{"document":{"slug":"rec-20260810-5149","title":"Post-Technical Conference Comments of Persistence Analytics Group LLC re PJM Governance and Stakeholder Reforms","issued":"2026-08-10","accession":"20260810-5149","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260810-5149_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-5149","tier":"record","sha256":"e1f4face20791eb747564397b960992195e08f207ce9e3673f914442bbf8e3f5","pages":4,"tokens":1541,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":85,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nExploring the Current State of PJM Governance\nDocket No.\nAD26-7-000\nPOST-TECHNICAL CONFERENCE COMMENTS\nOF PERSISTENCE ANALYTICS GROUP LLC\nPJM Governance and Stakeholder Reforms\nAugust 10, 2026\nGovernance reform should determine not only who may make a consequential decision, but \nwhat evidence must support it, when material assumptions must be revalidated, and how \nimplementation outcomes are verified afterward.\nSubmitted by: Neil P. Osnato, Founder\nPersistence Analytics Group LLC | United Grid\nneil@persistenceanalyticsgroup.com  |  609-464-9055  |  persistenceanalyticsgroup.com"},{"page":2,"startToken":85,"endToken":520,"text":"I. INTRODUCTION AND INTEREST OF PERSISTENCE ANALYTICS GROUP LLC\nPersistence Analytics Group LLC (PAG) respectfully submits these post-technical conference comments in \nresponse to the Commission's examination of PJM Interconnection, L.L.C. governance and stakeholder processes in \nDocket No. AD26-7-000. PAG is an independent infrastructure-risk and decision-assurance firm focused on large-\nload integration, demand durability, grid stress, load integrity, transmission cost causation, and implementation \nverification.\nThe Commission's July 23, 2026 technical conference was directed toward concrete, actionable reforms that can \nimprove PJM's ability to address operational and market needs in a timely and efficient manner. The Commission's \nsubsequent process also identifies Board independence, section 205 filing rights, more timely and transparent \nstakeholder decision-making, and meaningful structured participation by state entities as major reform themes.\nPAG's central recommendation is straightforward: governance reform should include an explicit decision-\nassurance layer. The stakeholder process should not end when a proposal receives the votes, approvals, or filings \nnecessary to move forward. For decisions with material reliability, transmission, cost-allocation, large-load, or \ncapital consequences, the process should identify the assumptions supporting the decision, the evidence supporting \nthose assumptions, the conditions requiring revalidation, and the evidence showing whether the expected result was \nultimately realized.\nA stakeholder process can be procedurally complete while the assumptions underneath the \nresulting decision remain unverified.\nThese comments address governance principles only. PAG does not address the merits of any specific contested \nproceeding pending before the Commission.\nII. THE GOVERNANCE PROBLEM IS ALSO AN EVIDENCE PROBLEM\nPJM is operating in an environment in which changes in large-load development, generation availability, \ntransmission needs, equipment lead times, financing conditions, siting, permitting, and state policy can materially \nchange the assumptions supporting major system decisions. The governance challenge is therefore not simply speed. \nA faster process that relies on assumptions that are incomplete, stale, internally inconsistent, or insufficiently tested \ncan accelerate the wrong decision.\nThe inverse is also true. A process that repeatedly relitigates settled questions because participants lack a \ncommon evidentiary record can delay decisions even when the underlying need is real. Better governance should \ntherefore create a disciplined way to distinguish policy disagreement from factual uncertainty, and to determine \nwhich assumptions require verification before a decision becomes difficult to reverse.\nPAG recommends that PJM distinguish among at least four categories of information: (1) announced or forecast \nconditions; (2) contractually supported conditions; (3) independently supportable or executable conditions; and (4) \nrealized operating outcomes. These categories are not interchangeable. For example, announced load is not the same \nas durable operating demand, and financial security is not the same as proof that every critical infrastructure \ndependency can be delivered on the required timetable."},{"page":3,"startToken":520,"endToken":1069,"text":"III. A PJM ACCOUNTABLE DECISION ARCHITECTURE\nPAG recommends that the Commission encourage PJM and its stakeholders to develop an Accountable \nDecision Architecture for material governance decisions. The architecture need not prescribe substantive outcomes. \nIts function is to create a repeatable evidentiary record around consequential decisions.\nDecision\nMaterial\nassumption\ns\nSupporting\nevidence\nAffected\nstates\nCost\ncausation\nAuthority /\napproval\nImplementat\nion\nExceptions\nRevalidatio\nn\nMeasured\noutcome\n1. What is being assumed? Identify the material load, timing, reliability, cost, resource, transmission, \nimplementation, and market assumptions that make the proposed decision reasonable.\n2. What evidence supports each assumption? Separate forecasts, representations, contracts, engineering \nevidence, operating data, and other forms of support so decision-makers can see the quality and limitations of the \nrecord.\n3. Who is affected if an assumption is wrong? Identify states, customers, market participants, transmission \nowners, generators, and other stakeholders that bear material consequences if an assumption fails.\n4. What event requires revalidation? Define objective triggers for reconsideration when material facts change, \nincluding delays, downsizing, cancellation, changes in load, changed infrastructure dependencies, or other \ndeviations from the record supporting the decision.\n5. Who owns the exception? Assign responsibility for identifying, escalating, correcting, and closing material \nexceptions rather than allowing them to persist across committees or planning cycles.\n6. What evidence proves the outcome? After implementation, compare the realized condition against the \nassumptions that justified the decision and make the result available to improve future governance.\nIV. FIVE GOVERNANCE REFORMS THE COMMISSION SHOULD ENCOURAGE\n1. Material-Assumption Disclosure. For consequential decisions, PJM should identify the material \nassumptions that drive the recommendation before the relevant stakeholder or Board action. The objective is not \ndisclosure of every model input. It is a concise decision-level record showing which assumptions are outcome-\ndeterminative and the evidence category supporting each one.\n2. Structured State Evidentiary Access. State entities should have a defined path to the evidence underlying \ndecisions that materially affect customers in their jurisdictions. Meaningful state participation requires more than \nan opportunity to comment after an allocation or planning conclusion has largely hardened. It requires timely \naccess to the assumptions and evidence that drive the decision.\n3. Defined Revalidation Triggers. PJM should identify circumstances that require a material assumption to be \nrevisited before the next irreversible implementation or capital step. Revalidation should be targeted, not an \ninvitation to reopen every prior decision. The trigger should be tied to a change in a fact that was material to the \noriginal decision.\n4. Decision and Exception Ownership. Material assumptions, unresolved exceptions, and corrective actions \nshould have identifiable institutional owners. Governance slows when responsibility is diffuse. A transparent \nowner-and-deadline structure can improve accountability without changing voting rights or substantive market \nrules.\n5. Post-Decision Outcome Verification. For selected high-consequence decisions, PJM should compare actual \noutcomes with the assumptions that supported approval. The purpose is not retrospective fault-finding. It is \ninstitutional learning: determine where assumptions were durable, where they failed, and which governance \ncontrols should change as a result.\nV. LARGE-LOAD INTEGRATION SHOWS WHY REVALIDATION MATTERS\nLarge-load integration illustrates the need for an explicit verification and revalidation discipline because a \nsingle project may depend on several timelines that do not move together. Customer commitment, utility \nconstruction, network upgrades, generation, substations, transformers, fuel supply, permitting, financing, cooling, \nand customer occupancy may each be credible individually while remaining inconsistent as a combined execution \nplan."},{"page":4,"startToken":1069,"endToken":1541,"text":"Financial security and minimum-payment structures can be important tools for allocating financial \nconsequences. They do not, by themselves, prove that the underlying load will energize on schedule, persist at the \nassumed level, or create the precise system need attributed to it. Governance should therefore distinguish the \nquestion of who pays if an assumption fails from the separate question of whether the assumption should be relied \nupon in the first instance.\nCREDIT / CONTRACT PROTECTION\nDECISION ASSURANCE\nWho bears defined financial consequences if the project changes \nor fails?\nWhat evidence shows the assumptions are sufficiently durable \nand executable to rely upon before additional commitments are \nmade?\nA governance process that explicitly records the difference between forecast, commitment, executability, and \nrealized performance would improve the Commission's and states' ability to understand when a change in large-load \nconditions should affect planning, cost causation, or implementation sequencing. It would also reduce the risk that \nan assumption continues to influence later decisions after the underlying facts have materially changed.\nVI. A PRACTICAL IMPLEMENTATION PATH\nPhase 1 - Select. Choose a limited set of high-consequence decision types in which material assumptions are \nidentifiable and changes in those assumptions can materially affect reliability, cost, or implementation.\nPhase 2 - Record. Create a concise decision record listing the material assumptions, evidence category, affected \nstakeholders, accountable owner, and revalidation trigger.\nPhase 3 - Revalidate. When a trigger occurs, require a focused update of the affected assumption rather than \nreopening the entire governance record.\nPhase 4 - Verify. After implementation, compare actual performance with the assumptions that justified the \ndecision and identify any recurring governance failure modes.\nPhase 5 - Scale. Use the results to determine which elements should become standard across additional PJM \nstakeholder, planning, market, or Board processes.\nThis approach is compatible with different views regarding voting structures, Board independence, section 205 \nfiling authority, sector representation, and state participation. It provides a common evidentiary layer regardless of \nwhich institutional reforms the Commission and PJM ultimately pursue.\nVII. CONCLUSION\nThe Commission has appropriately focused this proceeding on concrete and actionable reform. PAG \nrespectfully submits that durable reform requires more than changing who participates, who votes, or how quickly a \nproposal advances. It also requires a disciplined record of what the decision assumes, what evidence supports those \nassumptions, what changes require revalidation, and whether the expected result was ultimately realized.\nA governance process should be able to answer three questions at any consequential \ndecision point: What did we assume? What evidence supported it? What happened \nafterward?\nPAG therefore recommends that the Commission encourage PJM to incorporate material-assumption disclosure, \nstructured state evidentiary access, revalidation triggers, decision and exception ownership, and post-decision \noutcome verification into the governance reforms developed through this docket.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid\nNational Security & Infrastructure Risk Analytics\nInfrastructure Assumption Verification™ | Decision Assurance™\nneil@persistenceanalyticsgroup.com | 609-464-9055\npersistenceanalyticsgroup.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":0,"startToken":0,"endToken":85},{"p":2,"at":0,"title":"I. INTRODUCTION AND INTEREST OF PERSISTENCE ANALYTICS GROUP LLC","method":"printed heading","endPage":2,"endAt":1834,"startToken":85,"endToken":319},{"p":2,"at":1834,"title":"II. THE GOVERNANCE PROBLEM IS ALSO AN EVIDENCE PROBLEM","method":"printed heading","endPage":3,"endAt":1807,"startToken":319,"endToken":753},{"p":3,"at":1807,"title":"IV. FIVE GOVERNANCE REFORMS THE COMMISSION SHOULD ENCOURAGE","method":"printed heading","endPage":3,"endAt":3705,"startToken":753,"endToken":1006},{"p":3,"at":3705,"title":"V. LARGE-LOAD INTEGRATION SHOWS WHY REVALIDATION MATTERS","method":"printed heading","endPage":4,"endAt":2374,"startToken":1006,"endToken":1391},{"p":4,"at":2374,"title":"VII. CONCLUSION","method":"printed heading","endPage":4,"endAt":3583,"startToken":1391,"endToken":1541}]}