{"document":{"slug":"rec-20260803-5143","title":"Comment of wilton c smit smith in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/3/2026","issued":"2026-08-03","accession":"20260803-5143","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260803-5143_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5143","tier":"record","sha256":"74430b6930912bb18bb8147361345d45aa6f6ce4f695a8938f9a8c1567f4346e","pages":null,"tokens":447,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":447,"text":"wilton c smit smith, Round Rock, TX.\nControllable Load Framework: A Reliability Opportunity\n\nThe electric grid is entering a new era. For more than a century, planning assumed that demand simply consumed electricity while generators produced it. That assumption is no longer entirely true.\nThe rapid growth of artificial intelligence data centers has introduced a new class of electric load. Unlike traditional industrial facilities, these computational loads can often be scheduled, shifted, paused, or reduced in seconds through software. They are not simply consumers of electricity; they are programmable electric resources.\n\nToday's planning and reliability frameworks largely continue to treat these facilities as conventional load. That overlooks an engineering opportunity.\n\nThe Controllable Load Framework (CLF) proposes that qualified large programmable loads be recognized as reliability resources alongside generation, transmission, storage, and conventional demand response. Their flexibility should be measured, verified, and incorporated into planning and system operations where appropriate.\n\nThis is not a substitute for dispatchable generation. Reliable electric systems will continue to require sufficient generation, transmission, and reserves. Rather, controllable computational load should become another engineering tool available to system operators.\n\nFor NERC\nNERC's work on emerging large loads appropriately focuses on protecting Bulk Electric System reliability. That effort should also examine how programmable computational loads can contribute to reliability.\n\nFuture reliability standards could establish performance expectations for qualified controllable loads, including:\n\nverified response capability,\ncommunications and telemetry,\npredictable operating characteristics,\nresponse during frequency and voltage events,\ntesting and validation procedures.\nRecognizing controllable loads as measurable reliability resources would strengthen planning while maintaining system security.\n\nFor PJM Governance\nPJM's governance challenge is not simply making decisions faster. It is ensuring that planning evaluates all available engineering solutions.\n\nGovernance should require that planning studies evaluate controllable large loads alongside generation, transmission, storage, and demand response whenever significant new load is proposed.\n\nThis would allow stakeholders to compare engineering alternatives using objective reliability metrics rather than relying solely on traditional assumptions about electric demand.\n\nBetter governance is not merely faster governance. Better governance is governance that consistently considers the full range of technically viable solutions.\n\nLooking Forward\nThe electric grid has always evolved when technology changed.\n\nToday, the change is not only new generators or new transmission lines. It is the emergence of software-controlled electric demand capable of supporting grid reliability.\n\nPlanning frameworks should evolve to recognize that reality.\n\nThe Controllable Load Framework does not replace existing reliability tools. It expands the engineering toolbox available to planners and operators.\n\nAs computational load continues to grow across North America, the question should no longer be whether programmable demand exists. The question should be how best to integrate it into a reliable, resilient electric system.\n\nWilton Smith\nRound Rock, Texas"}],"sections":[{"p":1,"at":0,"title":"Document text","method":"document text","endPage":1,"endAt":3427,"startToken":0,"endToken":447}]}