{"document":{"slug":"rec-20260817-5086","title":"Comments of Wolf Meridian Group re PJM Governance and Stakeholder Processes","issued":"2026-08-17","accession":"20260817-5086","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Wolf Meridian Group","kind":"comments","file":"sources/filings/text/20260817-5086_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5086","tier":"record","sha256":"e1d33ccb628c8054f61d9c34b8fe92e36e6ea755080d7a3e1403a6c5c87a23f6","pages":5,"tokens":1969,"emptyPages":[],"textThemes":["registry"]},"pages":[{"page":1,"startToken":0,"endToken":380,"text":"UNITED STATES OF AMERICA \nBEFORE THE​\nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Governance and Stakeholder Processes \nDocket No. AD26-7-000 \n \nCOMMENTS OF WOLF MERIDIAN GROUP \nJustin Trout, Founder & Principal \nAugust 16, 2026 \nI. Introduction and Summary \nWolf Meridian Group respectfully submits these comments in response to the Commission's July \n30, 2026 notice inviting post-technical-conference comments concerning PJM Interconnection, L.L.C. \ngovernance and stakeholder processes. Wolf Meridian Group is an independent infrastructure and \nstrategic analysis firm focused on power, compute, infrastructure, and the decision processes that shape \nlarge-scale energy development. \nThese comments are submitted from the perspective of an independent outside participant. Wolf \nMeridian Group does not represent a PJM member, market participant, utility, governmental entity, or \nother stakeholder organization in this proceeding. Its recommendations are offered in response to the \nCommission's request for concrete, actionable reforms and draw on practical analysis of grid capacity, \nlarge-load growth, load forecasting, infrastructure readiness, and the physical systems required to \nsupport new electrical demand. \nThese comments focus on the Commission's questions concerning accountability and \nresponsiveness in PJM governance, transparency, state participation, committee delay, and the potential \nuse of fast-path or time-bound stakeholder procedures. Wolf Meridian Group recommends that PJM \nconsider a permanent critical-issue decision track that builds on the experience of existing Critical Issue \nFast Path processes while using objective activation criteria, a defined decision schedule, a common \ntechnical record, formal state and consumer consultation, a written Board disposition, and \npost-implementation review. \nA faster process should not mean a less rigorous process. The objective should be to compress \nsequencing, reduce duplicative review, and support decisions against one transparent technical record. \nFor matters with material reliability, market, or infrastructure consequences, delay can itself create risk. \nA well-defined expedited process can preserve stakeholder input while creating a dependable path from \nproblem identification to decision. \nII. Why Governance Speed Matters in a Large-Load Era \nThe Commission convened the July 23, 2026 technical conference specifically to examine whether \nPJM's governance mechanics and stakeholder processes allow the organization to address operational \nand market needs in a timely and efficient manner. The conference agenda asked whether existing \ncommittee structures contribute to delay and whether PJM should increase the use of fast-path or \ntime-bound review procedures for high-importance topics. Those questions are especially important as \nWolf Meridian Group | Docket No. AD26-7-000 | 1"},{"page":2,"startToken":380,"endToken":851,"text":"electricity demand becomes more dynamic and as large new loads can alter planning assumptions on \ntimelines that do not align neatly with traditional committee cycles. \nPJM has already recognized this problem in practice. Its Critical Issue Fast Path process for Large \nLoad Additions was initiated to develop reliability-focused solutions for integrating large loads rapidly \nand reliably. PJM has also continued to refine its load forecasting process, including updated large-load \nadjustments, a Data Center Accuracy Report, and a 2026 mid-year load forecast update. These efforts \ndemonstrate both the scale of the challenge and the need for governance processes that can absorb new \ntechnical information without forcing every urgent issue through a long sequence of separate \ncommittees. \nThe governance lesson is broader than any one class of load. When assumptions affecting reliability, \nresource adequacy, transmission planning, market design, or customer costs change materially, PJM \nneeds a process capable of separating verified information from projections, rapidly developing \nalternatives, obtaining state and stakeholder input, and reaching a reasoned decision on a known \nschedule. \nIII. Recommended Reform: A Permanent Critical-Issue Decision Track \nA. Objective Activation Criteria \nPJM should establish written criteria for activating an expedited decision process. The process \nshould be available when an issue presents a material reliability or market consequence, requires action \nwithin a defined time horizon, crosses multiple PJM committees or functional areas, or presents a \nmeaningful risk that delay will increase system cost, reliability exposure, or implementation difficulty. \nStakeholders should be able to request activation, but the Board or PJM management should make the \nactivation decision through a short written finding. \nObjective activation criteria would improve predictability and help prevent an expedited process \nfrom becoming either an extraordinary tool used too rarely or a routine shortcut used too often. The \nstandard stakeholder process should remain the default. A critical-issue track should be reserved for \nmatters where the need for expedited action can be demonstrated. \nB. A Defined Decision Schedule \nA critical-issue track should begin with a published issue charter identifying the problem, decision \nauthority, scope, governing documents implicated, lead technical group, required data, and target \ndecision date. As a default framework, PJM could target a 90-day process unless the Board determines \nthat a different schedule is necessary. A model schedule could include the following milestones: \n●​Day 0: Publish the issue charter, scope, decision authority, and schedule. \n●​By Day 15: Publish the common technical record and identify material data gaps. \n●​By Day 45: Publish a limited set of technically viable alternatives with reliability, market, \nimplementation, and cost implications. \n●​By Day 60: Complete a defined consultation period for states, consumer advocates, and other \naffected stakeholder groups. \n●​By Day 75: Complete stakeholder voting or written position submissions, as applicable. \n●​By Day 90: Publish a Board or PJM disposition and, where Commission action is required, direct \nthe appropriate filing. \nWolf Meridian Group | Docket No. AD26-7-000 | 2"},{"page":3,"startToken":851,"endToken":1325,"text":"Extensions should be permitted, but they should require a written explanation identifying the \nunresolved issue and a new decision date. A deadline that can disappear without explanation is not a \nmeaningful deadline. \nC. One Common Technical Record \nExpedited governance will only work if participants are debating policy choices from the same \ntechnical baseline. PJM should therefore create a common technical record at the beginning of each \ncritical-issue process. That record should identify the assumptions, data sources, uncertainty ranges, and \nknown limitations that will be used to compare alternatives. \nFor issues involving significant load growth, the record should distinguish between verified system \ndata and projected demand, and projected demand should be categorized by confidence based on \nobjective development milestones. The purpose is not to exclude uncertain future demand from \nplanning. The purpose is to prevent highly uncertain projections and near-certain obligations from being \ntreated as though they carry the same evidentiary weight. \nThe technical record should also identify, where relevant, the effects of each option on reliability, \ngeneration adequacy, transmission needs, implementation timing, customer cost exposure, and the \nability to revise the decision as better information becomes available. Confidential commercial \ninformation can be protected, but the assumptions used for regional planning should be disclosed at a \nlevel sufficient for meaningful review. \nD. Formal State and Consumer Consultation Without Creating a Veto \nThe Commission's agenda appropriately asks how states should participate in PJM's governance and \nstakeholder processes. On critical issues, state participation should be structured rather than informal. \nThe expedited process should include a defined consultation window for the Organization of PJM \nStates, Inc., individual state commissions where appropriate, and state consumer advocates. Their \nwritten positions should become part of the decisional record. \nThis consultation should not convert regional grid governance into a state-by-state veto structure. \nPJM must retain the independence required to perform its regional functions. But where a decision may \nmaterially affect retail customers, state resource planning, infrastructure development, or local \nimplementation, the process should require those concerns to be surfaced early enough to influence the \nanalysis rather than after a preferred solution has effectively been selected. \nE. A Written Board Disposition \nAt the conclusion of a critical-issue process, the Board should publish a concise decisional \nmemorandum. The memorandum should identify the alternatives considered, the principal technical \nfindings, major stakeholder disagreements, material uncertainties, the reasons for the selected path, and \nany matters that require Commission approval or further stakeholder work. \nThis would directly improve accountability and transparency. It would also create an institutional \nrecord that later Boards, states, stakeholders, and the Commission can use to understand why a decision \nwas made under a particular set of facts. \nF. Mandatory Post-Implementation Review \nFast decisions are sometimes made with incomplete information. That is acceptable when the \nuncertainty is acknowledged and the decision is revisited. Each critical-issue process should therefore \nWolf Meridian Group | Docket No. AD26-7-000 | 3"},{"page":4,"startToken":1325,"endToken":1731,"text":"include a scheduled post-implementation review, ordinarily within 12 to 18 months. PJM should \ncompare forecast assumptions with observed results, identify unintended effects, and determine whether \nthe governing rule or process should be modified. \nThis creates a feedback loop between planning and reality. It also reduces the pressure to make \nevery expedited decision permanent on day one. \nIV. Large Loads Demonstrate Why the Reform Is Necessary \nLarge-load growth provides a useful example of why governance structure and technical analysis \ncan no longer be separated. A single large project may implicate load forecasting, generation adequacy, \ntransmission planning, interconnection timing, distribution utility coordination, market rules, cost \nresponsibility, and state policy. If those questions are handled serially through separate processes, the \nsystem can spend substantial time debating pieces of a problem that is operationally one problem. \nPJM's existing Large Load Additions Critical Issue Fast Path shows that expedited treatment can be \nappropriate. The next step should be to convert that experience into a durable governance capability \nrather than treating each new urgent issue as a one-off emergency. The critical-issue track should \nprovide a reusable structure for high-impact questions while allowing the technical content to vary by \nissue. \nLoad forecasting illustrates the need for this structure. Forecasts necessarily contain uncertainty, and \nemerging large loads can change quickly as projects are announced, delayed, resized, financed, \nconnected, or cancelled. Governance should require decision-makers to see not only a single forecast \nnumber, but the confidence and development maturity underlying material forecast adjustments. That \napproach would improve the quality of decisions without requiring PJM to wait for perfect information \nthat will never exist. \nV. Relationship to the Commission's Questions \nThe recommendations above directly respond to several questions posed in the July 23 technical \nconference agenda: \n●​Panel 1, Question 3 - Accountability and responsiveness: objective activation criteria, a fixed \nschedule, and a written Board disposition create an auditable decision process. \n●​Panel 2, Question 2 - Transparency: a common technical record makes assumptions, uncertainties, \nand alternative impacts visible before decisions are made. \n●​Panel 2, Question 3 - State participation: a defined consultation window gives states and consumer \nadvocates a meaningful role without compromising PJM's regional independence. \n●​Panel 2, Questions 5 and 7 - Stakeholder-process reform and committee delay: a single issue charter \nand lead process reduce serial referrals and duplicative committee work. \n●​Panel 2, Question 8 - Fast-path procedures: a permanent, criteria-based critical-issue track would \ninstitutionalize time-bound review while preserving technical rigor and stakeholder input. \nWolf Meridian Group | Docket No. AD26-7-000 | 4"},{"page":5,"startToken":1731,"endToken":1969,"text":"VI. Conclusion \nPJM does not need to choose between inclusive governance and timely decisions. It needs a process \ndesigned to do both. The Commission should encourage PJM to consider formalizing a permanent \ncritical-issue decision track that includes objective activation criteria, a published schedule, one \ncommon technical record, structured state and consumer consultation, a written Board disposition, and a \nmandatory post-implementation review. \nThe physical system is changing rapidly, and governance processes must be capable of responding \nto new information without sacrificing transparency or accountability. Large loads, changing forecasts, \nnew generation needs, transmission constraints, and emerging infrastructure demands will continue to \ncreate difficult regional decisions. A durable fast-path structure can help PJM address those decisions \nmore efficiently while preserving meaningful stakeholder participation and a clear public record. \n \nRespectfully submitted, \n/s/ Justin Trout \nJustin Trout \nFounder & Principal \nWolf Meridian Group \nPower • Compute • Infrastructure Strategy \nwww.wolfmeridian.com \nwolfmeridiangroup@gmail.com \nReferences \n1. Federal Energy Regulatory Commission, Commission-Led Technical Conference on PJM Governance \nand Stakeholder Reforms, Docket No. AD26-7-000, July 23, 2026. \n2. Federal Energy Regulatory Commission, FERC Invites Public Comment Following PJM Governance \nand Stakeholder Reforms Conference, July 30, 2026. \n3. PJM Interconnection, L.L.C., Critical Issue Fast Path - Large Load Additions, including Board \nmaterials and stakeholder-process records. \n4. PJM Interconnection, L.L.C., Load Forecast Development Process, 2026 materials, including the \nLong-Term Load Forecast, Data Center Accuracy Report, and 2026 Mid-Year Update. \nWolf Meridian Group | Docket No. AD26-7-000 | 5"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":228,"startToken":0,"endToken":30},{"p":1,"at":228,"title":"I. Introduction and Summary","method":"printed heading","endPage":1,"endAt":2287,"startToken":30,"endToken":297},{"p":1,"at":2287,"title":"II. Why Governance Speed Matters in a Large-Load Era","method":"printed heading","endPage":2,"endAt":1202,"startToken":297,"endToken":549},{"p":2,"at":1202,"title":"III. Recommended Reform: A Permanent Critical-Issue Decision Track","method":"printed heading","endPage":2,"endAt":1270,"startToken":549,"endToken":557},{"p":2,"at":1270,"title":"A. Objective Activation Criteria","method":"printed heading","endPage":3,"endAt":219,"startToken":557,"endToken":883},{"p":3,"at":219,"title":"C. One Common Technical Record","method":"printed heading","endPage":3,"endAt":1511,"startToken":883,"endToken":1061},{"p":3,"at":1511,"title":"D. Formal State and Consumer Consultation Without Creating a Veto","method":"printed heading","endPage":3,"endAt":3182,"startToken":1061,"endToken":1288},{"p":3,"at":3182,"title":"F. Mandatory Post-Implementation Review","method":"printed heading","endPage":4,"endAt":395,"startToken":1288,"endToken":1381},{"p":4,"at":395,"title":"IV. Large Loads Demonstrate Why the Reform Is Necessary","method":"printed heading","endPage":4,"endAt":1906,"startToken":1381,"endToken":1589},{"p":4,"at":1906,"title":"V. Relationship to the Commission's Questions","method":"printed heading","endPage":5,"endAt":0,"startToken":1589,"endToken":1731},{"p":5,"at":0,"title":"VI. Conclusion","method":"printed heading","endPage":5,"endAt":1845,"startToken":1731,"endToken":1969}]}