{"document":{"slug":"rec-20260820-3009","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Midcontinent Independent System Operator, Inc. et al","issued":"2026-08-20","accession":"20260820-3009","docket":"EL26-70-001","group":"MISO show cause proceeding (E-8)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3009_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3009","tier":"record","sha256":"11280f5b80110d388c0324ddd53e293f6f0a2e4281e108b17c3e69251f73dd4d","pages":null,"tokens":331,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":331,"text":"196 FERC ¶ 62,090\n\tUNITED STATES OF AMERICA\n\t\tFEDERAL ENERGY REGULATORY COMMISSION\n\t\nMidcontinent Independent System Operator, Inc.\n\nAEP Indiana Michigan Transmission Company, Inc.\nALLETE, Inc.\nAmeren Illinois Company\nAmeren Transmission Company of Illinois\nAmerican Transmission Company, LLC\nCleco Power LLC\nDuke Energy Indiana, LLC\nEntergy Arkansas, LLC\nEntergy Louisiana, LLC\nEntergy Mississippi, LLC\nEntergy New Orleans, LLC\nEntergy Texas, Inc.\nGridLiance Heartland LLC\nIndianapolis Power & Light Company\nInternational Transmission Company\nITC Midwest LLC\nMichigan Electric Transmission Company, LLC\nMidAmerican Energy Company\nMontana-Dakota Utilities Company\nNorthern Indiana Public Service Company LLC\nNorthern States Power Company, a Minnesota   Corporation\nNorthern States Power Company, a Wisconsin Corporation\nNorthwestern Wisconsin Electric Company\nOtter Tail Power Company\nPioneer Transmission, LLC\nRepublic Transmission, LLC\nSouthern Indiana Gas & Electric Company\nUnion Electric Company\nWolverine Power Supply Cooperative, Inc.\nDocket No.\n EL26-70-001\n\n\n\n\n\n\n\n\n\n\nNOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND PROVIDING FOR FURTHER CONSIDERATION\n\n(August 20, 2026)\n\n\tRehearing has been timely requested of the Commission’s order issued on \nJune 18, 2026, in this proceeding.  Midcontinent Indep. Sys. Operator, Inc., 195 FERC    ¶ 61,212, errata notice, 196 FERC ¶ 61,123 (2026).  In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied.  16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc).\n\nAs provided in 16 U.S.C. § 825l(a), the request for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section.  As also provided in 16 U.S.C. § 825l(a), the Commission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.  \n\n\n\nDebbie-Anne A. Reese,\nSecretary.\n\n\nheader1 (Word template)\nCUICUI\nCUI\nCUI\n\nheader2 (Word template)\nDocket No. EL26-70-001\t\t-2-"}],"sections":[{"p":1,"at":0,"title":"Document text","method":"document text","endPage":1,"endAt":2196,"startToken":0,"endToken":331}]}
