{"document":{"slug":"rec-20260819-5091","title":"Comments of Christine Pendzich o/b/o Third Act Maryland re PJM Governance and Stakeholder Reforms","issued":"2026-08-19","accession":"20260819-5091","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260819-5091_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260819-5091","tier":"record","sha256":"e84eb1f9101ac62dfe41b35501ae8220600e7ac4811642ee59efdddbf535d6cd","pages":3,"tokens":1302,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":419,"text":"​\n​\n​\n​\n​\n​\n​\n​\n August 19, 2026 \n \n \nThird Act Maryland Comments \non \nPJM Governance and Stakeholder Reforms  \nDocket No. AD26-7-000 \n \nDear Sir or Madam, \n​\nI am writing on behalf of Third Act Maryland, a grassroots organization of citizens \nage 60 and over, to submit comments in the above referenced docket.  Our organization \nrepresents over 2,000 individuals from across multiple counties in Maryland on issues \nrelated to strengthening of democratic practice, climate change and clean energy \npromotion. \n​\nWe have been dismayed for years at PJM’s failure to bring technically sound, \nfinancially viable clean power (wind, solar, battery storage) projects onto its grid in a \ntimely fashion.  The RTO’s delays in this regard have led to a widely recognized and \njustly criticized reliability crisis, evidenced by its failure to achieve its own reliability \nmargins over two consecutive capacity auctions.  PJM has defended its opposition to \nclean power through specious technical and reliability arguments, which increasingly fail \nto stand up to scrutiny.  Its practices also have led to a scenario of high and rising \nelectricity prices, which exacerbate the country’s inflationary pressures. \nThe core problem is PJM’s governance, which overwhelmingly projects the \ninterests of its oil, gas and coal company members, to the detriment of ratepayers and \nthe general public.  PJM’s governance – who gets to vote, how they vote and the \ntransparency of its votes – must change to more accurately reflect its role as a provider \nof a key public good, whose manner of provision has wide-ranging effects on public \nhealth and welfare.   \nIn that context, we are pleased to submit the following recommendations on \nchanges urgently needed in PJM’s governance structures and process: \n1.​ Reflect affordability and the public interest in PJM’s mission and governing \ndocuments. Decisions made at PJM impact 67 million ratepayers across 13 states \nand the District of Columbia. Yet PJM has no formal commitment to serve the public \ninterest or to consider the affordability of electricity on the same footing as reliability. \nThe PJM Board should have its independence and power expanded – as suggested at \nthe conference – but this should happen only if meaningful steps are taken to commit \nPJM to serve the public, and not just its members.  Specifically, PJM’s mission and \ngoverning documents must be rewritten to explicitly include a public interest mandate \nand concern about affordability. \n2.​ Grant OPSI 205 jump ball filing rights. Currently, PJM member states – much less \nconsumer advocates – do not have a strong enough voice in PJM’s decision-making \nprocess. One way to strengthen the voice of the states and of consumer advocates is"},{"page":2,"startToken":419,"endToken":953,"text":"to grant the Organization of PJM States, Inc. (OPSI) 205 “jump ball” filing rights with \nthe Federal Energy Regulatory Commission (FERC), so that they can advance \nproposals that will be considered on an even footing with those from PJM. This is \nalready the case for other regional transmission organizations (RTOs), and PJM must \nbe brought into alignment with this standard. Additionally, 205 filing rights for OPSI can \nserve as an oversight mechanism for a public interest mandate, as they will give state \nauthorities and public advocates a formal route to intervene. \n3.​ Formalize Board consultation with OPSI. Under the status quo, the PJM Board \ndoes not sufficiently consult OPSI, its member states or consumer advocates prior to \nmaking major filings with FERC. Poor communication increases the likelihood that the \nstates and the PJM Board will be at odds on proposals, especially those that would \nincrease costs substantially for ratepayers. While granting OPSI 205 filing rights \nprovides a backstop, increased consultation between the PJM Board, representatives \nof its member states and consumer advocates – such as getting feedback on draft \nfilings – would foster trust, build credibility, and avoid litigation. \n4.​ Require cost impact information. To evaluate whether PJM is serving the public \ninterest on the basis of affordability, it is necessary for states, advocates, stakeholders, \nand the public to have access to accurate cost impact information. PJM should \nanalyze all proposals for cost impact and make the results widely and publicly \navailable so that interested parties can make informed decisions. Such transparency \nwill also serve to improve PJM’s accountability to the public.  \n5.​ Expanding the Mandate of the Independent Market Monitor. For over 25 years, an \nIndependent Market Monitor has provided indispensable oversight of PJM’s power \nmarkets, performing cost impact analysis and identifying structural problems. No less \nthan the energy and capacity markets, transmission planning at PJM has a significant \nimpact on ratepayer costs. The Market Monitor must expand his report to include an \nanalysis of transmission costs at all levels of the interstate markets and to review all \ncost assignment and cost allocation rules to ensure that the rules are in the public \ninterest. \n6.​ Expand the Nominating Committee to include state representatives. If the PJM \nBoard is to better engage with the states, it would help to have more formalized \ninvolvement of the states in the nominating process for Board directors. Currently, the \nNominating Committee does not consistently include a consumer advocate, and the \nstates do not get to appoint representatives. Along with reserving a permanent seat for \na consumer advocate, the Nominating Committee should also allow for one appointee \nfrom OPSI and another from a governors’/legislators’ organization – as recommended \nby the Governors’ Collaborative. \n7.​ Expand the Board expertise requirements to include state and ratepayer \nexperience. Expertise requirements are an important guardrail to ensure the PJM \nBoard has the collective experience and insight necessary to do its job effectively. \nHowever, the current requirements do not include expertise in state regulatory work, \nconsumer advocacy, or clean energy. To have a Board that is equipped to understand \nhow their decisions impact the affordability of electricity for ratepayers, it is critical to \nrequire that at least one Board member brings direct experience from each of these"},{"page":3,"startToken":953,"endToken":1302,"text":"areas. Moreover, expanding requirements in this way would better equip PJM to \nadhere to a public interest and affordability mandate in its governing documents. \n8.​ Open Board meetings and publish Board votes. Perhaps the most straightforward \nreforms PJM can choose to make would be to open all Board meetings to the public \nand publish the results of individual Board votes. By increasing the transparency of \nBoard proceedings, PJM can concretely demonstrate accountability to its mission – \nwhich should include an explicit public interest and affordability mandate – rather than \nmerely asking PJM members and the public to trust the process. Moreover, with \npublished votes, all interested parties will be equipped to evaluate the performance of \nindividual Board directors. \n9.​ Expand sector-weighted voting to all Standing Committees and Senior Task \nForces. At higher committee levels in PJM the practice of sector-weighted voting \nhelps ensure that no individual sector overwhelms the others. However, this voting \nmethod is not employed in lower-level standing committees and senior task forces, \nwhich leads to outsize influence by supply-side interests and their many affiliate \nmembers. Applying sector-weighted voting at all committee levels would ensure that \nthe voices of end-use customers, including representatives of residential ratepayer \ninterests, are not drowned out. \n10.​Require transparency of individual firm votes across all committee levels. In a \nbody like PJM, whose decisions ultimately impact the affordability of electricity for 67 \nmillion people, there is no justification for keeping the votes of PJM members under \nwraps. Just as votes by the Board should be made public, votes at all committee \nlevels of PJM should be transparent and accessible to oversight. If states are to \nconduct meaningful oversight of the utilities within their jurisdiction, PJM should not \nserve as an obstacle to that function by allowing member votes to remain obscured. In \nthe same spirit of transparency, all PJM meetings should be recorded and made \npublicly available. \nWe very much appreciate the FERC’s initiative on reviewing PJM governance issues and we \nlook forward to seeing the institution of the urgently needed changes described above. \n \nVery respectfully, \nChristine Pendzich \nThird Act Maryland  \nSteering Committee member"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 3","method":"page range","endPage":3,"endAt":2362,"startToken":0,"endToken":1302}]}
