{"document":{"slug":"rec-20260804-3091","title":"Notice of Shortened Answer Period re California Independent System Operator Corporation et al","issued":"2026-08-04","accession":"20260804-3091","docket":"EL26-71-000","group":"CAISO show cause proceeding (E-10)","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"answer","file":"sources/filings/text/20260804-3091_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3091","tier":"record","sha256":"f6a264e343342fda690aec1794b46f22b13310485b88898e8b055bd1acfacf60","pages":null,"tokens":337,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":337,"text":"UNITED STATES OF AMERICA\nFEDERAL ENERGY REGULATORY COMMISSION\n\n\nCalifornia Independent System Operator Corporation\n\nCitizen S-Line Transmission LLC \nCitizens Sunrise Transmission LLC \nCitizens Sycamore-Penasquitos Transmission LLC \nCity of Anaheim, California \nCity of Azusa, California \nCity of Banning, California \nCity of Colton, California \nCity of Pasadena, California \nCity of Riverside, California\nDCR Transmission, L.L.C. \nDesertLink, LLC \nGridLiance West LLC \nHorizon West Transmission, LLC\nLS Power Grid California, LLC \nMorongo Transmission LLC \nPacific Gas and Electric Company \nSan Diego Gas & Electric Company \nSouthern California Edison Company \nStartrans IO, L.L.C. \nSunZia Transmission, LLC \nTrans Bay Cable LLC \nValley Electric Association, Inc. \nViridon Path 15, LLC \nWestern Area Power Administration\n\t\t\t\t\t\t\t\tDocket No.\n\t\t\t\t\t\t\t\tEL26-71-000\n\t\t\t\t\t\t\t\t\n\n\nNOTICE OF SHORTENED ANSWER PERIOD\n\n(August 4, 2026)\n\nOn July 31, 2026, pursuant to Rule 212 of the Commission’s Rules of Practice and Procedure,[fn:2] the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California (Six Cities) filed a motion to rescind the June 18, 2026, show cause order issued by the Commission in the above-referenced proceeding[fn:3] as directed to each of the Six Cities as Participating Transmission Owners in the California Independent System Operator Corporation.  Six Cities request that the Commission waive the answer period applicable to this motion.\nOn August 3, 2026, pursuant to Rule 212 of the Commission’s Rules of Practice and Procedure, Western Area Power Administration (WAPA) filed a motion to rescind the June 18, 2026, show cause order issued by the Commission in the above-referenced proceeding as directed to WAPA in its capacity as a Participating Transmission Owner in the California Independent System Operator Corporation.  WAPA requests that the Commission waive the answer period applicable to this motion.\nUpon consideration, notice is hereby given that answers in response to the motions are due by 5:00 pm Eastern Time on August 7, 2026.\n\n\n\nDebbie-Anne A. Reese,\nSecretary.\n\n\n\n\n\nFootnotes\n[fn:2] 18 C.F.R. § 385.212 (2025).\n[fn:3] Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026).\n\nheader2 (Word template)\nDocket No. EL26-71-000\t\t\t\t\t\t\t\t- 2 -"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":2121,"startToken":0,"endToken":308},{"p":1,"at":2121,"title":"Footnotes","method":"Word notes","endPage":1,"endAt":2292,"startToken":308,"endToken":337}]}
