{"document":{"slug":"rec-20260817-5124","title":"2026-08-17_Revisions to Attachment FF-ATCLLC re: Show Cause Order","issued":"2026-08-17","accession":"20260817-5124","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"Midcontinent Independent System Operator, Inc.American Transmission Company LLC","kind":"tariff filing","file":"sources/filings/text/20260817-5124_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5124","tier":"record","sha256":"ec2836d68aebaf23789dbd9921259996d34c8000d258dadb452d6f89abef070d","pages":20,"tokens":8200,"emptyPages":[],"textThemes":["study","cost","retail","registry"]},"pages":[{"page":1,"startToken":0,"endToken":357,"text":"MAILING ADDRESS:  P.O. BOX 47 ▪ WAUKESHA, WI 53187-0047 ▪ Phone: 262-506-6830 ▪ Fax: 262-506-6710  \nSTREET ADDRESS:  W234 N2000 RIDGEVIEW PARKWAY COURT ▪ WAUKESHA, WI 53188-1022 \n \nLegal Department \nDirect Line: (262) 506-6170 \nE-Mail: sneitzel@atcllc.com \n \nAugust 17, 2026 \n \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, DC 20426 \nRe: \nAmerican Transmission Company LLC, Docket No. ER26-___-000 \nProposed Revisions to Attachment FF-ATCLLC of the MISO Tariff in Response to Show \nCause Order  \n \nDear Secretary Reese: \n \n \nPursuant to Section 205 of the Federal Power Act (“FPA”),1 Part 35 of the Federal \nEnergy Regulatory Commission’s (“Commission”) regulations,2 and the Commission’s \ndirectives in the Order Instituting Proceeding Under Section 206 of the Federal Power Act \n(“Show Cause Order”),3 the Midcontinent Independent System Operator, Inc., (“MISO” as the \nTransmission Provider),4 on behalf of American Transmission Company LLC, by its corporate \nmanager, ATC Management Inc. (collectively, “ATC”)5, hereby submits proposed revisions to \nAttachment FF-ATCLLC of MISO’s Open Access Transmission, Energy, and Operating Reserve \nMarkets Tariff (“Tariff”).   \nParagraph 36 of the Show Cause Order indicates that Transmission Owners may elect to \nsubmit their own FPA Section 205 filings to address matters discussed in the Show Cause Order.  \nBecause ATC currently has its own local planning process included in Attachment FF-ATCLLC \nof the MISO Tariff, ATC is proposing certain revisions to Attachment FF-ATCLLC to fulfill \nobligations outlined in the Show Cause Order to address large load integration in the ATC \nservice territory.  ATC understands that MISO intends to file various amendments to its Tariff in \nfuture filings to comply with the Commission’s directives in the Show Cause Order and ATC \n \n1 16 U.S.C. § 824d. \n2 18 C.F.R. Part 35 (2026). \n3  Midcontinent Indep. System Op., Inc., Order Instituting Proceeding Under Section 206 of the Federal Power Act, \n195 FERC ¶ 61,212 (2026) (“Show Cause Order”).  \n4  MISO joins this filing as the administrator of its Tariff, and reserves the right to comment or protest.   \n5 Note, in Attachment FF-ATCLLC, ATC is generally referred to as ATCLLC.  Therefore, for purposes of this \nfiling, ATC and ATCLLC may be used interchangeably."},{"page":2,"startToken":357,"endToken":873,"text":"August 17, 2026 \nPage 2 \n \n \nmay also join in those filings.6  ATC’s filing here is intended to establish requirements in its \nfootprint and be complementary to MISO’s future filings.  As described below, ATC’s proposed \nrevisions to Attachment FF-ATCLLC describe processes that are designed to work together with \nMISO’s process in the same way ATC’s local planning process in Attachment FF-ATCLLC \nworks with the annual MISO Transmission Expansion Plan (“MTEP”) process today.  ATC also \nseeks approval for modifications to the local planning process that is utilized today in ATC’s \nfootprint.   \nI. \nBackground \nA. \nATC \nATC is a Wisconsin limited liability company created as a single-purpose, for-profit \ntransmission company.7  ATC began operations under the terms of its own open access \ntransmission tariff on January 1, 2001, and currently owns and operates over 10,000 miles of \njurisdictional transmission facilities in the states of Wisconsin, Illinois, Minnesota, and \nMichigan.  Many of ATC's facilities were acquired, with Commission approval, from a number \nof previously vertically integrated companies, municipalities, and electric cooperatives.  On \nFebruary 1, 2002, ATC transferred operational control of its facilities to MISO.8  Since that time, \nMISO has provided transmission service over ATC’s transmission facilities pursuant to the terms \nof the MISO Tariff, with ATC operating its transmission facilities at MISO’s direction.  ATC has \nits own Commission-approved local planning process set forth in the MISO Tariff at Attachment \nFF-ATCLLC. \nB. \nATC’s Planning Functions and Attachment FF-ATCLLC \nSince beginning operations in 2001, ATC has engaged in local transmission planning as \none of its core functions.  ATC’s local transmission planning process is open, collaborative, \ndriven by stakeholder needs, and responsive to industry changes and technology developments.  \nAttachment FF-ATCLLC sets forth ATC’s planning functions and the manner in which ATC \nmeets the transmission needs of its customers, which is a key element of ATC’s operations.  \nPursuant to Wisconsin law,9 ATC is a transmission only company and not permitted to directly \n \n6 See MISO’s Motion to Hold Proceeding in Abeyance, Docket No. EL26-70, filed on Aug. 3, 2026 (MISO \nAbeyance Motion).  As noted in MISO’s Abeyance Motion, ATC is filing a separate Section 205 filing in response \nto certain of the Commission’s directives in the Show Cause Order.  In future MISO filings, ATC will indicate \nwhether it joins MISO and the MISO Transmission Owners in the proposed changes.  \n7 Wis. Stats. § 196.485(3m) established the framework for the formation of ATC as a single-purpose transmission \ncompany to own and operate the electric transmission facilities as a single transmission grid in the areas in which \nfacilities are contributed, and authorized ATC to plan, construct, operate, maintain, and expand the transmission \nfacilities to provide adequate and reliable transmission service. \n8 Transfer of operational control of ATC’s facilities to MISO was authorized in Am. Transmission Co. LLC, 97 \nFERC ¶ 62,182 (2001).  \n9 Under the Wisconsin law that enabled ATC to be formed, ATC sought and thereafter became “a transmission \ncompany” and “public utility” which obligated ATC to engage in as “its sole purpose the planning, constructing, \noperating, maintain and expanding of transmission facilities, and the providing of transmission service, to"},{"page":3,"startToken":873,"endToken":1360,"text":"August 17, 2026 \nPage 3 \n \n \nserve retail customers.  Therefore, ATC engages in the necessary planning to provide for \nchanges, modifications, or additions to its transmission facilities to provide adequate, reliable, \nand sufficient transmission capability so that entities that rely on ATC’s transmission facilities \nare able to meet the needs of their respective retail customers.   \nATC’s planning processes are structured to include all interested parties and treat all \nsimilarly situated interconnected customers in a similar, consistent manner.  Additionally, while \nATC maintains its own planning processes in Attachment FF-ATCLLC, ATC coordinates \nextensively with MISO.  Under the Transmission Owners Agreement,10 ATC conducts “bottom-\nup” local planning to implement its planning functions and obligations to ensure the adequacy \nand reliability of the ATC system for the benefit of all customers.  As the utility industry changes \nand new technology develops, especially with the recent advent of large load data centers, ATC \nhas actively engaged with the changing landscape to continue to fulfill its obligations.   \nC. \nATC’s Distribution – Transmission Interconnection Process   \nAttachment FF-ATCLLC sets forth ATC’s process for Distribution – Transmission \nInterconnections.  The process is initiated by one or more of ATC’s distribution customers \nthrough submission of a Load Interconnection Request Form (“LIRF”).  Upon receipt of a \ncomplete LIRF, ATC will begin its studies and analyses of the interconnection.  More \nspecifically, ATC will engage with its Best Value Planning process, as defined in Attachment \nFF-ATCLLC, and collaborate with the customer to determine the best value solution to \ninterconnect the new load request.   \n \nUpon ATC’s development of the project containing the transmission facilities necessary \nto facilitate the load interconnection in a safe, reliable, and cost-effective manner, ATC \ncoordinates with MISO and engages with MISO’s planning process.  ATC will submit the \nproposed project to MISO either through the annual MTEP process or MISO’s Expedited Project \nReview (“EPR”) process.  Upon MISO’s approval, the project would be included in Appendix A \nof MTEP.   \n \nAs an active participant in the MISO stakeholder process, ATC is aware that MISO is \ndeveloping proposals to comply with the requirements in the Show Cause Order.  ATC will \ncontinue to engage with the stakeholder process and work with MISO to ensure that ATC’s local \nplanning and interconnection processes in Attachment FF-ATCLLC comply with the Show \nCause Order and can be implemented in a manner that complements MISO’s process.  ATC \nintends for the revisions to Attachment FF-ATCLLC to integrate into MISO’s processes in the \n \nprovide for an adequate and reliable transmission system that meets the needs of all users that are dependent on the \ntransmission system and that supports effective competition in energy markets without favoring any market \nparticipant.”  Wis. Stat. § 196.485(ge) (2025) (emphasis added).  ATC, therefore, is not permitted to delegate its \nplanning obligations under state law to any other entity.  \n10 Agreement of Transmission Facilities Owners to Organize the Midcontinent Independent System Operator, Inc., a \nDelaware Non-Stock Corporation, Appendix B-Planning Framework, available at: \nhttps://www.misoenergy.org/legal/rules-manuals-and-agreements/tariff/."},{"page":4,"startToken":1360,"endToken":1866,"text":"August 17, 2026 \nPage 4 \n \n \nsame way ATC’s existing Distribution – Transmission Interconnection process interplays with \nMTEP and the EPR process.  \nD. \nATC’s Development of Large Load Studies and Requirements  \nIn 2022, ATC began receiving serious inquiries about potential new large loads, and in \nparticular data centers.  While ATC had already developed a robust local planning process, \ninternal planning experts quickly realized that more than traditional steady state analysis would \nbe needed to appropriately study and determine the system impacts of the unique characteristics \npresented by large load data centers.  ATC began intensive internal studies and engaged with \nvendors to develop concepts for mitigation of key concerns related to large data center loads.  \nSubsequently, in 2024 through 2025, ATC elevated its engagement with external \nresources, including specialized power system consultants.  Specifically, ATC and its consultants \nengaged with new and unique types of analyses to study large loads, including flicker analysis, \nrotor swing modes, and generator shaft studies.  ATC determined that to safely and reliably \ninterconnect large loads, more robust planning criteria requirements that apply specifically to \nthese new, unique large loads must be developed and implemented.  Development of these \nrequirements posed unique challenges as there was no industry documentation of these issues, \nconcerns, impact, mitigation measures, or performance requirements.  Authorities such as NERC \nhad not yet engaged with these issues.  Recognizing the need for transformation in response to \nthe characteristics of new large loads, ATC stepped into the role of industry leader in developing \nreliability criteria.  \nEach new large load presents its own unique characteristics and challenges, however \nATC realized early in the development phase that it would not be practical to perform custom \nstudies for each load interconnection request and to derive bespoke project-specific limits to \naddress reliability concerns.  Therefore, through intensive studies and analyses, internally and \nwith consultants, ATC developed new local planning criteria, including new criteria developed \nexclusively to apply to large load interconnections across ATC’s footprint.  Uniquely situated \namong the Great Lakes and Mississippi River, ATC’s geography stands out from other areas in \nthe MISO footprint.  Additionally, as a transmission-only company, ATC has developed close \nrelationships with its customers.  These factors have contributed to ATC’s ability to develop \nprocesses and requirements that are specifically applicable to ATC’s system without \ncompromising reliability.  \nThrough studies and analysis, ATC initially determined that the appropriate threshold for \ncategorizing large loads in the ATC footprint would be 200 MW.  As discussed below, ATC \ncontinues to analyze, on no less than an annual basis, the appropriate threshold for categorizing \nlarge loads and associated reliability and operational criteria.  Through the proposed Attachment \nFF-ATCLLC updates described below, ATC is now updating its large load threshold to 100 MW \nto align with directives from the Public Service Commission of Wisconsin (“PSCW”) regarding \nappropriate measures to mitigate cost shifting concerns at the retail level.11  ATC has determined \n \n11 See Public Service Commission of Wisconsin Order Docket 6630-TE-113 Final Decision (PSC REF# 591873) \n(“PSCW Retail Tariff Order\").  The PSCW made a finding of fact that it would be “reasonable to make the VLC"},{"page":5,"startToken":1866,"endToken":2372,"text":"August 17, 2026 \nPage 5 \n \n \nthat 100 MW is an initially appropriate threshold for categorizing large loads for cost allocation \nand to ensure reliability, but will continue to re-evaluate and apply reliability criteria for large \nloads that present unique characteristics as necessary.  ATC also continues to be an active \nstakeholder and participant in MISO and NERC efforts to ensure reliable service.  ATC will \ncontinue to be responsive to industry standards, as needed.   \nAs described in depth below, ATC proposes to revise Attachment FF-ATCLLC to \ninclude requirements, processes, and procedures associated with the interconnection of large \nloads, including the operational and reliability requirements discussed above.  \nII. \nDiscussion  \nATC’s proposed revisions to Attachment FF-ATCLLC are just and reasonable.  The \nCommission acknowledged in the Show Cause Order that ATC has its own distribution \ninterconnection request process and load interconnection procedures described in Attachment \nFF-ATCLLC, but that Attachment FF-ATCLLC did not explicitly address interconnections of \nlarge loads.12  Over the last few years, ATC has developed company-specific business practices \ncontaining policies, practices, and requirements directed specifically at large loads that also \naddress several concerns identified by the Commission in the Show Cause Order.13  Therefore, in \nthis filing, ATC is seeking to amend Attachment FF-ATCLLC to add these requirements and \nprocesses associated with large loads in ATC’s footprint.  \n \nAs discussed above, many of the revisions to Attachment FF-ATCLLC reflect existing \nprocesses, practices, and requirements in ATC’s footprint.  Therefore, ATC’s proposed revisions \nshould not disrupt existing commercial arrangements and in-flight projects.  By allowing ATC to \nmaintain existing process and requirements, while seamlessly building in additional requirements \nand provisions necessary to address several of the Commission’s concerns in the Show Cause \nOrder, the proposed revisions are just and reasonable and will provide clarity and transparency \nfor the reliable interconnection of large loads in the ATC footprint.14  \n \ntariff mandatory for all customers with an aggregate load forecast of 100 MW” and therefore ordered the “VLC \ntariff mandatory for all customers with an aggregated load forecast of over 100 MW” Id., Finding of Fact 3, Order \nPoint 5.  See also Public Service Commission of Wisconsin Order Docket 6680-TE-115 Final Decision (PSC REF# \n594678) (“PSCW Individual Contract Order\"), Finding of Fact 3 (finding 100 MW to be the appropriate threshold to \napply a new large load retail tariff).   \n12 Show Cause Order at P 21, FN 75 (“Although Attachment FF-ATCLLC includes ATC’s distribution-to-\ntransmission interconnection request process and load interconnection procedure, Attachment FF-ATCLLC does not \ninclude provisions specific to large loads.”); id. at P 21, FN 77 (noting that ATC has developed specific procedures \nand requirements outside of the Commission-jurisdictional tariff). \n13 ATC’s current business practices can be found on its website.  During the pendency of this filing, ATC will make \nadministrative updates to its website and Business Practices to ensure that all language proposed to be revised in \nAttachment FF-ATCLLC corresponds to the website and Business Practices.   \n14 See Show Cause Order at P 36 (noting that filers should provide explanation for how FPA section 205 filings will \navoid disrupting existing commercial arrangements)."},{"page":6,"startToken":2372,"endToken":2791,"text":"August 17, 2026 \nPage 6 \n \n \nA. \nInterconnection Process for Large Loads \n1. \nApplication Process  \ni. FERC Directive \nIn the Show Cause Order, the Commission made a preliminary finding that the MISO \nTariff appears to be unjust and unreasonable because it lacks an application process for Eligible \nCustomers15 seeking transmission service on behalf of large loads.16  The Commission \nemphasized that “clear and consistent provisions” will deter speculative requests and provides \ncertainty and clarity for stakeholders.17  The Commission indicated that applications should be \naccepted on a rolling basis.18 \nii. ATC Compliance  \nAs the Commission acknowledged in the Show Cause Order, ATC has developed local \nplanning processes and requirements in Attachment FF-ATCLLC, including processes for \nDistribution – Transmission Interconnections.19  ATC’s local planning process for Distribution – \nTransmission Interconnection applies to all ATC customers (i.e., Eligible Customers), including \nlarge loads, seeking transmission service on ATC’s system.   \nATC proposes to add the following Tariff language to further clarify that the Distribution \n– Transmission Interconnection planning functions, processes, and requirements apply to large \nloads:  \n• Sections V.C and VI.A.1 state that Distribution – Transmission Interconnection \nPlanning Function includes Large Load Distribution – Transmission \nInterconnection Planning.  \n \n15 Defined by MISO as “(i) Any electric utility (including the Transmission Owner(s), ITC Participants(s), and any \npower marketer), Market Participant, Federal Power Marketing Agency, or any person generating electric Energy \nfor sale or resale is an Eligible Customer…; or (ii) Any retail customer taking unbundled transmission service \npursuant to a state requirement that a Transmission Owner or ITC Participant offer the transmission service, or \npursuant to a voluntary offer of such service by a Transmission Owner or ITC Participant, that is an Eligible \nCustomer under this Tariff.  Unbundled retail customers that seek to take local distribution service cannot be \nEligible Customers under this Tariff with respect to that service.”  MISO, FERC Elec. Tariff, Module A, §1.E \n(Definitions E) (93.0.0).  In ATC’s footprint, an Eligible Customer includes ATC’s distribution customers with \nwhich ATC has a Commission-accepted Distribution – Transmission Interconnection Agreement.  Any new \ndistribution customer in ATC’s footprint would be required to enter into a Distribution – Transmission \nInterconnection Agreement prior to interconnecting to ATC system to ensure compliance with ATC’s requirements \nand procedures as outlined in Attachment FF-ATCLLC.  \n16 Show Cause Order at PP 3, 57. \n17 Id. at P 56. \n18 Id. at P 59.  \n19 Id. at P 21, FN 77.  See Attachment FF-ATCLLC §§ V.C (identifying ATC’s Planning Functions); VI.A \n(describing the Distribution – Transmission Interconnection Planning Function and associated process)."},{"page":7,"startToken":2791,"endToken":3185,"text":"August 17, 2026 \nPage 7 \n \n \nThe Distribution – Transmission Interconnection process in Attachment FF-ATCLLC \ndetails clear and specific procedures for submitting a load interconnection request form \n(“LIRF”), which kicks off applicable study procedures as described below.  ATC accepts \napplications on a first-come, first-served basis, upon completion of applicable readiness \nrequirements, also described below.  ATC proposes additional Tariff language to Attachment FF-\nATCLLC to establish these procedures, including:  \n• Section IV defines the LIRF as the form in which a distribution customer initiates \na request for a distribution interconnection to ATC’s system that includes a \nrequest for service to a large load.  \n• Section IV also includes in the definition of “Distribution – Transmission \nInterconnection Requests” that the processes for distribution interconnections in \nATC’s footprints apply to large load interconnections, plus any requirements or \nprocesses exclusively applicable to large loads. \n• Section VI.A.1-2 provides clarifying edits to sections of Attachment FF-ATCLLC \naddressing Distribution – Transmission Interconnection Requests and Study \nSequencing to establish procedures that apply to large load interconnections. \nGenerally, ATC’s established local planning procedures in Attachment FF-ATCLLC \napply to large load interconnections, as clarified by the proposed revisions above.  Notably, \nhowever, certain existing and proposed new requirements will apply exclusively to large loads.  \nThese large load-specific requirements are detailed herein.  ATC has added the following Tariff \nlanguage to state that while the general Distribution – Transmission Interconnection Process \napplies to all loads in ATC’s footprint, including large loads, certain requirements apply \nexclusively to large loads:  \n• Section III proposes to add to the “Purpose” section of Attachment FF-ATCLLC \nTariff language stating that ATC has developed certain policies that apply \nexclusively to large loads. \nImportantly, as described above, ATC’s application process and studies of all distribution \ninterconnections, including large load interconnections, contemplates close coordination with \nMISO.  While ATC has developed its own process to accept and study distribution \ninterconnections within its footprint, ATC works closely with MISO to provide it with all \nnecessary information so that the interconnection can be integrated into the annual MTEP, which \nmay include on an as needed basis, review and approval on an expedited timeline through \nMISO’s Expedited Project Review (“EPR”) process.  Upon Commission acceptance of these \nchanges to Attachment FF-ATCLLC, ATC will continue to coordinate with MISO to ensure all \nprojects interconnecting to ATC’s system are included in MTEP either through the standard \nplanning process or the EPR process.  \n2. \nReadiness Requirements  \ni. FERC Directive"},{"page":8,"startToken":3185,"endToken":3585,"text":"August 17, 2026 \nPage 8 \n \n \nThe Commission indicated that sufficient readiness requirements may be necessary to \naddress concerns associated with speculative large loads.20  The readiness requirements may \ninclude a fee and certain requirements associated at different phases of the study process.21  \nFurther, as a component of the readiness requirements, the Commission indicated that it may be \nhelpful to collect information regarding the characteristics of the large load customer.22 \nii. ATC Compliance  \nPrior to initiation of a System Impact Study (described in detail below), ATC requires all \ndistribution customers to meet certain readiness requirements to deter speculative requests and \nensure accurate studies.  First, distribution customers must submit a LIRF that is deemed \ncomplete, pursuant to criteria outlined by the applicable ATC Business Practice.  Additionally, \nany distribution customer that seeks to add a new large load must submit a Large Load \nInterconnection Criteria Confirmation Form which details specific operating characteristics of \nthe proposed load increase so that ATC has sufficient information to appropriately analyze the \nlarge load impacts.  Other documentation may be necessary prior to ATC’s initiation of the \nSystem Impact Study to ensure that ATC can accurately study the new interconnection and \nensure resources are allocated only to non-speculative requests.  ATC proposes to add these \nrequirements to Attachment FF-ATCLLC, including:.  \n• Section VI.A.4 contains a new section detailing the readiness requirements to \ninitiate a System Impact Study, including requirements specifically applicable to \nlarge load interconnections.   \nAdditionally, ATC proposes to implement a new requirement associated with large load \ninterconnections in response to the Commission’s Show Cause Order.  Any new distribution \ninterconnection request that exceeds the large load threshold shall be required to pay an initial \nnon-refundable deposit, in an amount of $50,000 which will be established by the applicable \nATC Business Practice.  Subsequently, the distribution customer shall be invoiced by ATC for \ntime and materials above and beyond the initial deposit necessary to complete the System Impact \nStudy.  In ATC’s experience, implementation of this charge will help to defer speculative \nrequests and ensure that distribution customers will provide accurate and up to date information \nto ATC when submitting a new LIRF and other required documentation.  \n• Section VI.A.5 adds a section requiring an initial deposit and any time and \nmaterials cost in exceedance of the deposit necessary for ATC to complete the \nSystem Impact Study. \n \n20 Show Cause Order at P 59.  \n21 Id. \n22 Id."},{"page":9,"startToken":3585,"endToken":4002,"text":"August 17, 2026 \nPage 9 \n \n \n3. \nStudy Procedures  \ni. FERC Directive  \nIn the Show Cause Order, the Commission expressed concern that the MISO Tariff \nlacked specific study procedures for Eligible Customers seeking transmission service on behalf \nof large loads for new and incremental additions.23  Additionally, the Commission indicated that \nstudies to produce a non-binding good-faith estimate of the cost and time to construct facilities \nnecessary to interconnect a large load customer should take no more than 90 days to complete.24  \nThe Commission also indicated that studies should consider operational characteristics and that \naccurate models using Electromagnetic Transient studies may be helpful in analysis of large \nloads.25 \nii. ATC Compliance  \nAs described above, Attachment FF-ATCLLC has guided ATC’s interconnection process \nsince its adoption in MISO’s Tariff.  In response to the Commission's Show Cause Order and \nchanging industry needs, ATC proposes to add additional detail and requirements to its \ndistribution interconnection study process.  Upon completion of all applicable readiness \nrequirements as discussed above, ATC will initiate a System Impact Study.  System Impact \nStudies are split into two distinct phases:  (1) steady state analysis, and (2) applicable special \nstudies.   \nAll load interconnections require ATC to conduct the steady state analysis.  The steady \nstate analysis phase of the System Impact Study shall result in a non-binding good-faith estimate \nof time, cost, and potential facilities necessary to interconnect a load, responsive to the \nCommission's directives outlined in the Show Cause Order.  Upon completion of the steady state \nanalysis, ATC can move into the special studies phase, as needed.  Not all load interconnection \nrequests require special studies, and the extent to which depends upon the complexity of the \nproject.  However, potential projects that exceed ATC’s large load threshold or display unique \ncharacteristics will require additional studies during the special studies phase.  The special \nstudies phase includes analysis of, but is not limited to, transfer analysis, reactive power analysis, \nangular and voltage stability of nearby generators, load voltage stability, voltage ride through of \nboth generators and loads, power quality analysis, short-circuit analysis, and other transient study \nanalyses.  The special studies phase analyses may also involve several positive sequence and \nElectromagnetic Transient study tools and result in technical reports or recommendations for \npotential mitigation of any limitations observed. \nATC proposes to include the requirements of System Impact Studies in Attachment FF-\nATCLLC and include additional detail, procedures, or other relevant information associated with \n \n23 Show Cause Order at PP 3, 39.  \n24  Id. at PP 39, 63.  \n25 Id. at P 60."},{"page":10,"startToken":4002,"endToken":4374,"text":"August 17, 2026 \nPage 10 \n \n \nthe System Impact Studies in applicable Business Practices and the ATCLLC Local Planning \nCriteria. \n• Section VI.A.3 proposes to add a section to Attachment FF-ATCLLC detailing \nthe process and requirements of a System Impact Study, as described above. \n4. \nEvaluation of Alternative Transmission Technologies  \ni. FERC Directive  \n \nIn the Show Cause Order, the Commission expressed concern with the lack of clear and \nconsistent provisions requiring the evaluation of alternative transmission technologies.26  The \nCommission indicated that transparent and clear requirements for the evaluation of these \ntechnologies be included in Tariff language.27  Similarly, the Commission indicated that a study \nreport should indicate why alternative transmission technologies are not feasible in the event no \nalternative transmission technology facility is used in response to a request to interconnect a \nlarge load.28  \nii. ATC Compliance  \nAttachment FF-ATCLLC requires ATC to engage in Best Value Planning, which is \ndefined as: \n[T]he consideration of, or evaluation of, one or more alternatives to the proposed \nconstruction of new, or the modification of existing, Transmission Facilities \nwhich have been identified in a planning process to determine whether an \nalternative or alternatives exist that may include the construction of new, or the \nmodification of the existing, Distribution Facilities or Transmission Facilities \nowned by others that is/are less costly or which may provide greater enhancement \nto the reliability, capability or integrity of ATCLLC’s Transmission Facilities and \nsuch interconnected Transmission or Distribution Facilities when compared to the \nestimated cost of the construction and capability of the proposed new, or the \nproposed modification of, ATCLLC’s Transmission Facilities, while taking into \naccount the environmental considerations, regulatory approvals and the ability to \nconstruct the proposed Distribution or Transmission Facilities in a timely and \nappropriate manner.29 \n \n26 Show Cause Order at P 51.  Alternative transmission technologies are also commonly referred to as Grid \nEnhancing Technologies (“GETs ”).  The terms are used interchangeably in ATC’s footprint and may include static \nsynchronous compensators, static VAR compensator, advanced power flow control devices, transmission switching, \nsynchronous condensers, voltage source converter, advanced conductors, tower lifting, and dynamic line ratings, \namong other technologies named in the applicable ATC Business Practice.  \n27 Id. at 62. \n28 Id. at P 62. \n29 Attachment FF-ATCLLC § IV."},{"page":11,"startToken":4374,"endToken":4780,"text":"August 17, 2026 \nPage 11 \n \n \nTo facilitate Best Value Planning, ATC engages with evaluation of grid enhancing \ntechnologies or alternative transmission technologies for all distribution interconnection requests.  \nATC proposes to make this requirement clear in Attachment FF-ATCLLC through addition of \nnew, specific language:  \n• Section VI.A.9 adds language detailing that in Best Value Planning ATC shall \nevaluate the use of grid enhancing technologies or alternative transmission \ntechnologies in each System Impact Study.  \nAdditionally, Section VI.A.9 requires ATC to provide results of studies to the distribution \ncustomer, which is commonly referred to as Best Value Planning documentation or reporting in \nATC’s footprint.  Specific Best Value Planning documentation requirements are detailed in \napplicable ATC Business Practices.  This documentation, which is required by Attachment FF-\nATCLLC, inherently includes narrative information regarding the use of and evaluation of \nalternative transmission technologies.  In the Best Value Planning documentation, ATC provides \ndetails on the evaluation including, if applicable, details as to why grid enhancing technologies \nor alternative transmission technologies were not used.  \nB. \nLarge Load Definition and Operational Requirements  \n1. \nLarge Load Definition  \ni. FERC Directive  \nIn the Show Cause Order, the Commission expressed concern due to the lack of a \ndefinition of large load in MISO’s Tariff that sufficiently captures loads that present unique \nchallenges described in the Show Cause Order.30 \nii. ATC Compliance  \nAs stated above, ATC previously established a threshold of 200 MW to define large loads \nin its system.  To address the Commission’s concerns in the Show Cause Order, ATC is \nproposing amended language in Attachment FF-ATCLLC, Section IV to change the threshold to \n100 MW.  The 100 MW threshold shall serve as ATC’s initial threshold to classify loads to \nwhich certain requirements, procedures, and processes shall apply to address reliability, \noperational, and cost shifting concerns.  This threshold shall serve as a baseline threshold and \nmay be adjusted in appliable ATC Business Practices and local planning criteria as necessary.  \nAs described above, ATC has determined that 100 MW is an appropriate threshold from \na planning, reliability, and operational perspective within ATC’s footprint.  ATC consistently \ncoordinates with MISO, other regional and national entities, its customers, and other \ninterconnected entities to ensure that any process or requirement in ATC’s footprint shall not \ncompromise reliability within ATC’s territory, MISO’s service area, or broader.  Additionally, \nthe PSCW has recently established that 100 MW is an appropriate threshold to address retail cost \n \n30 Show Cause Order at P 57."},{"page":12,"startToken":4780,"endToken":5222,"text":"August 17, 2026 \nPage 12 \n \n \nshifting concerns associated with large loads.31  In its final decisions in a recent retail tariff \nproceeding and recent individual retail contract proceeding, the PSCW determined that it was \nmost reasonable to set the applicability threshold at 100 MW.32  The PSCW found that the rates \nand rules established by retail tariffs and retail contracts are appropriately applied to large loads \ngreater than 100 MW.33 In an effort to align with the state’s authority over retail rates of ATC’s \ndistribution customers, ATC has applied the 100 MW threshold to address cost shifting concerns \nat the wholesale level, as discussed in detail below.   \n• Section IV adds a definition of “ATCLLC Large Load” to establish that in ATC’s \nfootprint, an initial threshold of 100 MW shall apply. \n2. \nOperational Requirements  \ni. FERC Directive  \nThe Commission expressed concern in the Show Cause Order that the MISO Tariff lacks \nongoing operational requirements to address the unique characteristics and challenges of large \nloads.34  Specifically, the Commission highlighted several areas of concern, including:  (1) lack \nof sufficient visibility and channels for communication of data; (2) lack of required monitoring \nequipment to monitor impacts such as ramp rate; (3) requirements related to disconnection of \nlarge loads when necessary; (4) lack of ramp rate or ride-through requirements; and (5) lack of \nnecessary protection systems or control technology requirements.35   \nii. ATC Compliance  \nAs discussed above, ATC has already developed requirements that are applicable to loads \nin its footprint that address the Commission’s concerns.  In response to the Show Cause Order, \nATC proposes to add these requirements to Attachment FF-ATCLLC.  ATC is constantly re-\nengaging with the established requirements, updating and adjusting when necessary and as \ntechnology changes.  Therefore, specific requirements will be outlined in ATC’s Local Planning \nCriteria which is submitted to MISO and in applicable Business Practice.  ATC has developed its \ncriteria and Business Practices in accordance with its robust analysis process coupled with \nstakeholder feedback.  Therefore, ATC proposes to add specificity and clarity on operational and \nplanning requirements that are applicable in ATC’s footprint, including: . \n• Section IV.V.D adds the term “ATCLLC Local Planning Criteria” to define \nATC’s local planning criteria and establish that within the ATCLLC Local \nPlanning Criteria, ATC has developed certain requirements that apply exclusively \n \n31 PSCW Retail Tariff Order at Order Point 5.  PSCW Retail Contract Order at Order Point 2.  \n32 PSCW Retail Tariff Order at 17.  PSCW Retail Contract Order at Finding of Fact 3.  \n33 PSCW Retail Tariff Order at Order Point 5.  PSCW Retail Contract Order at Order Point 2. \n34 Show Cause Order at P 41.   \n35 Id. at P 64."},{"page":13,"startToken":5222,"endToken":5589,"text":"August 17, 2026 \nPage 13 \n \n \nto large loads. \n• Section IV.V.D also includes specific references to ATC’s “Business Practices” \nwhich shall provide additional details and procedures to implement the \nrequirements of Attachment FF-ATCLLC, which includes requirements \napplicable exclusively to large loads. \n• Section IV.V.E. adds a new section to Attachment FF-ATCLLC which includes \nthe performance criteria that ATC must include in the ATCLLC Local Planning \nCriteria, including but not limited to steady state criteria, dynamic stability \nassessments, resource facility requirements, large load interconnection \nrequirements including active power oscillations and ramp rate limits, voltage ride \nthrough, load power factor, and power quality impacts.  Additionally, that section \nstates that ATC shall maintain certain data monitoring, data retention, forecasting, \nand additional design criteria in applicable business practices.  \n• Section IV.V.E. also includes language specifically to require all ATC’s \ncustomers, including customers service large loads, to comply with ATC’s \nrequirements pursuant to the established Distribution – Transmission Agreements \n(discussed below).  In the event a distribution customer fails to comply with ATC \ncriteria and requirements, ATC shall take appropriate action necessary to maintain \nreliability in accordance with its operating procedures and as necessary, as \ndirected by MISO pursuant to the ATC operating procedures.  \n• Section IV.V.F adds language to establish that ATC’s criteria, requirements, \nprocesses, and procedures apply in its footprint, may be updated at ATC’s \ndiscretion from time to time based on new conditions, safety concerns, \noperational issues, customer requests, regulatory developments, among other \nreasons.  \nAdditional details on the requirements and criteria will be included in the applicable ATC \nBusiness Practices and in the ATCLLC Local Planning Criteria.  In certain circumstances, ATC \nmay elect to defer certain requirements to MISO in areas such as data reporting and providing \nforecasting information directly to MISO.  As MISO continues to develop its own requirements \nin response to the Show Cause Order via the stakeholder process, ATC will make adjustments to \nits own Business Practices to outline any areas that ATC may defer to MISO requirements.   \nC. \nService Agreement  \n1. \nTransmission Service Agreement  \ni. FERC Directive  \nThe Commission expressed concern in the Show Cause Order regarding the lack of a pro \nforma transmission service agreement between MISO and the eligible customer taking"},{"page":14,"startToken":5589,"endToken":5973,"text":"August 17, 2026 \nPage 14 \n \n \ntransmission service on behalf of a large load to memorialize all terms and ensure that MISO \nmay be able to enforce large load requirements.36  \nii. ATC Compliance  \n \nATC has executed and filed with the Commission numerous Distribution – Transmission \nInterconnection Agreements (“D-TIAs”).  Prior to interconnecting a new distribution customer to \nATC’s system, ATC requires execution and filing of a D-TIA.  Each D-TIA is on file with the \nCommission.  Because each D-TIA governs all interconnections among ATC and its distribution \ncustomer, all load interconnections, including large load interconnections, are governed by the \nD-TIAs.  The D-TIA requires that all distribution customers comply with ATC’s processes, \nprocedures, and requirements to interconnect with ATC’s system.  Further, ATC may take \nappropriate action as necessary pursuant to its Operating Guides as needed in the event a \ndistribution customer fails to abide by any of ATC’s requirements.  ATC respectfully submits \nthat for use in ATC’s footprint, a pro forma transmission service agreement in the MISO Tariff \nis not necessary as ATC already employs its D-TIAs which serve the same function, as is \ncurrently reflected in Section IV:  \n• Section IV states that any new distribution customer shall be required to enter into \na D-TIA prior to interconnecting to ATC’s system and that ATC shall post a \ntemplate D-TIA to its public website to ensure transparency. \nD. \nCost Shifting  \n1. \nAgreement to Address Cost Shifting Concerns  \ni. FERC Directive  \nIn the Show Cause Order, the Commission expressed concern regarding cost shifting that \nmay occur among transmission customers as a result of the interconnection of large loads.37  The \nCommission made a preliminary finding that a pro forma cost recovery agreement between \nMISO, the Transmission Owner, and the Eligible Customer taking transmission service on behalf \nof the large load would mitigate the risk of cost shifting among transmission customers.38  \nSpecifically, the Commission directed MISO and/or the Transmission Owners to address \nsituations in which the proposed load fails to materialize or fails to materialize to the extent \ninitially anticipated.39  \nThe Commission references previously filed agreements designed to address such \nconcerns, including Transmission Security Agreements as possible ways to alleviate cost shifting \n \n36 Show Cause Order at P 65.  \n37 Show Cause Order at PP 3, 69. \n38 Id. at PP 3, 67.  \n39 Id. at P 80."},{"page":15,"startToken":5973,"endToken":6431,"text":"August 17, 2026 \nPage 15 \n \n \nconcerns.40  However, the Commission leaves a significant amount of discretion to MISO and/or \nthe Transmission Owners to develop methods, processes, and cost recovery agreements by which \nit will provide protections against cost shifting.41  The Commission also made a preliminary \nfinding that any such cost recovery agreement should require credit support and/or security \nsufficient to secure obligations of customer taking transmission service to paid the amounts \nowned pursuant to the agreement.42 \nii. ATC Compliance  \nFor the past two years, ATC has engaged with its customers and other stakeholders to \naddress the concerns described by the Commission.  Ultimately, this led ATC to develop a new \nBusiness Practice on Large Load Cost Allocation and develop two new agreements to ensure \ncost shifting concerns are addressed in ATC’s footprint at the wholesale level, and in a manner \nthat allows ATC’s customers who provide retail service, are able to comply with directives from \nstate authorities on cost shifting prevention at the retail level.  Specifically, ATC has developed a \nLarge Load Project Commitment Agreement (“LLPCA”) and a Minimum Transmission Charge \nAgreement (“MTCA”) that it will enter into with its distribution customer.  Pursuant to ATC’s \nLarge Load Cost Allocation Business Practice, ATC requires these agreements if the project \nexceeds the definition of large load (i.e., 100 MW), or exceeds $100M in costs.  The PSCW has \ndetermined that 100 MW would be an appropriate threshold in the State of Wisconsin to \nadequately protect against cost shifting concerns.43  Further, ATC recognized the need to address \nthe potential impact from new loads that may be smaller than 100 MW, but because they are in \nareas of the system that have less transmission buildout than others, drive a disproportionate \namount of network upgrades.  Therefore,  ATC intends to ensure that no cost shifting occurs for \ndistribution interconnection projects that drive projects that exceed $100M in cost.  \nATC recently filed several LLPCAs and an MTCA associated with a large load in its \nfootprint44 and intends to develop additional LLPCAs and MTCAs with in-flight projects in its \nfootprint.  The protections provided by the LLPCA and MTCA work in tandem, each described \nin detail below.  \nThe LLPCA is designed to protect the Parties and other wholesale customers from costs \nassociated with construction of facilities tied to a new large load and in the event of project \ncancellation, termination, or substantial modification prior to the project being placed in service.    \nLikewise, ATC can invoke the terms of the LLPCA in the event of cancellation, termination, or \nsubstantial modification to recoup costs incurred during project development and construction.  \n \n40 Id.  at P 83. \n41 Id.  at PP 80-84.  \n42 Id.  at P 84.  \n43 See PSCW Retail Tariff Order.  \n44 Docket No. ER26-3265."},{"page":16,"startToken":6431,"endToken":6961,"text":"August 17, 2026 \nPage 16 \n \n \nIn turn, the LLPCA provides ATC’s distribution customer with a transparent accounting \nmechanism that will allow it to protect its retail ratepayers either through a specific retail \nagreement or tariff.  In sum, the Amended LLPCAs are designed to provide protections against \ncost shifting during project development and construction.   \nAfter ATC’s transmission facilities go into service, the MTCA provides additional \nprotections to prevent cost shifting associated with transmission buildout in the event the large \nload that formed the basis for the buildout fails to materialize.  As an initial step pursuant to \nATC’s Large Load Cost Allocation Business Practice, ATC coordinates with the distribution \ncustomer pursuant to Attachment FF-ATCLLC through the Best Value Planning process, as \ndescribed above, to develop a proposed project including facilities necessary to adequately serve \nthe distribution customer, and by extension, its end-use customer.  The distribution customer will \ncontinue to benefit from ATC’s entire transmission system and therefore will continue to pay for \nNetwork service pursuant to the MISO Tariff.  Additionally, under the terms of the MTCA, the \ndistribution customer will pay for Network Service for all capacity it has requested, regardless of \nactual use, so that other customers do not bear those costs.  However, the charges incurred under \nthe MTCA will be limited to the incremental revenue requirement for the transmission facilities, \nsuch that the distribution customer, and by extension, its customer, will not subsidize \ntransmission service for other customers.  \nThe protections provided by the LLPCA and MTCA are directly responsive to the \nCommission’s Show Cause Order related to large load interconnections.45  In the Show Cause \nOrder, the Commission preliminarily found “that MISO’s Tariff appears to be unjust and \nunreasonable because it lacks adequate mechanisms to mitigate the risk of cost shifting among \ntransmission customers, which may result in unjust and unreasonable rates for transmission \nservice.”46  The LLPCA and MTCA provide a mechanism by which ATC’s other wholesale \ncustomers are protected during the period of construction and also in the event the large load \nend-use customer fails to materialize or fails to take service to the full extent of its request to \nATC’s distribution customer.  The protection mechanisms provided by the LLPCA and MTCA \ndirectly respond to the Commission’s concerns on the risk of unjust cost shifts.47  The Amended \nLLPCAs and MTCA offer the protections that the Commission is seeking in a fair, just, and \nreasonable manner and similar to other accepted cost recovery agreements, such as Transmission \nSecurity Agreements, which the Commission recognizes in its Show Cause Order.48 \nFurther, as stated above, the Commission preliminarily found in the Show Cause Order \nthat just and reasonable cost recovery agreements would require credit support or other financial \nsecurity “sufficient to secure the obligations of the Eligible Customer taking transmission service \n \n45 See Show Cause Order at PP 78 – 85.  \n46 Id. at P 78.  \n47 Id. at P 80 (expressing the Commission’s concern that speculative transmission service requests associated with \nlarge loads may lead to unjust and unreasonable rate increases in jurisdictional transmission rates). \n48 Id. at P 83 (highlighting other filed cost recovery agreements such as the Transmission Security Agreements, \nwhich is analogous to the MTCA filed herein)."},{"page":17,"startToken":6961,"endToken":7376,"text":"August 17, 2026 \nPage 17 \n \n \non behalf of a large load to pay the amounts owed pursuant to the cost recovery agreement.”49  \nThe MTCA requires a distribution customer to provide security within seven days of the \neffective date of the MTCA for the full amount that it may be required to pay under the terms of \nthe MTCA, subject to the liability cap established by the terms of the agreement. \nTherefore, in response to the Show Cause Order. ATC proposes to reference the LLPCA \nand MTCA, in Section VI.12.B of Attachment FF-ATCLLC as follows:   \n• Including a provision stating that the Large Load Cost Allocation Business \nPractice applies exclusively to large loads.  \n• Stating that ATC and distribution customer must enter into a Large Load Project \nCommitment Agreement and a Minimum Transmission Charge Agreement to \nprovide adequate cost shifting protection in ATC’s footprint.   \n• Requiring that the LLPCA and MTCA templates shall be posted on ATC’s public \nwebsite and, when executed, filed for acceptance with the Commission.  \n2. \nAppropriate Crediting  \ni. FERC Directive  \nIn the Show Cause Order, the Commission indicated that any cost shifting protections \nshould include a mechanism to ensure such payments are appropriately credited toward \ntransmission owners’ transmission revenue requirements.50 \nii. ATC Compliance  \nAs indicated in the pending filing in Docket No. ER26-3265, ATC will include revenues \ncollected under the MTCA in the Account 456.1 revenue credits line in Attachment O, providing \nsupporting detail for the amounts charged via the Attachment O workpapers so that it is clear in \nATC’s annual informational filing how payments made under the terms of the LLPCA and \nMTCA are reflected in ATC’s formula rate.  \n3. \nAdditional Cost Shifting Protections Provided by ATC’s Business \nPractices   \nIn addition to developing methods responsive to the Commission’s directive to provide \ncost shifting protections described above, over the course of its operations, ATC has developed \nadditional cost shifting protection measures in its footprint, as described in appliable business \npractices.  While these measures do not apply exclusively to large loads, ATC has developed \ncertain policies aligned with Attachment FF-ATCLLC to ensure project specific costs are not \ninappropriately shifted to other wholesale customers.  For example, ATC has developed a Project \nAcceleration Business Practice and an Elective Facilities Business Practice.  In the event a \ndistribution customer requests ATC to “speed up” its design, engineering, scoping, pre-\ncertification, and other timelines, an end-use customer must directly pay for those additional \n \n49 Id.  at P 84. \n50 Show Cause Order at PP 3, 85."},{"page":18,"startToken":7376,"endToken":7718,"text":"August 17, 2026 \nPage 18 \n \n \nexpenses.  Further, if a distribution customer, on behalf of its end-use customer, requests certain \nfacilities that are above and beyond or outside of ATC’s Best Value Plan, the end-use customer \nwill be directly assigned those costs.  These protections ensure that any end-use customer that \ndirectly causes an additional cost not inherently incorporated into the Network Rate (i.e., \nacceleration and additional or specialty facilities), will be responsible for that cost.   \nE. \nMiscellaneous Updates  \n1. \nGenerator Interconnection Process  \nPrior to joining MISO, ATC had developed its own generator interconnection process.  \nThe ATC-specific process was maintained after initial development of Attachment FF-ATCLLC, \nhowever ATC has since adopted MISO’s processes identified in Attachment X of MISO’s Tariff.  \nAs ATC no longer engages with its own specific process for generator interconnections, ATC is \nproposing to remove outdated references and clarify existing procedures that still exist in ATC’s \nfootprint in conjunction with the MISO Attachment X process.  \n \n• Removal of references to Attachment R throughout Attachment FF-ATCLLC.  \n \n• Adding the definition of “Generating Facilities Modification Notification \n(GFMN) Process” and associated procedures to clearly describe ATC’s process of \nevaluating modifications or other changes to generating facilities.  ATC’s process \nstudies all changes associated with generating facilities, and as appropriate, ATC \ndirects the generating interconnection customer to work with MISO in any \nappropriate Attachment X process.51 \n \n• Removal of definitions and references to obsolete definitions, practices and \nprocedures.52  \n2. \nMiscellaneous Clean-Up Edits  \nATC proposes several miscellaneous clean-up edits to Attachment FF-ATCLLC \nthroughout.  Any edits not specifically mentioned in this letter are not substantive, eliminate \noutdated or confusing language, and/or correct grammatical or formatting errors.  For example, \nATC updates reference to its public website, certain outdated citations and definitions, adds \ncertain definitions to increase clarity, updates references to other entities, organizations, and \nterminology, among other miscellaneous corrections.  Each edit is shown in redline in the \nenclosed Redline Tariff Sheets.  \n \n51 Redline Tariff Sheets, Attachment FF-ATCLLC § IV (adding the definition of Generating Facilities Modification \nNotification Process).   \n52 Id. (removing outdated definitions associated with the generator interconnection process)."},{"page":19,"startToken":7718,"endToken":8029,"text":"August 17, 2026 \nPage 19 \n \n \nIII. \nInformation Required Under 18 C.F.R. § 35.13 \nA. \nProposed Effective Date and Waiver \nATC respectfully requests that the Commission accept the proposed revisions to \nAttachment FF-ATCLLC as of October 17, 2026, 60 days from the date of filing.  During this \ntime, ATC shall prepare and update necessary components of its Business Practices, ATCLLC \nLocal Planning Criteria, public website, and other external information to align with the updated \nAttachment FF-ATCLLC language described herein.  ATC shall include in its Load \nInterconnection Business Practice a detailed table mapping a large load interconnection \nrequirements described in Attachment FF-ATCLLC and where an interested stakeholder can find \nall applicable requirements, processes, and procedures.   \n \nTo the extent necessary, ATC respectfully requests waiver of any applicable requirement \nof Part 35 not addressed herein.  \nB. \nCorrespondence and Service \nCorrespondence and service regarding this filing should be sent to the following \nindividuals, who should be placed on the official service list in this proceeding53: \nChristopher D. Supino*  \nManaging Senior Corporate Counsel  \nMichael Kessler*  \nManaging Assistant General Counsel  \nMidcontinent Independent System \nOperator, Inc.  \n720 City Center Drive  \nCarmel, Indiana 46032  \nTelephone: (317) 249-5400  \ncsupino@misoenergy.org  \nmkessler@misoenergy.org  \n \nJames C. Holsclaw*  \nCalfee, Halter & Griswold LLP  \n3900 Salesforce Tower  \n111 Monument Circle  \nIndianapolis, Indiana 46204  \nTelephone: (317) 308-4266  \njholsclaw@calfee.com  \nStephanie Neitzel* \nSenior Counsel \nAmerican Transmission Company  \nW234 N2000 Ridgeview Pkwy. Ct. \nWaukesha, WI 53188-1022 \n(262) 506-6170 \nsneitzel@atcllc.com \n \nLinda Walsh* \nHusch Blackwell LLP  \n1801 Pennsylvania Ave NW Suite 1000  \nWashington, DC 20006 \n(202) 378-2308 \nLinda.Walsh@huschblackwell.com \n*Persons authorized to receive service. \n \n53 To the extent necessary, ATC respectfully request a waiver of Rule 203(b)(3) of the Commission’s Rules of \nPractice and Procedure, 18 C.F.R. § 385.203(b), to permit all of the persons listed to be placed on the official service \nlist for this proceeding."},{"page":20,"startToken":8029,"endToken":8200,"text":"August 17, 2026 \nPage 20 \n \n \nC. \nService \nMISO notes that it has served a copy of this filing electronically, including attachments, \nupon all Tariff Customers under the Tariff, MISO Members, Member representatives of \nTransmission Owners and Non-Transmission Owners, as well as all state commissions within the \nRegion. The filing has been posted electronically on MISO’s website at \nhttps://www.misoenergy.org/legal/ferc-filings/ for other interested parties in this matter.  In \naddition, MISO has served a copy of this filing electronically on all parties to this agreement. \nD. \nDocuments Submitted with This Filing \nIn accordance with the Commission’s regulations, MISO submits this transmittal letter \nand: \n \nTab A – Redline Attachment FF-ATCLLC Tariff Sheets; and,  \n \nTab B – Clean Attachment FF-ATCLLC Tariff Sheets. \n \nIV. \nConclusion \nWHEREFORE, MISO on behalf of ATC, respectfully requests that the Commission \naccept the proposed modifications to Attachment FF-ATCLLC attached hereto for filing with the \neffective date of October 17, 2026. \n \nRespectfully submitted, \n \n/s/ Stephanie Neitzel  \n \n \n \nStephanie Neitzel \nSenior Counsel \nATC Management Inc. corporate manager of \nAmerican Transmission Company LLC"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":600,"startToken":0,"endToken":447},{"p":2,"at":600,"title":"I. Background","method":"printed heading","endPage":2,"endAt":1573,"startToken":447,"endToken":586},{"p":2,"at":1573,"title":"B. ATC’s Planning Functions and Attachment FF-ATCLLC","method":"printed heading","endPage":3,"endAt":1132,"startToken":586,"endToken":1033},{"p":3,"at":1132,"title":"C. ATC’s Distribution – Transmission Interconnection Process","method":"printed heading","endPage":4,"endAt":150,"startToken":1033,"endToken":1380},{"p":4,"at":150,"title":"D. ATC’s Development of Large Load Studies and Requirements","method":"printed heading","endPage":5,"endAt":731,"startToken":1380,"endToken":1970},{"p":5,"at":731,"title":"II. Discussion","method":"printed heading","endPage":6,"endAt":29,"startToken":1970,"endToken":2377},{"p":6,"at":29,"title":"A. Interconnection Process for Large Loads","method":"printed heading","endPage":11,"endAt":1244,"startToken":2377,"endToken":4543},{"p":11,"at":1244,"title":"B. Large Load Definition and Operational Requirements","method":"printed heading","endPage":13,"endAt":2352,"startToken":4543,"endToken":5553},{"p":13,"at":2352,"title":"C. Service Agreement","method":"printed heading","endPage":14,"endAt":1475,"startToken":5553,"endToken":5811},{"p":14,"at":1475,"title":"D. Cost Shifting","method":"printed heading","endPage":18,"endAt":509,"startToken":5811,"endToken":7451},{"p":18,"at":509,"title":"E. Miscellaneous Updates","method":"printed heading","endPage":19,"endAt":30,"startToken":7451,"endToken":7723},{"p":19,"at":30,"title":"III. Information Required Under 18 C.F.R. § 35.13","method":"printed heading","endPage":19,"endAt":82,"startToken":7723,"endToken":7733},{"p":19,"at":82,"title":"A. Proposed Effective Date and Waiver","method":"printed heading","endPage":19,"endAt":931,"startToken":7733,"endToken":7851},{"p":19,"at":931,"title":"B. Correspondence and Service","method":"printed heading","endPage":20,"endAt":30,"startToken":7851,"endToken":8034},{"p":20,"at":30,"title":"C. Service","method":"printed heading","endPage":20,"endAt":581,"startToken":8034,"endToken":8116},{"p":20,"at":581,"title":"D. Documents Submitted with This Filing","method":"printed heading","endPage":20,"endAt":832,"startToken":8116,"endToken":8149},{"p":20,"at":832,"title":"IV. Conclusion","method":"printed heading","endPage":20,"endAt":1227,"startToken":8149,"endToken":8200}]}