{"document":{"slug":"rec-20260805-5176","title":"Comment of Larry Fisher in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/5/2026","issued":"2026-08-05","accession":"20260805-5176","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260805-5176_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260805-5176","tier":"record","sha256":"17c1387e86342d7492f985af48a0baedbe32e95b9db680167b34f40e30d4f88c","pages":null,"tokens":1418,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":1418,"text":"Larry Fisher, Romney, WV.\nPJM REFORM MUST CLOSE THE GAP BETWEEN LOAD, GENERATION, TRANSMISSION AND LAND\nI am President of the Quivey’s Grove Property Owners Association, a small private residential community in Hampshire County, West Virginia. A proposed study segment for the Valley North 765-kV transmission project would cross through the center of our community.\nI am not an electrical engineer or utility regulator. I am a retired information-technology architect. My concern arises from a familiar systems problem: every participant can perform its assigned function correctly while the complete process still produces a poor result because no one owns the end-to-end decision.\nThe Commission has asked how PJM can become more accountable, transparent and responsive while giving states and stakeholders a meaningful role. Valley North provides a practical example of why those reforms must address more than the speed of PJM’s decision-making.\nThe underlying problem is that no participant appears responsible for proving that the combined load, generation, transmission, timing, cost and land-use result is the least costly and least destructive reasonable solution.\nI do not oppose data centers, artificial intelligence, necessary generation or necessary transmission. Nor do I claim to have proved that another engineering solution can replace Valley North. I ask FERC to require an accountable process that examines the complete problem before a major greenfield transmission decision becomes effectively irreversible.\nHOW THE REGIONAL NEED DEVELOPED\nPJM’s January 14, 2026 forecast summary quantifies the “hockey-stick” change: PJM’s 2021 forecast projected average annual summer-peak growth of 0.3% over the following ten years; its 2026 forecast projects 3.6% annually over the next decade—more than ten times as fast—even after PJM reduced its forecast for several near-term years through 2032, in part because of improved vetting of large-load requests.\nIn its 2022 RTEP Window 3 analysis, PJM considered up to 7,500 MW of new data-center load associated with facilities to be sited in Virginia and Maryland, together with approximately 11,100 MW of announced generator deactivations west and south of the Conastone area.\nPJM received 72 transmission proposals. The resulting package included MARL and related reinforcements intended to move more electricity toward Northern Virginia and surrounding load centers.\nFor its 2024 RTEP Window 1 analysis, PJM modeled approximately 10,000 MW more load for 2029 and approximately 15,000 MW more for 2032 than in earlier cases. PJM attributed most of that increase to data centers, with additional growth from electrification and electric vehicles.\nPJM received 94 transmission proposals from 16 entities. Forty of those proposals were primarily greenfield projects.\nThe selected regional package included Proposal 708, the approximately $1.945 billion John Amos–Welton Spring–Rocky Point 765-kV project now being developed as Valley North. It was part of a larger group of 63 baseline reliability projects totaling approximately $5.9 billion approved by the PJM Board on February 26, 2025.\nThe developers then began translating PJM’s electrical endpoints into possible geographic routes. That is when the regional planning decision appeared on the ground as study segments crossing West Virginia farms, homes and communities, including Quivey’s Grove.\nThen, on July 28, 2026—after PJM had approved Valley North—Dominion announced plans for a new 2.6-GW natural-gas combined-cycle generating station at Mt. Storm, West Virginia. Dominion also stated that the existing 1.6-GW coal-fired Mt. Storm station would continue operating. The proposed new station is expected to begin operating around 2034, subject to permits and regulatory approval.\nThe later Mt. Storm proposal does not prove that Valley North is unnecessary, nor does it prove that Valley North caused Dominion to select Mt. Storm.\nIt does, however, expose the planning question:\nWould PJM have selected the same transmission solution, of the same size and across the same general geography, if the new Mt. Storm generation and other possible load-generation combinations had been evaluated as part of the same decision?\nThe publicly available record I have reviewed does not answer that question.\nTHE MISSING INTEGRATED DECISION\nThe present process divides responsibility:\n•\tLocal governments approve data centers.\n•\tDevelopers select locations and request electric service.\n•\tUtilities incorporate those requests into load forecasts.\n•\tGenerator owners separately decide whether plants remain open and where new plants may be built.\n•\tPJM receives those decisions, identifies projected reliability violations and evaluates transmission proposals.\n•\tState commissions or other state siting authorities later consider whether to approve the proposed facilities and routes under applicable state law.\n•\tCommunities and landowners enter near the end, after the regional need and broad transmission solution have largely taken shape.\nPJM is effectively handed one set of assumptions saying, “Add enormous new load here,” and another saying, “Remove generation there.” PJM must then keep the grid reliable.\nTransmission becomes the default extension cord because PJM directly controls neither the location of the new load nor many of the generation decisions.\nPJM may perform a thorough comparison among transmission proposals without performing—or having authority to perform—a comparable system-wide analysis of whether the transmission requirement could be avoided or reduced through:\n•\tDependable generation nearer the load;\n•\tLocating extraordinary new loads nearer dependable generation;\n•\tRetaining strategically important existing generation;\n•\tUpgrading or rebuilding within existing rights-of-way;\n•\tAdvanced conductors;\n•\tStorage and demand response;\n•\tStaged, flexible or interruptible service;\n•\tReasonable undergrounding; or\n•\tDelaying unconditional firm service until the required infrastructure is ready.\nThat is the governance gap FERC should address.\nRATEPAYER PROTECTION DOES NOT PROTECT LANDOWNERS\nPresident Trump’s Ratepayer Protection Pledge establishes an important principle: companies creating extraordinary new electric demand should build, bring or buy the power they require and pay for the delivery infrastructure needed to serve them.\nOrdinary electric customers should not subsidize private data-center development.\nBut customer payment does not prove that a project is necessary, properly sized or based upon the least harmful reasonable solution. Payment answers who writes the construction check.\nIf data centers pay the utility’s construction bill, ratepayers may be declared protected while rural families absorb losses involving land, property value, privacy, security, views and community character to transmission lines required to provide the power.\nThat is not full cost. It is cost shifting to people whose losses do not appear on a utility invoice.\nAvoidance must therefore come before compensation. Unnecessary impacts should be avoided, unavoidable impacts minimized, and affected owners fully compensated only after the need and alternatives have been fairly examined.\nWHAT FERC SHOULD REQUIRE\nI am not asking FERC to adopt my engineering solution or select a transmission route. I am asking FERC to use its authority over PJM’s governance, tariffs and regional planning requirements to ensure that someone is accountable for evaluating the complete problem.\nThat process should require:\n1.\tAN INTEGRATED ALTERNATIVES RECORD\nBefore selecting major greenfield transmission, the record should show that load location, load readiness, generation, retirements, existing transmission capacity, existing rights-of-way, storage, flexibility, staging and new transmission were evaluated as parts of one system.\n2.\tAN ACCOUNTABLE DECISION-MAKER\nThe process should identify who is responsible for determining that the combined result is reliable, reasonably economical and the least destructive reasonable alternative.\nThat responsibility should not disappear into the boundaries among utilities, generator owners, PJM, FERC and state regulators.\n3.\tEARLY STATE AND COMMUNITY PARTICIPATION\nStates, consumer advocates, local governments and representatives of affected communities should enter while meaningful alternatives remain available—not only after the broad electrical solution has been selected and routing has begun.\n4.\tPERIODIC REVALIDATION\nLoad commitments, generator retirements, new generation, technological developments and project timing should be retested before major property acquisition and construction.\nA project justified by one forecast should not proceed automatically if the underlying facts materially change.\n5.\tCLEAR RESPONSIBILITY FOR FORECAST RISK\nThe customer creating the extraordinary load should bear the financial risk if that load is delayed, reduced or never constructed.\nRatepayers should not inherit stranded costs, and landowners should not permanently surrender property for infrastructure that updated analysis no longer supports.\nCONCLUSION\nFERC’s objective should not be simply to make PJM’s existing process faster or give PJM more unilateral authority.\nA faster fragmented process is still fragmented—and may merely reach an incomplete decision sooner.\nFERC should enforce coordination, not take control of the land.\nI cannot establish that another solution will eliminate Valley North. But neither should affected landowners be required to design an alternative regional grid before questioning whether the responsible institutions ever evaluated the complete load-generation-transmission-land problem as one system.\nFirst determine what is reasonably necessary. Then determine who should pay for it. Before either decision becomes irreversible, require someone to examine and accept responsibility for the complete result.\n\nRespectfully,\n Larry Fisher"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":9127,"startToken":0,"endToken":1304},{"p":1,"at":9127,"title":"CONCLUSION","method":"printed heading","endPage":1,"endAt":9953,"startToken":1304,"endToken":1418}]}
