{"document":{"slug":"rec-20260820-3020","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re ISO New England Inc. et al","issued":"2026-08-20","accession":"20260820-3020","docket":"EL26-72-001","group":"ISO-NE show cause proceeding (E-11)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3020","tier":"record","sha256":"cb68979a98c141044374b933da2c52bd98437fdad15909ead714d69a8def15ee","pages":null,"tokens":278,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":278,"text":"196 FERC ¶ 62,093\n\tUNITED STATES OF AMERICA\n\t\tFEDERAL ENERGY REGULATORY COMMISSION\n\t\n\tISO New England Inc.\n\t\n\tCentral Maine Power Company \n\tThe Connecticut Light and Power Company\n\tFitchburg Gas and Electric Light Company\n\tGreen Mountain Power Corporation \n\tMaine Electric Power Company \n\tThe Narragansett Electric Company\n\tNew England Power Company\n\tNew Hampshire Transmission, LLC \n\tNSTAR Electric Company\n\tPublic Service Company of New Hampshire\n\tThe United Illuminating Company \n\tUnitil Energy Systems, Inc. \n\tVermont Electric Power Company, Inc.\n\tVermont Transco LLC \n\tVersant Power \nDocket No.\n EL26-72-001\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nNOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND PROVIDING FOR FURTHER CONSIDERATION\n\n(August 20, 2026)\n\n\tRehearing has been timely requested of the Commission’s order issued on \nJune 18, 2026, in this proceeding.  ISO New Eng. Inc., 195 FERC ¶ 61,215, errata notice, 196 FERC ¶ 61,012 (2026).  In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied.  16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc).\n\nAs provided in 16 U.S.C. § 825l(a), the request for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section.  As also provided in 16 U.S.C. § 825l(a), the \n\n\n\n\n\n\nCommission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.  \n\n\n\nDebbie-Anne A. Reese,\nSecretary.\n\n\nheader1 (Word template)\nCUICUI\nCUI\nCUI\n\nheader2 (Word template)\nDocket No. EL26-72-001\t\t-2-"}],"sections":[{"p":1,"at":0,"title":"Document text","method":"document text","endPage":1,"endAt":1732,"startToken":0,"endToken":278}]}
