to \nabsorb a rate spike with the least structured way to be heard. Any reform to the voting \nstructure must address that imbalance specifically and must guarantee residential ratepayers \nreal notice and a genuine opportunity to participate, not just the commercial and industrial \ncustomers who already know how to work PJM's process. \n \nOn Section 205 filing rights: Pennsylvania legislators raised specific concern about the Section \n205 versus 206 authority split. PJM is more responsive to FERC under Section 205, while \nstates currently have no comparable filing standing. Granting states Section 205 filing rights \nwould address this imbalance within the existing Federal Power Act framework, without \nrequiring new Congressional authority. \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion"},{"page":46,"startToken":17097,"endToken":17479,"text":"PENNSYLVANIA - STATE COMMENTS \n46 \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?  \n \nNo. This question produced the strongest consensus of anything we surveyed. \n \nPJM's planning assumptions, load forecasts and congestion analyses drive billions of dollars in \ninfrastructure decisions and directly determine what Pennsylvania families pay on their \nelectric bills. Pennsylvania's state regulators and consumer advocates cannot independently \nreproduce those forecasts or verify PJM's assumptions. That is a structural barrier to effective \nstate oversight of decisions that Pennsylvania ratepayers must fund. \n \nPennsylvania has already acted on this. We signed Electricity Load Forecast Accountability \nprovisions into law in 2025, giving our PUC authority to review and validate the load forecasts \nutilities submit to PJM, so large new energy users are not double-counted, and consumers are \nnot paying for phantom demand. We are asking FERC and PJM to meet that same standard \nregion-wide: regulators and consumer advocates need the ability to independently reproduce \nPJM's forecasts and congestion analyses, not just review PJM's own conclusions. \n \nPennsylvania colleagues who responded support the following, listed by level of support: \n \n1. Full access by the Pennsylvania PUC and consumer advocates to PJM planning \nassumptions, load forecasts and congestion analyses sufficient to allow independent \nreplication and verification. (86%) \n2. The right to commission independent studies on affordability and reliability issues at \nPennsylvania's request. (71%) \n3. Public disclosure of PJM's major planning assumptions so independent researchers, \nconsumer advocates and state legislators can evaluate them. (57%) \n \nOn residential ratepayer equity in transparency: access to PJM data and the ability to \nparticipate in proceedings is not equally distributed. Large commercial and industrial \ncustomers have dedicated staff to monitor PJM's processes. Residential ratepayers do not. Any \ntransparency reform must include access and real notice for residential consumer advocates, \nnot just expanded data portals that only well-resourced actors can use. \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?"},{"page":47,"startToken":17479,"endToken":17930,"text":"PENNSYLVANIA - STATE COMMENTS \n47 \n \nNo. PJM's footprint has grown faster than its visibility into what is driving demand. Large-\nload growth is reshaping planning assumptions region-wide, and the governance structure was \nnot built for this pace. \n \nThe structural problem is best described by the three clocks framework identified by Dr. \nJeanine Johnson, former PJM Board Member, in her 2026 paper: infrastructure operates on \nmulti-year timelines; governance operates on stakeholder cycle timelines of months to years; \nand information now operates at AI-accelerated software speed of seconds to minutes. Risk \nconcentrates in the gap between these tempos. \n \nThe foundational question that must be answered before any structural model is chosen: who \nowns PJM, who is accountable for its outcomes and does that accountability serve the public \ninterest? As Duane and Clark identified in 2021, PJM's structure dissipates any locus of \ncontrol, blurs ultimate accountability and often fails to reach consensus. A faster PJM that still \ncannot show its work on how costs get allocated will move problems downstream faster. \nSpeed and accountability must go together. \n \nThe economic case for structural reform begins with a fact that often goes unstated: PJM is a \nnatural monopoly. There is no competing grid operator serving the same 13 states. No \ncustomer, state or utility can opt out and go elsewhere. Standard economic theory, applied to \nrailroads, water infrastructure and pipelines for over a century, holds that natural monopolies \nrequire public regulation with genuine accountability. Voluntary stakeholder processes where \nincumbent market participants hold blocking power are not a substitute for public \naccountability. When incumbents can veto change, accountability disappears. \n \nA workable institutional model for a multi-state public resource already exists in \nPennsylvania's backyard. The Delaware River Basin Commission was created in 1961 when \nPennsylvania, Delaware, New Jersey, New York and the federal government recognized that \nshared regional infrastructure could not be managed through fragmented, competing \njurisdictions. Before the DRBC, 43 state agencies, 14 interstate agencies and 19 federal \nagencies all claimed overlapping authority over the same river system. The result was \nsplintered authority and no clear accountability for outcomes. The solution was an interstate \ncompact with the force of law, equal state and federal partners and defined decision-making \nauthority. The Commission has operated for more than six decades. It governs a physically \ninterconnected regional resource without regard to political boundaries. The parallel to PJM is \nnot perfect. PJM is larger, more technically complex and already exists as a functioning \ninstitution. A DRBC-style redesign would require time and Congressional action. \nPennsylvania raises this model not as a prescription but as proof of concept: structured public \naccountability over a shared regional resource is achievable. The question is whether FERC \nand the states have the will to move in that direction."},{"page":48,"startToken":17930,"endToken":18275,"text":"PENNSYLVANIA - STATE COMMENTS \n48 \nOn structural reform, Pennsylvania respondents were split. Four of seven survey respondents \nsupported moving toward a multi-state public authority model. Two did not have enough \ncontext to weigh in. One, who selected the stronger option on the survey, clarified in follow-up \nthat his real position is closer to Section 205 parity plus other structural mechanisms from \nexisting ISOs, short of a full public authority model. Senator Collett expressed that \nPennsylvania should not advocate for breaking PJM apart; this submission does not advocate \nfor dissolution. \n \nGiven that range of views, Pennsylvania does not prescribe a single structural model. We do \nadvocate for FERC to begin answering the ownership and accountability question explicitly, \nrather than deferring it through incremental adjustments. \n \nSpecifically: \n \n1. Grant Pennsylvania and other PJM states Section 205 filing rights over cost allocation \nequivalent to those held by MISO and SPP states. This is the floor, not the ceiling. \n2. Direct PJM to establish fast-track decision authority with mandatory timelines for high-\npriority issues and defined escalation paths when the stakeholder process cannot produce a \ndecision. \n \n7. OTHER: Please add any other comments or respond to the FERC technical \nconference panel questions specifically here:   \n \nPennsylvania is one of PJM's largest net exporters of electricity. Our ratepayers carry real \nexposure to how this footprint is governed. Governor Shapiro's legal action against PJM's \nflawed auction design, and the price collar that followed, has already saved PJM customers \nacross the region an estimated $45 billion. That is the direct result of engaged state oversight. \nBut price suppression is not a solution. Downward pressure on capacity prices without fixing \nthe underlying market failures, including phantom load and speculative data center demand in \nPJM’s forecasts, creates the conditions for an even sharper price spike when the collar comes \noff. Pennsylvania is not asking FERC to choose between short-term relief and long-term \nreform. We are asking for both. \n \nDistrict-specific issues Pennsylvania asks FERC to include in the record: \n \n● Rep. Arvind Venkat (HD30, Allegheny County): Rising energy bills driven by grid \nmanagement failures are a top constituent concern."},{"page":49,"startToken":18275,"endToken":18425,"text":"PENNSYLVANIA - STATE COMMENTS \n49 \n● Rep. Christina Sappey (HD158, Chester County); Rep. Danielle Friel Otten (HD155, \nChester County): Constituents are experiencing consistently rising rates and reliability \nconcerns. \n \n● Rep. Greg Scott (HD54, Montgomery County): Data center siting near his district and \nrising electric costs for constituents. \n \n● Rep. Perry Stambaugh (HD86, Perry and Juniata Counties): The proposed 765-kV \nKammer-Juniata Transmission Line is routed through New Bloomfield in HD86. \nMitigation of new rights-of-way must be a priority in transmission planning. \n \n● Rep. Jim Prokopiak (HD140, Bucks County): Data center expansion and rising electric \ncosts are top constituent concerns. \n \n● Sen. Maria Collett (SD12, Montgomery/Bucks): Senator Collett has fought to renew \nChapter 14 consumer protections and pushed back when PECO sought a rate increase \nshe did not find justified. She asks FERC to hold PJM to that same standard: reforms \nthat make decisions faster should also make them more accountable to the people \npaying for them."},{"page":50,"startToken":18425,"endToken":18760,"text":"VIRGINIA - STATE COMMENTS \n50 \nVirginia- State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \n \n(speaking only for themselves) \n \nDelegate Rip Sullivan,   delrsullivan@house.virginia.gov \nSenator Kannan Srinivasan, senatorsrinivasan@senate.virginia.gov  \n \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nRegulated, net importer, clean energy goals \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nYes. PJM’s organizational structure puts its members’ interests ahead of the public interest, is \nopaque, and results in a decision-making process that is too slow for the accelerated energy \ndemand environment we are facing. A re-design is definitely required. \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes. market processes.  \n \nIt is hard to answer this question without knowing what a newly-designed PJM would look \nlike or how it would be governed. And the question begs another question: would “states role \nand  influence” implicate governors, state legislators, and/or state utility commissions?  \nSuffice it to say that all three of those should be involved in PJM decision-making in a way \nthat goes beyond being merely stakeholders in the process, and recognizes and empowers their \nresponsibilities to ratepayers to deliver reliable, affordable electricity to the PJM region. \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include"},{"page":51,"startToken":18760,"endToken":19157,"text":"VIRGINIA - STATE COMMENTS \n51 \nstate-selected or state-nominated seats; establishing formal board performance metrics \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nNo. In the absence of a major restructuring along the lines of an interstate compact or other \nRTO models, the current board is not positioned to be effective. With the slow stakeholder \nprocess the board is often unable to act in a timely manner to respond to challenges. This \nsystem may have been effective when demand growth was low, but the board needs to be \nreformed and put in position to make decisions to meet the current moment. In addition,  the \nlack of  representation from states (governors, legislators, and regulators) leaves the board \nresponsive only to the stakeholders who comprise private generators, utilities, and \ntransmission operators who do not necessarily have the best interests of ratepayers first in \nmind.  \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority.   \n \nNo. The stakeholder process has significant flaws that need to be addressed. The consensus \nrequirements slow decisions and recommendations delivered to the board (if they are not \noutright vetoed by the stakeholder process). Other RTOs, like ERCOT, have moved from \nconsensus models to more advisory models which allow action to be taken more swiftly and  \napprovals from FERC to be expedited. \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?  \n \nNo. Load forecasts and congestion analyses are typically submitted by utilities with little or no \nopportunity for independent evaluation by regulators or consumer advocates. \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient"},{"page":52,"startToken":19157,"endToken":19207,"text":"VIRGINIA - STATE COMMENTS \n52 \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?    \n \nSee answers in 3 and 4 regarding structural issues within PJM."},{"page":53,"startToken":19207,"endToken":19555,"text":"WEST VIRGINIA - STATE COMMENTS \n53 \nWest Virginia- State Comments \n \nState Representatives’ names, titles, and emails: (please list the lead author as well as those \ncollaborating on this document) \n \nGeorge Street, WV House of Delegates, george.street@wvhouse.gov \n \nState energy descriptors: (regulated or deregulated; net importer/exporter; etc.):  \n \nRegulated, Net Exporter  \n \n1. GOVERNANCE: Do we need to reform the governance of PJM? If so, why? For \nexample, please consider how PJM’s current governance affects your state, other RTOs' \ngovernance, and your recommendations for reform.  \n \nGovernance reform appears necessary, particularly to grant states a more meaningful voice in \nPJM's decision-making processes. However, the specific mechanics of how this should be \nstructured require further exploration, as there are still outstanding questions regarding how to \nimplement such changes effectively. \n \n2. STATE ROLE: What role and influence should states have in PJM?  Please consider \nwhether states should have a role: on the PJM Board or in the nominations process, \nengaged in joint technical sessions with the PJM Board, in a formal consultation process, \nenhanced observer status, or information rights before major filings, participating in \nindependent reviews of load forecasting accuracy and major planning assumptions, \nreceiving early-warning reporting when material changes occur in large-load forecasts, \nreliability assessments, or planning assumptions, and/or formally embedding state policy \nobjectives into PJM's planning and market processes.  \n \nWhile the concept of increased state engagement and influence is supported, the details and \nlong-term ramifications of implementation raise significant questions. Key concerns include \nhow PJM would manage potential ideological conflicts between states with differing energy \ngeneration preferences, such as fossil fuels, wind, solar, and nuclear. Additionally, there are \ncritical equity issues for power-exporting or passthrough jurisdictions like West Virginia. \nThese areas often face local protests over major transmission line projects that appropriate \nrural land to serve high-demand urban centers to the east without offering direct local benefits. \nA clear mechanism is needed to resolve these interstate disparities. \n \n \n3. BOARD: Is the current board authority and accountability effective? Please \nconsider the board’s ability to act unilaterally, reforming Board composition to include \nstate-selected or state-nominated seats; establishing formal board performance metrics"},{"page":54,"startToken":19555,"endToken":19916,"text":"WEST VIRGINIA - STATE COMMENTS \n54 \nand periodic external accountability reviews; exploring Independent Representative \nStakeholder (RSC) Board model used at other RTOs.   \n \nStates should have direct representation on the PJM Board. However, the precise level of \nauthority and input remains to be defined, and safeguards must be considered to prevent larger \nstates from disproportionately outvoting smaller states. \n \n4. STAKEHOLDER PROCESS: Is the existing stakeholder process and filing right \nstructure working?  If not, should it be changed?  Please consider if the process \naccurately reflects the interests of those ultimately bearing reliability and affordability \nrisk, particularly ratepayers and emerging large-load customers? Please consider: \nmodifying the voting structure, improving transparency and information access, \nreviewing and refreshing filing rights, and/or strengthening FERC's use of its Section \n206 backstop authority.   \n \nThe current stakeholder process does not appear to be functioning optimally, as concerns over \ngrid instability and potential facility shutdowns indicate underlying system issues. While there \nare complex technical aspects to this process that require deeper study, the current outcomes \npoint to a clear need for improvement.  \n \n5. TRANSPARENCY: Does the PJM operational structure allow sufficient \nengagement with independent information and transparency necessary to affect \naffordability?   Please consider whether regulators and consumer advocates have \nsufficient access to reproduce and independently evaluate the forecasts, congestion \nanalyses, and planning assumptions that ultimately influence ratepayer costs. Should \nstates be able to request studies on emerging affordability and reliability issues? Can we \nexpand independent analytical access to PJM data while preserving market-sensitive \nconfidentiality?  \n \nPJM's operational structure likely does not provide sufficient transparency or independent \ninformation access. However, a highly technical assessment of these specific information-\nsharing gaps is outside the respondent's current areas of primary expertise. \n \n6. STRUCTURE: Is PJM currently structured in a way to operate effectively in \ntoday’s rapidly changing context?  Please consider whether PJM has sufficient \nvisibility into emerging risks, sufficient authority to act on them, and sufficient \naccountability for the outcomes. Is it sufficient regardless of the governance reform?  \nWhat recommendations do you have for the future structure of PJM?   \n \nPJM may not be optimally structured for today's rapidly changing environment. While \nincreased state-level control is highly desirable, there is a valid concern that expanding state"},{"page":55,"startToken":19916,"endToken":19990,"text":"WEST VIRGINIA - STATE COMMENTS \n55 \ndecision-making authority could inadvertently lead to regional gridlock and reduce operational \nefficiency.  \n \n7. OTHER: Please add any other comments or respond to the FERC technical \nconference panel questions specifically here:   \n \nFurther legislative education is essential to fully grasp the technical complexities of these \nissues. It is difficult to confidently propose specific structural fixes without first establishing a \nclearer, shared consensus on exactly which components of the system are failing."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":9,"endAt":1007,"startToken":0,"endToken":3587},{"p":9,"at":1007,"title":"Conclusion","method":"printed heading","endPage":55,"endAt":551,"startToken":3587,"endToken":19990}]}
