{"document":{"slug":"rec-20260804-5163","title":"Motion for Leave and Answer of Constellation Energy Generation, LLC to Indicated PJM Transmission Owner's Rehearing Request","issued":"2026-08-04","accession":"20260804-5163","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"rehearing request","file":"sources/filings/text/20260804-5163_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-5163","tier":"record","sha256":"0baee63c685fd4ccd3222d6b3c94fc2eaa8f53afb8d61db049d9189c9b716e58","pages":6,"tokens":1446,"emptyPages":[],"textThemes":["colo","study"]},"pages":[{"page":1,"startToken":0,"endToken":236,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C., et al. \n \n \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \n \nConstellation Energy Generation, LLC \n \n     v. \n \nPJM Interconnection, L.L.C. \n \n \n \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n \n) \n) \n) \n \n) \n) \n) \n) \n) \n) \n) \n \n) \n) \n) \n \n \n \nDocket Nos. EL25-49-002 \nEL25-49-000 \n \n \n \nDocket No. AD24-11-001 \n \n \n \nDocket No. EL25-20-001 \n(consolidated) \n \n \n \n \n \n \nDocket No. ER26-1479-000 \nMOTION FOR LEAVE AND ANSWER OF  \nCONSTELLATION ENERGY GENERATION, LLC \nConstellation submits this motion for leave and answer1 to emphasize one point: if the \nCommission’s goal is to interconnect loads faster than the current 7-to-10-year timeframe,2 it must \n \n1 Constellation Energy Generation, LLC (“Constellation”) submits there is good cause to accept this answer to the \nrehearing requests filed by Indicated PJM Transmission Owners and jointly by Exelon Corporation (“Exelon”) and \nFirstEnergy Service Company (“FirstEnergy”) (collectively, Transmission Owner Rehearing Requests) as our \nanswer is intended to assist the Commission in its decision making. See, e.g., Tex. E. Transmission, LP, 127 FERC \n¶ 61,162, at P 6 (2009) (finding good cause to accept an answer to a rehearing request because the answer “provides \ninformation that will assist [the Commission] in [its] decision-making process”). \n2 See, e.g., Comments of Talen Energy Corp., Docket No. AD24-11-000, Analysis Group Report at 12 n.43 (Oct. 28, \n2024) (describing wait times to plan, design, site and construct a new grid connection to be as long as seven years \nfor Dominion and seven to ten years for AEP)."},{"page":2,"startToken":236,"endToken":698,"text":"2 \ncontinue to promptly deny the Transmission Owners’ rehearing requests3 – filed in this docket and \nin response to the Large Load Show Cause Order.4 Despite the Commission’s clear determinations \nthat there are benefits to allowing alternative configurations to traditional front-of-the-meter \n(“FTM”) connections, the Transmission Owners’ acceptance of alternative configurations has not \nevolved, and they steadfastly persist in refiling the same challenges that the Commission has \nalready comprehensively rejected. Indeed, much of Exelon and FirstEnergy’s July 20th Rehearing \nRequest repackages verbatim their January 16th Rehearing Request, swapping “co-located load” \nfor “load served by BTMG.”5 Moreover, in so doing, they fail to address the legal and policy \ngrounds on which the Commission previously disposed of these same challenges.   \nUnfortunately, the Transmission Owners’ rehearing request underscores the fact that the \nonly configuration that they support is a fully FTM one. They continue to point to the Susquehanna \nISA Proceeding and Talen’s transition to an FTM arrangement as demonstrating that Network \nService is sufficient for co-located load.6 But the question before the Commission is not what is \n \n3 See Request for Rehearing and Clarification of the Indicated PJM Transmission Owners, Docket No. EL25-49-000, \net al. (July 20, 2026) (“Indicated TO June 2026 Co-Location Order Rehearing”); Request for Rehearing of Exelon \nCorporation and FirstEnergy Service Company, Docket No. EL25-49-000, et al. (July 20, 2026) (“Exelon & \nFirstEnergy July 20th Rehearing Request”). \n4 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 (2026) (“Large Load Show Cause Order”). Similar to this \nproceeding, the Indicated PJM Transmission Owners and Exelon together with FirstEnergy filed requests for \nrehearing of the Large Load Show Cause Order. See Request for Rehearing of Exelon Corporation and FirstEnergy \nService Company, Docket No. EL26-67-000 (July 20, 2026); Request for Clarification, or in the Alternative, \nRehearing of the Indicated PJM Transmission Owners, Docket No. EL26-67-000, at 6-8 (July 20, 2026) (“Indicated \nTO Large Load Show Cause Rehearing”). \n5 Compare Exelon & FirstEnergy July 20th Rehearing Request at 3 (“There is No Evidence In the Record That Loads \nServed by BTMG Are Unable to Obtain Reliable, Timely, and Reasonably Priced Service Using the Existing \nNetwork Service Construct. Therefore, the Commission Fails To Satisfy the Requirement Under the Administrative \nProcedure Act That Its Decision Be Supported With Substantial Evidence.”) with Request for Rehearing of the \nIndicated PJM Transmission Owners at 5 (Jan. 16, 2026) (with the Indicated PJM Transmission Owners listed as \nExelon and FirstEnergy) (“Exelon & FirstEnergy January 16th Rehearing Request”) (“There is No Evidence In the \nRecord That Co-Located Loads Are Unable to Obtain Reliable, Timely, and Reasonably Priced Service Using the \nExisting Network Service Construct. Therefore, the Commission Fails To Satisfy the Requirement Under the \nAdministrative Procedure Act That Its Decision Be Supported With Substantial Evidence.”). \n6 Exelon & FirstEnergy July 20th Rehearing Request at 14-15."},{"page":3,"startToken":698,"endToken":1074,"text":"3 \nsufficient but in fact what is just and reasonable and consistent with the public interest. And the \nCommission has found that alternative configurations indeed meet this standard. The Transmission \nOwners fail to acknowledge the Commission’s finding that Talen’s decision to transition to front-\nof-meter “in fact, might support” a showing “that there is a lack of sufficient clarity related to Co-\nLocation Arrangements writ large,”7 while at the same time seeking to perpetuate continued \nregulatory uncertainty through multiple rehearing requests recycling the same arguments.  \nThe Transmission Owners also renew their challenge to the Commission’s denial of PJM’s \nunauthorized replacement of “Point of Interconnection” with “Point of Change in Ownership” in \nthe definition of Co-Located Load.8 The Commission should reject this argument, as it did PJM’s, \nfor failure to timely raise it on rehearing of the December 2025 Co-Location Order.9 As the \nCommission observed recently, “an attack on a judgment in a proceeding other than a direct \nappeal” is a collateral attack and “is generally prohibited.”10 \nLooking forward, the Commission should grant Constellation’s Request for Rehearing and \nimplement three reforms to expedite interconnection: (1) establish study deadlines binding both \nPJM and Transmission Owners, (2) require PJM to spell out its methodology and process for \ncompleting Necessary Studies in its Tariff, and (3) require all Transmission Owner standards, \nrequirements, guidance, and practices related to necessary control technologies and/or protection \n \n7 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209, at P 63 (2026) (“June 2026 Co-Location Order”). \n8 Indicated TO June 2026 Co-Location Order Rehearing at 3, 6, 16-17; see also Indicated TO Large Load Show Cause \nRehearing at 6-8 (requesting that the Commission “clarify that in any Section 205 filing or other response to the \nPJM Show Cause Order, PJM and/or the PJM Transmission Owners are not limited to defining ‘large load’ or \n‘electrically proximate large load’ based on reference to the point of interconnection, and that they will have \nsufficient flexibility to propose other points of reference, such as the Point of Change of Ownership.”) (emphasis \nadded). \n9 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“December 2025 Co-Location Order”). \n10 Voltus, Inc. v. PJM Interconnection, L.L.C., 196 FERC ¶ 61,074, at P 65 (2026)."},{"page":4,"startToken":1074,"endToken":1235,"text":"4 \nschemes to be filed with the Commission.11 Filing these standards is especially critical if the \nCommission clarifies that Transmission Owners may require protection schemes on both sides of \nthe Point of Interconnection.12 In light of this approach, establishing study deadlines and ensuring \nall requirements are clear and enforceable are critical paths to faster interconnection. \nCONCLUSION \nFor the reasons stated above, Constellation respectfully requests that the Commission grant \nConstellation’s Request for Rehearing of the June 2026 Co-Location Order and reject the \nTransmission Owner Rehearing Requests. \n \n \n11 See generally Request for Rehearing and Clarification of Constellation Energy Generation, LLC (July 20, 2026) \n(“Constellation’s Request for Rehearing”). \n12 Indicated TO June 2026 Co-Location Order Rehearing at 3 (“The Commission should clarify that PJM and the PJM \nTransmission Owners will be permitted to require protection on both the customer and Transmission Owner sides \nof the Point of Interconnection, to the extent that a study determines that such protection is necessary and \nappropriate.”)."},{"page":5,"startToken":1235,"endToken":1364,"text":"5 \n \n \n \n \n \n \n \n    Respectfully submitted, \n \n \n \n \n \n \n \n    /s/ Paul F. Wight \n \n \n \nAugust 4, 2026 \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nSeth T. Lucia \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \nseth.lucia@constellation.com \n  \nChristopher A. Wilson \nVice President, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \n \nPaul F. Wight \nCarolyn E. Clarkin \nDLA Piper LLP (US) \n500 Eighth Street NW \nWashington, D.C. 20004 \n703-773-4058 \npaul.wight@us.dlapiper.com  \ncarolyn.clarkin@us.dlapiper.com  \n \nSophia Browning \nDLA Piper LLP (US) \n4365 Executive Drive \nSuite 1100 \nSan Diego, CA 92121 \n858-677-1455 \nsophia.browning@us.dlapiper.com \n \nCounsel for Constellation Energy \nGeneration, LLC"},{"page":6,"startToken":1364,"endToken":1446,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have on this 4th day of August 2026, caused to be served a copy of \nthe foregoing upon all parties on the service lists in these proceedings in accordance with the \nrequirement of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010 (2026). \n/s/ Sophia Browning \n \n \nSophia Browning \nDLA Piper LLP (US) \n4365 Executive Drive \nSuite 1100 \nSan Diego, CA 92121 \n858-677-1455 \nsophia.browning@us.dlapiper.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":387,"startToken":0,"endToken":1131},{"p":4,"at":387,"title":"CONCLUSION","method":"printed heading","endPage":6,"endAt":0,"startToken":1131,"endToken":1364},{"p":6,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":484,"startToken":1364,"endToken":1446}]}