{"document":{"slug":"rec-20260817-5042","title":"Motion to Intervene and Comments of Neil P. Osnato o/b/o Persistence Analytics Group LLC in response to PJM Interconnection, L.L.C.'s 07/31/2026 filing…","issued":"2026-08-17","accession":"20260817-5042","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No AffiliationPERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260817-5042_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5042","tier":"record","sha256":"20865ba46d966d224f3d3ae4c7a0983930162f0142df42a486d282576825b6c9","pages":1,"tokens":264,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":264,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nPJM Interconnection, L.L.C.\nDocket No. ER26-3380-000\nMOTION TO INTERVENE OF PERSISTENCE ANALYTICS GROUP LLC\nPursuant to Rule 214 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.214, \nPersistence Analytics Group LLC (\"PAG\") respectfully moves to intervene in the above-\ncaptioned proceeding.\nI. INTEREST\nPAG is a New Jersey-based small business focused on infrastructure risk analytics, including \ninfrastructure assumption verification, decision assurance, demand durability, grid stress, load \nintegrity, and large-load development. This proceeding concerns PJM's proposed Reliability \nBackstop Procurement and presents issues directly relevant to PAG's work, including the \nevidentiary basis for modeled resource-adequacy needs, the maturity and durability of forecast \nlarge-load demand, and the relationship between projected need and long-duration procurement \ncommitments. PAG's participation may assist the Commission, and no other party can \nadequately represent PAG's particular interests and perspective.\nII. POSITION\nPAG does not take a position on the ultimate disposition of PJM's filing through this motion. \nPAG seeks intervention so that it may address whether material assumptions supporting the \nproposed procurement are sufficiently evidenced and subject to appropriate revalidation before \nlong-duration contractual obligations are created.\nIII. COMMUNICATIONS\nAll communications and service should be directed to Neil P. Osnato, Founder, Persistence \nAnalytics Group LLC, neil@persistenceanalyticsgroup.com, 609-464-9055.\nIV. CONCLUSION\nFor the foregoing reasons, PAG respectfully requests that the Commission grant this Motion to \nIntervene in Docket No. ER26-3380-000.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid\n82 Spring Lake Blvd, Waretown, NJ 08758\nneil@persistenceanalyticsgroup.com | 609-464-9055\nDated: August 17, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":385,"startToken":0,"endToken":58},{"p":1,"at":385,"title":"I. INTEREST","method":"printed heading","endPage":1,"endAt":1109,"startToken":58,"endToken":147},{"p":1,"at":1109,"title":"II. POSITION","method":"printed heading","endPage":1,"endAt":1455,"startToken":147,"endToken":194},{"p":1,"at":1455,"title":"III. COMMUNICATIONS","method":"printed heading","endPage":1,"endAt":1637,"startToken":194,"endToken":216},{"p":1,"at":1637,"title":"IV. CONCLUSION","method":"printed heading","endPage":1,"endAt":1991,"startToken":216,"endToken":264}]}