{"document":{"slug":"rec-20260819-5114","title":"Post Technical Conference Comments of the Illinois Commerce Commission re PJM Governance and Stakeholder Reforms","issued":"2026-08-19","accession":"20260819-5114","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Illinois Commerce Commission","kind":"comments","file":"sources/filings/text/20260819-5114_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260819-5114","tier":"record","sha256":"7ab376022ad0c420ddf2be46aacb61584ccf0a3b8fe8013867cdc59d57001a8a","pages":15,"tokens":3933,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":181,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Governance and Stakeholder Reforms  \n) \nDocket No. AD26-7-000 \n \n \nILLINOIS COMMERCE COMMISSION  \nPOST TECHNICAL CONFERENCE COMMENTS \n \n \nPursuant to the Commission’s invitation extended on July 23, 2026, to provide post-\ntechnical conference comments in this docket, and the Notice Requesting Post-Conference \nComment issued July 30, 2026, the Illinois Commerce Commission (“ICC”) does hereby provide \nthese post-technical conference comments for consideration.  The ICC is the public utility \ncommission in the State of Illinois.  Illinois has utilities in both PJM Interconnection, L.L.C. \n(“PJM”) and the Midcontinent Independent System Operator, Inc. (“MISO”).  The ICC \nsubmitted a notice of intervention in this docket on August 5, 2026, so it is an interested party. \nThe ICC appreciates the Commission convening the technical conference on July 23, \n2026 (“Technical Conference”) and provides these comments in support of the needed reforms to \nimprove PJM’s Board of Directors (“PJM Board” or “Board”) independence, more effective PJM \nleadership in the stakeholder process, increased state input into the process, and clear direction \nthat PJM should be working in the public interest."},{"page":2,"startToken":181,"endToken":497,"text":"2      \n \nI. \nCOMMENTS \n \nA. The Commission Should Direct PJM to More Effectively Lead the RTO and its \nStakeholders to Address High Priority Issues in a Timely Manner.  \nIn Order No. 2000, the Commission set forth the minimum functions and characteristics \nfor the formation of regional transmission organizations (“RTOs”).1  Notably, the Commission \ndid not impose any restrictions on state agencies participation and encouraged the states to \nparticipate in the formation of the RTOs.2  The Commission took a flexible approach.  It made \nthe point that “states will play a key role in RTO formation and development”3 but it declined to \n“specify generically a state's role in governance.”4  The Commission said, “State involvement is \nimportant for several reasons, especially where RTOs are a critical element of the retail choice \nprograms of many states.  State commissions are in a unique position to assess whether a \nparticular RTO design will help or hinder their efforts to promote retail competition.”5 \nIn response, states formed a regional state committee (“RSC”), the Organization of PJM \nStates, Inc. (“OPSI”).  The ICC is a member of OPSI and the Organization of MISO States, Inc. \n(“OMS”), the RSC in the MISO region.  OPSI and its member states have actively collaborated \nand participated in the formation and development of the PJM processes.  Recent events, \nhowever, such as the generation fleet transition, tremendous load growth, and public policy \nchanges have transformed the energy landscape such that an increased state role and public \ninterest focus has become crucial. These changes have increased costs while threatening \nreliability. The PJM existing stakeholder process has struggled to meet this moment. Given the \nstakes, it is reasonable to revisit the PJM process to ensure PJM provides economically efficient \n \n1 Regional Transmission Organizations, Order No. 2000, 89 FERC ¶ 61,285 (1999) (“Order No. 2000”). \n2 Order No. 2000 at 230-231. \n3 Id. at 628. \n4 Id. \n5 Id. at 231."},{"page":3,"startToken":497,"endToken":818,"text":"3      \n \nand reliable electric service and elevates public concerns in the PJM stakeholder process.   \n \nThe ICC cares about the viability of PJM and sees the need to improve the PJM \nstakeholder process.  As a restructured state, Illinois relies significantly on our participation in \ncompetitive RTO markets to ensure resource adequacy and reliability for our ratepayers at an \naffordable price. As discussed at the Technical Conference, many key reliability and economic \nissues get lost in the sometimes seemingly obtuse stakeholder process in which related issues are \noften split between various committees, subcommittees, task forces and work groups.   \nTo combat this problem, PJM should develop a clear process of both (1) better \ncollaboration with state entities (detailed further in section B below) and (2) setting an annual \nwork plan, requiring each committee and subcommittee to do the same, including a plan to \nprioritize each work plan action item. If PJM is unwilling to set a clear work plan, set timelines, \nand ultimately follow through, the Commisssion should direct PJM to achieve this.  An example \nof how to efficiently prioritize work plan action items is to determine key priorities then give \neach issue/work plan item a prioritization ranking according to high, medium or low risk.  Each \ncommittee, subcommittee and task force follows through with a focus first on those items \nconsidered highest priority.  Such a system in which PJM has developed a clear work plan and \naction items with a prioritization on high-priority items, should help PJM and stakeholders stay \nfocused.  If a time sensitive issue appears throughout a year, there should be clear plans from \nPJM on how to address time-sensitive issues to reduce reliance on Critical Issue Fast-Paths, \nsomething that has become a normalized process in the PJM stakeholder process over the past \nfew years.      \nFurther, while the ICC agrees that stakeholder discussions can be productive, these \ndiscussions should be led with the purpose of accomplishing goals in a more-timely manner."},{"page":4,"startToken":818,"endToken":1148,"text":"4      \n \nSolutions exist today that can accomplish noticeable change.  Specifically, PJM stakeholder \nmeetings should be streamlined and more rigorously moderated to make them more productive. \nCommittee and subcommittee leadership should consider limiting participants to one or two \nquestions before going back into the queue to allow more voices and diverse opinions to be \nheard, similar to MISO stakeholder processes.  Moreover, PJM should streamline obtuse \ncommittee structures that bifurcate related issues and force stakeholders to guess when and \nwhere their key issues will be discussed.  PJM agendas should be clear and respect time \nschedules to help stakeholders know how best to allocate what may be scarce resources.  A \nfeedback process like MISO has may be a useful tool.  These suggestions could be implemented \nquickly and would require little work on PJM Staff to incorporate. \nB.  The Retail Jurisdictions Need A Larger Voice in the PJM Stakeholder Process \nTo Better Represent Their 67 Million Residents. \nPJM’s current structure and culture largely relegate retail jurisdictions to the sidelines. \nStates and the District of Columbia (“DC”), despite their key role in providing resource \nadequacy, lack a functional way to directly participate in PJM’s governance process.  PJM \ngovernance will be improved by allowing states and DC, all of whom represent ratepayers and \nraise necessary questions about issues like affordability, a greater voice in the stakeholder \nprocess. This enhanced voice for states and DC should come in two specific forms.  \nFirst, while it is not a public utility under the Federal Power Act, OPSI needs an enhanced \nvoice in the PJM section 205 rate filing process under the Federal Power Act.6 At a minimum, \nOPSI should be provided the opportunity for input and to provide alternative proposals when \nPJM makes a section 205 filing at the Commission. OPSI is the primary vehicle for states and the \n \n6 Federal Power Act, Section 205, 16 U.S.C. § 824d (.”. . .  Utilities are required to file schedules of rates, charges, \nand contracts with FERC and make them publicly available, . . “"},{"page":5,"startToken":1148,"endToken":1450,"text":"5      \n \nDC to communicate preferences and concerns to the PJM Board, Staff, and stakeholders. Despite \nthis crucial role, OPSI does not currently have sufficient opportunity for meaningful input to help \nshape PJM’s direction.  \nStates and the DC lack a formal voice at PJM, a significant problem. They are responsible \nfor resource adequacy and are important representatives of their ratepayers’ concerns.  In \naddition, state regulators bring technical expertise and state policy background that would \nenhance PJM filings.  Given states regulators’ important function in the PJM region, it is sensible \nfor the Commission to require PJM to make any necessary tariff changes to allow OPSI the \nopportunity to provide input as well as alternative proposals to the Commission when PJM \nmakes section 205 filings.  Failure to do so directly results in an underdeveloped and incomplete \nstakeholder process.  After all, ratepayers are directly impacted by the cost and reliability issues \nthat flow from such filings, as well as any resource adequacy and transmission cost allocation \ndecisions made in the PJM stakeholder process.  \nGiven this, it is crucial for states and DC to have a greater voice in shaping any PJM \nsection 205 filings, particularly with respect to resource adequacy and transmission cost \nallocation matters.  Specifically, states and DC should be provided alternative proposal “jump \nball” rights that require PJM to file state and DC preferences alongside PJM Board filings. \nGiving PJM states and DC more input into PJM filings would bring PJM in alignment with other \nRTOs. RSCs in the Southwest Power Pool (“SPP”), ISO New England (“ISO-NE”) and the \nMISO regions have some version of this option over certain policy areas.  The ICC supports \nOPSI’s request to have at the very least the same level of valuable input into PJM’s section 205 \nfilings.  This simple change will improve PJM’s proposals by bringing more perspectives,"},{"page":6,"startToken":1450,"endToken":1747,"text":"6      \n \nnotably the currently largely overlooked state and DC voices, more centrally into the PJM \nprocess  \n  Second, ICC also supports a meaningful voice in the process for the Governors’ \nCollaborative.  Importantly, this group should have formal recognition at PJM.  Bringing the \nregion’s executives into the PJM’s stakeholder and governance processes in a more meaningful \nway will elevate important voices in conversations on the most pressing issues the region faces.  \nC. The PJM Board Should Have Greater Independence To Enable the Board to \nMake Necessary, Difficult Decisions. \nThe PJM Board requires greater independence to meet current and future challenges.  For \nPJM to accomplish its duty of providing reliable power at the lowest price possible to consumers, \nit is crucial that PJM – and the PJM Board – have sufficient independence to enact the policies \nthey believe are right at any given moment while balancing its responsibilities to stakeholders \nand its 67 million residents.  RTOs, such as PJM, require careful interaction of numerous \ntechnical aspects to accomplish their mission.  RTOs exist at the intersection of prudent market \ndesign, thoughtful transmission planning, careful legal reasoning, and policy implementation.  \nEach of these areas requires the PJM Board, at times, to make the right decision based on \nfeedback from PJM’s technical staff, not simply to implement the most popular choice of the \nvoting members.  \nPJM’s current governance structure too often impedes the Board’s decision-making \nauthority.  PJM Members’ ability to file tariff changes on their own with a supermajority vote \nand without Board support as well as their power to remove Board members after only three \nyears, means that PJM’s Board is often restricted in its choices.  PJM’s Board needs sufficient \nprotection to ensure non-discriminatory tariffs and important revisions to the PJM operating \nmanuals are implemented.  Stakeholder input and expertise is undeniably central to PJM’s"},{"page":7,"startToken":1747,"endToken":1985,"text":"7      \n \nprocess, particularly to developing nuanced, workable solutions for market and transmission \nproblems. PJM Members, however, are also unavoidably (and reasonably) tied to their own \ninterests and perspectives.  Too often PJM Members’ entrenched preferences have resulted in \nPJM’s stakeholder process breaking down and failing to converge on workable solutions.  PJM \nBoard’s independence can come in many forms, such as longer terms for its members.  The \nCommission should consider ways to expand PJM Board’s independence without wholly \nundermining PJM Board’s responsiveness to its members and other stakeholder concerns.    \nII. \nSURVEY RESPONSE \nIn the July 30, 2026, Notice Requesting Post-Technical Conference Comments, the \nCommission directed commenters to include responses to the survey attached in Appendix A to \nthe Notice.  As described below, many of the individual changes proposed by the ICC must \naccompany others and cannot stand alone.  Changes can make PJM better able to address the \nchallenges that it faces today.  As Chairman Swett said at the Technical Conference, there are \nways to “right the ship.”  What has been made clear in the last few years, PJM ratepayers are \nexperiencing the highest costs from PJM while being the least protected from abuses and scarcity \nprices.  Empowering and incorporating states government, including the public service \ncommissions tasked with balancing protection ratepayers, is critical to ensuring PJM works for \nthe consumers who ultimately pay the bills, not just powerful market sector interests.    \nThe ICC provides the following responses to the survey:"},{"page":8,"startToken":1985,"endToken":2336,"text":"8      \n \nPJM Board Independence \n \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nx \n \n \nComments:  \nPJM’s Board members’ term should be lengthened to five years.  It was made clear at \nthe July 23 Technical Conference that PJM Board and Staff must take a greater \nleadership role in guiding PJM, its planning, its operation, and the markets it oversees.  \n \nMuch of this leadership role is utilizing the tools and authority PJM already has.  There \nare difficult choices to make, and term lengths greater than three years will help ensure \nstability in Board leadership to make tough choices.  Five-year terms, for example, \nwould help ensure Board member positions are not a revolving door and there is \nstability when the Board needs to make important, sometimes unpopular, decisions, \nwhile also ensuring Board Members are responsible to the stakeholders of PJM.  \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nx \n \n \nComments:  \n \nThere should be a maximum number of years any Board member may serve. This is not \ndependent on other changes that Commission or PJM may undertake to improve \ngovernance and PJM’s health.  Reasonable board turnover is good for the longevity of \nany organization.  While there should be a limit on the number of years any Board \nmember may serve, the total should allow for Board members to stay on for a \nreasonable amount of time.  ICC recommends around 10 years (or two five-year terms) \nto strike a reasonable balance between encouraging institutional expertise on the Board \nwhile also ensuring new perspectives.   \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \n \n \n \nComments:  \nWhile the ICC does not believe that residency in PJM is a necessary requirement to \nserve on PJM Board, residency in the PJM territory should not be a barrier to being \nconsidered and selected as a board member. \n \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \n \n \n \nComments:"},{"page":9,"startToken":2336,"endToken":2714,"text":"9      \n \n \nQuestions/Comments \nYes No \nThe ICC does not take a position on this issue at this time.   \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \n \n \n \nComments:  \nThe ICC does not take a position on this issue at this time. Ex parte rules currently do \nnot apply to the ICC, as the ICC is not a PJM Member.  Any reduction in ex parte \ncommunication should also be accompanied by greater transparency.  \nOf note, PJM has a culture of limiting communication and contact directly and \ninformally between Board members and the retail jurisdictions.   \nCommunication must be increased between the Board members and government entities, \nespecially public utility commissions.  Public utility commissions must implement \nmany actions that PJM cannot and are tasked with protecting their jurisdictions and \nresidents’ interest. This requires open and frequent communication between PJM Board \nmembers and the governments.  Frequent and informal conversations with individual \njurisdictions, as well as collectively, will help improve actions taken at PJM and \nultimately improve and speed up processes by addressing problems early on. Board \nmembers should meet with state officials on individual and more frequent basis in both \nformal and informal settings. \n6) \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning?  \nx \n \n \nComments:  \nIn keeping with the public interest goals, Board votes should be held in public, made \npublic, and explained.  This will increase confidence in the Board actions.  PJM Board’s \nsecrecy is undermining faith in the RTO and the actions it is taking.  \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nx \n \n \nComments:   \nBoard meetings should be open to the public with exceptions for information that needs \nto be kept confidential.  This will increase confidence in the Board’s actions. PJM \nBoard’s secrecy is undermining faith in the RTO and the actions it is taking. \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \nx \n \n \nComments:  \nThe governing documents should be revised to explicitly state that the responsibility of \nPJM and the PJM Board is to serve the public interest. This will direct the Board not"},{"page":10,"startToken":2714,"endToken":2990,"text":"10      \n \n \nQuestions/Comments \nYes No \njust to move forward with any proposal that is reasonable but to push for the best one \nfor the residents of PJM and the overall system based on its duty established in Order \nNo. 2000, “to promote efficiency in wholesale electricity markets and to ensure that \nelectricity consumers pay the lowest price possible for reliable service”, as intended by \nthe Commission. This change is critical especially if the Board receives expanded 205 \nfiling rights to ensure that Board independence results in the best outcome for PJM and \nits residents.   \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nx \n \n \nComments:  \nState, including DC, representatives should have no less than three representatives on \nthe PJM Board Nominating Committee.  \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \n \n \nComments:  \nThe ICC does not take a position on this at this time. \n \nSection 205 Filing Rights \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \nx \n \n \nComments:  \n \nThe ICC supports the stakeholder process becoming advisory only if states are given an \nunencumbered pathway to exercising rights to include an alternative to PJM’s section \n205 filings on certain matters and under certain conditions (e.g., supermajority OPSI \nvote).  \n \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee?  \nx \n \n \nComments:  \nYes, but only if states are given an unencumbered pathway to exercising rights to \ninclude an alternative to PJM’s 205 filing  on certain matters and under certain"},{"page":11,"startToken":2990,"endToken":3322,"text":"11      \n \n \nQuestions/Comments \nYes No \nconditions (e.g., supermajority OPSI vote). This means providing PJM with 205 rights \nover all aspects of the Operating Agreement. \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nx \n \n \nComments:   \nYes, but only if states are given an unencumbered pathway to exercise rights to include \nan alternative proposal to PJM’s section 205 filings on certain matters and under \ncertain conditions (e.g., supermajority OPSI vote). This means providing PJM with 205 \nrights over all aspects of the Operating Agreement. \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \nx \n \n \nComments:  \nOPSI should have at least the same jump ball rights within PJM as has been granted to \nother regions’ RSCs.  States assign costs associated with PJM’s resource adequacy \nconstruct and transmission planning process, promote resource adequacy to enable PJM \nto maintain reliability in real time, and site much of the transmission that PJM approves. \nDespite these crucial roles, OPSI does not have an adequate opportunity to help direct \nPJM’s decisions, unlike public utility commissions in other RTOs, such as SPP, MISO \nand ISO-NE.  States’ work is intertwined with PJM’s work, and our residents are \ndirectly impacted by PJM’s decisions. The retail jurisdictions need a stronger voice in \nthe section 205 filing process, including the ability to proffer a state alternative proposal \nunder section 205, or “jump ball” rights, when PJM makes a filing.  This opportunity \nwill improve the dialogue between the retail jurisdictions and PJM even if those rights \nare not utilized. \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \n \n \n \nComments:  \nThe ICC does not take a position on this at this time."},{"page":12,"startToken":3322,"endToken":3527,"text":"12      \n \nStakeholder Process \n \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \n \n \nComments:  \n \nThe ICC does not take a position on this at this time. \n \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \nx \n \n \nComments:  \n \nVoting rules that apply to senior standing committees should apply to lower-level \ncommittees.  This reflects the true structure and nature of the voting members and may \nhelp streamline PJM committee meetings.  The voting should be consistent.  \n \n \nState Participation \n \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \nx \n \n \nComments:  \nThe ICC is supportive of the formal recognition of the Governors’ Collaborative that \ncomplements OPSI’s role at PJM.  \n \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?   \n \nx \n \nComments:  \nThe ICC does not support a formal voting role in the stakeholder process for states and \nDC.  This reflects the position OPSI, including the ICC, consistently has held.  If retail"},{"page":13,"startToken":3527,"endToken":3819,"text":"13      \n \n \nQuestions/Comments \nYes No \njurisdictions had a voting role, then retail jurisdictions would have 14 out of 1,137 votes \nbut represent 67 million residents.  A small number of votes in the stakeholder process \nis an inadequate mechanism for reflecting the voice of the states in the PJM stakeholder \nprocess.  \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \nx \n \n \nComments:  \nPJM should consult with OPSI prior to making such a filing.  However, this should not \nbe limited to a mere consultation.  It must include unencumbered jump ball filing rights \nshould the states so choose.  The ICC does not support binding consultation in lieu of \nOPSI being able to exercise jump ball filing rights by providing alternative proposals \nfor a PJM section 205 filing when the RSC so chooses, however.  Having only a \nconsultation without meaningful input and recognition is not a significant shift from the \nstatus quo, which prevents the regulatory jurisdictions, and the ratepayers that we \nrepresent, a true seat at the table. \nPJM should consult with OPSI and its members on a regular basis.  It is particularly \nimportant for PJM to consult with OPSI and its members before PJM makes a section \n205 filing, however, to provide OPSI and its members with an opportunity to discuss \nand provide an alternative proposal if appropriate. \n \nIII. \nCONCLUSION \nWHEREFORE, for the reasons set forth above, the ICC does hereby submit these post-\ntechnical conference comments for your consideration.  The ICC appreciates your attention to \nthese important issues. \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n/s/ Christine F. Ericson \n \n     \n \n \n \n \n____________________________ \nChristine F. Ericson \n \n \n \n \n \n \nSpecial Assistant Attorney General \n \n \n \n \n \n \nIllinois Commerce Commission \n \n \n \n \n \n \nOffice of General Counsel \n \n \n \n \n \n \n160 N. LaSalle St., Suite C-800 \n \n \n \n \n \n \nChicago, IL 60601"},{"page":14,"startToken":3819,"endToken":3838,"text":"14      \n \n \n \n \n \n \n \n(312) 814-3706 \n \n \n \n \n \n \nChristine.Ericson@Illinois.gov \n \n \n \n \n \n \n \n \n \n \n                                                              \n \n \n \n \n \n \n \nCounsel on behalf of the \nILLINOIS COMMERCE COMMISSION \n \n \n \n \n \n \nDated: August 19, 2026"},{"page":15,"startToken":3838,"endToken":3933,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I caused copies of the foregoing document of the Illinois Commerce \nCommission to be served this day upon each person designated on the official service list compiled \nby the Secretary in this proceeding in accordance with the requirements of Rule 2010 of the \nCommission's Rules of Practice and Procedure. \n \n \n          Dated at Chicago, Illinois, this 19th day of August, 2026. \n \n \n \n \n \n \n \n/s/ Christine F. Ericson \n \n \n \n \n \n \n_____________________________ \n \n \n \n \n \n \nChristine F. Ericson \n \n \n \n \n \n \nSpecial Assistant Attorney General \n \n \n \n \n \n \nIllinois Commerce Commission \n \n \n \n \n \n \nOffice of General Counsel \n \n \n \n \n \n \n \n160 N. LaSalle St. \n \n \n \n \n \n \nSuite 800-C \n \n \n \n \n \n \nChicago, IL 60601 \n \n \n \n \n \n \n(312) 814-3706"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":10,"startToken":0,"endToken":182},{"p":2,"at":10,"title":"I. COMMENTS","method":"printed heading","endPage":2,"endAt":26,"startToken":182,"endToken":184},{"p":2,"at":26,"title":"A. The Commission Should Direct PJM to More Effectively Lead the RTO and its","method":"printed heading","endPage":4,"endAt":900,"startToken":184,"endToken":951},{"p":4,"at":900,"title":"B. The Retail Jurisdictions Need A Larger Voice in the PJM Stakeholder Process","method":"printed heading","endPage":6,"endAt":480,"startToken":951,"endToken":1519},{"p":6,"at":480,"title":"C. The PJM Board Should Have Greater Independence To Enable the Board to","method":"printed heading","endPage":7,"endAt":640,"startToken":1519,"endToken":1834},{"p":7,"at":640,"title":"II. SURVEY RESPONSE","method":"printed heading","endPage":13,"endAt":1449,"startToken":1834,"endToken":3759},{"p":13,"at":1449,"title":"III. CONCLUSION","method":"printed heading","endPage":15,"endAt":0,"startToken":3759,"endToken":3838},{"p":15,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":792,"startToken":3838,"endToken":3933}]}