{"document":{"slug":"rec-20260817-5042-2","title":"PAG_Comments_ER26-3380-000_Pre-Procurement_Assumption_Verification","issued":"2026-08-17","accession":"20260817-5042","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No AffiliationPERSISTENCE ANALYTICS GROUP LLC","kind":"attachment","file":"sources/filings/text/20260817-5042_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5042","tier":"record","parent":"rec-20260817-5042","sha256":"8b8a0054ed9c72e9391e02b09befbfc0fe62075a119854ce79c1820ec34b1e81","pages":4,"tokens":1386,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":375,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nPJM Interconnection, L.L.C.\nDocket No. ER26-3380-000\nCOMMENTS OF PERSISTENCE ANALYTICS GROUP LLC REGARDING PRE-\nPROCUREMENT ASSUMPTION VERIFICATION AND REVALIDATION\nPersistence Analytics Group LLC (\"PAG\") respectfully submits these comments in response to \nPJM Interconnection, L.L.C.'s July 31, 2026 filing proposing a Reliability Backstop Procurement \n(\"RBP\") in Docket No. ER26-3380-000.\nPAG's central point is narrow: a reliability procurement should not convert a modeled shortfall \ninto long-duration financial obligations until the material assumptions producing that shortfall \nhave been revalidated against the best currently available evidence.\nI. THE COMMISSION SHOULD TREAT ASSUMPTION REVALIDATION AS A THRESHOLD \nDECISION-ASSURANCE ISSUE\nPJM states that the proposed RBP is intended to address a 6,831 MW shortfall identified for the \n2028/2029 Delivery Year. PJM also states that the procurement could secure new resources for \nterms of up to 15 years, subject to a maximum willingness to pay equal to a MW-weighted \naverage of $555/MW-day, and that the initial procurement target would be reduced by qualifying \nnew resources reflected in executed bilateral contracts or otherwise bringing new capacity to the \nsystem. See PJM, \"PJM Reliability Backstop Proposal Outlines Steps To Secure New Supply \nand Maintain Reliability\" (July 31, 2026).\nThose features make the quality of the underlying evidence especially consequential. A \nprocurement quantity is not simply a mathematical output. It is the result of assumptions \nconcerning accredited supply, seasonal capability, outage risk, load growth, project timing, \nbilateral commitments, interconnection status, and other inputs. When those inputs materially \nchange, the decision supported by the model may also need to change.\nThe relevant decision chain is: forecast demand + accredited supply -> modeled shortfall -> \nevidence status -> sensitivity testing -> revalidation -> procurement quantity -> contract \nobligation -> cost allocation -> actual load -> realized ratepayer outcome.\nThe Commission need not determine in this proceeding that any competing model is correct. It \nshould determine whether PJM's proposed procurement quantity is sufficiently evidenced, \ntransparent as to material assumptions, and capable of being resized when those assumptions \nmaterially change before commitments become fixed.\nII. CURRENT SUPPLY-SIDE EVIDENCE SHOULD BE REVALIDATED BEFORE THE PROCUREMENT \nQUANTITY IS FIXED\nA recent external analysis published by SemiAnalysis challenges aspects of PJM's resource-\nadequacy modeling, including the treatment of winter thermal capability and post-Storm Elliott"},{"page":2,"startToken":375,"endToken":776,"text":"winterization. The authors estimate that those modeling choices may materially affect the \namount of reliable capacity credited to the existing fleet and, in turn, the size of the perceived \nshortfall. See Robert Boswall et al., SemiAnalysis (Aug. 16, 2026).\nPAG does not ask the Commission to adopt SemiAnalysis's reconstructed model, its dollar \nestimate, or its conclusions as established fact. The authors themselves acknowledge limitations \narising from unavailable information and describe their reconstruction as an approximation. The \nsignificance of the analysis for this docket is therefore procedural and evidentiary: it identifies \nspecific, potentially material assumptions that can be tested before the proposed procurement \ncreates long-duration obligations.\nAt minimum, the Commission should require a current evidentiary record addressing whether \nmaterial changes in seasonal resource capability, winterization, operating limits, demonstrated \nperformance during recent cold-weather events, and other relevant supply-side conditions are \nreflected in the procurement quantity. Where an assumption is based substantially on historical \nperformance, the record should explain whether subsequent physical changes or demonstrated \noperating performance warrant revalidation rather than mechanical continuation of the historical \nassumption.\nHistorical evidence is not necessarily current evidence. A planning assumption can remain \nstatistically embedded after the physical system has changed. If a material system change has \noccurred, the appropriate question is whether the old assumption remains decision-grade for the \nprocurement now before the Commission.\nIII. DEMAND-SIDE MATURITY AND DURABILITY SHOULD BE TESTED WITH THE SAME \nDISCIPLINE\nThe RBP is also expressly tied to resource adequacy challenges associated with large-load \ngrowth. That makes demand-side evidence equally important. Forecast load should not be treated \nas a single undifferentiated category when the economic consequences of the procurement \ndepend on whether that load actually becomes executable, energized, and persistent.\nFor large-load planning, the Commission should distinguish among at least the following \nevidentiary states: announced -> requested -> contracted or financially committed -> executable \n-> energized -> persistent.\nA reported MW value may be appropriate for one planning purpose yet insufficient for another. \nA long-duration procurement and associated cost-allocation structure warrant a clear explanation \nof the evidence supporting the load assumptions being relied upon, the project milestones that \nincrease or decrease confidence, and the triggers that require revalidation if projects are delayed, \nresized, self-supply, secure bilateral arrangements, move to another region, or do not materialize.\nThis is not an argument to exclude legitimate forecast demand. It is an argument to preserve the \ndistinction between a forecast and the evidentiary maturity necessary to support a consequential \nfinancial commitment."},{"page":3,"startToken":776,"endToken":1160,"text":"IV. THE COMMISSION SHOULD REQUIRE DEFINED REVALIDATION TRIGGERS BEFORE AND \nDURING THE PROCUREMENT WINDOW\nPJM has already recognized that the initial procurement target should be reduced for qualifying \nbilateral contracts and other new capacity. That is a form of revalidation. PAG respectfully \nsubmits that the same principle should be applied systematically to all material decision inputs.\nBefore the procurement quantity becomes fixed, and again before final awards become \nirrevocable, PJM should identify material revalidation triggers. Those triggers should include, as \napplicable: significant changes in accredited or seasonal supply capability; verified winterization \nor resilience improvements; executed bilateral supply arrangements; material changes in large-\nload commitments; interconnection delays or withdrawals; project cancellations or resizing; \nchanges in expected in-service dates; and other developments that materially alter the shortfall or \nthe parties expected to bear the resulting costs.\nFor each trigger, the record should identify the responsible decision owner, the evidence \nrequired, the effect on the procurement quantity or cost allocation, and the disposition of \nunresolved exceptions. The objective is not perpetual reopening of the model. It is disciplined \nchange control for assumptions that are material enough to affect a multi-year obligation.\nV. THE COMMISSION SHOULD REQUIRE A DECISION-GRADE EVIDENTIARY RECORD, NOT \nMERELY A MODEL OUTPUT\nA system of record is not the same as a system of verification. Likewise, a model output is not \nself-validating simply because it was produced through an established process. For consequential \nreliance, the evidentiary record should make clear what assumptions are being relied upon, what \nevidence supports them, what material uncertainties remain, and what changes would require the \ndecision to be revisited.\nA useful classification for material assumptions is: SUPPORTED / CONDITIONAL / \nUNSUPPORTED / REVALIDATION REQUIRED.\nSuch a framework need not displace PJM's modeling, engineering judgment, tariff authority, \nstakeholder process, or the Commission's statutory responsibilities. It simply makes the \nevidentiary status of decision-critical assumptions visible before they are converted into \ncontractual obligations and ratepayer exposure.\nVI. REQUESTED COMMISSION ACTION\nPAG respectfully requests that, in acting on PJM's filing, the Commission require or direct PJM \nto provide a pre-procurement revalidation record that:\n• identifies the material supply-side and demand-side assumptions producing the procurement \nquantity;\n• states the current evidence supporting each material assumption and any material uncertainty;\n• explains how recent changes in seasonal capability, winterization, operating performance, \nbilateral commitments, large-load maturity, and interconnection status have been evaluated;"},{"page":4,"startToken":1160,"endToken":1386,"text":"• defines objective triggers for revalidation and resizing before the procurement quantity and \nawards become fixed;\n• documents how material changes affect procurement quantity, cost allocation, or continued \nreliance; and\n• preserves an auditable decision record showing why the final procurement quantity remained \nsupportable at the time commitments were made.\nThe Commission does not need to resolve every technical disagreement about PJM's resource-\nadequacy model to impose this discipline. It need only ensure that the assumptions driving a \nlong-duration backstop procurement are current, evidenced, and subject to defined revalidation \nbefore the resulting obligations are allowed to harden.\nVII. CONCLUSION\nPJM is confronting a genuine reliability challenge in an environment of rapid load growth and \nconstrained supply. That makes speed important. It also makes evidence quality more important, \nnot less. The greater the duration and financial consequence of the procurement, the stronger the \ncase for verifying that the assumptions producing the procurement quantity remain supportable \nwhen the decision is made.\nTrust the model. Verify the assumptions. Revalidate before commitment.\nFor the foregoing reasons, PAG respectfully requests that the Commission require a transparent \npre-procurement assumption-verification and revalidation record as part of its disposition of \nPJM's Reliability Backstop Procurement proposal.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid\nNational Security & Infrastructure Risk Analytics\n82 Spring Lake Blvd\nWaretown, NJ 08758\nneil@persistenceanalyticsgroup.com\n609-464-9055\nDated: August 17, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":728,"startToken":0,"endToken":97},{"p":1,"at":728,"title":"I. THE COMMISSION SHOULD TREAT ASSUMPTION REVALIDATION AS A THRESHOLD","method":"printed heading","endPage":1,"endAt":2456,"startToken":97,"endToken":338},{"p":1,"at":2456,"title":"II. CURRENT SUPPLY-SIDE EVIDENCE SHOULD BE REVALIDATED BEFORE THE PROCUREMENT","method":"printed heading","endPage":2,"endAt":1677,"startToken":338,"endToken":593},{"p":2,"at":1677,"title":"III. DEMAND-SIDE MATURITY AND DURABILITY SHOULD BE TESTED WITH THE SAME","method":"printed heading","endPage":3,"endAt":0,"startToken":593,"endToken":776},{"p":3,"at":0,"title":"IV. THE COMMISSION SHOULD REQUIRE DEFINED REVALIDATION TRIGGERS BEFORE AND","method":"printed heading","endPage":3,"endAt":1392,"startToken":776,"endToken":964},{"p":3,"at":1392,"title":"V. THE COMMISSION SHOULD REQUIRE A DECISION-GRADE EVIDENTIARY RECORD, NOT","method":"printed heading","endPage":3,"endAt":2342,"startToken":964,"endToken":1091},{"p":3,"at":2342,"title":"VI. REQUESTED COMMISSION ACTION","method":"printed heading","endPage":4,"endAt":702,"startToken":1091,"endToken":1254},{"p":4,"at":702,"title":"VII. CONCLUSION","method":"printed heading","endPage":4,"endAt":1693,"startToken":1254,"endToken":1386}]}
