{"document":{"slug":"rec-20260811-4003","title":"Comments of East Kentucky Power Cooperative re PJM Interconnection’s recent proposals to FERC for addressing capacity needs in the short and long terms","issued":"2026-08-11","accession":"20260811-4003","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"EAST KENTUCKY POWER COOPERATIVE","kind":"comments","file":"sources/filings/text/20260811-4003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260811-4003","tier":"record","sha256":"2b9c02ae6a4f01e2e8be9f2485c45450def06056cbab6a9e411ab4f9a172c6df","pages":3,"tokens":799,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":255,"text":"4775 Lexington Road 40391 \nTel.  (859) 744-4812 \nP.O. Box 707, Winchester, \nFax:  (859) 744-6008 \nKentucky 40392-0707 \n             http://www.ekpc.com \n \n \n \n \n \nAugust 6, 2026 \n \n \n \nSecretary Chris Wright \nU.S. Department of Energy \n1000 Independence Ave., SW \nWashington, DC 20585 \n \nChairman Laura V. Swett \nFederal Energy Regulatory Commission \n888 First Street, NE \nWashington, DC 20426 \n \n \nSecretary Wright and Chairman Swett, \n \nAs the CEO of East Kentucky Power Cooperative (EKPC), which owns and operates power plants \nand high-voltage transmission infrastructure serving 1.2 million Kentucky residents and \nbusinesses, I wish to express my deep concerns with PJM Interconnection’s recent proposals to \nFERC for addressing capacity needs in the short and long terms. EKPC has been a member of \nPJM since 2013 and we are devoted to reliable, low-cost electric service for our members, and \nsupporting economic development that brings jobs and investment to Kentucky. \n \nUnfortunately, it seems PJM’s ability to establish market rules that provide long-term stability \nand low, predictable costs is repeatedly undermined by the machinations of politicians from \nretail-choice states that lean heavily on PJM’s wholesale power market to meet their basic \nenergy needs. The result is cost volatility and cost shifting for regulated states like Kentucky \nthat have responsibly maintained reliable generating resources to match our needs. Simply \nstated, we did not create PJM’s problems, but we would forced to pay for them under PJM’s \nproposals.  \n \nPJM’s proposal to FERC seeks to fix problems created by states that voluntarily and knowingly \nmade themselves dependent on PJM’s wholesale market to meet their energy needs because"},{"page":2,"startToken":255,"endToken":710,"text":"DOE Sec. Wright & FERC Chairman Swett \nAug. 6, 2026 \nPage 2 \n \nthey have not placed appropriate requirements on those who serve their retail customers to \nensure safe, reliable and adequate service. These proposals only create more volatility and shift \ncosts unfairly to market participants in regulated states like Kentucky that have done nothing to \ncreate the problem.  \n \nThis result is especially disappointing because EKPC and others worked very hard during PJM’s \nstakeholder process to identify common ground and build a coalition of support for well-\ngrounded rules that would apply fairly and consistently across PJM’s footprint. The rejected \ncoalition proposal—the only proposal to achieve the requisite support to pass—would have \ncreated greater stability and certainty while shielding homes and businesses from bearing the \ncosts of serving large loads. \n \nPJM needs billions invested in new generating resources to close its existing capacity gap and to \nmeet the growing energy demand from data centers. But investors need certainty and stability, \nwhich has been lacking at PJM. In 2024, PJM bowed to political pressure from Pennsylvania \nGov. Josh Shapiro and politicians from other retail-choice states to impose a cap on power plant \ncapacity prices. The negative reliability consequences EKPC identified in its protest of the cap \nhave come to fruition: existing resources are choosing to export to other regions and new \ninvestment is not coming to PJM fast enough. And the ability to obtain 15-year price certainty \nin a backstop procurement likely chilled new entry in PJM’s most recent capacity auction. \nNeither of those outcomes should be surprising. Market manipulations challenge investor \nconfidence. \n \nBy PJM’s own estimate, 70 gigawatts of new generating resources are needed in the next 12 \nyears to meeting growing load, much of it driven by data centers, which play a growing role in \nthe nation’s economy. Data center capabilities determine global competitiveness in emerging \napplications for R&D, industry, commerce, and national defense. But the ability of PJM \nmembers to serve the sizable energy needs of data centers is impeded by the organization’s \ninability to establish and sustain clear ground rules on which market participants can base 20-\nyear investment decisions. At a pivotal moment when nations and organizations are competing \nto lead in developing industries and technologies that will endure for decades, PJM now is \nsignaling that its territory is closed for business until further notice. \n \nPJM can protect everyone by efficiently operating competitive markets and ensuring grid \nreliability with clear, consistent rules and transparent price signals that support the goal of \nmaintaining generation capacity sufficient to cover peak demand, even in periods of robust \ngrowth. That goal is much more achievable if states face mandates forbidding overreliance on \nwholesale markets to meet retail obligations. States should take responsibility for maintaining"},{"page":3,"startToken":710,"endToken":799,"text":"DOE Sec. Wright & FERC Chairman Swett \nAug. 6, 2026 \nPage 3 \n \nreliable generating capacity to meet their own needs, as Kentucky has done. Where state \nleaders choose not to act responsibly, it is not FERC’s job to cover for their errors by punishing \neveryone. \n \nEKPC looks forward to actively participating in the dockets established to evaluate PJM’s \nproposals and reserves its rights with respect thereto. \n \nSincerely, \n \nDon Mosier \nPresident & CEO \n \n \n \nCC:  \nDavid E. Mills, President & CEO, PJM \nPJM Board of Managers \nKentucky Gov. Andy Beshear \nKentucky Public Service Commission"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 3","method":"page range","endPage":3,"endAt":593,"startToken":0,"endToken":799}]}