{"document":{"slug":"rec-20260814-5009-2","title":"PAG_Comments_ER26-3515-000","issued":"2026-08-14","accession":"20260814-5009","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20260814-5009_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5009","tier":"record","parent":"rec-20260814-5009","sha256":"6064b724c8cd7a4ebfb7cc836c9cf293a8d743e9da23da90227d8b2f4c6b654a","pages":6,"tokens":2189,"emptyPages":[],"textThemes":["registry","retail"]},"pages":[{"page":1,"startToken":0,"endToken":478,"text":"1\nUNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nPJM Interconnection, L.L.C.\nDocket No. ER26-3515-000\nCOMMENTS OF\nPERSISTENCE ANALYTICS GROUP LLC\nI. INTRODUCTION\nPersistence Analytics Group LLC (\"PAG\") respectfully submits these comments concerning PJM \nInterconnection, L.L.C.'s August 13, 2026 proposal to establish Interim Resource Adequacy Service \n(\"IRAS\") and a Large Load Registry. PAG supports the core objectives of improving visibility into \nlarge-load development, protecting system reliability, and creating a more disciplined basis for the \ntreatment of new large loads. PAG's comments are limited to an implementation-assurance question \nthat becomes increasingly important as PJM, Electric Distributors, state commissions, and other \nauthorized entities begin to rely on registry information for consequential planning and operational \ndecisions.\nPJM's proposal recognizes that the Large Load Registry cannot function merely as a collection of \nreported megawatts. The filing would require information concerning in-service dates, peak load and \nramp schedules, telemetry, Bring Your Own New Capacity (\"BYONC\"), backup generation and \npermitting limitations, contracts or service agreements, and points of interconnection. PJM also \nproposes authority to review information, coordinate with Transmission Owners and Electric \nDistributors regarding validity, request additional information, and update the registry periodically. \nPJM Filing at 37-45; proposed RAA Schedule 11, section B.\nMost significantly, PJM states that reliance on the registry must reflect accurate and complete \ninformation and that the registry is intended to become an accurate, complete, and reliable database \nsupporting decisions about the amount of New Large Load available to provide IRAS. PJM Filing at \n43-45. PAG agrees. The Commission should recognize that the quality of the framework will depend \nnot only on whether information is submitted, but also on whether material assumptions remain \nsufficiently supported when the information is relied upon.\nAccordingly, PAG recommends that the Commission, in accepting or otherwise acting on the \nfiling, recognize four implementation principles for PJM's development of the Large Load Registry and \nrelated Manuals: (1) material load information should be accompanied by sufficient context to \ndistinguish projected or requested load from more mature load states; (2) execution-critical assumptions \nshould be subject to identifiable revalidation triggers; (3) information used to support IRAS load-\nreduction capability should be decision-useful for the actual operating conditions in which that \ncapability may be called; and (4) authorized users should have sufficient provenance to understand \nwhat supports a material registry input and when it was last materially validated.\nII. THE LARGE LOAD REGISTRY SHOULD BE TREATED AS A DECISION-GRADE \nEVIDENTIARY RECORD, NOT ONLY A REPORTING REPOSITORY\nPJM proposes a registry with considerably more information than a conventional interconnection \nqueue. Among other items, each Party would submit or cause to be submitted the Large Load's \ndescription and location, in-service date for each increment of load, delivery points or points of \ninterconnection, peak-load quantity and ramp schedule, telemetry specifications, BYONC quantity and \nramp schedule, allocated RBP UCAP, backup generation including fuel type and relevant permitting"},{"page":2,"startToken":478,"endToken":1021,"text":"2\nlimitations, and contracts or service agreements between the Large Load and the LSE. PJM Filing at \n37-38; proposed RAA Schedule 11, section B.1(a).\nThose fields reflect an important reality: a headline megawatt value does not, by itself, describe \nthe maturity, timing, operational characteristics, or reliability implications of a large-load project. A 500 \nMW value may represent a development envelope, a requested service level, a studied quantity, a \ncontracted commitment, a phased construction plan, an energized load, or a persistent operating level. \nThose states can have materially different implications for capacity planning, transmission planning, \ncost allocation, IRAS eligibility, and state retail treatment.\nPAG therefore recommends that implementation of the registry preserve enough context for \nauthorized users to understand the status represented by a material MW figure. This need not require \nPJM to adopt a new public scoring system or to disclose commercially sensitive information. It can be \naccomplished through clear definitions, dated status fields, source attribution, and structured \ninformation about the stage to which the reported quantity relates.\nThe objective is straightforward: information should be decision-grade for the decision being \nmade. A quantity suitable for early planning visibility may not be sufficient for an irreversible capital \ncommitment or an operational baseline. Recognizing that distinction would improve the usefulness of \nthe registry without slowing the interconnection of projects that have demonstrated sufficient maturity.\nIII. MATERIAL ASSUMPTIONS SHOULD HAVE IDENTIFIABLE REVALIDATION \nTRIGGERS\nPJM expressly proposes that each Party promptly inform the Office of the Interconnection of any \nchange in required registry information concerning a Large Load. Proposed RAA Schedule 11, section \nB.2; PJM Filing at 43-44. That is an important foundation. PAG recommends that PJM's \nimplementation guidance make the concept operational by identifying categories of material change \nthat should trigger revalidation of affected assumptions.\nExamples can include a material change in the expected in-service date or ramp schedule; a \nchange in the customer or contractual commitment underlying the load; a change in the quantity, \ntiming, or status of BYONC; a change in backup-generation capability, fuel availability, or relevant \npermitting limitations; a material change in points of interconnection or service configuration; or a \nchange that affects the facility's claimed ability to reduce load under IRAS.\nThe purpose of revalidation is not to require continuous resubmission of unchanged information. \nIt is to prevent an assumption that was reasonable at one point in project development from remaining \nembedded in planning or operational treatment after the conditions supporting it have materially \nchanged.\nThis distinction is particularly important for projects developed in phases. PJM recognizes the \nimportance of in-service dates for each increment of load and of ramp schedules. PJM Filing at 38-40. \nA phased project can change customer mix, construction sequence, equipment strategy, generation \narrangements, or energization timing while retaining the same ultimate development capacity. The \nregistry should allow those changes to be reflected before other entities continue relying on an outdated \nimplementation assumption.\nIV. IRAS RELIES ON OPERATIONAL CAPABILITY, SO CLAIMED LOAD REDUCTION \nSHOULD BE SUPPORTED BY OPERATIONALLY RELEVANT EVIDENCE\nIRAS is designed to allow certain New Large Loads to interconnect without sufficient new \ncapacity on the condition that they may be required to reduce load or switch to onsite backup resources \nunder specified emergency conditions. PJM Filing at 39-40, 74-100. The proposed registry accordingly"},{"page":3,"startToken":1021,"endToken":1518,"text":"3\nincludes telemetry specifications and backup generation, including fuel type and relevant permitting \nlimitations. PJM Filing at 37-38.\nThat architecture makes operational capability a consequential assumption. A stated ability to \nreduce 100 MW is not identical to a demonstrated ability to produce that reduction under the timing, \ncontrol, telemetry, fuel, permitting, and restoration conditions relevant to an IRAS event. The same \napplies where onsite generation is part of the expected response.\nPAG does not suggest that every Large Load must be subjected to a single standardized physical \ntest. Facilities differ materially, and PJM and state authorities retain the appropriate operational and \nregulatory roles. PAG instead recommends that the Commission recognize a principle of evidence \nproportionality: where PJM or an Electric Distributor relies on a claimed operational capability to \nprotect reliability, the evidence supporting that capability should be commensurate with the \nconsequence of non-performance.\nAt a minimum, the implementation framework should allow the relevant parties to understand the \nquantity expected to be reduced, the mechanism by which reduction is expected to occur, telemetry or \nvisibility needed to confirm performance, material constraints on backup generation, and circumstances \nthat would require the capability to be revalidated. This would complement, rather than replace, \nexisting PJM emergency procedures and state-approved load-reduction plans.\nV. BYONC SHOWS WHY REPORTED ARRANGEMENTS AND DURABLE CAPACITY \nSHOULD REMAIN DISTINCT\nPJM proposes BYONC as a pathway for New Large Loads to facilitate new capacity and reduce \nthe quantity of load subject to IRAS. The filing includes gating criteria intended to ensure that BYONC \nrepresents genuinely new capacity rather than repackaged existing capacity, and it proposes \nparticipation requirements designed to ensure that the capacity benefit is real and lasting. PJM Filing at \n50-59.\nPAG supports the distinction embodied in those provisions. An announced generation project, a \nbilateral arrangement, an interconnection milestone, an accredited Capacity Resource, and capacity that \nremains available through the period on which the system relies are related but not interchangeable \nfacts. The registry and associated implementation processes should preserve that distinction.\nWhere a New Large Load receives treatment based on a BYONC arrangement, authorized users \nshould be able to determine the relevant quantity, timing, status, and material changes affecting the \narrangement. PJM already proposes to collect BYONC quantity and ramp schedule and to associate \nBYONC resources with Large Loads. PJM Filing at 37-43. PAG recommends that revalidation of \nmaterial changes be carried through to any registry or operational determination that depends on the \narrangement.\nVI. STATE COMMISSIONS AND ELECTRIC DISTRIBUTORS WILL NEED \nINFORMATION THAT IS RELIABLE FOR THEIR DISTINCT DECISIONS\nPJM's proposal expressly recognizes a significant state role. Electric Distributors would \ncoordinate, as appropriate, with relevant states or Relevant Electric Retail Regulatory Authorities, \nLSEs, and customers to support transparent, effective, and orderly deployment of IRAS. PJM Filing at \n27-28. The filing further explains that Electric Distributors, consistent with state programs, identify \nwhich loads to reduce in response to a PJM directive, and that state-approved contracts and load-\nreduction plans govern that implementation. PJM Filing at 85-100."},{"page":4,"startToken":1518,"endToken":2029,"text":"4\nThe proposed registry may also be made available, subject to confidentiality protections, to \nAuthorized Commissions, Transmission Owners, Electric Distributors, LSEs, the Market Monitoring \nUnit, and the Commission. PJM Filing at 42-44.\nThese authorized users will not necessarily rely on the same field for the same purpose. A state \ncommission may be considering retail rate treatment or cost responsibility. An Electric Distributor may \nbe preparing an operational load-reduction plan. A Transmission Owner may be considering system \nimpacts. PJM may be establishing an IRAS baseline. The registry will be most valuable if a user can \nunderstand both the reported value and the evidentiary context relevant to the decision at hand.\nPAG therefore recommends that PJM's implementation work preserve data provenance and \nvalidation status for material fields where feasible. This can include the reporting entity, effective date, \nlast material update, and whether the field is based on a contract, utility study, operational \nmeasurement, permit, accredited capacity status, customer representation, or another identified source \ncategory. Such provenance can be protected under the same confidentiality framework that PJM \nproposes for commercially sensitive information.\nVII. THESE PRINCIPLES CAN IMPROVE RELIABILITY WITHOUT CREATING A NEW \nAPPROVAL LAYER\nPAG's recommendations are intended to support PJM's proposed framework, not to create a \nparallel interconnection process. The Commission need not require a new approval gate for every \nregistry field. Nor should an independent assurance concept displace the technical, legal, regulatory, or \noperational responsibilities assigned to PJM, Transmission Owners, Electric Distributors, LSEs, Large \nLoads, state commissions, or FERC.\nThe narrower point is that institutional reliance should be matched to evidentiary maturity. As the \nconsequences of reliance increase, the importance of accurate status, provenance, and revalidation also \nincreases. PJM's filing already contains the core building blocks: structured information, validation \nauthority, periodic updating, prompt reporting of changes, confidentiality safeguards, and an explicit \nrequirement that the registry provide an accurate and reliable basis for IRAS.\nImplementation guidance can build on those elements without prescribing a proprietary \nmethodology. Clear status definitions, material-change triggers, source categories, and operationally \nrelevant evidence expectations would make the registry more useful to all authorized users and reduce \nthe risk that an outdated or insufficiently supported assumption becomes an operational baseline.\nVIII. CONCLUSION\nPAG supports PJM's effort to establish a Large Load Registry and an interim framework that \nbetter aligns large-load integration with resource adequacy and ratepayer protection. The proposal \ncorrectly recognizes that reliable implementation depends on more than collecting a headline MW \nvalue.\nPAG respectfully recommends that the Commission recognize, in its consideration of the filing, \nthat: (1) material large-load information should carry sufficient context to distinguish planning-stage \nprojections from more mature implementation states; (2) execution-critical assumptions should be \nsubject to identifiable revalidation triggers; (3) claimed IRAS load-reduction or onsite-backup \ncapability should be supported by evidence appropriate to the operational consequence; and (4) \nauthorized users should have sufficient provenance to understand what supports a material registry \ninput and when that information was last materially validated.\nThese principles would strengthen the reliability of the Large Load Registry while preserving \nPJM's flexibility to develop detailed implementation provisions through its Manuals and stakeholder"},{"page":5,"startToken":2029,"endToken":2088,"text":"5\nprocesses. They would also help state commissions and Electric Distributors use the registry for their \ndistinct responsibilities without treating all reported information as equally mature or equally reliable \nfor every decision.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid™\n82 Spring Lake Blvd.\nWaretown, NJ 08758\nneil@persistenceanalyticsgroup.com\n609-464-9055\nDated: August 13, 2026"},{"page":6,"startToken":2088,"endToken":2189,"text":"6\nCERTIFICATE OF SERVICE\nI hereby certify that on August 13, 2026, I served the foregoing Comments of Persistence Analytics \nGroup LLC electronically on the applicant's representatives identified in PJM Interconnection, L.L.C.'s \nAugust 13, 2026 filing in Docket No. ER26-3515-000. If Persistence Analytics Group LLC has been \nadded to the official service list before these comments are submitted, the undersigned will also serve \nthe filing on all persons then appearing on that service list in accordance with Rule 2010 of the \nCommission's Rules of Practice and Procedure.\nNeil P. Osnato\nPersistence Analytics Group LLC\nDated: August 13, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":172,"startToken":0,"endToken":25},{"p":1,"at":172,"title":"I. INTRODUCTION","method":"printed heading","endPage":1,"endAt":2853,"startToken":25,"endToken":393},{"p":1,"at":2853,"title":"II. THE LARGE LOAD REGISTRY SHOULD BE TREATED AS A DECISION-GRADE","method":"printed heading","endPage":2,"endAt":1597,"startToken":393,"endToken":702},{"p":2,"at":1597,"title":"III. MATERIAL ASSUMPTIONS SHOULD HAVE IDENTIFIABLE REVALIDATION","method":"printed heading","endPage":2,"endAt":3419,"startToken":702,"endToken":959},{"p":2,"at":3419,"title":"IV. IRAS RELIES ON OPERATIONAL CAPABILITY, SO CLAIMED LOAD REDUCTION","method":"printed heading","endPage":3,"endAt":1504,"startToken":959,"endToken":1228},{"p":3,"at":1504,"title":"V. BYONC SHOWS WHY REPORTED ARRANGEMENTS AND DURABLE CAPACITY","method":"printed heading","endPage":3,"endAt":2885,"startToken":1228,"endToken":1426},{"p":3,"at":2885,"title":"VI. STATE COMMISSIONS AND ELECTRIC DISTRIBUTORS WILL NEED","method":"printed heading","endPage":4,"endAt":1277,"startToken":1426,"endToken":1697},{"p":4,"at":1277,"title":"VII. THESE PRINCIPLES CAN IMPROVE RELIABILITY WITHOUT CREATING A NEW","method":"printed heading","endPage":4,"endAt":2676,"startToken":1697,"endToken":1879},{"p":4,"at":2676,"title":"VIII. CONCLUSION","method":"printed heading","endPage":6,"endAt":2,"startToken":1879,"endToken":2089},{"p":6,"at":2,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":646,"startToken":2089,"endToken":2189}]}
