{"document":{"slug":"rec-20260728-5073","title":"Motion for Extension of Compliance Deadline of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period","issued":"2026-07-28","accession":"20260728-5073","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"comments","file":"sources/filings/text/20260728-5073_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5073","tier":"record","sha256":"5a4bfed8572ff89dc44f80c1c39c31650ff9d5e0b4973b50a3b41079cd217069","pages":10,"tokens":2860,"emptyPages":[],"textThemes":["colo","procedure","flex"]},"pages":[{"page":1,"startToken":0,"endToken":350,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al.\n) \nDocket No. EL25-49-002 \n) \nDocket No. EL25-49-000 \n) \nLarge Loads Co-Located at Generating Facilities \n)  \nDocket No. AD24-11-001 \n) \nConstellation Energy Generation, LLC \n) \nv. \n)  \nDocket No. EL25-20-001 \nPJM Interconnection, L.L.C.  \n)  \n(Consolidated) \n) \nPJM Interconnection, L.L.C.  \n)  \nDocket No. ER26-1479-000 \nMOTION FOR EXTENSION OF COMPLIANCE DEADLINE OF THE \nINDICATED PJM TRANSMISSION OWNERS \nAND REQUEST FOR EXPEDITED ACTION  \nAND SHORTENED COMMENT PERIOD \nPursuant to Rule 212 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission’s (“Commission” or “FERC”),1 the Indicated PJM Transmission Owners \n(“PJM Transmission Owners”)2 respectfully request that the Commission grant an extension of \ntime with respect to the compliance obligations imposed on the PJM Transmission Owners in the \n1\n18 C.F.R. § 385.212 (2025). \n2\nThe Indicated PJM Transmission Owners are:  American Electric Power Service Corporation on behalf of its \naffiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport \nPower Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., \nAEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio \nTransmission Company, Inc., and AEP West Virginia Transmission Company, Inc.; The Dayton Power and Light \nCompany d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a \nDominion Energy Virginia; Duke Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy \nOhio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative, Inc.; Exelon Corporation on behalf of its \naffiliates Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, \nCommonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and \nPotomac Electric Power Company; FirstEnergy Service Company, on behalf of its affiliates American Transmission \nSystems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, The \nPotomac Edison Company, Monongahela Power Company, Keystone Appalachian Transmission Company, and \nTrans-Allegheny Interstate Line Company (collectively, the “FirstEnergy Companies”); PPL Electric Utilities \nCorporation; Public Service Electric and Gas Company; Rockland Electric Company; and the Southern Maryland \nElectric Cooperative."},{"page":2,"startToken":350,"endToken":773,"text":"2 \nCommission’s June 18, 2026 Order on Rehearing, Clarification, Compliance Filing, and Paper \nHearing in these proceedings.3  The PJM Transmission Owners request that the Commission \nextend the compliance deadline in this proceeding for 90 days, until November 16, 2026,4 so that \nit aligns with the deadline by which PJM and the PJM Transmission Owners have requested to \nsubmit one or more filings pursuant to section 205 of the Federal Power Act (“FPA”) in response \nto the Commission’s show cause order in Docket No. EL26-67-000.5\nGood cause exists to grant this motion because the issues the Commission has required \nPJM and the PJM Transmission Owners to address in the compliance filing in the above-captioned \nproceedings significantly overlap those being addressed by PJM and the PJM Transmission \nOwners in response to the PJM Show Cause Order.6  Granting this request will ensure the PJM \nTransmission Owners have adequate time to determine the appropriate additions and revisions to \nthe PJM Open Access Transmission Tariff (“PJM Tariff” or “Tariff”) for transmission services \napplicable to co-located load customers as well as other large load customers, and will avoid \nunnecessary duplication, confusion, and potential inconsistencies between provisions being \ndeveloped to address issues relevant to both proceedings.  The PJM Transmission Owners further \nrequest a shortened comment period of five (5) days to facilitate the Commission’s issuance of an \norder granting the motion to extend the compliance deadline no later than August 10, 2026.   \n3\nPJM Interconnection, L.L.C., et al., 195 FERC ¶ 61,209 (2026) (“June 18 Order”). \n4\nNovember 16 is the first business day after the end of the 90-day abeyance period. \n5\nSee PJM Interconnection, L.L.C., et al., 195 FERC ¶ 61,211 (2026) (“PJM Show Cause Order”); see also \nMotion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened \nComment Period, Docket No. EL26-67-000 (filed July 28, 2026).   \nIn the event that the Commission grants less than a 90-day abeyance in the PJM Show Cause Order proceeding, the \nPJM Transmission Owners request the Commission adopt that date as the deadline for submitting the compliance \nfiling required in the instant proceedings.   \n6\nThe PJM Transmission Owners understand that PJM will submit certain of the compliance changes directed \nto it by the June 18 Order by the existing 60-day deadline of August 17, 2026.  The PJM Transmission Owners are \ncurrently working with PJM to determine if it would be necessary or efficient to submit certain of their own \ncomplementary compliance changes by August 17, 2026 as well."},{"page":3,"startToken":773,"endToken":1100,"text":"3 \nI.\nBACKGROUND \nA.\nThe PJM Co-Located Load Proceeding \nOn December 18, 2025, the Commission issued an order in Docket Nos. EL25-49-000, et \nal., pursuant to section 206 of the FPA, finding the PJM Tariff unjust and unreasonable because it \ndoes not contain provisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to generators serving Co-Located Load and Eligible Customers \ntaking transmission service on behalf of Co-Located Load.7\nThe Commission directed PJM, inter alia, to submit revisions to its Tariff to require that \nthe Eligible Customer taking transmission service on behalf of the Co-Located Load takes one of \nthree transmission services:  (1) Network Integration Transmission Service (“NITS”), including a \nnew interim, non-firm transmission service available until all Network Upgrades necessary to \nprovide the requested NITS are complete (“Interim NITS”), (2) a new Firm Contract Demand \n(“Firm Contract Demand”) transmission service, or (3) a new Non-Firm Contract Demand (“Non-\nFirm Contract Demand”) transmission service.8  The Commission also established a paper hearing \nto determine the just and reasonable rates, terms, and conditions for these new transmission \nservices.9  On February 23, 2026, in Docket Nos. EL25-49-000, et al., PJM and the PJM \nTransmission Owners each submitted an initial brief to address the Commission’s paper hearing \nquestions with respect to the new transmission services.  On March 25, 2026, and on April 24, \n2026, various parties submitted response briefs and reply briefs, respectively. \n7\nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 2 (2025) (“December Order”). \n8\nDecember Order at P 2. \n9\nId. at PP 2, 194, 219.  The Commission also found the Behind the Meter Generation (“BTMG”) rules in the \nTariff to be no longer just and reasonable, and the Commission directed PJM to submit in its compliance filing \nrevisions to its Tariff to revise the retail BTMG netting rules and to implement a transition process for existing BTMG \nparticipants.  Id. at PP 2, 179, 186, 221-224."},{"page":4,"startToken":1100,"endToken":1419,"text":"4 \nIn the June 18 Order, the Commission addressed the rates, terms, and conditions for the \nrequired new transmission services as developed through the paper hearing submissions, including \nthe rate proposals made by the PJM Transmission Owners.  The Commission accepted certain of \nthe proposals and rejected others, and directed PJM and the PJM Transmission Owners to submit \ncompliance filings with 60 days of the date of the June 18 Order (i.e., August 17, 2026) to reflect \nthe rates, terms, and conditions for the new transmission services in the PJM Tariff.10\nB.\nThe PJM Large Load Show Cause Proceeding \nOn June 18, 2026, the Commission also issued a show cause order under section 206 of the \nFPA to PJM, together with the PJM Transmission Owners, directing PJM to justify or reform the \nTariff provisions governing how large loads connect to and receive service from the transmission \nsystem.11  The PJM Show Cause Order preliminarily found that PJM’s Tariff appeared to be unjust, \nunreasonable, or unduly discriminatory or preferential because of a lack of sufficiently clear and \nconsistent provisions to address service for large loads and related configurations.12  The \nCommission therefore directed PJM and the PJM Transmission Owners, within 60 days, to show \ncause why the Tariff remains just and reasonable without provisions addressing:  (1) the \napplication process, study procedures, and ongoing operational requirements for Eligible \nCustomers seeking transmission service on behalf of large loads; (2) additional transparency \nconcerning Network Upgrade costs for such service, together with the absence of a pro forma cost \nrecovery agreement and a mechanism to ensure related payments are properly credited to \ntransmission owners’ revenue requirements; (3) transmission service options tailored to flexible \nlarge loads willing and able to limit their use of the transmission system under certain conditions; \n10\nJune 18 Order at Ordering Para. (C)-(H). \n11\nPJM Show Cause Order at PP 3, 35. \n12\nId. at PP 3, 35."},{"page":5,"startToken":1419,"endToken":1723,"text":"5 \nand (4) rates, terms, and conditions applicable to interconnection customers serving “electrically \nproximate large load” or co-located load.13  The Commission directed PJM either to justify the \nabsence of such provisions or to propose Tariff revisions addressing those concerns.14\nThe PJM Show Cause Order indicated that the Commission would consider requests from \nPJM and/or transmission owners to hold all or certain aspects of the FPA section 206 proceeding \nin abeyance, for up to 90 days, including the August 17, 2026, deadline to respond.15  The \nCommission explained that the purpose of such an abeyance would be to provide PJM and the \nPJM Transmission Owners time while they work through the stakeholder process to develop FPA \nsection 205 filings to revise the PJM Tariff to address the issues raised in the PJM Show Cause \nOrder.16\nII.\nMOTION FOR EXTENSION \nOn the same date as the instant motion, the PJM Transmission Owners are submitting a \nmotion, consistent with the PJM Show Cause Order, requesting that the Commission hold the \ndeadline to respond to that order in abeyance for a 90-day period in order to allow the PJM \nTransmission Owners to address, through one or more FPA section 205 filings, the issues \nidentified in the PJM Show Cause Order.  The PJM Transmission Owners understand that PJM is \nsubmitting a substantially similar request.  In their abeyance motion, the PJM Transmission \nOwners commit to file their FPA section 205 filing(s) responsive to the PJM Show Cause Order \n13\nId.  \n14\nId. \n15\nId. at P 39.  Because 60 days from issuance of the PJM Show Cause Order falls on a Saturday, the deadline \nto respond does not end until the close of business on Monday, August 17.  See 18 C.F.R. § 385.2007(a)(2). \n16\nPJM Show Cause Order at P 39."},{"page":6,"startToken":1723,"endToken":2051,"text":"6 \nby no later than November 16, 2026, which is the date 90 days after the deadline to respond to the \nPJM Show Cause Order.17\nThe issues the PJM Transmission Owners are addressing in response to the PJM Show \nCause Order substantially overlap with those that the Commission directed the PJM Transmission \nOwners to address in the June 18 Order.  Many of the issues addressed in the PJM Show Cause \nOrder incorporate or otherwise build off of the requirements imposed by the Commission in the \nPJM Co-Located Load proceeding.  For instance, the PJM Show Cause Order preliminarily found \nthat new transmission services should be available to “flexible large loads” willing and able to \nlimit their withdrawals, specifically the three new services it required in the PJM Co-Located Load \nproceeding:  (1) Interim NITS, (2) Firm Contract Demand, and (3) Non-Firm Contract Demand.18\nIn effect, the PJM Show Cause Order contemplates expanding the scope of these new transmission \nservices to a broader set of customers.  Therefore, the PJM Transmission Owners anticipate that \nthe underlying rate design approaches that the Commission directed be adopted in compliance with \nthe June 18 Order would serve as the basis for these new services as applied to both Co-Located \nLoad customers and flexible large load customers.  However, the PJM Transmission Owners will \nstill need to carefully consider, in coordination with PJM and other interested stakeholders, what \nadditions and modifications are necessary to adapt those rate proposals to new services available \nunder the PJM Show Cause Order.    \nGiven the substantial overlap between the requirements in the two orders, the best approach \nis for PJM and the PJM Transmission Owners to develop the Co-Located Load compliance filing \n17\nSee id. (“The Commission will consider requests from PJM and/or the Transmission Owners to hold, for up \nto 90 days, all or certain aspects of this FPA section 206 proceeding in abeyance, including the deadline to respond \nto this order.”) (emphasis added). \n18\nId. at 86."},{"page":7,"startToken":2051,"endToken":2376,"text":"7 \nand the FPA section 205 filing(s) holistically, rather than separately, and to file them on the same \ndate.  This approach has several benefits.  First, it will be more efficient for PJM, the PJM \nTransmission Owners, and PJM stakeholders to prepare and consider the necessary tariff changes \ntogether.  Absent this coordination, PJM and the PJM Transmission Owners will inevitably end \nup significantly duplicating their design and stakeholder outreach efforts.  A holistic process will \nalso avoid potential confusion on the part of PJM stakeholders regarding the scope and impact of \nproposed procedures and other rates, terms, and conditions that will likely end up affecting both \nCo-Located Loads and other large load customers.  An approach whereby PJM and the PJM \nStakeholders are required to submit a compliance filing in the Co-Located Load proceeding at an \nearlier time most likely would result in the need to amend Tariff revisions submitted in the Co-\nLocated Load compliance filing in response to the PJM Show Cause Order, thus creating the risk \nof inconsistencies between overlapping and superseding tariff versions.  Finally, having a single \nfiling date for both proceedings will allow interested parties to address any issues or concerns with \nthe proposed tariff provisions filed by PJM and the PJM Transmission Owners, and will allow the \nCommission to review those revisions, in a coherent and administratively efficient fashion.  \nA modest 90-day extension of the compliance directives in the June 18 Order will not \nunfairly prejudice PJM stakeholders or other interested parties.  As discussed above, addressing \nthe Co-Located Load revisions in conjunction with the issues identified in the PJM Show Cause \nOrder will provide several advantages to interested parties.  Moreover, this extension will not \nimpact the ultimate effective date of any of the proposed revisions relating to the June 18 Order or \nthe PJM Show Cause Order.  For these reasons, the PJM Transmission Owners respectfully request \nthat the Commission grant a 90-day extension so that the deadline for submitting the compliance"},{"page":8,"startToken":2376,"endToken":2649,"text":"8 \nfiling in response to the June 18 Order will be the same as the deadline for FPA section 205 filing(s) \nmade in response to the PJM Show Cause Order:  November 16, 2026. \nIII.\nREQUEST FOR EXPEDITED CONSIDERATION AND SHORTENED \nCOMMENT PERIOD \nThe PJM Transmission Owners request expedited consideration of this motion for \nextension and request that the Commission issue an order granting the motion no later than August \n10, 2026.  Expedited consideration and the issuance of an order by that date will provide the PJM \nTransmission Owners sufficient assurance that they will have adequate time to develop and submit \nboth the June 18 Order compliance filing, as well as one or more FPA section 205 filings necessary \nto implement the PJM Show Cause Order.  Expedited consideration will also allow the PJM \nTransmission Owners to focus their efforts on developing these filings in a holistic consistent \nfashion, rather than spending critical time preparing a separate Co-Located Load compliance filing \nthat likely would require substantial subsequent amendments.  Consistent with this request, the \nPJM Transmission Owners also seek a shortened comment period on this motion for an extension \nof time.  Specifically, the PJM Transmission Owners request that the Commission establish a \ncomment period of five (5) days.  Good cause exists to grant a shortened comment period for the \nreasons set forth above.  Moreover, no party will be prejudiced as a result of granting a five (5) \nday comment period, as the additional time and certainty afforded by an expedited order will \naccrue to the benefit of stakeholders by providing the PJM Transmission Owners sufficient time \nto solicit and consider stakeholder feedback on their proposals."},{"page":9,"startToken":2649,"endToken":2781,"text":"9 \nIV.\nCONCLUSION \nFor the reasons set forth above, the PJM Transmission Owners’ request that the \nCommission establish a five (5) day comment period for answers to this motion, and issue an order \non or before August 10, 2026, granting the PJM Transmission Owners’ request to extend the \ncompliance deadline in the above-captioned proceedings until November 16, 2026, or whatever \nalternative date the Commission adopts as the deadline to submit one or more FPA section 205 \nfilings in response to the PJM Show Cause Order. \nRespectfully submitted, \n/s/ Michael Kunselman\nMichael Kunselman  \nRichard P. Sparling \n \nNicholas J. Cicale \nJonathan A. Namazi \nDavis Wright Tremaine LLP \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nCounsel for the FirstEnergy\n  Companies \nOn behalf of the Indicated PJM   \n  Transmission Owners\nDated:  July 28, 2026"},{"page":10,"startToken":2781,"endToken":2860,"text":"CERTIFICATE OF SERVICE \nUnder Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § \n385.2010 (2025), I hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service lists compiled by the Secretary in these proceedings.  \nDated at Washington, D.C., this 28th day of July 2026.  \n/s/ Daniel Klein \nDaniel Klein  \nDavis Wright Tremaine LLP  \n1301 K Street NW  \nSuite 500 East  \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":3,"startToken":0,"endToken":774},{"p":3,"at":3,"title":"I. BACKGROUND","method":"printed heading","endPage":3,"endAt":18,"startToken":774,"endToken":776},{"p":3,"at":18,"title":"A. The PJM Co-Located Load Proceeding","method":"printed heading","endPage":4,"endAt":567,"startToken":776,"endToken":1192},{"p":4,"at":567,"title":"B. The PJM Large Load Show Cause Proceeding","method":"printed heading","endPage":5,"endAt":850,"startToken":1192,"endToken":1557},{"p":5,"at":850,"title":"II. MOTION FOR EXTENSION","method":"printed heading","endPage":8,"endAt":174,"startToken":1557,"endToken":2410},{"p":8,"at":174,"title":"III. REQUEST FOR EXPEDITED CONSIDERATION AND SHORTENED","method":"printed heading","endPage":9,"endAt":3,"startToken":2410,"endToken":2650},{"p":9,"at":3,"title":"IV. CONCLUSION","method":"printed heading","endPage":10,"endAt":0,"startToken":2650,"endToken":2781},{"p":10,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":474,"startToken":2781,"endToken":2860}]}