{"document":{"slug":"rec-20260820-3010","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re California Independent System Operator Corporation et al","issued":"2026-08-20","accession":"20260820-3010","docket":"EL26-71-001","group":"CAISO show cause proceeding (E-10)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3010_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3010","tier":"record","sha256":"da357940df959d01fa2d3eb0b418e14c5e4cefd2b2c38573cbdaae8375ec942f","pages":null,"tokens":307,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":307,"text":"196 FERC ¶ 62,091\n\tUNITED STATES OF AMERICA\n\t\tFEDERAL ENERGY REGULATORY COMMISSION\n\t\nCalifornia Independent System Operator Corporation \n\nCitizen S-Line Transmission LLC\nCitizens Sunrise Transmission LLC \nCitizens Sycamore-Penasquitos Transmission LLC \nCity of Anaheim, California\nCity of Azusa, California\nCity of Banning, California\nCity of Colton, California\nCity of Pasadena, California\nCity of Riverside, California\nDCR Transmission, L.L.C. \nDesertLink, LLC \nGridLiance West LLC \nHorizon West Transmission, LLC \nLS Power Grid California, LLC \nMorongo Transmission LLC\nPacific Gas and Electric Company \nSan Diego Gas & Electric Company \nSouthern California Edison Company \nStartrans IO, L.L.C. \nSunZia Transmission, LLC \nTrans Bay Cable LLC \nValley Electric Association, Inc. \nViridon Path 15, LLC \nWestern Area Power Administration\nDocket No.\n EL26-71-001\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nNOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND PROVIDING FOR FURTHER CONSIDERATION\n\n(August 20, 2026)\n\n\tRehearing has been timely requested of the Commission’s order issued on \nJune 18, 2026, in this proceeding.  Cal. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,214 (2026).  In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied.   \n16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC,  \n964 F.3d 1 (D.C. Cir. 2020) (en banc).\n\nAs provided in 16 U.S.C. § 825l(a), the request for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section.  As also provided in 16 U.S.C. § 825l(a), the \nCommission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.  \n\n\n\n\nDebbie-Anne A. Reese,\nSecretary.\n\n\nheader1 (Word template)\nCUICUI\nCUI\nCUI\n\nheader2 (Word template)\nDocket No. EL26-71-001\t\t-2-"}],"sections":[{"p":1,"at":0,"title":"Document text","method":"document text","endPage":1,"endAt":1960,"startToken":0,"endToken":307}]}
