{"document":{"slug":"rec-20260820-5015-2","title":"Attachment_A_E3_ELCC_RRS_Model_Evaluation_Dec2025","issued":"2026-08-20","accession":"20260820-5015","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20260820-5015_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5015","tier":"record","parent":"rec-20260820-5015","sha256":"a0e66b7a515744bb73d756fb44ffc7a6d08882efc322f62259ac68e86264de46","pages":91,"tokens":27938,"emptyPages":[],"textThemes":["adequacy","study","registry","flex"]},"pages":[{"page":1,"startToken":0,"endToken":10,"text":"PJM ELCC / RRS Model Evaluation \n \nPrepared for PJM \n \nDecember 2025"},{"page":2,"startToken":10,"endToken":57,"text":"415.391.5100 | 44 Montgomery Street, Suite 1250, San Francisco, CA 94104 | www.ethree.com \n \n \nProject Team \nZach Ming \nRuoshui Li \nHugh Somerset \nMelissa Rodas \nNick Schlag \n \nEnergy and Environmental Economics, Inc. (E3) \n44 Montgomery Street, Suite 1250 \nSan Francisco, CA 94104 \n \n© 2025 Energy & Environmental Economics, Inc."},{"page":3,"startToken":57,"endToken":237,"text":"415.391.5100 | 44 Montgomery Street, Suite 1250, San Francisco, CA 94104 | www.ethree.com \n \nTable of Contents \nExecutive Summary _______________________________________________________________ 2 \nOverview of Loss-of-Load-Probability Modeling and Best Practices ________________ 2 \nEvaluation of PJM ELCC/RRS Model ______________________________________________ 3 \nConsiderations for Improvement ________________________________________________ 4 \nSummary _______________________________________________________________________ 5 \nIntroduction ______________________________________________________________________ 6 \nOverview of Loss-of-Load-Probability Modeling and Best Practices __________________ 8 \nIndustry Best Practices __________________________________________________________ 8 \nUsing LOLP Models in the Capacity Market ______________________________________ 13 \nPJM ELCC/RRS Model Overview _________________________________________________ 15 \nEvaluation of PJM Model Design __________________________________________________ 17 \nRepresentation of Load _________________________________________________________ 17 \nResource Forced Outages ______________________________________________________ 21 \nResource Planned and Maintenance Outages ___________________________________ 24 \nUnlimited Resource Capability and Deliverability ________________________________ 27 \nVariable Resource Availability and Deliverability ________________________________ 29 \nLoad and Resource Scrambling _________________________________________________ 34 \nDispatch of Energy Limited Resources and Demand Response ___________________ 43 \nResource Accreditation ________________________________________________________ 45 \nValidation of PJM Model Performance _____________________________________________ 51 \nCritical Hours Review __________________________________________________________ 51 \nForecast Pool Requirement ____________________________________________________ 53 \nELCC Results _________________________________________________________________ 54 \nModel Validation Tests _________________________________________________________ 58 \nConsiderations for Improvement _________________________________________________ 64 \nSummary of Evaluation of Considerations for Improvement ______________________ 65 \nConsiderations for Model Improvements ________________________________________ 67 \nConsideration 1: Improve identification of critical hours __________________________ 67 \nConsideration 2: Publish critical hours, including load and resource availability data \nduring these hours ____________________________________________________________ 69"},{"page":4,"startToken":237,"endToken":417,"text":"415.391.5100 | 44 Montgomery Street, Suite 1250, San Francisco, CA 94104 | www.ethree.com \n \nConsideration 3: Update the scrambling process to draw resource performance from \nthe same weather conditions used to synthesize load ____________________________ 70 \nConsideration 4: Use more temporal granularity to model capability and deliverability of \nunlimited resources ___________________________________________________________ 71 \nConsideration 5: Schedule planned maintenance based on net load _______________ 73 \nConsideration 6: De-weight historical resource performance events as new resource \nperformance events under similar weather conditions occur ______________________ 74 \nConsideration 7: Increase the number of load rotations to balance days-of-week ___ 76 \nConsideration 8: Calculate solved load by adding or subtracting “flat” load instead of \nscaling load ___________________________________________________________________ 78 \nConsideration 9: Stochastically model hydro resources and extend hydro record ___ 78 \nConsideration 10: Stochastically model forced outages for storage resources ______ 79 \nConsideration 11: Evaluate improved mapping of deliverability constraints to system \nconditions ____________________________________________________________________ 81 \nConsideration 12: Represent “Capacity Benefit of Ties” on a more time-granular basis\n ______________________________________________________________________________ 82 \nConsideration 13: Study updates to resource performance sampling methodology to \ncapture multi-day events ______________________________________________________ 83 \nConsideration 14: More optimally dispatch energy storage, demand response, and \nhydro_________________________________________________________________________ 85 \nConclusion ______________________________________________________________________ 88"},{"page":5,"startToken":417,"endToken":786,"text":"PJM ELCC / RRS Model Evaluation  \n \n 2 \nExecutive Summary \nE3 was retained by PJM to independently assess PJM’s Effective Load Carrying Capability / \nReserve Requirement Study Model (ELCC/RRS Model) for alignment with industry best \npractices in loss-of-load-probability (LOLP) modeling. The outputs of the ELCC/RRS model \nare used directly in PJM’s capacity market (i.e., Reliability Pricing Model), determining both \nthe system-wide capacity requirement (i.e., Reserve Requirement) and the capacity \naccreditation of individual resources (i.e., Effective Load Carrying Capability). \nE3 is an independent consulting firm with extensive experience developing LOLP models \nand conducting LOLP studies across the North American continent.1 To conduct this review, \nE3 developed a list of industry best practices for LOLP modeling and evaluated PJM’s \nELCC/RRS model against these best practices. Additionally, E3 provided a list of potential \nimprovements for PJM to consider for the ELCC/RRS model.  \nOverview of Loss-of-Load-Probability Modeling and Best Practices \nEnsuring resource adequacy requires accurate analysis to evaluate whether sufficient \ngenerating resources will be available when needed to meet demand. Among electricity \nsystem planners, there is a broad and growing consensus that chronological probabilistic \nmethods are essential to accurately capturing the full suite of potential resource adequacy \nrisks that electricity systems face. The consensus behind the importance of probabilistic \nmethods is underscored by their increasingly prevalent use within the industry, from RTOs \n& ISOs charged with managing resource adequacy to utilities that manage their own \nportfolios. \nThe call for a probabilistic approach to resource adequacy implicates the need for a type of \nanalysis known as “Loss-of-Load-Probability” (LOLP) modeling. LOLP models employ a \nvariety of statistical and simulation techniques to compare forecast electricity demand with \navailable generation resources under a broad range of conditions that account for variability \nof weather, loads, renewable generation, forced outages, and a number of other constraints \nand stressors that could impact the ability of a portfolio of generators to meet load.2 Best \npractices for LOLP modeling include: \n1. Capture a diverse range of load conditions that account for potential extreme \nweather \n2. Simulate generator outages stochastically and include correlated outages if \nhistorical data suggests this as a possible risk \n \n \n1 https://www.ethree.com/tools/recap-renewable-energy-capacity-planning-model/  \n2 https://msites.epri.com/resource-adequacy/tools/tool-capability-guidelines"},{"page":6,"startToken":786,"endToken":1150,"text":"Executive Summary  \nPJM ELCC / RRS Model Evaluation  \n3 \n3. Incorporate realistic profiles for renewable generation that capture correlation \nwith load \n4. Simulate dispatch of energy-limited resources on a time-sequential basis \n5. Reflect actual expected system operations \n6. Ensure statistical significance of results \n7. Balance model accuracy with tractability \n8. Promote transparency \nEvaluation of PJM ELCC/RRS Model \nE3 evaluated PJM’s model and concluded that it is methodologically sound and consistent \nwith industry best practices. In particular, PJM’s transparency of methods, inputs, and \noutputs sets a standard for other markets and LOLP models. At the same time, E3’s review \nfound a few areas where the model could be improved. A summary of E3’s assessment of \nkey model features is provided below, where “pros” reflect how the current model is \nconsistent with industry best practices for modeling resource adequacy risk, and “cons” \nreflect potential areas of improvement. The “pros” and “cons” in the table below are not \nnecessarily equal in importance or significance but rather are presented to provide a \ncomprehensive assessment of all aspects of PJM’s model. \n \nModel Aspect \nE3 Evaluation \nLoad Modeling \nPros: Use of 31 weather years with 13 load rotations ensures the model \ncaptures a wide range of load conditions and corresponding reliability \nrisks. Cons: Uneven day-of-week representation. \nForced Outages \nPros: Thermal and renewable outages are modeled stochastically using \nactual historical data, capturing correlated outage events such as Polar \nVortex and Winter Storm Elliot. Cons: Battery outages are represented \nusing static de-rates that do not vary by hour. \nPlanned \nMaintenance \nPros: Reasonably mimics actual system operations by intelligently \nscheduling maintenance during low-risk periods, while also capturing a \nminimum amount of “forced-in” maintenance during high-risk weeks that \naligns with historical observation. Cons: Scheduling maintenance based \non gross load does not account for variation in availability of renewables, \nalthough it is also important to accurately mimic system operations. \nThermal Resource \nCapability \nPros: Model incorporates ambient derates for thermal resources when \ntemperatures rise. Model incorporates transmission network constraints \nthrough deliverability limitations. Cons: Generator capability is limited to \ncapacity output in ambient summer peak conditions. \nVariable Resource \nRepresentation \nPros: Twelve years of historical generation data captures wide range of \npotential availability conditions. Time-matched individual profiles to"},{"page":7,"startToken":1150,"endToken":1466,"text":"Executive Summary  \nPJM ELCC / RRS Model Evaluation  \n4 \ndevelop resource-class profiles appropriately represent geographic \ndiversity and correlations between variable resources. Cons: \nMethodology to assign deliverability constraints to hours in PJM Model \ndoes not dynamically reflect transmission system conditions, although \nmore complexity reduces tractability. \nLoad and Resource \nScrambling \nPros: Introduces new plausible conditions while preserving correlation \nbetween load and resource performance by linking through temperature. \nJoint sampling of all resource classes preserves correlation between \nresource classes. Bin sizes ensure sufficient performance observations in \neach bin. Sufficient sampling ensures statistical significance. Cons: \nWeather for resource performance bins is not fully aligned with weather \nfor load in “load rotations,” which fails to preserve load and resource \ncorrelations. Does not capture multi-day resource performance events, \nalthough the near-term impact of this is likely to be limited. Assigning \nequal likelihood of recent and far-in-the-past resource performance may \nnot reflect the system “as is” if resources have undertaken \nenhancements. \nDispatch of \nEnergy-Limited \nResources \nPros: Hourly time-sequential dispatch of energy limited resources and \ndemand response enable realistic dispatch. Cons: Use of heuristic \ndispatch is not fully optimal, although it is very complex to implement \noptimization. \nResource \nAccreditation \n(ELCC) \nPros: Accreditation founded on marginal ELCC accurately and fairly \naccredits resource classes. Individual performance adjustment approach \nyields sufficiently accurate values. \n \nConsiderations for Improvement \nE3’s review also identified several aspects of the model where PJM may consider making \nfuture improvements. Each consideration for improvement has pros and cons along the \nfollowing criteria: accuracy, objectivity, stability, transparency, tractability, impact, and \nease of implementation. A summary of E3’s considerations for improvement is provided \nhere, with the body of the report outlining how each consideration scores along the \nevaluation criteria.  \n1. Improve identification of critical hours  \n2. Publish critical-hour data to increase transparency \n3. Draw load and resource profiles from the same weather conditions \n4. Adopt seasonal/daily capability ratings for unlimited resources to improve \nrepresentation of temperature-dependent performance"},{"page":8,"startToken":1466,"endToken":1675,"text":"Executive Summary  \nPJM ELCC / RRS Model Evaluation  \n5 \n5. Schedule maintenance using net load instead of gross load \n6. Gradually de-weight outdated performance data as new events occur to more \nquickly capture changes in resource performance over time and maintain incentives \nfor resource improvement \n7. Increase weather rotations to balance day-of-week representation \n8. Calibrate solved load by adding “flat” load instead of scaling load \n9. Extend and stochastically model hydro generation records to capture wider \nhydrologic variability \n10. Stochastically model storage outages to capture correlated failures  \n11. Refine deliverability mapping to link transmission constraints to system conditions \nrather than fixed calendar periods \n12. Represent capacity benefit of ties (CBOT) dynamically by time and season \n13. Capture multi-day persistence in resource performance to reflect extended low-\noutput periods \n14. Optimize dispatch algorithms for energy-limited resources, balancing realism and \ncomputational tractability \nSummary \nE3 concludes that PJM’s ELCC/RRS model is fit for purpose, sophisticated, and aligned with \nindustry best practices. It supports the efficient implementation of PJM’s capacity market \nthrough accurate determination of both the Reserve Requirement and Effective Load \nCarrying Capability values. However, as with any existing LOLP model, there are \nopportunities for PJM to consider making improvements to ensure the model remains \nindustry-leading and adaptable to future system dynamics."},{"page":9,"startToken":1675,"endToken":2104,"text":"Introduction  \nPJM ELCC / RRS Model Evaluation  \n6 \nIntroduction \nThe PJM regional transmission organization is responsible for maintaining resource \nadequacy within the PJM footprint through the administration of a capacity market (the \n“Reliability Pricing Model”). 3 This market is designed to allow loads and generators to \ntransact “capacity” through a centrally cleared auction such that, under equilibrium \nconditions, the quantity of capacity transacted is sufficient to meet resource adequacy \nneeds. 4 The price at which the market settles provides an economic signal to support \ninvestment in and retention of the resources needed to supply that capacity. \nTwo core functions of properly implementing the capacity market are to appropriately \ncalculate 1) the total capacity requirements of the system and 2) the individual capacity \naccreditation values assigned to each resource. These determinations are essential to \nensuring that the system achieves the “one day in ten year” target reliability standard and \nthat resources are fairly compensated for the services they provide to the grid.  \nPJM performs these calculations with the “Effective Load Carrying Capability / Reserve \nRequirement Study Model” (also referred to as the “PJM ELCC/RRS Model” or “PJM \nModel”). This model falls within a class of models referred to as “loss-of-load-probability” \nmodels (“LOLP models”), which are industry standard to perform capacity market \ncalculations. The PJM model is used to perform two related functions: 1) a “Reserve \nRequirement” calculation to determine the total capacity requirement for the system and 2) \n“Effective Load Carrying Capability” calculations to accredit the capacity value of individual \nresources.  \nAt the direction of the PJM Board,5 PJM retained E3 to perform a comprehensive review of the \nPJM ELCC/RRS Model for alignment with industry best practices and to identify potential \nareas for improvement. \nE3’s evaluation of the PJM ELCC/RRS Model is based on significant experience with loss-of-\nload-probability modeling. E3 has developed and maintains the RECAP LOLP model, which \nit has used to conduct reserve requirement and ELCC analyses for utilities across North \nAmerica and to analyze evolving resource adequacy challenges facing the industry on behalf \nof a wide range of clients. Additionally, E3 has worked extensively with electric system \noperators – including PJM, NYISO, MISO, and ERCOT – on other LOLP models. Finally, E3’s \nreview leverages publicly available materials on LOLP modeling from both industry and \nacademic sources. \nAn overview of this report is provided below: \n \n \n \n3 https://learn.pjm.com/three-priorities/buying-and-selling-energy/capacity-markets.aspx  \n4 The technical specification of this resource adequacy need is a loss-of-load-expectation (LOLE) standard of 0.1 days/year  \n5 https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2025/20250804-board-\ncorrespondence-re-irm-and-fpr.pdf"},{"page":10,"startToken":2104,"endToken":2249,"text":"Introduction  \nPJM ELCC / RRS Model Evaluation  \n7 \n Section 2: Overview of Loss-of-Load-Probability Modeling and Best Practices \n• This section provides an overview of the importance and role of loss-of-load-\nprobability modeling. It provides an overview of modeling best practices and \nhow LOLP models are used to calculate values such as the total capacity \nrequirement and individual capacity accreditation values. \n Section 3: Evaluation of PJM Model Design \n• This section provides E3’s evaluation of the PJM ELCC/RRS model for \nalignment with industry best practices. \n Section 4: Validation of PJM Model Performance \n• This section tests inputs, methods, and outputs of the PJM ELCC/RRS to \nensure that the model is working as intended. \n Section 5: Considerations for Improvement \n• This section provides a list of considerations for model improvement. E3 \nevaluates each consideration for improvement against the criteria of \naccuracy, objectivity, stability, transparency, tractability, impact, and ease of \nimplementation."},{"page":11,"startToken":2249,"endToken":2642,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n8 \nOverview of Loss-of-Load-Probability Modeling and \nBest Practices \nIndustry Best Practices \nEnsuring resource adequacy requires accurately understanding whether sufficient \ngenerating resources will be available when needed to meet demand. Among electricity \nsystem planners, there is a broad and growing consensus that chronological probabilistic \nmethods are essential to accurately capturing the full suite of potential resource adequacy \nrisks that electricity systems face. The importance of a probabilistic approach has been \nemphasized by a number of notable groups, including:  \n NERC, which has published technical reports on best practices in modeling \napproaches and data collection and has hosted a biannual Probabilistic Analysis \nForum; \n The Western Electricity Coordinating Council (WECC), which recommends that \n“[p]lanning entities and their regulatory authorities should consider moving away \nfrom a fixed planning reserve margin to a probabilistically determined margin”6; \n The IEEE Resource Adequacy Working Group, wherein industry experts meet \nannually to share learnings and findings related to probabilistic analysis of resource \nadequacy; and \n The Energy Systems Integrations Group (ESIG), whose whitepaper Redefining \nResource Adequacy for Modern Power Systems introduced six philosophically \ngrounded principles for resource adequacy analysis that emphasize the importance \nof probabilistic methods. Among its six guiding principles for resource adequacy, \nESIG’s Redefining Resource Adequacy Task Force includes a direct endorsement \nthat “[c]hronological operations must be modeled across many weather years” \nelaborating: \n“Modeling sequential grid operations is critical to capture the whole picture: the variability of wind and \nsolar resources along with the energy limitations of storage and load flexibility. Chronological \nstochastic analysis is thus increasingly important, simulating a full hour-to-hour dispatch of the \nsystem’s resources for an entire year of operation across many different weather patterns, load \nprofiles, and random outage draws.”7 \nThe consensus belief in the importance of probabilistic methods is further underscored by \nthe increasingly prevalent use within the industry, from RTOs & ISOs charged with managing \nresource adequacy in the context of organized markets to utilities that manage their own \nportfolios to ensure reliability for their customers. The table below provides an overview of \n \n6  WECC. The Western Assessment of Resource Adequacy Report. Dec. 2020. https://www.wecc.org/Administrative/ \nWestern%20Assessment%20of%20Resource%20Adequacy%20Report%2020201218.pdf \n7  Energy Systems Integration Group (ESIG). Redefining Resource Adequacy for Modern Power Systems. 2021. \nhttps://www.esig.energy/wp-content/uploads/2021/08/ESIG-Redefining-Resource-Adequacy-2021.pdf"},{"page":12,"startToken":2642,"endToken":2962,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n9 \nprobabilistic models used across the industry for resource adequacy calculations. This \ntable demonstrates the prevalence of probabilistic models for these purposes. \nTable 1. Probabilistic models used for resource adequacy8 \n  \nUtility/Jurisdiction  \nSoftware Provider  \nSoftware  \nCanadian \nUtilities  \nNova Scotia Power, Inc.  \nEnergy Exemplar  \nPLEXOS  \nNewfoundland Hydro  \nEnergy Exemplar  \nPLEXOS  \nSouthwest \nUtilities  \nArizona Public Service Co  \nPowerGEM  \nSERVM  \nEl Paso Electric Co  \nE3  \nRECAP  \nPublic Service Co of New Mexico \nPowerGEM \nSERVM \nSalt River Project \nPowerGEM \nSERVM \nTucson Electric Power  \nE3  \nRECAP  \nOther Western \nUtilities  \nAvista Corporation  \nAvista Corporation  \nAVAM (Excel-based)  \nBlack Hills Energy - Colorado  \nE3  \nRECAP  \nNV Energy  \nE3  \nRECAP  \nPortland General Electric  \nPortland General Electric  \nSequoia  \nPublic Service Co of Colorado  \nE3  \nRECAP  \nPuget Sound Energy  \nE3  \nRECAP  \nEastern Utilities  \nDominion Energy South Carolina  \nPowerGEM  \nSERVM  \nDuke Energy Carolinas  \nPowerGEM  \nSERVM  \nFlorida Power and Light   \nE3  \nRECAP  \nRTOs  \nISO New England  \nGeneral Electric  \nGE-MARS  \nNew York ISO  \nGeneral Electric  \nGE-MARS  \nMidcontinent ISO  \nPowerGEM  \nSERVM  \nERCOT \nPowerGEM \nSERVM \nPJM  \nPJM  \nELCC/RRS Model \n \nThe call for a probabilistic approach to resource adequacy implicates the need for a type of \nanalysis known as “Loss-of-Load-Probability” (LOLP) modeling. LOLP models employ a \nvariety of statistical and simulation techniques to compare forecast electricity demand with \navailable generation resources under a very broad range of conditions that account for \nvariability of weather, loads, renewable generation, forced outages, and other constraints \nand stressors that could impact the ability of a portfolio of generators to meet load.9 \nModern LOLP models typically simulate the performance of the electricity system on an \nhourly basis over the course of the entire year. Within an LOLP analysis, these annual \nsimulations are repeated hundreds or thousands of times – each iteration stochastically \n \n8  Summary based on E3’s work from: https://www.ethree.com/wp-content/uploads/2025/11/E3_New-Brunswick-\nPower_Resource-Adequacy-Framework.pdf  \n9 https://msites.epri.com/resource-adequacy/tools/tool-capability-guidelines"},{"page":13,"startToken":2962,"endToken":3413,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n10\ncapturing a different combination of weather conditions and outages – to provide a robust \nassessment of the probability of tail events that drive resource adequacy challenges. \nThe simulation of electricity supply and demand across a broad range of conditions allows \nLOLP models to calculate a variety of statistical measures of resource adequacy. These \nmetrics quantify the expected frequency, size, and duration of loss of load events. Table 2 \nlists the typical metrics produced by LOLP models; among these, the most commonly used \nis Loss of Load Expectation (LOLE), defined by NERC as “the expected number of days per \ntime period (usually a year) for which the available generation capacity is insufficient to \nserve the demand at least once per day.” 10 However, best practices also increasingly \nrecognize that calculating multiple metrics provides additional insight into system \nreliability. Several common reliability metrics produced by LOLP models is provided in the \ntable below. \nTable 2. Typical metrics produced by LOLP models \nMetric \nType (Units) \nDefinition \nLoss of Load Expectation \n(LOLE) \nFrequency \n(days per year) \nAverage number of days per year in which unserved \nenergy occurs due to system demand exceeding \navailable generating capacity \nLoss of Load Events \n(LOLEV) \nFrequency \n(events per year) \nAverage number of loss of load events per year, of \nany duration or magnitude, due to system demand \nexceeding available generating capacity \nExpected Unserved Energy \n(EUE) \nMagnitude \n(MWh per year) \nAverage total quantity of unserved energy (MWh) \nover a year due to system demand exceeding \navailable generating capacity \nNormalized EUE \n(nEUE) \nMagnitude \n(parts per million) \nExpected unserved energy normalized by total \nexpected annual demand \nLoss of Load Hours \n(LOLH) \nDuration \n(hours per year) \nAverage number of hours per year with loss of load \ndue to system demand exceeding available \ngenerating capacity  \nLOLP modeling has advanced significantly from its origins in the mid-1900s, and today \nresource adequacy program administrators (such as PJM) use both commercial and in-\nhouse software solutions to perform this analysis. Most LOLP models in use in the industry \ntoday use a Monte Carlo approach to simulate load and resource availability on an hourly, \nchronological basis to capture the inherent complexities of today’s systems. While each \nmodel has unique qualities and idiosyncrasies, it is nonetheless useful to define a minimum \nstandard of best practices for functionality needed to address the complex issues \ndiscussed above. In 2024, the Electric Power Research Institute (“EPRI”) conducted a \ncomprehensive review of LOLP models in use across the industry to “understand where the \n \n10\n NERC. \nProbabilistic \nAdequacy \nand \nMeasures: \nTechnical \nReference \nReport.https://www.nerc.com/comm/PC/Probabilistic%20Assessment%20Working%20Group%20PAWG%20%20Rel\nat/Probabilistic%20Adequacy%20and%20Measures%20Report.pdf"},{"page":14,"startToken":3413,"endToken":3849,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n11\nindustry stands as a whole” on the capabilities of these models.11 This report, coupled with \nE3’s judgement and experience, elucidates several best practices for LOLP modeling, \nincluding: \n1. Capture a diverse range of load conditions that account for potential extreme \nweather. Electricity demand should reflect the expected range of possible weather \nvariability across many years (including mild, average, and extreme). \n2. Simulate generator outages stochastically. Generator outages should be modeled \nstochastically for all resources. If historical data suggests a possible risk of \ncorrelated outages among generators, this information should be included in \nsimulation of outages. \n3. Incorporate realistic profiles for renewable generation that capture correlation \nwith load. Production patterns for variable resources (e.g. solar and wind) should \nincorporate multiple years of meteorological data and reflect underlying correlations \nwith electricity demand. \n4. Simulate dispatch of energy-limited resources on a time-sequential basis. A \nchronological approach to simulation of loads and resources should be used to \nincorporate constraints of energy-limited resources (e.g. energy storage, demand \nresponse, and hydro). \n5. Reflect actual expected system operations. The model should use resources \nconsistently with how system operators would be expected to use resources during \ntimes of system stress. The model should avoid perfect foresight that does not exist \nin practice and should mimic actual operator protocols during loss-of-load events. \n6. Ensure statistical significance of results. The model should run sufficient \nreplications in order to ensure statistical significance of LOLE or other reliability \nresults. Because loss-of-load events only occur once every ten years on average, the \nmodel should simulate the system across hundreds or thousands of years of \npotential conditions to ensure statistical significance. \n7. Balance accuracy with tractability. Simulating an electricity system across \nhundreds or thousands of years of potential conditions requires large computing \nhorsepower. In order to ensure this process is tractable, the model may need to make \nsimplifications in how accurately it models certain characteristics of the electricity \nsystem. \n8. Promote transparency. The model should make inputs, methods, and outputs \navailable and transparent for stakeholders to improve understanding and facilitate \nacceptance of model results. \nLike most technical analyses, curating a robust, quality-controlled set of inputs, \nassumptions, and methods is critical to meaningful analysis of resource adequacy; at the \nsame time, because LOLP models seek to capture exceptionally rare events in a \nprobabilistic manner, developing datasets and methods that appropriately represent the \nmagnitude and frequency of rarely observed “tail” events (and correlations among them) is \na marked challenge. In Reliability Evaluation of Power Systems, author Roy Billinton \n \n11 https://www.epri.com/research/products/000000003002027832"},{"page":15,"startToken":3849,"endToken":4334,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n12\nrecognizes this challenge: “Meaningful reliability data are not always easy to obtain, and \nthere is often a marked degree of uncertainty associated with the required input.” \nThe challenges in gathering data and the corresponding uncertainties have compounded \nsince this observation was written several decades ago. Practitioners of LOLP modeling \nmust be cogently aware of the inherent limitations in their datasets and the implications \nthey may have upon their evaluations. Among the most significant data challenges facing \nplanners today: \n Distributions of extreme weather events: forecasting future climatic conditions is \nincreasingly challenging. While planners have long relied on extended samples of \nhistorical weather data to inform probability distributions of tail weather events; the \nassumption that historical conditions provide an accurate representation is an \nongoing area of research within the field. Therefore, planners must be cautious to \nconsider a broad plausible range of conditions that may extend beyond historical \ndistributions. \n Renewable production data: the adequacy of a system will depend, in part, on how \nrenewables perform during rare extreme load events. For many renewable facilities, \nlittle to no historical data is available that can be used directly for this purpose if the \nresources are new or in development. For this reason, the use of simulated \nrenewable profiles, which rely on historical meteorological data as inputs into \nsimulations of wind and solar plant performance, is common practice. However, \nmodelers must understand that this introduces a risk of simulated profiles deviating \nfrom actual performance due to simulation error and a variety of real-world factors \nthat may not be captured in the simulation. \n Performance assumptions for emerging technologies: generation technologies \nare quickly advancing, and electricity systems are presented with new resource \noptions to meet their needs that would not have been available a decade ago. This \ntrend is likely to continue, as research, development, and deployment will continue \nto bring new technologies into the market. While these advances offer long-term \npromise, planners should also take caution in assumptions made regarding the \nperformance of new resources with limited operational history at commercial scale. \nEspecially during early years of commercialization, new technologies may not \nperform as expected. \n Correlations among unit outages: the assumption that forced outages of \ngenerators can be modeled as independent, uncorrelated events is a historically \ntraditional practice in LOLP modeling; to the extent that underlying factors like \nweather patterns and fuel supply issues may affect outages at multiple plants \nsimultaneously, it is important to capture this correlated risk. How to use the limited \navailability of robust data sets that inform this factor is an emerging area of research \nwithin the field. \n Representation of unit improvements: some types of generators are capable of \nmaking enhancements or improvements over time such as improved weatherization \nor improved access to fuel. These changes mean that the historical performance of \nthese units may not accurately reflect their expected future performance. At the"},{"page":16,"startToken":4334,"endToken":4653,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n13\nsame time, assuming improved performance in certain extreme conditions that are \nrare by definition can introduce subjectivity into the model. Balancing these tradeoffs \nrequires sound modeling judgment. \n Model tractability: because LOLP models must simulate the system over hundreds \nor thousands of years to ensure statistical significance of rare events, they must \nmaintain tractability, often by making key simplifications in areas such as generator \ndispatch and geographic granularity relative to a more detailed “production cost \nmodel” used in other areas of electricity system modeling. Determining where to add \ndetail and granularity in the model requires sound judgment on the impacts of each \ndecision. \n \nUsing LOLP Models in the Capacity Market \nThe first step in administering a capacity market is determining a total capacity requirement. \nPJM calculates a capacity requirement that will achieve a 1-day-in-10-year loss of load \nexpectation reliability standard (e.g. 0.1 days/year LOLE), the most common resource \nadequacy standard used across North America. This process is illustrated in the figure \nbelow. \nFigure 1: Illustration of Capacity Requirement Calculation \n \nThe result of this calculation is a total capacity requirement (expressed in megawatts) that \nrepresents the needs of the system during the times of highest loss-of-load risk. Historically, \nthese periods of loss-of-load risk have occurred during peak load hours, but increasingly \nthey occur outside of peak load hours when resource availability of renewables, thermal, or \nstorage is low. To the extent that the hours that drive system capacity needs are outside of \ngross peak load hours, the total capacity requirement may be lower than the peak electricity \ndemand. This very phenomenon has been observed in PJM’s most recent analysis: PJM’s \nrecommended capacity requirement (what they term the “Forecast Pool Requirement” or \n    e   apa     \n    \n o   of  oad   pe  a  o         \n         \n  der       \npor fo  o\n                 \n           \n ppropr a e          \n ea    o   por fo  o\n                     \n        \n  er       por fo  o"},{"page":17,"startToken":4653,"endToken":4979,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n14\nFPR) for the 2027/2028 Delivery Year is 0.9260.12 This means that the total procured quantity \nof effective capacity is equal to 92.6% of the 50/50 system peak load. \nCalculating the capacity accreditation value of resources using LOLP models is becoming \nincreasingly common among utilities and RTOs throughout North America.13 Specifically, \nthe marginal effective load carrying capability (“marginal ELCC”) metric is an application of \nLOLP modeling that represents the quantity of “perfect” capacity that could be replaced or \navoided by a resource while providing equivalent system reliability. Another (mathematically \nidentical) conceptualization of marginal ELCC is availability of a resource during “critical \nhours,” defined as hours where additional energy will improve system reliability. For \nexample, if a 100 MW resource has an ELCC of 50 MW, that means that 100 MW of this \nresource could displace the need for 50 MW of perfect capacity with no impact on system \nreliability. ELCC values are often expressed in percentage terms by dividing by the \nnameplate capacity; in this example, the ELCC of the resource would be 50%. Because \nELCCs rely on the identification of critical hours that impact reliability, LOLP modeling is \ninherently necessary. \nThe figure below illustrates how LOLP models calculate both the capacity requirement and \nELCC values. Specifically, LOLP models identify which hours are “critical” to system \nreliability. The total capacity requirement is equal to the average system need (load + \nrequired operating reserves) during those hours. Capacity accreditation (i.e., marginal \nELCC) is equal to average resource availability during those hours.  \nFigure 2: Stylized Illustration of Capacity Requirement and Capacity Accreditation \nCalculations in LOLP Modeling \n \n \n12  https://www.pjm.com/-/media/DotCom/committees-groups/committees/mrc/2025/20250723/20250723-item-04---1-\n2027-2028-bra-fpr-and-irm---presentation.pdf  \n13\n For \nexample, \nsee \nslide \n12 \nof \n“ELCC \nConcepts \nand \nConsiderations \nfor \nImplementation” \nhttps://www.nyiso.com/documents/20142/24172725/NYISO%20ELCC_210820_August%2030%20Presentation.pdf"},{"page":18,"startToken":4979,"endToken":5445,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n15\nOne strength of an ELCC-based approach lies in the use of a common benchmark (“perfect \ncapacity”) against which the impacts of all resources can be measured. In “Redefining \nResource Adequacy for Modern Power Systems,” the authors espouse the principle that \n“there is no such thing as perfect capacity,” elaborating: “Future resource adequacy \nanalysis should explicitly recognize that all resources have limitations based on weather-\ndependence, potential for outages, flexibility constraints, and common points of failure.”14 \nBy measuring each resource’s impact on system reliability relative to this common \nbenchmark, an ELCC-based approach is well-suited to achieve an aspirational level of \ntechnological agnosticism, placing all resources on a level playing field that accounts for \nthe various constraints and limits on their availability. \nPJM ELCC/RRS Model Overview \nThe PJM Effective Load Carrying Capability / Reserve Requirement Study Model (the “PJM \nELCC/RRS Model” or “PJM Model”) is the LOLP model that PJM has developed and maintains \nfor the express purpose of use in the capacity market. PJM uses this model to determine the \ntotal capacity requirement (i.e. the “Reserve Requirement”) that is necessary to achieve the \nreliability target as well as the capacity accreditation (i.e. “Effective Load Carrying \nCapability” values for resources) assigned to each resource for use in the capacity market.  \nPJM has provided documentation on the model methodology and functionality that this \nreport does not reproduce.15 The 70+ pages of documentation that PJM has released on the \nELCC/RRS model exceed any publicly available documentation that E3 is aware of for any \nother LOLP model. Several features that are distinctive or notable about PJM’s approach as \nof November 2025 include: \n 31 historical weather years, 13 load rotations, and 100 resource availability draws for \na total of 40,300 simulated years \n Resource availability draws are taken from 12 years of historical data (2012 – 2024) \n The model draws resource availability for all resource classes (e.g., solar, wind, \nthermal) from the same historical day to preserve correlation between resource \nclasses \n The model “scrambles” resource availability and loads through a temperature-based \nbinning approach. Each day is assigned to a specific “bin” based on a PJM-calculated \ntemperature-humidity index (“THI”). The THI metric represents system-wide weather \nconditions and is calculated as the load-weighted combination of temperature and \nhumidity across the PJM footprint. The model then stochastically pairs historical \nresource performance days with historical load days that occur within the same THI \nbin. In this way, the model scrambles load and resource profiles that occurred on \ndays with similar temperature \n \n14  Energy Systems Integration Group (ESIG). Redefining Resource Adequacy for Modern Power Systems. 2021. \nhttps://www.esig.energy/wp-content/uploads/2021/08/ESIG-Redefining-Resource-Adequacy-2021.pdf \n15 https://www.pjm.com/-/media/DotCom/planning/res-adeq/elcc/2025-pjm-elcc-rrs.pdf"},{"page":19,"startToken":5445,"endToken":5553,"text":"Overview of Loss-of-Load-Probability Modeling and Best Practices  \nPJM ELCC / RRS Model Evaluation  \n16\n The model chronologically dispatches energy-limited resources such as energy \nstorage and demand response to meet the residual needs of the system that other \nresource classes (including thermal and renewables) could not meet. Any unserved \nenergy is classified as loss-of-load \nPJM uses outputs of the ELCC/RRS model to directly inform two critical applications: (1) the \nForecast Pool Requirement, which determines the capacity market procurement target to \nmaintain the 0.1 LOLE standard, and (2) resource accreditation, which calculates Effective \nLoad Carrying Capability values for resource classes and adjusts them to individual units via \nperformance factors."},{"page":20,"startToken":5553,"endToken":5901,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n17\nEvaluation of PJM Model Design \nIn this section, E3 evaluated the design of the PJM ELCC/RRS model to assess whether its \nmethodological framework aligns with industry best practices for loss-of-load-probability \nmodeling. This section focuses on the conceptual foundations of the PJM model to assess \nhow the model represents the relationship between weather, load, and resource availability, \nand how those design choices influence the system’s risk profile and resulting capacity \naccreditation values. \nE3 identified the following aspects of PJM’s model for evaluation: \n Representation of Load \n Resource Forced Outages \n Resource Planned and Maintenance Outages \n Unlimited Resources Capability and Deliverability \n Variable Resource Availability and Deliverability \n Load and Resource Scrambling \n Dispatch of Energy Limited Resources and Demand Response \n Resource Accreditation \nFor each model aspect, E3 provided the following: \n1. Best Practice: What is industry best practice for this aspect of LOLP modeling? \n2. PJM Approach: What is the current approach used in the PJM ELCC/RRS model? \n3. E3 Evaluation: Is PJM’s approach consistent with industry best practices? Does \nPJM’s approach appropriately capture key reliability risks? \nRepresentation of Load \nIndustry Best Practice \nLOLP modeling should include a diverse range of potential load conditions (mild, average, \nand extreme). Because weather is the single biggest factor that drives load, best practice \nrequires incorporating as many potential weather conditions as practicable, while \nrecognizing that weather conditions too far in the past may not be reflective of current \nweather conditions. Such an approach not only ensures that the model includes extreme \npeak loads that drive reliability risk but also that the model contextualizes the appropriate \nexpected frequency that these extreme loads are expected to occur. To achieve this, most \nLOLP models include a minimum of 20 years of load under different potential weather \nconditions with some using upwards of 80 years of weather conditions.  \nTo capture potential future weather conditions, most LOLP models use historical weather \ndata. Given that future weather conditions may not match historical conditions, it is an \nemerging area of research on how to adjust historical weather data to match future"},{"page":21,"startToken":5901,"endToken":6319,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n18\nexpectations.16 However, climate adjustments are not standard in LOLP modeling today \ngiven the uncertainty in how weather patterns will change. Moreover, omitting climate \nadjustments to the historical weather record does not necessarily mean ignoring climate \nchange altogether if the absolute level of load forecast in the LOLP model is based on future \nweather.17  \nFinally, LOLP modeling should use load profiles that accurately reflect the level and shape \nof expected loads during given weather and calendar conditions (e.g., month, day of week, \nholiday, etc.). Industry best practice achieves accurate load profiles through regression \nanalysis or artificial neural networks.  \nPJM Approach \nLoads in the PJM ELCC/RRS Model are developed by the 2025 PJM Long-Term Load Forecast \nModel. 18 This model uses regression analysis to simulate hourly loads for 31 historical \nweather years (June 1993- May 2024). This approach yields an hourly load profile where each \nhistorical weather day occurs on a specific date. What this approach does not capture is the \nfact that an extreme weather day that occurred on a Sunday could have occurred on a \nMonday when loads are typically much higher due to commercial building occupancy.  To \nreflect that historical weather patterns from a given day could reasonably have occurred on \nnearby dates, each weather year pattern is rotated +/- 6 calendar days, creating a total of 13 \n“load rotations” for each weather year.  The result is 403 years of hourly load profiles (31 * \n30) for a studied future delivery year.19 \nE3 Evaluation \nPJM’s simulated loads accurately reflect the level of expected loads during given weather \nconditions when compared to historical loads. The figures below illustrate the strong \nalignment between historical and simulated load data for different temperature conditions. \nAdditionally, the simulated loads used in the model do not introduce peak loads that are \nsignificantly higher than historical levels, indicating that the load conditions represented in \nthe model are based on risks that have been observed historically and do not introduce \nundue or unfounded risk into the model.   \n \n16 https://www.utilitydive.com/news/e3-new-york-nyserda-climate-change-decarbonized-energy-systems/721391/  \n17 For example, the 50/50 peak load forecast could be based on future weather conditions, but historical weather variability \ncould be used to estimate the variability of load around this 50/50 forecast \n18 https://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2025-load-report.pdf  \n19  See PJM’s 2025 Long-Term Load Forecast Supplement: https://www.pjm.com/-/media/DotCom/planning/res-\nadeq/load-forecast/2025-long-term-load-forecast-supplement.pdf"},{"page":22,"startToken":6319,"endToken":6539,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n19\nFigure 3: Daily Peaks of Simulated & Historical Load in Summer \n \nFigure 4: Daily Peaks of Simulated & Historical Load in Winter  \n \nPJM’s hourly load simulation process across 31 years of historical weather data provides a \nrich distribution of potential load conditions, is comparable with other industry models, and \nis consistent with LOLP modeling best practices. The figure below shows summer and \nMa   o rly     in S   er  ays ,   \n aily Pea ,           o  50 50      \n ig er daily  a     led to \n ig er daily  ea s in bot  \nsi  lated  ro les and \n istorical records\n           n    s o       o  s                           s n   \ns          o  s      o      202  202                  n    s o      \n o  s  o            o  20    202    n      ng  o  s         ng   \no       s     o   s                 s  n         n   s       n    s  \nSi  lated  aily Pea s \n202  202               s ng      202             s \n istorical  aily Pea s\n20   202       s\nMin  o rly     in  inter  ays ,   \n aily Pea ,           o  50 50      \nLo er daily  in    led to  ig er \ndaily  ea s in bot  si  lated \n ro les and  istorical records\nSi  lated  aily Pea s \n202  202               s ng      202             s \n istorical  aily Pea s\n20   202       s\n        on  n  o    s    s \n      o          n    n ss   \n n       s   0     s"},{"page":23,"startToken":6539,"endToken":6803,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n20\nwinter peak loads for each simulated weather year. Summer peaks generally exceed winter \npeaks except during extreme winter conditions. This chart highlights that PJM’s model does \nnot contain a single static peak load value but rather a large range of potential peak loads \nacross different weather conditions.  \nFigure 5: Summer and Winter Peak loads by Historical Weather Year  \n \nPJM’s simulated load profiles also contain daily “shapes” that must accurately reflect how \nloads change throughout the day in order to accurately model how variable and energy-\nlimited resources can help serve these loads. The figure below demonstrates how the load \nshapes reflect seasonal and diurnal load patterns, with the morning/evening double peak in \nwinter (driven by morning and evening heating loads) and the single afternoon peak in \nsummer driven by cooling loads. Additionally, this chart highlights the difference between \nload on an “average” day and the “maximum” loads simulated in the model. This once again \nhighlights the rich set of loads that are used in the PJM model, consistent with best practice. \nFigure 6: Average and Maximum Loads by Month-Hour \n \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n    \n                                      \n    \n   /     ea \nPea  loads    to      ig er \nt an t e    /     ea \nL  g   nn           on  n  o   s  son    n  \n  so         s               ng  o  n      o   \n on    ons   s  on   s                  n s\nPolar vorte  of     \n         o       ng  o   g \n  n    o  s\nPolar vorte   \n inter Stor Elliot\nRotation  verage Pea  Load\nRotation  ea  range\n            \n            \n    \n    \n    \n    \n    \n    \n    \n \n  \n  \n  \n  \n   \n   \n   \n   \n   \n   \n   \n                             \n \n   \n   /     ea \nJan\nFeb\nMar\nApr\nMay\nJun\nJul\nAug\nSep\nOct\nNov\n ec\nMa i    Load\n verage Load"},{"page":24,"startToken":6803,"endToken":7136,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n21\nPJM’s approach that rotates weather +/- 6 days for a total of 13 “load rotations” \nappropriately ensures that peak-producing extreme weather is applied to peak-producing \ncalendar variables, with the most important calendar variable being day-of-week. However, \nthis approach introduces an inconsistency where the day of the week for the initial \nsimulated date is only represented once, whereas all other days of the week are represented \ntwice through forward and backward rotations. \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nRepresentation of Load: E3 Evaluation Summary \nPros \nCons \n Appropriately wide range of potential \nweather conditions and load levels \n Simulated loads levels in different \nweather conditions match historical \nobservations \n Simulated load shapes match expected \nseasonal and diurnal load shapes \n 13 load rotations may result in six of the \nseven days of the week being simulated \ntwice for a given historical weather day, \nand one day of the week simulated once  \n \nResource Forced Outages \nIndustry Best Practice \nAccurately representing forced outages for dispatchable thermal resources (or what PJM \nterms “unlimited” resources) is critical to accurately characterizing the reliability of the \nsystem. This includes capturing periods where larger quantities of dispatchable thermal \nresources are on outage either due to random variability or external factors such as cold \nweather.  \nBest practices for modeling forced outages include: \n Simulate a diverse range of aggregate dispatchable thermal outage performance that \nreflects observed and expected performance, including periods of higher than \nnormal outage conditions. This is often accomplished through stochastic outage \nmodeling \n If historical data suggests a possible risk of correlated outages among generators \ndue to common mode issues, such as extreme weather or fuel supply availability, \nincorporate factors in the model to reflect these risks \nApplication of these best practices varies widely across different LOLP models. Some \napproaches model forced outages individually for each unit while incorporating factors that \nincrease the likelihood of failure for each individual unit during conditions that drive"},{"page":25,"startToken":7136,"endToken":7452,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n22\ncommon mode failures. Other approaches model thermal performance in aggregate in ways \nthat capture higher than average aggregate historical outage events.  \nPJM Approach \nPJM incorporates forced outages differently by resource class: \n• Unlimited resources: PJM models forced outages of unlimited resources by \ncollecting historical daily forced outage profiles from NERC Generating Availability \n ata System (“GA S”) and aggregating across all unlimited resources. By using \nthese aggregated profiles across all unlimited resources, the model implicitly \ncaptures periods where aggregate forced outages are greater (or less than) average \nforced outages. Because daily forced outages are based on historical data, the \nmodel also captures the impact of historical extreme events where significant \nquantities of unlimited resources were unavailable (such as Polar Vortex 1 in January \n2014 or Winter Storm Elliot in December 2022). The model stochastically pairs these \nforced outage profiles with load through a stochastic scrambling process that this \nreport evaluates in a later section. The figure below shows PJM’s historical hourly \nforced-outage timeseries, aggregated across the “Gas Combustion Turbine” and \n“Gas Combined Cycle” resource classes from 2012-2024. The timeseries shows \nsignificant variability in the timing, duration, and magnitude of unlimited resource \nforced outages. \nFigure 7: Historical Forced Outage Record of Unlimited Resources \n \n• Variable resources: PJM’s modeling implicitly captures forced outages for variable \nresources (wind and solar) through historical availability profiles for these resources. \nForced outages are embedded within these historical availability profiles and provide \na reasonable representation of the probability and impact of forced outages for \nmodeling purposes.  \n istorical  ear\n o rly  orced O tage Rate ( )\nPro le ca t res correlated \nt er al  lant o tages \nobserved d ring e tre e \ncold events\nJ n 20   Po     o      \n    2022   n      o       o  \n  ide range of o tage  agnit de and d ration \nis ca t red in t e  istorical  o rly  ro le"},{"page":26,"startToken":7452,"endToken":7794,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n23\n• Battery storage: PJM models battery storage resources by statically de-rating both \nthe maximum discharge and charge rate in all hours by the historical average \nEquivalent Forced Outage Rate on  emand (“EFORd”) from NERC GADS. PJM’s \napproach therefore does not model periods where battery forced outages are higher \nor lower than average. The table below shows the static EFORd derates PJM applies \nto each battery storage resource class in the ELCC/RRS Model.  \nTable 3: Battery Storage Forced Outage Rate Assumption in PJM ELCC/RRS Model \nResource Class \nEquivalent Forced Outage Rate on Demand (EFORd) \n4-hour Storage \n5.1% \n6-hour Storage \n2.3% \n8-hour Storage \n6.7% \n10-hour Storage \n2.8% \n \nE3 Evaluation \nFor unlimited resources, PJM’s use of forced outage profiles that are both 1) aggregated \nacross all unlimited resources and 2) cover a 10+ year timeframe ensures that PJM achieves \nthe best practice of simulating a diverse range of aggregate dispatchable performance, \nincluding periods of higher-than-normal outage conditions. Additionally, PJM’s approach \ncaptures correlated outage events that are driven by common mode issues to the extent that \nthese events are present in historical data. For these reasons, PJM’s approach appropriately \nmaintains the stochasticity of forced outages and correlation in thermal outages among \nunlimited resources. However, PJM’s approach assumes future resource performance is \nidentical to historical performance, limiting the model’s ability to reflect unit enhancement \nmeasures such as improved winterization or fuel supply. \nFor variable resources, because PJM’s historical availability profiles include forced outages, \nPJM’s approach also captures periods of higher (and lower) variable resource outage \nconditions. For this reason, PJM’s approach aligns with industry best practice. \nFor storage resources, while PJM’s approach correctly approximates average forced \noutages over time, it does not capture periods where battery storage forced outages are \nhigher than average. This approach understates a potentially important system risk. The \nimpact of understating this risk will increase as battery storage penetration increases. \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice."},{"page":27,"startToken":7794,"endToken":8161,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n24\nResource Forced Outages: E3 Evaluation Summary \nPros \nCons \n Simulates \na \ndiverse \nrange \nof \naggregate dispatchable performance, \nincluding periods of higher-than-\nnormal \noutage \nconditions \nfor \nunlimited and variable resources \n Captures correlated outage events \nfor unlimited and variable resources \nthat are driven by common mode \nissues to the extent that these events \nare included in historical data \n Static assumption of battery storage \nforced outages does not capture periods \nof higher-than-average forced outages \nand is inconsistent representation of \nunlimited and variable resources \nResource Planned and Maintenance Outages \nIndustry Best Practice \nPlanned and maintenance outages for unlimited resources temporarily reduce availability \nof these resources for scheduled inspections or maintenance activities. 20 Planned and \nmaintenance outages are similar to forced outages, but their timing is more controllable by \nPJM and individual plant operators. Planned and maintenance outages are generally \nscheduled during the periods of low system reliability risk such as shoulder months in the \nspring or fall.  \nLOLP modeling best practice should incorporate planned and maintenance outages by \nscheduling these outages during periods of lowest system reliability risk while ensuring \nconsistency with real-world operations. In other words, best practices limit the scheduling \nof maintenance during high-risk periods; however, to the extent that maintenance \nschedules are inflexible or imperfect foresight limits operators’ abilities to avoid scheduling \nmaintenance during high-risk periods altogether, some maintenance outages may \nreasonably be included during high risk periods.  \nPJM Approach \nPJM models planned and maintenance outages for unlimited resources using two \ncomponents: scheduled outages and forced-in outages: \n• Scheduled outages are scheduled dynamically within the system to minimize \noverlap with high-risk periods. This is intended to reflect coordinated scheduling of \nplanned and maintenance outages to minimize system risk. The required total \n \n20 Generators report planned outages and maintenance outages separately to NERC GADS. Outages are registered as \n“planned” if specifically listed within annually filed operation plans and typically scheduled only once or twice a year. \nOutages are registered as “maintenance” if it can be at least deferred to the following calendar week but is required \nbefore \nthe \nnext \nplanned \noutage. \nFor \ninformation \non \nNERC \noutage \ncategories, \nsee: \nhttps://www.nerc.com/pa/RAPA/gads/DataReportingInstructions/2025_GADS_DRI.pdf"},{"page":28,"startToken":8161,"endToken":8457,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n25\nscheduled outage requirement for each resource is based on its registered planned \nand maintenance outages reported in GADS from June 1, 2012 to May 31, 2024. When \nGADS data is unavailable for individual units (such as new units), PJM uses class-\naverages. PJM’s ELCC/RRS model schedules planned and maintenance outages into \nperiods of lowest gross load, employing a valley-filling technique to spread these \noutages across the year.  \n• Forced in outages are used to represent maintenance that occurs in spite of its \ncoincidence with high risk. PJM has observed that some resources have experienced \nplanned and maintenance outages during historical scarcity events, likely due to the \nfact that those scarcity events are not perfectly forecastable. To ensure the model \nreflects this real-world dynamic, PJM uses historical data to determine a minimum \nquantity of resources to represent as offline during future scarcity events. \nSpecifically, PJM assigns observed maintenance outages from historical scarcity \nevents to the seasonal peak-load week of each weather year as demonstrated in the \ntable below.  \nTable 4: Forced-in Maintenance Rates from Historical Scarcity Events \nHistorical Scarcity Event \nMaintenance Outage \n% of Unlimited ICAP \nWeather Years Applied \nSummer 2012 \n0.7% \n1999, 2001,2006, 2010, 2011, 2012 \nSummer 2013 \n1.3% \n1993, 1995, 2002, 2013 \nPolar Vortex 1 (2014, Winter) \n0.8% \n1993, 1995, 2002, 2013 \nPolar Vortex 2 (2019, Winter) \n5.0% \n1996, 2004, 2014 \nWinter Storm Elliot (2022, Winter) \n2.4% \n2022 \n \nThe figure below illustrates the outcome of PJM’s approach for both “scheduled” and \n“forced-in” planned and maintenance outages for unlimited resources for the 1993 weather \nyear. Scheduled outages are concentrated in the spring and fall, the periods of lowest gross \nload. Forced-in maintenance introduces outages during the highest seasonal gross-load \nweeks."},{"page":29,"startToken":8457,"endToken":8794,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n26\nFigure 8: Weekly Average Maintenance and Planned Outages for 1993 Weather \n  \nE3 Evaluation \nPJM’s approach to modeling both “scheduled” and “forced-in” maintenance and planned \noutages for unlimited resources reasonably reflects expected real-world operations.  \nThe “scheduled outage” methodology resembles the intelligent scheduling of maintenance \nand planned outages that PJM uses in real-world operations. However, as variable and \nstorage resources increase in penetration, gross peak load will not most accurately predict \nsystem risk. This is because risk periods are shifting to periods of extended low resource \navailability which may fall outside of gross peak periods. \nThe “forced-in outage” methodology ensures the model does not overstate scheduling \nflexibility for planned or maintenance and is aligned with observed outages during historical \nscarcity events. This feature therefore improves alignment with real-world operational \nconstraints, recognizing that some maintenance cannot be deferred indefinitely and that \noperators have imperfect foresight of upcoming reliability events.  \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nResource Planned and Maintenance Outages: E3 Evaluation Summary \nPros \nCons \n Reflects expected real-world planned \nand maintenance outages by 1) smartly \nscheduling outages into periods of \nlowest risk and 2) recognizing that \nimperfect foresight will yield some \nminimum \nlevel \nof \nresources \non \nmaintenance during scarcity events \n Use of gross load to define risk periods \ndoes not fully align with evolving risk \npatterns as variable and energy storage \nresource \npenetrations \nincrease \n(although gross load is used to some \ndegree in PJM operational practices) \n ee  of  ear\nSc ed led Maintenance concentrated\nin Spring and Fall shoulder months\n ee ly  verage Maintenance Si e (M )\n inter\nS ring\nS   er\n all\n orced in Maintenance \ncoincident with challenging \nconditions seen in past \nscarcity events \n o      n    n  n n         s  n \n             s      o           o   \n o    ons\nIllustrative example for weather year 1  3, average of 13 rotations \nJ n  s \nM     s \n        P  o     o   \n        20    on    on \n    o     P  o     \no    20   Po    \n o        on    on"},{"page":30,"startToken":8794,"endToken":9222,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n27\nUnlimited Resource Capability and Deliverability \nIndustry Best Practice \nCapability and deliverability ratings determine the potential generation capacity of unlimited \nresources when these resources are not experiencing forced, maintenance, or planned \noutages. “Capability” is the physical ability of a plant to generate power. “Deliverability” \nreflects the physical ability of the transmission network to deliver energy from the point of \ngeneration to load. Industry best practices for incorporating unlimited resources into LOLP \nmodeling should: \n Represent changes to maximum potential generation capability (e.g., outages, \nambient derates) based on real-time system conditions \n Represent key system network constraints, for example through resource \ndeliverability constraints or zonal modeling  \nApplication of these best practices varies widely across different LOLP models.  \n \nPJM Approach \nPJM currently limits the maximum availability of unlimited resources to their “ICAP” rating \nin all hours. The ICAP rating of an unlimited resource is the lesser of its 1) Summer Net \nCapability rating and 2) Capacity Interconnection Rights (CIRs). 21 Summer Net Capability is \nthe measured generation capability of a resource during the last 15 years of summer peak \nload conditions. Resources report updates to Summer Net Capability to PJM annually. CIRs \nis the quantity of deliverable generating capacity during summer peak conditions as \nassigned by PJM to individual resources in their interconnection agreements. Currently, PJM \nuses ICAP to represent maximum available capacity of unlimited resource in all hours of the \nyear. However, PJM is in the process of introducing “Winter” deliverability constraints from \nRTEP for unlimited resource classes in future versions of the PJM Model.22 \nOn an hourly basis, resources are derated below their ICAP rating when the temperature \nexceeds the level used to develop a resource’s Summer Net Capability rating. This reflects \nthe fact that under more extreme temperature conditions the ability of a plant to produce \npower decreases due to reduced thermodynamic efficiency. PJM refers to this as “ambient \nderating.” PJM develops ambient derate profiles from historical derates submitted by \nindividual resources in eDART (electronic Dispatcher Application and Reporting Tool) and \naggregated by resource class. The model stochastically pairs both ambient derate profiles \nand forced outages with load through a scrambling process. This scrambling process is \nevaluated in a later section of this report.  \n \n21\nFor \nmore \ninformation \non \nICAP, \nsee \npage \n25 \nof \nPJM \nManual \n21b: \nhttps://www.pjm.com/-\n/media/DotCom/documents/manuals/m21b.pdf   \n22 For more information on the introduction Winter Deliverability for non-variable resources, see: https://www.pjm.com/-\n/media/DotCom/committees-groups/task-forces/elccstf/2025/20250403/20250403-item-05---reflecting-winter-\ncapability-in-accreditation-education--design-considerations---pjm-presentation.pdf"},{"page":31,"startToken":9222,"endToken":9580,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n28\n \nE3 Evaluation \nThe PJM Model simulates resource performance in all hours of the year, but limits the \npotential generation capacity of unlimited resources based on generator capability and \ndeliverability in summer peak load conditions. Thermal resources generally have higher \npotential generation capacity outside of summer peak conditions due to colder ambient \ntemperatures. Additionally, resource deliverability is generally higher outside of summer \npeak conditions due to less network congestion in hours of lower load. Limiting the \navailability of unlimited resources at ICAP, which is the lesser of Summer Net Capability and \nCIR, under-represents availability in non-summer periods. \nPJM’s ambient derate methodology captures the relationship between temperature and \nthermal resource capability at high temperatures but does not capture generator capability \nrising above ICAP under lower ambient temperatures. The figure below illustrates how PJM \nasymmetrically applies ambient derates to the ICAP of unlimited resource classes when \ntemperatures rise but does not apply ambient uprates when temperatures fall. PJM’s \napproach limits the potential generation capability during cold temperatures.  \nFigure 9: Thermal Resource Capability Limited at ICAP \n \nBecause the majority of system risk occurs in the winter, this methodological decision does \nimpact model results. PJM studied a modification that introduced a newly termed “winter \nICAP” rating, defined as Winter Net Capability with all deliverability constraints removed.23 \nThe aggregate Winter ICAP of unlimited resource fleet was 8,561 MW higher than the total \n \n23 Winter Net Capability is the expected generation capability during the last 15 years of winter peak load conditions. The \nremoval of all deliverability constraints in this study was a simplifying assumption that presented a bookend of how \nmuch winter ICAP could possibly increase. PJM has stated that they would apply winter deliverability ratings developed \nif directed to implement seasonal ICAP ratings.   \n o rly Ca ability of   el   el Co b stion   rbine\n  of ICAP\n C P\n  lesser of Summer Net \nCapability   Capacity \nInterconnection Rights \n(CIRs)\nModel does not ca t re generator \nca ability rising above  C P  nder \nlo er a bient te  erat res\n  bient  erates\nApplied hourly to capture capability \nfalling below ICAP\nTHI ( F)"},{"page":32,"startToken":9580,"endToken":9928,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n29\nSummer Net Capability due to colder ambient temperatures. Implementing this into the \nmodel resulted in 33% less unserved energy in winter months and a 1.1% lower IRM relative \nto the 2025/26 BRA model results.24  \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nUnlimited Resource Availability and Deliverability: E3 Evaluation Summary \nPros \nCons \n Ambient derates are applied to adjust \nresource capability when temperatures \nrise  \n Network constraints are incorporated \nthrough deliverability limitations \n Generator capability is limited to \npotential capacity output in ambient \nsummer peak conditions \nVariable Resource Availability and Deliverability \nIndustry Best Practice \nVariable resources (wind, solar, run-of-river hydro) have availability that varies on an hour-\nby-hour basis due to fluctuating meteorological and hydrological conditions. Industry best \npractices for incorporating variable resources into LOLP modeling include: \n Representing the full spectrum of potential variable resource availability on an hourly \nbasis across both low, average, and high resource availability periods. The LOLP \nmodel should use at least 5 but ideally 10+ years of historical availability data25 \n Incorporating resource availability profiles in a manner that preserves underlying \ncorrelations with electricity demand and other supply resources \n Representing key system network constraints, for example through resource \ndeliverability constraints or zonal modeling  \nWhen historical variable resource generation data is available, this can serve as a robust \nstarting point for modeling future generation availability. However, given that many variable \nresource projects are new or in development, historical data may not exist for many \nprojects. In its place, industry best practice uses simulated generation profiles using \nhistorical meteorological data (e.g., insolation) and the characteristics of the variable \nresource (e.g., inverter loading ratio). Best practices should also reflect the geographic \ndiversity of variable resources within the modeled resource portfolio. \n \n24 For more information on the seasonal capability assessment in ELCCSTF Package C, see: https://www.pjm.com/-\n/media/DotCom/committees-groups/task-forces/elccstf/2025/20250522/20250522-item-02---elcc-accreditation-\nmethodology-update-on-sensitivity-analyses---pjm-presentation.pdf \n25 https://iea-wind.org/wp-content/uploads/2021/08/2016_WIW16_Capacity-value_paper_final_web.pdf"},{"page":33,"startToken":9928,"endToken":10338,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n30\nPJM Approach \nPJM variable resources include wind, utility-scale solar, intermittent hydro, and intermittent \nlandfill gas. PJM develops generation profiles for individual variable resources on an hourly \nbasis across 12 years from 2012 to 2024. PJM derives individual resource availability from \nsettlement data where possible, adjusted for historical curtailment. Where settlement data \nis unavailable, PJM mostly uses a simulated profile derived from historical weather data and \nindividual site characteristics.  \nThe variable resource hourly profiles in the PJM Model are derived by using the lesser of \nresource availability (described in prior paragraph) and resource deliverability. PJM’s \nRegional Transmission Expansion Plan (RTEP) process develops generator deliverability \nconstraints under three snapshots of system conditions: “Summer”, “Winter”, and “Light-\nLoad”.26 \nPJM assigns each deliverability constraint a “time of year” window: “Summer  eliverability” \napplies to all hours from May through October. “Winter Deliverability” applies from 6pm-\n9am from November through April. “Light-Load Deliverability” applies from 9am-6pm from \nNovember through April. Each deliverability constraint is expressed as a percentage of \nEffective Nameplate Capacity for Solar and Wind variable resource classes. Deliverability of \nintermittent hydro and intermittent landfill gas is represented with ICAP.  \nE3 Evaluation \nPJM’s representation of variable resources using 12 years of historical data captures \nsufficient conditions to align with industry best practices. PJM’s use of historical data where \navailable objectively captures weather conditions and other outage factors. Weather-\nderived simulated profiles is an appropriate alternative where historical settlement data is \nunavailable. The development of resource-class profiles by aggregating time-matched \nindividual site profiles appropriately captures geographic diversity and preserves \ncorrelations within the variable resource class.27  \nVariable resource availability profiles (or “shapes”) must accurately reflect how availability \nchanges between hours, seasons, and years to accurately model how variable resources \ncan serve load. The figure below shows the average, 99th, and 1st percentile availability \nprofiles for onshore wind and solar-tracking resource class by month/hour that are used in \nthe PJM model. This chart shows how PJM’s resource performance data captures a broad \nspectrum of potential wind and solar conditions, shown by the wide ranges shaded in blue \nand yellow. \n \n26 For more information on tests on Deliverability of Generation, see Attachment C.3 “ eliverability of Generation” on page \n92 of PJM Manual 14b: https://www.pjm.com/-/media/DotCom/documents/manuals/m14b.pdf \n27 Capturing correlation between variable resources and load is addressed in the “Load and Resource Scrambling” section \nlater in this report."},{"page":34,"startToken":10338,"endToken":10632,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n31\nFigure 10: Variable Resource Availability Reflected in 2012-2024 Weather Year Profiles\n \nPJM applies deliverability constraints developed within PJM’s Regional Transmission \nExpansion Plan (RTEP) to variable resource profiles, which aligns with industry best practice \nof representing key network constraints. Actual network congestion changes from hour-to-\nhour, but the complexity of network congestion makes temporally granular modeling of \ndeliverability intractable. PJM therefore sets deliverability constraints based on a “time of \nyear” methodology for “Summer”, “Winter”, and “Light-Load” periods.28 Given the limited \ntemporal granularity of deliverability constraints, best practice is to prioritize accuracy in \nduring critical-hour periods. The figure below illustrates how deliverability constraints in PJM \nreduce the deliverable energy of variable resources. \n \n28 For more information on tests on  eliverability of Generation, see Attachment C.3 “ eliverability of Generation” on page \n92 of PJM Manual 14b: https://www.pjm.com/-/media/DotCom/documents/manuals/m14b.pdf \n  \n   \n   \n   \n   \n    \n \n  \n  \n  \n  \n   \n   \n   \n   \n   \n   \n   \n  \n   \n   \n   \n   \n    \n \n  \n  \n  \n  \n   \n   \n   \n   \n   \n   \n   \nInterannual \n ariability\n ariability in  ind Pro les\nMonth Hour Availability (  of E ective Nameplate Capacity)\n   ide range of lo   average  and  ig   ind conditions ca t re \ndiverse syste  conditions t at  ay in  ence reliability\n iurnal \nPattern\nSeasonal Pattern\nJan\nFeb\nMar\nApr\nMay\nJun\nJul\nAug\nSep\nOct\nNov\n ec\n  g    n     s \n          n     \n                   \n                \nLo    n     s\n  s      n     \n    \n    \nSub monthly \n ariation\nInterannual \n ariability\n ariability in Solar Pro les\nMonth Hour Availability (  of E ective Nameplate Capacity)\n   ide range of solar  ro les ca t re variability in s nlig t and seasonal \n atterns t at a ect not only generation itself b t also interaction  it  storage\n iurnal \nPattern\nSeasonal Pattern\nJan\nFeb\nMar\nApr\nMay\nJun\nJul\nAug\nSep\nOct\nNov\n ec\n  g   o       s\n          n     \n                   \n                \nLo   o       s\n  s      n     \n    \n    \nSub monthly \n ariation"},{"page":35,"startToken":10632,"endToken":10895,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n32\nFigure 11: Deliverability of Variable Resources \n \nReductions in deliverability only impact model results to the extent that they impact \nresource performance during critical hours. The figure below illustrates reductions in wind \nand solar deliverability during winter days with loss of load. This figure shows that “Light-\nLoad” deliverability constraints are being applied in hours with loss of load (when load is \nover 150 GW). While the “time of year” methodology to map deliverability constraints to \nhours in the PJM Model can reflect changes in network constraints on average winter days, \nit less accurately represents network constraints on peak winter days.  \nThe figure below also highlights that transitioning from “Winter” to “Light-Load” \ndeliverability constraints at 9 AM on winter days with loss of load has, on average, a 2 GW \nimpact on available-but-undeliverable energy. This is illustrated through the sharp reduction \nin undeliverable solar at   AM when deliverability constraints relax to “Light-Load” levels. \n \n2\n \n \n8\n1 12 1 1 18 2 22\n inter \nPeriod\n5    n    \n              \n  \n1  \n2  \n3  \n   \n   \n   \n   \n \n2\n \n \n8\n1 12 1 1 18 2 22\nTime of  ear  eliverability Periods for  ariable Resources\nAverage Availability    eliverability by Season (  of E ective Nameplate Capacity)\n  \n1  \n2  \n3  \n   \n   \n   \n   \n \n2\n \n \n8\n1 12 1 1 18 2 22\nS   er\nPeriod\n    s      \n              \n    s      \n              \nLig t Load \nPeriod\n5     g    o   \n              \n \n2\n \n \n8\n1 12 1 1 18 2 22\n      n    \n              \n      g    o   \n              \n otal  vailable \nSolar\n eliverable \nSolar\n otal  vailable  ind\n eliverable  ind\n                                       \n                                       \n                                           \n                                   \n inter \nPeriod\nHour of  ay, Winter\nHour of  ay, Summer\n      n"},{"page":36,"startToken":10895,"endToken":11107,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n33\nFigure 12: Average Undeliverable Energy in Winter Days with Loss of Load \n \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nVariable Resource Availability & Deliverability: E3 Evaluation Summary \nPros \nCons \n Sufficient number of years of historical \nvariable resource availability data (12\nyears) to capture full spectrum of \npotential conditions \n Aggregating time-matched individual \nprofiles to develop resource-class \nprofiles \nappropriately \nrepresents \ngeographic diversity and correlations \nbetween variable resources \n Deliverability constraints are applied to \nreflect network limits in a tractable (3 \ntime-of-year periods) manner \n Limited \ntemporal \ngranularity \nof \ndeliverability \nconstraints \n(summer \ndeliverability, \nwinter \ndeliverability, \nlight-load deliverability) limits overall \ngranularity \nof \nvariable \nresource \nrepresentation. However, too much \ntemporal granularity is intractable \n “Time-of-year” methodology to assign \ndeliverability constraints to hours in \nPJM Model does not directly reflect \nsystem conditions  \n \n  \n 1,   \n 2,   \n 3,   \n  ,   \n  ,   \n  ,   \n  ,   \n \n1\n2\n3\n \n \n \n \n8\n 1 11 12 13 1 1 1 1 18 1 2 21 22 23\nLig t Load  eliverability\n5    o                 y\n      n                \n inter  eliverability\n5   o                 y\n      n                \n inter  eliverability\n ndeliverable \nSolar Energy\n ndeliverable \n ind Energy\nHour of day\n o rs  it  \nloss of load \n                 \n                     \n                     \n              \n      \n      \nImpact of  eliverability Constraints in Winter  ays with Loss of Load\nAverage Available but  ndeliverable Energy (MW)"},{"page":37,"startToken":11107,"endToken":11362,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n34\nLoad and Resource Scrambling  \nIndustry Best Practice \n“Scrambling” is a practice used in nearly all LOLP models to expand the range of system \nconditions captured by historical data. This practice mixes and matches observed \ncombinations of load and resource performance to construct plausible conditions that may \nhave not been observed historically. The goal of scrambling is to ensure the model sees \npotential risk events that are important to the reliability of the system. \nImplementing scrambling into an LOLP model nonetheless raises an important challenge – \nhow to introduce plausible combinations of load and resource availability without \nintroducing implausible combinations. Best practices within scrambling: \n Limit scrambling based on underlying factors that drive correlation between loads \nand resources such as weather, load, and date. These model-imposed limitations \npreserve realistic correlation between loads and resources. For example, it would \nnot make sense to pair the load profile from a hot summer day with a solar profile \nfrom a cold winter day \n Ensure that plausible high-risk events (such as high load paired with low variable \ngeneration) are represented \n Ensure sufficient scrambling replications so that model results are statistically \nsignificant \nPJM Approach \nPJM implements a scrambling methodology by limiting scrambling to within a set of PJM-\ndefined bins based on temperature-humidity index (“THI”) for both the summer and winter \nseasons. PJM’s approach scrambles, with equal probability, daily load profiles and daily \nresource availability profiles within each THI bin. An overview of PJM’s THI bins is provided \nin the figure below."},{"page":38,"startToken":11362,"endToken":11782,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n35\nFigure 13: Seasonal THI Bins Used in PJM Model \n \nThe “size” of each bin is determined by the range of temperatures that define it, as illustrated \nabove. A smaller bin will create fewer opportunities to scramble plausible load and resource \nconditions that were not observed historically, while a larger bin may introduce potential \nerroneous conditions into the model. This is particularly important for extreme temperature \nbins; because extreme events occur infrequently, there are only a handful of historical \nobservations available to represent how the system behaves under those conditions, \nmaking it challenging to size bins that are both statistically robust and representative of \nphysical system behavior. \nPJM’s approach differs slightly from other LOLP models where the probability of pairing days \nis based on how “similar” the days are along certain dimensions such as temperature, load \nlevels, month, or other variables. In this sense, other models do not assign a strict boundary \nwhere the probability of pairing a resource performance day with a load day becomes zero \nbut rather gradually reduces the likelihood of such a pairing as an underlying condition (such \nas temperature) becomes more different between the load and resource performance days \nin question. Despite the differences between these two methodological approaches, they \nboth rely on the same principle of limiting scrambling based on underlying factors that drive \ncorrelations between loads and resources. \nTo decide the default width of bins, PJM applies the Freedman–Diaconis rule, a statistical \nmethod for choosing the optimal bin width for a histogram, balancing bias and variance to \nbest approximate the true underlying data distribution. PJM bins weather data from 1993-\n2024 separately for the summer and winter seasons29. When there are too few observations \nin a bin, adjacent bins are merged to increase observations (e.g., the two rightmost hottest \nbins in summer are merged, and the six leftmost coldest bins are merged30). Once bins are \n \n29 Summer bins apply to modeled days from May 1 to October 31, winter bins apply to model days from November 1 to April \n30. \n30 Note that this is sperate from the discussion of merging Winter Storm Elliot bin and Polar Vortex bin. \n inter  ins\n e ned by min hourly THI in each winter day \nApplies to Nov  April\nS   er  ins\n e ned by max hourly THI in each summer day \nApplies to May  Oct\n efault bin width:         THI\n efault bin width:         THI\n 1 . \n2 .2\n2 . \n  .8\n 1.2\n 2. \n  .8\n8 . \n3."},{"page":39,"startToken":11782,"endToken":12175,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n36\nestablished, each day between 1993-2 2  is assigned to a bin based on that day’s \ntemperature profile. The model scrambles daily load and resource profiles from the same \ntemperature bin. \nTo ensure sufficient scrambling, PJM derives 100 unique resource generation profiles for \neach day within the 13 load rotations. These profiles are developed through random draws \nfrom historical performance days within the THI bin assigned to that day. For example, when \nscrambling generation for a load day that falls into winter Bin 15, 100 random draws are \ntaken from historical observations in winter Bin 15. When the load day is “rotated” forward \nand backward by 6 calendar days in the remaining 12 load rotations, 100 random draws will \nbe performed from the same bin (Winter Bin 15) for each rotation. \nAnother feature of PJM’s current approach is that it does not scramble resource \nperformance profiles for different resource classes. For example, while PJM may scramble \ngeneration from July 1st with load from July 6th (if they are in the same temperature bin), all \ngeneration (unlimited and variable resources) is pulled from July 1st.  \nAmong all resource classes, intermittent hydro generation is not subject to this scrambling \nmethodology. For hydro resources, each load year (1993 – 2024) is mapped to a specific \nhydro year (2012 – 2024) based on similarity of the peaks in the load years. These pairings \nare then used across all simulations. This means that while other resource classes are \nscrambled by day and vary across 100 resource performance scenarios, annual availability \nprofiles for intermittent hydro generation are fixed for each weather year. \nThe figure below provides an illustration of PJM’s scrambling approach. \nFigure 14: Illustration of Scrambling Process in ELCC/RRS Model \n \n \nE3 Evaluation \nPJM’s approach of using a temperature proxy (in this case, “temperature-humidity index”) \nto preserve correlation between load and resource availability is common practice in LOLP \n inter  in  \n 1 .   3.  F\nsa e  istorical day\n e er load days \n it  e tre e cold\nLi ited Reso rce Perfor ance  ays\n inter  in   \n2 .2  2 .  F\nsa e  istorical day\n iverse Reso rce Perfor ance  ays\n o scra bling \n it  load days in \ndi erent \nte  erat re bins\nMore fre  ent Load days \n \n \n \n \n o scra bling \n it  load days in \ndi erent \nte  erat re bins"},{"page":40,"startToken":12175,"endToken":12472,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n37\nmodeling and aligns with industry best practice. 31  This approach is common because \ntemperature and humidity directly and indirectly impact both load and renewable resource \nproduction. For example, high temperatures and humidity drive high load levels due to air \nconditioning. At the same time, high temperatures are also caused by sunny conditions. It \ntherefore is less likely that high temperature/load days would occur on days with low solar \noutput. PJM’s approach captures this effect. \nAnother factor that PJM’s binning approach captures well is the correlation between low \ntemperatures and unlimited resource performance. Low temperatures in PJM drive both \nhigh loads (due to electric heating) and higher forced outage rates for unlimited resources \ndue to units freezing and reduced access to fuel. The figure below highlights how forced \noutage rates for combined cycle resources increase as temperature decreases.  \nFigure 15: Correlation Between Combined Cycle Fleet Daily Outage Rate (%) and \nTemperature-Humidity Index \n \nBin Size and Membership \nIn PJM’s binning methodology, one key assumption is defining the size of the bins. Larger bin \nsizes mean the model scrambles more load and resource pairings, resulting in a larger \nsample of potential system conditions. However, larger bin sizes also diminish correlation \nbetween load and resource days by scrambling days with underlying weather conditions \nthat are more different. Ultimately, defining bin sizes (or in other LOLP models, \n \n31 Because temperature and load are so tightly correlated, some models use load levels itself as a proxy for temperature in \nthe scrambling process \n aily  verage  e  erat re    idity  nde  \n inter\n1 scatter point   1 winter day \n inter Stor  Elliott\nwith the highest observed \nCombined Cycle  eet outages\nPolar  orte   \nwith the \ncoldest\nobserved \ntemperature\n     g  o   g  \n              n\n aily O tage Rate  ( )"},{"page":41,"startToken":12472,"endToken":12811,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n38\nmathematically defining how “similar” days are to each other) is subjective to a degree and \nrequires the modeler’s judgement.  \nOne important factor in determining bin definitions is ensuring there are sufficient number \nof load and resource performance days in each bin in order to ensure there is enough data \nto scramble. PJM’s dataset relies on loads that are simulated using weather across 31 years \n(1993 – 2024) and resource performance across 12 years (2012 – 2024). As a result, there \nare many more load days than resource performance days in PJM’s model. It is thus \nimportant that PJM defines large enough bins that there are a sufficient number of resource \nperformance days in each bin. Otherwise, a bin with a single poor resource performance day \ncould assume this level of performance across many load days, improperly increasing the \nimpact of this day. The figure below shows the number of resource performance days that \nfall in each THI bin. The coldest bin contains 7 resource performance days, while the hottest \nbin contains 28 resource performance days. In E3’s assessment, this is a sufficient number \nof days in the bins that contribute significantly to loss of load risk.  \nFigure 16: Number of Unique Historical Resource Performance Days in Each THI Bin \n \nLoad vs. Resource Performance Scrambling \nAfter bins are defined, the model scrambles load and resource days within each bin. One \nway to measure how well this scrambling approach performs (and whether 100 resource \nperformance draws are sufficient) is by comparing the distribution of net loads for historical \ndata and scrambled model outputs. The figure below shows how these two distributions are \nvery similar for the “unrotated” load scenario (i.e. Load Rotation A), indicating that the \nmodel’s design performs well along this dimension.  \n  observations\n(  .3  of all winter\nobservations) \nin coldest \ntemperature bin\n e  erat re    idity  nde   ins   o     o n  \n   observations\n( 1.2  of all summer \nobservations) \nin hottest \ntemperature bin\nSummer Bin \ndefault width: \n        \nWinter Bin \ndefault width:"},{"page":42,"startToken":12811,"endToken":13135,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n39\nFigure 17: Daily Peak Load Net of Availability Resources Before and After Scrambling \n \n \nHowever, the current PJM modeling approach does not just scramble loads and resource \nperformance values for an “unrotated” day but rather uses 13 different load rotations. A \nconcern with PJM’s current implementation of load rotations is that while it rotates weather \nfor the purpose of determining loads, it does not rotate weather for the purpose of drawing \nresource performance profiles. This leads to misalignment between the weather conditions \nreflected in the load profile and the weather conditions reflected in the resource \nperformance assumptions for certain load scenarios. For example, resource performance \nconditions from non-extreme weather conditions might be paired with load profiles from \nextreme weather conditions when rotation introduces a more severe weather pattern.  \nHow this over-scrambling impacts model results is an empirical question. If extreme \nweather (and its associated high loads) is correlated with poor resource performance, then \nover-scrambling will overstate the reliability of the system. Conversely, if extreme weather \nis correlated with good resource performance, then over-scrambling will understate the \nreliability of the system. Given that the majority of PJM’s reliability risk is in the winter when \nresource performance is poor, over-scrambling overstates the reliability of the system. This \nfinding is illustrated in the chart below. The “unrotated” load day (Load Rotation A) has over \ntwice as many reliability events as the average across all load rotations. Rectifying this issue \nwould appropriately reflect that PJM’s system is less reliable than currently modeled. \n aily Ma i     et Load (M )\n nscra bled\nScra bled \nthrough binning \napproach\n ays with low net load\n ays with high net load\nNet Load   Gross Load  Thermal Availability  Renewable Generation, Load Rotation   e a  le \nScra bled data  rod ces a \nsi ilar  ea  net load \ndistrib tion as t e  istorical \n( nscra bled) data  \nes ecially d ring c allenging \n ig  net load  eriods"},{"page":43,"startToken":13135,"endToken":13323,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n40\nFigure 18: PJM 2027/28 BRA Simulated LOLE results by Load Rotation Scenario \n \nMulti-day Scrambling Considerations \nAnother important feature of PJM’s approach is that it draws resource performance days \nsolely based on temperature of that day without consideration of the prior day’s resource \nperformance. This approach does not capture the fact that high and low resource \nperformance days tend to cluster together due to multi-day weather patterns that pass \nthrough the PJM region. For example, cloudy (or sunny) days are more likely to be followed \nby cloudy (or sunny) days. The impact of this design element is shown in the figure below. \nThe figure shows that for the 3-day rolling average capacity factor for tracking solar has both \nmore high generation periods and more low generation periods than PJM’s scrambled \nsimulations. \nLoad Rotation Scenario\n verage LOLE (days/year)\n o rotation scenario corres onds to \n ig est LOLE for  reserving t e realistic \nload reso rce correlation\n  e ot er rotations s o lo er LOLE d e to \n isalign ent of load and reso rce conditions \n nrotated"},{"page":44,"startToken":13323,"endToken":13519,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n41\nFigure 19: Consecutive-Day Average Solar Performance Before and After Scrambling \n \nThis effect is also not just limited to variable resources. E3 observes the same phenomenon \nfor combined cycle plants as shown in the figure below. This is likely due to the fact that \nwhen an unlimited resource fails, it can take multiple days to repair the unit. \nFigure 20: Consecutive-Day Average Forced Outage Rates Before and After Scrambling \n \nWhether or not the impact of multi-day resource availability impacts model results (either \nthe LOLE of the system or resulting resource-class ELCCs) depends on the resources in the \nportfolio. As energy storage penetrations increase, the underrepresentation of multi-day \nperiods of low resource availability risks overstating the reliability of the system and the \nELCC of energy storage resources. This is because energy storage is likely to run out of \n  day Rolling  verage  aily O tage Rate ( )\nRa   istorical  ata\nP M Si  lated  ata \n ays with consecutive \nlow outages\n ays with sustained \nhigh outages\nSimulated data (red) captures \nmulti day stretches of high \noutages but does not f lly \nre rod ce t e  ersistence in \nhistorical data"},{"page":45,"startToken":13519,"endToken":13929,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n42\ncharge in these (underrepresented) multi-day events. In a system without large quantities of \nenergy storage, PJM’s current approach is unlikely to significantly impact model results. \nResource Performance Scrambling across ELCC Classes \nAnother design choice of PJM’s model is to not scramble resource performance across \nresource classes from different historical days. In other words, wind, solar, and unlimited \nresource performance is always drawn from the same historical day. While this limits the \npotential set of conditions available to the model, it also prioritizes preserving correlations \nof performance between resource classes. PJM’s approach is reasonable and ensures the \nmodel does not introduce implausible combinations of wind, solar, and unlimited resource \nperformance. \nResource Performance Scrambling Sampling Probability \nFinally, in the current PJM framework, any resource performance day within each THI bin has \nequal likelihood of being stochastically selected by the model for pairing with a load day. \nOne drawback of this approach is that resource performance days that occurred far back in \nthe past may not accurately represent the system “as is” if units have undergone \nimprovements or enhancements such as weatherization or improved fuel supply \nmodifications. This is not only a concern for ensuring the model accurately estimates the \nreliability of the system and the ELCCs of resource classes, but also for sending economic \nsignals to individual resources to undertake improvements and enhancements. If individual \nresources do not perceive that improvements will be recognized and rewarded through \nimproved accreditation, they may be less likely to undertake these improvements to the \ndetriment of the reliability of the system.  \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nLoad and Resource Scrambling: E3 Evaluation Summary \nPros \nCons \n Aligns with industry best practice by \nscrambling load profiles and resource \navailability profiles in a way that \nintroduces new plausible conditions \nwhile preserving correlation between \nload and resource performance by \nlinking them through temperature \n By not scrambling resource classes\nfrom different historical days, PJM’s \napproach \npreserves \nperformance\ncorrelations \nbetween \ndifferent \nresource classes \n Weather for resource performance bins \nis not aligned with weather for load in \n“load rotations”, which fails to preserve \nrealistic correlation between loads and \nresources  \n Does not capture high or low multi-day \nresource performance events in ways \nthat aligns with historical observations \n(unlikely to significantly impact model \nresults until larger quantities of storage \nare present) \n By assigning equal likelihood to recent \nresource performance days and those"},{"page":46,"startToken":13929,"endToken":14294,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n43\n Bin sizes ensure sufficient quantity of \nresource performance observations in \neach bin \n Number of resource performance \ndraws ensure statistically significant \nmodel results \nfar in the past, PJM’s approach may not \nreflect the system “as is” if resources \nhave undertaken improvements or \nenhancements \n \nDispatch of Energy Limited Resources and Demand Response \nIndustry Best Practice \nUnlike production cost models, LOLP models generally do not “dispatch” thermal resources \nin order to avoid unnecessary computation. Instead, LOLP models evaluate the availability \nof resources and how much the system could dispatch if needed. This approach works well \nfor thermal resources. However, this approach does not work for energy-limited resources \nsuch as storage and demand response because their use in one hour directly reduces their \navailability in other hours. Therefore, it is industry best practice to time-sequentially \ndispatch energy-limited resources in LOLP models. \nBest practice for dispatching energy-limited resources in LOLP models should 1) \napproximate how these resources would be used by system operators for the maximization \nof system reliability while accounting for limitations such as imperfect foresight and 2) be \ntractable in order to enable hundreds or thousands of years of dispatch as is standard in \nLOLP modeling. To balance these factors, industry best practice often approximates an \n“optimal” dispatch of energy-limited resources (where optimal is defined as one that \nmaximizes system reliability) using a heuristic that is more computationally tractable than \npure optimization.  \nIndustry best practice of energy-limited storage dispatch also uses time-sequential \nsimulation to track energy-limited resource state of charge, round-trip charging/discharging \nefficiency losses, and demand response call limits. \nPJM Approach \nPJM models the dispatch of energy-limited resources for battery storage (standalone and in \nhybrids), dispatchable hydro (i.e., “Hydro Non-Pumped Storage”), and demand response. \nThe model tracks the state of charge for battery storage and dispatchable hydro resources \non a time-sequential basis, allowing the model to capture how use of energy-limited \nresources can deplete their charge. This approach also tracks the time required to recharge \nthese resources.  \nIn lieu of pure optimization for the dispatch of energy-limited resources, PJM uses a more \ntractable heuristic that is best described as a “more available resources are dispatched"},{"page":47,"startToken":14294,"endToken":14657,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n44\nfirst” methodology.32 PJM defines more available resources as those with longer durations. \nBecause demand response is available 24 hours a day in PJM, this is considered to be the \nmost available resource and is therefore dispatched first.33 The result of this approach is \nthat PJM dispatches demand response in all hours where load exceeds unlimited and \nvariable resources availability, before energy limited resources are dispatched. The energy-\nlimited dispatch order in PJM’s model is: \n Demand Response \n 10-hour storage \n 8-hour storage \n 6-hour storage \n Hydropower with non-pumped storage \n Solar-Storage (4-hour) Hybrids Open-Loop \n Solar-Storage (4-hour) Hybrids Closed-Loop \n 4-hour storage \nPJM does not allow storage resources to charge during hours in which demand response is \nbeing dispatched. In other words, the model will not call demand response in order to free \nup generation resources to charge energy storage.   \nPJM charges energy-limited resources simultaneously at equal rates using available energy \nfrom unlimited and variable resources in excess of load. Hybrid resources can charge using \nco-located generation when available.  \nE3 Evaluation \nPJM’s use of time-sequential dispatch for energy-limited resources aligns with industry best \npractice.  \nPJM’s heuristic dispatch using a “more available resources are dispatched first” \nmethodology reasonably approximates how energy-limited resources would be used by \nsystem operators for the maximization of system reliability. This is because dispatching \nlonger duration resources first preserves the maximum amount of instantaneous capacity \nfor use by the system in later time periods. Additionally, PJM’s heuristic is tractable and \nfacilitates the dispatch of energy-limited resources across thousands of years of \nsimulations. \nEven though PJM’s dispatch heuristic reasonably approximates optimal use of energy-\nlimited resources, there are several plausible conditions where this approach is not optimal. \nFor example, if the system is “energy short” as opposed to “capacity short” during a \nparticular reliability event, it may be optimal to discharge resources with the highest \nroundtrip efficiency (which tend to be short-duration batteries) since they can recharge \nfaster with less energy. \n \n32  Slide 15, https://www.pjm.com/-/media/DotCom/committees-groups/committees/pc/2024/20240216-special/elcc-\neducation.pdf  \n33 The approach to demand response modeling is described in recent revisions to PJM Manual 18."},{"page":48,"startToken":14657,"endToken":15040,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n45\nAnother aspect of PJM’s dispatch that does not maximize reliability of the system is the \nlimitations on using demand response to facilitate charging of energy-storage resources. \nThere are not sufficient levels of energy storage on PJM’s system today to observe how \nsystem operators would act in such a situation, making it difficult to align the model with the \nprinciple of reflecting real-world operations. Nonetheless, if PJM perceived a high risk of \nloss-of-load later in the day unless storage is able to charge earlier in the day, it is likely that \nPJM would consider enacting demand response to facilitate storage charging.  \nA fully optimized dispatch approach can account for other factors beyond just duration, \nincluding roundtrip efficiency. Incorporating such factors would be more accurate but also \nmore complex and would reduce model tractability.  \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nDispatch of Energy Limited Resources and Demand Response: E3 Evaluation Summary \nPros \nCons \n Hourly time-sequential dispatch of \nenergy limited resources and demand \nresponse aligned with industry best \npractices in LOLP modeling  \n Tractable \ndispatch \nheuristic \nreasonably \napproximates \nsystem \noperations and facilitates thousands of \nmodel simulations \n Dispatch of energy limited resources \ncould be more optimal through an \nimproved dispatch order. However, this \nwould \nincrease \ncomplexity \nand \ndecrease tractability  \n Dispatch of energy limited resources \ncould be more optimal by allowing \nenergy storage to charge in hours where \ndemand response is dispatched \nResource Accreditation \nIndustry Best Practice \nUsing LOLP models to accredit the effective capacity of resources is increasingly standard \npractice throughout North America. Markets such as PJM, MISO, NYISO have all \nimplemented a marginal ELCC framework that accredits resources based on their \navailability during critical hours, and ISO-NE is actively exploring implementing this \nframework. \nA strength of a marginal ELCC approach lies in the use of a common benchmark (“perfect \ncapacity”) against which the impacts of all resources can be measured. Additionally, this \napproach sends economically efficient signals to the market for entry (i.e., new investment), \nretention, and exit (i.e., exit) that minimize total consumer cost.  \nIn theory, each resource in an electricity system has a distinct and unique marginal ELCC \nvalue that reflects its specific operating characteristics and limitations. In practice, it is"},{"page":49,"startToken":15040,"endToken":15317,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n46\nimpractical to calculate individual marginal ELCCs due to both data availability and \ncomputational tractability.34 To address this issue, it is common practice to group similar \nresources together into “resource classes” and calculate marginal ELCCs for the entire \ngroup. Market operators then commonly differentiate resources within each class based on \na simple heuristic such as average capacity factor during high reliability risk hours. \nPJM Approach \nPJM calculates marginal ELCC values for a defined set of “resource classes,” listed below. \n Onshore Wind \n Offshore Wind \n Fixed-Tilt Solar \n Tracking Solar \n Landfill Intermittent \n Hydro Intermittent \n 4-hr Storage \n 6-hr Storage \n 8-hr Storage \n 10-hr Storage \n Demand Resource \n Nuclear \n Coal \n Gas Combined Cycle \n Gas Combustion Turbine \n Gas Combustion Turbine Dual Fuel \n Diesel Utility \n Steam \n Waste to Energy Steam \n Oil-Fired Combustion Turbine \nFor each resource class, PJM calculates a marginal ELCC value that represents the \nincremental improvement to reliability that would be achieved by adding a small or \n“marginal” quantity of that resource class. All measurements for incremental improvement \nto reliability are performed on a system that has been calibrated (by scaling load) to the 0.1 \nLOLE days/year reliability target. The metric for measuring incremental improvements to \nreliability due to adding a resource to this system is measured in terms of MWh of reduction \nin Expected Unserved Energy. All resource class marginal ELCC values are measured in a \nrelative % to how much the additional of an equivalent amount of a perfect resource would \nmarginally improve system reliability. This calculation process is outlined in the figure \nbelow. \n \n34\n Pg \n42, \nhttps://www.ethree.com/wp-content/uploads/2025/08/E3_Critical-Periods-Reliability-Framework_White-\nPaper.pdf"},{"page":50,"startToken":15317,"endToken":15564,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n47\nFigure 21  I                JM’  Resource Class Marginal ELCC Calculation \n \nTo assign a capacity accreditation value to each individual resource, PJM calculates \n“Performance Adjustment” factors for each individual resource to adjust the resource class \nELCC assigned to each individual resource. PJM uses this approach to tractably differentiate \nthe capacity accreditation of resources within a class while ensuring that the average \naccreditation for all resources within the class equals the resource class marginal ELCC.  \nPJM calculates the performance adjustment factor for each individual resource as the \naverage availability of a resource during the hours of the day that have a temperature \ncondition in which loss of load occurs. For example, if Days 3, 8, and 12 comprise \nTemperature Bin 1, and there is a loss of load event during the hours from 4-6pm on Day 3, \nthen the performance adjustment factor is calculated as average resource availability from \n4-6pm across all days in the Temperature Bin (Days 3, 8, 12).  \nPJM then normalizes the performance adjustment factor for all resources in the class to 1.0 \nand multiplies these values by the resource class marginal ELCC to determine the final \nAccredited UCAP (AUCAP) value that is assigned to each individual resource. This value \nforms the basis of both individual resource compensation in the capacity market and the \ndetermination of the total capacity requirement through the “pool-wide accredited average \n CAP”. An illustration of this calculation process is provided below."},{"page":51,"startToken":15564,"endToken":15717,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n48\nFigure 22: Illustration of Performance Adjustment Process \n \nE3 Evaluation \nPJM’s tractable approach to calculating marginal ELCC for each resource class \nappropriately represents the marginal reliability contribution of each resource class and \naligns with industry best practice. \nPJM’s approach to calculating individual Performance Adjustment values is based on the \nperformance of resources during any day with weather conditions that have loss of load. A \nshortcoming of this approach is that loss-of-load events are not exclusively driven by \ntemperature. For example, a very cold day that is cloudy is much more likely to have loss of \nload than a very cold day that is sunny. The end result is that PJM’s current approach \nconsiders performance in hours that are not determinative of a resource’s marginal ELCC, \nfor the purposes of individual Performance Adjustment. An illustration of this effect is \nprovided in the figure below."},{"page":52,"startToken":15717,"endToken":15822,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n49\nFigure 23: I            Ex          JM’                                         \n \nDespite this theoretical misalignment, PJM’s approach yields individual capacity \naccreditation values that are close to the theoretical ideal. An ideally performing \nmethodology would yield an individual Performance Adjusted Resource Class marginal \nELCC that is exactly equal to an individual resource marginal ELCC, assuming sufficient and \nappropriate data. The figure below compares PJM’s approach to the theoretical ideal for a \nlimited number of individual resources across different resource classes. Perfect \nperformance would yield dots that fall exactly on the diagonal line. This chart shows that \nPJM’s results are reasonably accurate."},{"page":53,"startToken":15822,"endToken":16109,"text":"Evaluation of PJM Model Design  \nPJM ELCC / RRS Model Evaluation  \n50\nFigure 24: Comparison of PJM Performance Adjustment ELCC with Marginal ELCC \n \nAnother attribute of PJM’s approach is that it mitigates some of the “noise” present in \nhistorical availability data of individual resources. In other words, PJM’s approach avoids \nover-penalizing resources that may have not been available during historical critical hours \nand avoids over-rewarding resources that were. The impact of this approach, as shown in \nthe figure above, is a general “flattening” of resource accreditation values within each \nresource class toward the class average. In other words, resources with a higher “true” \nmarginal ELCC generally receive a lower capacity accreditation value, and vice versa. \nThe table below summarizes E3’s evaluation of how PJM’s representation of load aligns with \nindustry best practice. \n \nResource Accreditation: E3 Evaluation Summary \nPros \nCons \n Accreditation founded on a marginal \nELCC metric accurately and fairly \naccredits resource classes \n Individual \nperformance \nadjustment \napproach yields AUCAP accreditation \nvalues that reasonably align with\nindividual marginal ELCC values \n Performance \nadjustment \napproach \nflattens noise in historical data that \nmay yield anomalous results  \n \n \n \nMarginal ELCC   ( )\n1 point   1 individual solar / wind resource \n rac ed Solar  nits\nLower ELCC   units receive a \nboost in performance \nadjusted A CAP\nPerfor ance  d  sted \n ndivid al Reso rce ELCC ( )\nOns ore  ind  nits\nMarginal ELCC ( )\nOverall close align ent\nbetween class average \nadjusted ELCC and individual \nresource marginal ELCC\nHigher ELCC units have \nperformance adjusted \nA CAP values s ifted \ndo n ard\n  Marginal ELCCs are approximated with average resource generation during critical hours (more are discussed in the section b elow)\n   Lower ELCC for certain units may re ect inherently low performance quality or over penalization for unavailability during historical critical hours"},{"page":54,"startToken":16109,"endToken":16357,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n51\nValidation of PJM Model Performance  \nThis section evaluates the performance of the PJM ELCC/RRS model to validate that the \ninputs, processes, and outputs are consistent with the stated model design. This section is \ndivided into two parts: \n Critical Hours Review: Assessment of the “critical hours” of the model to validate \nkey model outputs, namely the Forecast Pool Requirement (“FPR”) and Effective \nLoad Carrying Capability (“ELCC”) values \n Model Validation Tests: Select additional tests designed and performed by E3 to \nvalidate the PJM Model \nCritical Hours Review \n“Critical hours” are an increasingly well-understood concept as hours that impact system \nreliability. 35 Historically, standard industry practice only treated “loss of load hours” as \nrelevant to system reliability. However, the growth of energy-limited resources (namely \nenergy storage) shows that some non-loss-of-load hours are also relevant to system \nreliability if additional energy in these hours can help preserve energy storage state of charge \nfor use during loss-of-load hours.  \nPJM currently estimates critical hours in a post-processing step to the ELCC/RRS model. \nSpecifically, PJM uses a heuristic method to approximately identify critical hours by \nidentifying both loss-of-load hours and what they term “energy benefit hours”, which are \nhours where additional energy allows energy storage to save charge for later in the day.  \nAn overview of the timing of critical hours in PJM based on post-processing outputs from the \nPJM ELCC/RRS model is provided below. \n \n35 https://www.ethree.com/new-framework-resource-adequacy/"},{"page":55,"startToken":16357,"endToken":16640,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n52\nFigure 25: Critical Hours Timing by Month-Hour \n \nThe outputs of the PJM ELCC/RRS model show critical hours in both the winter and summer \nseason, with the majority occurring in the winter. Specifically, the model shows critical \nhours in the winter season during mornings and evenings on severe cold days and in the \nsummer season on hot days during early evening hours when net load is high after solar \ndeclines.  \nWhile PJM has not had any loss-of-load events due to resource adequacy related issues in \nrecent decades, PJM has had several close calls, including periods where operating \nreserves have dropped below minimum required levels. In some events, PJM has enacted a \n“Performance Assessment” that requires all resources to generate at their committed levels \nor be financially penalized to avoid imminent load shed. A list of these actual historical \nscarcity events is provided in the table below. These historical events have occurred in both \nthe summer and winter but are more common in the winter. In this regard, the PJM \nELCC/RRS model outputs are consistent with available historical data. \nTable 5: List of Historical Scarcity Events in PJM \nHistorical Scarcity Event \nSeason \nPolar Vortex of 1994 \nWinter \n2012 Heatwave \nSummer \n2013 Heatwave \nSummer \nPolar Vortex 1 (2014) \nWinter \nPolar Vortex 2 (2019) \nWinter \nWinter Storm Elliot (2022) \nWinter \n \nShare of Critical Hours by Month Hour\n i e of  ay ( o r  eginning)\n  \n  \n  \n  \n  \n  \n  \n  \n  \n  \n  \n  \n  \n  \n \n \n \n \n \n \n \n \n \n \n \nMont \n \n \n \n \n \n \n \n \n  \n  \n  \nCritical hours most likely to occur at certain times of year, in both summer and winter\nJanuary and February have critical hours throughout the day, \nconcentrated in morning and evening\nJuly and August have \ncritical hours in the \nevening"},{"page":56,"startToken":16640,"endToken":16960,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n53\nDespite model consistency with historical scarcity events, validating the timing of critical \nhours must ensure that the model is consistent with future expectations of system risk. The \nPJM system is evolving in several ways that increase winter risk relative to the past. Solar \npenetration is increasing, which is most available in the summer. Winter loads are growing \nas customers electrify heating in some states. Therefore, E3’s assessment is that a majority \nof risk in the winter is consistent with historical and future expectations of system risk.   \nForecast Pool Requirement \nThe Total UCAP Reliability Requirement is theoretically identical to average load during \ncritical hours. The Total UCAP Reliability Requirement in the 2027/2028 BRA is 152,036 MW. \nAverage load during PJM-identified critical hours in the model is 153,189 MW. The relative \nalignment between these two values (<1% difference) indicates that the model is accurately \ncalculating the reliability requirement. The lack of exact alignment is due to the post-\nprocessing heuristic approach used by PJM to identify critical hours that is not perfectly \noptimal.  \nTable 6: 2027/2028 BRA Total UCAP Reliability Requirement vs Average Load During \nCritical Hours \nItem \nValue \nFormula \nForecasted Peak \n164,186 MW \n[A] \nForecast Pool Requirement (FPR) \n92.6% \n[B] \nTotal UCAP Reliability Requirement \n152,036 MW \n[C] = [A] x [B] \nAverage Load During Critical Hours \nCan be used to approximate Total \nUCAP Requirement \n153,189 MW \nWithin 1% of Total UCAP \nRequirement \n[D] \nThe 153,189 MW value in the table above represents average load during all critical hours. \nThis value is a product of some load hours that are higher than this average and some that \nare lower. To provide transparency into this value, the figure below shows all load levels \nduring all critical hours. The average, 90th percentile, and 10th percentile load during critical \nhours are specifically highlighted as horizontal bars."},{"page":57,"startToken":16960,"endToken":17164,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n54\nFigure 26: Load During Critical Hours \n \nELCC Results \nMarginal Effective Load Carrying Capability (“ELCC”) values are theoretically identical to \naverage resource availability during critical hours. These values represent the marginal \ncontribution of a resource toward reliability. Resources that consistently produce during \ncritical hours achieve higher marginal ELCC values. Conversely, resources available at low \nlevels during those hours receive lower marginal ELCC. Comparing PJM-calculated marginal \nELCC values with average availability during critical hours can help provide transparency \ninto model outputs and validate that the model is working correctly. \nThe table below shows the alignment between the marginal ELCC values calculated by the \nELCC/RRS model and the average availability of each resource class during critical hours. \nThe very close alignment between these two validates that the ELCC values calculated by \nthe model accurately represent the availability of these resource classes during the hours \nmost critical to system risk.  \nLoad  uring Critical Hours\n1 Scatter Point  1 Critical Hour\n           \n                        \nHour of  ay\nMW of Served Load\n                \n              \n 52 0   M \n 5      M \n \n otal  C P Reliability Re  ire ent \ncan be re rod ced by ta ing \naverage of served load d ring \ncritical  o rs"},{"page":58,"startToken":17164,"endToken":17358,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n55\nTable 7: PJM 2027/28 BRA ELCC Results vs Average Availability in Critical Hours \nResource Class \nAverage Availability  \nin Critical Hours (%) \nMarginal ELCC (%) Difference (%) \nOnshore Wind \n40% \n41% \n-1% \nOffshore Wind \n67% \n67% \n0% \nSolar Fixed \n7% \n7% \n0% \nSolar Tracking \n8% \n8% \n0% \n4hr Storage \n58% \n58% \n0% \n6hr Storage \n67% \n67% \n0% \n8hr Storage \n70% \n70% \n0% \n10hr Storage \n78% \n78% \n0% \nDemand Response \n92% \n92% \n0% \nThe marginal ELCC values in the table above represent average resource availability during \nall critical hours. This value is a product of some resource availability hours that are higher \nthan this average and some that are lower. To provide transparency into this value, the \nfigures below show all resource availability levels during all critical hours for solar. The \naverage, 90th percentile, and 10th percentile resource availability during critical hours are \nspecifically highlighted as horizontal bars. This chart shows the wide variability of solar \ngeneration during critical hours, including many hours at 0% availability and some hours \nthat exceed 60%. Nonetheless, the average contribution of solar is less than 10% relative to \na perfect resource."},{"page":59,"startToken":17358,"endToken":17529,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n56\nFigure 27: Solar Availability During Critical Hours \n \nAs with all resources, the average dispatch of energy-limited resources during critical hours \nis equivalent to these resources’ marginal ELCC. Because the dispatch of energy-limited \nresources is controllable, the most relevant factor that limits the ELCC of these resources \nis the duration of critical events. For example, a 4-hour duration battery would run out of \ncharge during a 5-hour critical event and not be available for dispatch in the last hour. The \nfigure below shows the duration of critical events in the ELCC/RRS model. The prevalence \nof many long-duration critical events (particularly in winter) explains the ELCC values \ncalculated by the ELCC/RRS model for energy-limited resources.  \n \nAvailability  uring Critical Hours\n1 Scatter Point  1 Critical Hour\nHour of  ay\n i ed Solar\n rac ing Solar\n               \nE   \n                    \n                 \n  \n  \n \n               \nE   \n                    \n                 \n  \n  \n \n i ed tilt solar  erfor s  orse \nd ring evening critical  o rs  \nres lting in lo er ELCC\n  of E ective Nameplate Capacity"},{"page":60,"startToken":17529,"endToken":17737,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n57\nFigure 28: Duration of Critical Hour Periods \n \nTo provide more transparency into battery storage marginal ELCC values, the figures below \nshow all resource availability levels during all critical hours for energy storage with 4 and 10-\nhour durations. The average, 90th percentile, and 10th percentile resource availability during \ncritical hours are specifically highlighted as horizontal bars. This chart shows the wide \nvariability of energy storage dispatch during critical hours, including many hours at 100% \ndischarge, many hours at 0% discharge, and a small number of hours below 0% discharge \n(which represent charging hours). Storage resources may charge during critical hours if it \nenables discharging at a later hour during a critical period. The average availability of energy \nstorage during critical hours ranges from 58% to 78%. \nEvent   ration (hours per event)\n  of summer events\n  of winter events\n   \n   \n   \n  \n  \n  \n   \n   \n   \n   \n   \n   \n   \n   \n   \n    \n \n \n  \n  \n  \n   \n      \n   \n                                  \n  \n   \n   \n   \n   \n   \n   \n   \n   \n   \n    \n \n \n  \n  \n  \nEvent   ration (hours per event)\nS   er critical events last \n   to    o rs\n         s      o s              \n ons    n    Mos               o s \n          n   2  o  s\n inter critical  eriods can \nlast    to     o rs\n  n      s      o s      o   \n n  g   n            ons    n    \n 5  o            o  s     5 o    ss \n o  s        n s        o     o 2  \n o  s  ong"},{"page":61,"startToken":17737,"endToken":17942,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n58\nFigure 29: Storage Dispatch in Critical Hours \n \n \nModel Validation Tests \nE3 designed and performed a series of tests to further validate that the PJM Model is \ninternally consistent and works as intended to produce transparent, explainable reliability \nresults. This section summarizes the validation tests conducted by E3, using both public \ninformation and additional data provided by PJM.  \nE3 performed three validation “Test Types”: \n1. Verification: confirm that model inputs, intermediate data, and outputs align with \nPJM’s documentation36 \n2. Replication: reproducing selected model results using model inputs or upstream \nmodel components \n3. Assessment: evaluating whether model inputs, intermediate data, and outputs fall \nwithin expected value ranges \n \n36  Specifically, the 2025 PJM ELCC and RRS Study Report: https://www.pjm.com/-/media/DotCom/planning/res-\nadeq/elcc/2025-pjm-elcc-rrs.pdf  and public data on PJM ELCC webpage: https://www.pjm.com/planning/resource-\nadequacy-planning/effective-load-carrying-capability  \n ispatch  uring Critical Hours\n1 Scatter Point  1 Critical Hour\nHour of  ay\n               \nE   \n                    \n                 \n5  \n5  \n \n               \nE   \n                    \n                 \n   \n   \n \n    o r Storage\n   o r Storage\n  of ICAP (Positive    ischarging, Negative   Charging)\nLonger d ration storage s stains  ig er \naverage disc arge rate d ring critical \n o rs  res lting in  ig er ELCC"},{"page":62,"startToken":17942,"endToken":18294,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n59\nE3 designed and prioritized tests based on E3’s assessment of the importance to model \nresults. While it was not possible to validate every aspect of the model, these tests \ncomprehensively show that the model is working as intended for all areas that E3 evaluated. \nEach table in the following sections describes the validation tests performed on a key \nfeature of the PJM Model. Each validation test is categorized by “Test Type”, corresponding \nto classification described above. The “ ata Access” column also indicates if the data is \npublic or non-public. \nVariable Resources \nE3 performed the following tests to validate the representation of variable resource classes, \nwith the focus on tracking solar and onshore wind. Key elements evaluated include effective \nnameplate capacity, availability profiles, and deliverability constraints. The first two tests \nfocused on raw generation profiles prior to the application of deliverability caps. These tests \nrequired non-public information, because PJM publishes availability profiles with \ndeliverability caps applied.  \n \nData \nAccess \nTest Type \nDescription of Test \nNon-\nPublic Assessment \nE3 validated that the 12 years (June 2012- May 2024) of historical \nuncapped generation profile shows annual capacity factors ranging \nbetween 20% - 23% for tracking solar and 30% - 34% for onshore \nwind, consistent with expected solar & wind output in the region. \nNon-\nPublic Assessment \nE3 validated that hourly solar generation profiles align with Eastern \nTime Zone sunrise and sunset times, accurately accounting for \nDaylight Saving Time. \nNon-\nPublic Verification \nE3 verified that the difference between deliverability-capped and \nuncapped variable resource profiles aligns with published \ndeliverability constraints. \nUnlimited Resources \nE3 performed the following tests to validate the representation of unlimited resources \nclasses, with the focus on Gas Combined Cycle and Gas Combustion Turbine class. Key \naspects evaluated include resource class ICAP, forced and ambient derate profiles, and the \nmethodology for planned and maintenance outage scheduling. These tests involved the \nplanned and maintenance outage scheduling module in model codebase, which is not \npublicly available. The methodology for planned and maintenance outage scheduling is \ndescribed in PJM’s 2 2  ELCC/RRS Report. \n \nData \nAccess \nTest Type \nDescription of Test"},{"page":63,"startToken":18294,"endToken":18609,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n60\nPublic Verification, \nAssessment \nE3 validated that the 12 years (June 2012- May 2024) of unlimited \nresource ambient derate profile show expected positive correlation \nwith hourly THI (up to 2.4% derate in hottest hours for Gas Combined \nCycle) \nNon-\nPublic \nVerification, \nReplication \nE3 reviewed and verified that the planned and maintenance outages \ncode module provided by PJM schedules outages into weeks with \nlowest weekly-gross-peak-load, before forced-in outages are applied \n(See Figure 8: Weekly Average Maintenance and Planned Outages ) \nNon-\nPublic Verification \nE3 verified that forced-in maintenance overrides planned and \nmaintenance outage rate in peak-load weeks of simulation year \nwhere weather pattern is similar to summer of 2012 or 2013, or \nwinters of 2014, 2019, or 2022. This is consistent with PJM \ndocumentation \n \nLoad Profiles \nE3 performed the following tests to validate load profiles. Key aspects evaluated include the \nshape of the load profiles and the implementation of load rotation in the model. These \nvalidation tests only involved publicly available information. \n \nData \nAccess \nTest Type \nDescription of Test \nPublic \nAssessment \nE3 validated that 31 years (June 1993 – May 2024) of simulated load \nprofiles show reasonable variability in annual peak (1-in-10 peak load \nis ~7% higher than 1-in-2 peak load) \nPublic \nAssessment \nE3 validated that simulated load profiles month-hour shapes and \ntemperature correlations align with historical PJM load profiles from \nthe last 10 years. (See Figure 3: Daily Peaks of Simulated & Historical \nLoad in Summer and Figure 4: Daily Peaks of Simulated & Historical \nLoad in Winter) \nPublic \nAssessment \nE3 validated that peak load timing aligns with historical records \n(summer loads peak between 3-6 PM, driven by air conditioning \nloads; winter loads peak between 6-8 AM and 6-7 PM, driven by \nheating loads)  \nPublic \nAssessment \nE3 validated that the 12 rotated load profiles maintain similar load \nvariability as the original unrotated load scenario \n \nLoad and Resource Scrambling"},{"page":64,"startToken":18609,"endToken":18957,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n61\nE3 performed the following tests to validate the load and resource scrambling process. The \nfocus was to confirm implementation of scrambling for the variable and unlimited resource \nclasses with load profiles. These validation tests rely on the Temperature-Humidity Index as \na key input.  \n \nData \nAccess \nTest Type \nDescription of Test \nPublic \nVerification, \nReplication \nE3 tested and verified that applying Freedman–Diaconis rule to THI \ndata replicates the same 31 winter bins and 20 summer bins \npublished by PJM (pre-merge) \nPublic \nVerification, \nReplication \nE3 verified that assigning June 1, 2012 – May 31, 2024 resource \nperformance days to summer and winter THI bins using hourly THI \nprofile replicates resource performance days in each THI bin \npublished by PJM \nPublic \nAssessment \nE3 validated that scrambling of renewable generation and thermal \navailability profile based on PJM published “Montecarlo by date” \nmapping file reproduces the scrambled profiles which are in the PJM \nmodel and published in “info for loss of load hours” file (for days with \npublish data) \nPublic \nVerification \nE3 verified that in the “Montecarlo by date” mapping file all of the 1   \nresource performance days come from the same THI bin as the load \nday they are matched to \nPublic \nVerification, \nAssessment \nE3 replicated and validated that scrambled net load profiles (gross \nload net of variable and unlimited resource availability) has a \ndistribution of daily peak net load aligned with unscrambled net load \nprofiles (see Figure 17: Daily Peak Load Net of Availability Resources \nBefore and After Scrambling) \nDispatch of Energy Limited Resource and Demand Response \nE3 performed the following tests to validate the dispatch of energy-limited resources and \ndemand response. The focus was on verifying the implementation of designed model \ndispatch rules. These validation tests involved 8760 hourly dispatch data for 100 simulated \nyears. This relied on non-public information, because PJM only publishes hourly dispatch \nresults for loss-of-load hours. \n \nData \nAccess \nTest Type \nDescription of Test \nNon-\nPublic \nVerification E3 reviewed and validated that demand response is only dispatched \nin hours where load exceeds the total availability of variable,"},{"page":65,"startToken":18957,"endToken":19278,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n62\nIntermittent hydropower, and unlimited resource classes. This aligns \nwith PJM documentation \nNon-\nPublic \nVerification \nE3 reviewed and validated that energy-limited resources (hybrid or \nstandalone battery storage, hydro with non-pumped storage) are only \ndispatched after demand response is dispatched. This aligns with PJM \ndocumentation \nNon-\nPublic \nVerification \nE3 reviewed and validated that shorter-duration battery storage is \nonly discharged when longer-duration battery storage is already \ndischarging at its maximum power output, or that longer-duration \nenergy is depleted. This aligns with PJM documentation \nNon-\nPublic \nVerification E3 reviewed and validated that battery storage of all duration charges \nsimultaneously. This aligns with PJM documentation \n \nReliability Results  \nE3 performed the following tests to validate reliability results produced by PJM’s model. The \nvalidation focused on two key aspects of system reliability outcomes: magnitude and timing \nof loss-of-load risks. In addition, the stability of the model results was evaluated to confirm \nthe convergence of system reliability metrics. These validation tests only involved publicly \navailable information. \n \nData \nAccess \nTest Type \nDescription of Test \nPublic \nVerification, \nReplication \nE3 calculated and verified that published loss of load hours achieves \nPJM’s 1-day-in-10-years Loss-of-Load-Expectation (0.1 LOLE) \nreliability standard \nPublic \nAssessment \nE3 validated that most of loss of load risks (87%) occur in winter \nmonths consistent with scarcity events observed in the last decade \n(Winter Storm Elliott, Polar Vortex 1, Polar Vortex 2). Winter loss of \nload is concentrated within 5:00am – 11:00am and 4:00pm – \n12:00am in January, aligned with hours featuring cold temperatures, \nhigh load, and low resource performance. Summer loss of load is \nconcentrated within 4:00pm – 8:00pm in July, aligned with hours \nfeaturing high temperatures, high load, and reduced solar \nperformance \nPublic \nAssessment \nE3 calculated and validated that across 100 resource performance \nrepetitions, system reliability converges to 0.1 LOLE, with variation \nno more than ±0.002 LOLE. This demonstrates strong stability in \nreliability results"},{"page":66,"startToken":19278,"endToken":19609,"text":"Validation of PJM Model Performance  \nPJM ELCC / RRS Model Evaluation  \n63\nPublic \nVerification, \nAssessment \nE3 validated that load rotations B-M each exhibit higher reliability \ncompared to load rotation A due to weather rotation misalignment in \nscrambling process as described in ELCCSTF Package C. (see Figure \n18: PJM 2027/28 BRA Simulated LOLE results by Load Rotation \nScenario) \n \nReliability Requirement and Resource Class Accreditation \nE3 performed the following tests to validate the reliability requirement and resource \naccreditation results. The most important aspects of these results validate the model’s \ninternal consistency and alignment with the theory of marginal accreditation in LOLP \nmodeling. These validation tests required several unpublished pieces of data: (1) hourly \ndispatch data in all critical hours based on PJM’s critical-hour identification methodology, \n(2) hourly dispatch results for perfect capacity run, tracking solar class ELCC run, and 4-\nhour storage class ELCC run. \n \nData \nAccess \nTest Type \nDescription of Test \nNon-\nPublic \nVerification, \nAssessment \nE3 calculated and validated that total AUCAP Reliability Requirement \nis close to average load served during critical hours (within 1% \ndifference) \nNon-\nPublic \nVerification, \nAssessment \nE3 calculated and validated that Class ELCCs of variable resources \nare close to average availability during critical hours (within 1% \ndifference) \nNon-\nPublic \nVerification, \nAssessment \nE3 calculated and validated that Class ELCCs of energy-limited \nresources and demand response are close to average availability \nduring critical hours  \nNon-\nPublic \nVerification, \nReplication \nE3 replicated the class ELCC for tracking solar and 4-hour storage by \ntaking the ratio of Expected Unserved Energy (MWh) reduction in \nstorage class and solar class ELCC run divided by the Expected \nUnserved Energy (MWh) reduction in perfect capacity run \nNon-\nPublic Verification \nE3 validated that energy-limited resources are re-dispatched in the \nstorage class and solar class ELCC run \nNon-\nPublic \nVerification, \nReplication \nE3 replicated the weight of each timestamp for the calculation of    \nresource Performance Adjustment for ELCC Classes; E3 verified that \nthey are consistent with weights published in “hours and weight for \nperformance adjustment calculation” spreadsheet on PJM website"},{"page":67,"startToken":19609,"endToken":19883,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n64\nConsiderations for Improvement \nE3’s review finds that PJM’s ELCC/RRS model is reasonable and fit-for-purpose for \ncalculating the “Effective Load Carrying Capability” and \"Reserve Requirement” values for \nuse in PJM’s capacity market. E3’s review also identifies several aspects of the model where \nPJM may consider making future improvements. Rather than recommend specific changes \nto the ELCC/RRS model, this report evaluates potential considerations for improvement \naccording to the following criteria: accuracy, objectivity, stability, transparency, \ntractability, impact, and ease of implementation, as described below.  \n \n \nIn some cases, model changes that improve performance along one dimension may reduce \nperformance along another dimension. Balancing these tradeoffs will ultimately require the \njudgment of PJM, PJM stakeholders, and policymakers. E3 does not view implementation of \nany of these considerations as strictly necessary for the continued use of the current model \n cc racy\nHow well a model change improves the model s representation of system \nreliability risks or resource capacity accreditation?\nOb ectivity\n oes a model change increase or decrease subjective modeling inputs or \nmethods?\nStability\nHow well a potential model change improves the ability of the model to produce \nrobust results that do not signi cantly change due to small input changes?\n rans arency\nHow clearly model methods, inputs, and results are documented and \ncommunicated? \n ractability\n oes a model change increase or decrease the computational and human \ne ort to run the model ?\n   act\nThe magnitude of impact on system reliability risks or resource capacity \naccreditation of a model change\nEase of    le entation \nThe level of e ort for PJM to implement a model change \n ey Eval ation Criteria"},{"page":68,"startToken":19883,"endToken":20139,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n65\nin the administration of the capacity market. Instead, they are intended to support \ncontinued improvement of PJM’s reliability modeling framework over time. \nSummary of Evaluation of Considerations for Improvement \nThe table below provides a summary of E3’s considerations for improvement and how each \nconsideration scores along the aforementioned evaluation criteria. Green boxes represent \nthe benefits of implementing a potential improvement, whereas yellow and red boxes \nrepresent tradeoffs that may caution against implementing a particular improvement. Gray \nboxes represent criteria that are not relevant for evaluating a particular consideration. More \ndetail on each consideration is provided throughout this section. \nTable 8: Summary of Evaluation of Considerations for Improvement \nConsideration \nIn order of approximate prioritization \nAccuracy  \nObjectivity \nStability \nTransparency  \nTractability \nImpact  \nEase of \nImplementation \n1) Improve identification of critical hours \n \n \n \n \n \n \n \n \n2) Publish critical hours, including load and \nresource availability data during these hours \n \n \n \n \n \n \n \n3) Update the scrambling process to draw resource \nperformance from the same weather condition used \nto synthesize load \n \n \n \n \n \n \n \n4) Use more temporal granularity to model \navailability and deliverability of unlimited resources \n \n \n \n \n \n \n \n \n5) Schedule planned maintenance based on net load \n \n \n \n \n \n \n \n \n6) De-weight historical resource performance \nevents as new resource performance events under \nsimilar weather conditions occur \n \n \n \n \n \n \n \n7) Increase the number of load rotations to balance \ndays-of-week \n \n \n \n \n \n \n \n8) Calculate solved load by adding or subtracting \n“flat” load instead of scaling load \n \n \n \n \n \n \n \n9) Stochastically model hydro resources and extend \nhydro record \n \n \n \n \n \n \n \n10) Stochastically model forced outages for storage \nresources \n \n \n \n \n \n \n \n \n11) Evaluate improved mapping of deliverability \nconstraints to system conditions"},{"page":69,"startToken":20139,"endToken":20183,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n66\n12) Re resent “Ca acity  enefit of  ies” on a  ore \ntime-granular basis \n \n \n \n \n \n \n \n13) Study updates to resource performance \nsampling methodology to capture multi-day events \n \n \n \n \n \n \n \n14) More optimally dispatch energy storage, demand \nresponse, and hydro"},{"page":70,"startToken":20183,"endToken":20641,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n67\n \nConsiderations for Model Improvements  \nConsideration 1: Improve identification of critical hours \n“Critical hours” are an increasingly well-understood concept within the context of resource \nadequacy.37 As described earlier in the report, critical hours are periods when additional \nenergy (or load reduction) would improve system reliability by reducing unserved energy. \nCritical hours include both loss-of-load hours and adjacent periods where additional energy \nimproves system reliability.  \nThe concept of critical hours is relevant to PJM because it is the load and resource \navailability during these hours that drive the outputs of the PJM ELCC/RRS model. \nSpecifically: \n Weighted average load during critical hours38 = the Forecast Pool Requirement \n Weighted average resource class availability during critical hours39 = resource class \nmarginal Effective Load Carrying Capability (ELCC) values \nAt the same time, accurately identifying critical hours is not strictly necessary to accurately \ncalculate either the Forecast Pool Requirement or resource class marginal Effective Load \nCarrying Capability values. PJM’s approach that measures the reliability improvement of the \nmarginal quantity of a resource class is implicitly driven by resource class availability during \ncritical hours and accurately captures all relevant critical hour dynamics. Nonetheless, \nexplicitly identifying critical hours and the availability of each resource class during these \nhours would provide significant transparency benefits to stakeholders. This is important \nbecause some stakeholders critique LOLP models as a “black box” that doesn’t provide \nvisibility into model outputs.40 \nIn an effort to improve transparency, PJM does currently attempt to identify critical hours in \nthe model. It should be noted that while the identification of loss-of-load hours is standard \npractice in LOLP modeling, it is not industry standard practice to identify all critical hours. \nPJM currently uses a heuristic method to approximately identify critical hours by identifying \nboth loss-of-load hours and what they term “energy benefit hours.” The average availability \n \n37 https://www.ethree.com/new-framework-resource-adequacy/  \n38 Weighted by the “criticality” of each critical hour. The “criticality” of a given hour is defined as how much 1 MWh of \nadditional energy reduces system unserved energy. 1 MWh of additional energy in an hour that reduces unserved energy \nby 0.8 MWh has a criticality factor of 0.8. In general, loss-of-load hours have a criticality of 1.0, because additional energy \nin those hours directly reduces unserved energy. However, some hours where additional energy is used to charge storage \nmay have a criticality of less than 1.0 due to storage roundtrip losses. Non-critical hours by definition have a criticality \nfactor of 0. Ideally, the criticality of each hour would be measured and published by the loss-of-load-probability model \nwithout any necessary post-processing. \n39 Ibid. \n40 For example, see IMM Dec. 21, 2023 Answer to PJM Deficiency Letter Response, Docket No. ER24-99"},{"page":71,"startToken":20641,"endToken":21081,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n68\nof resource classes during these critical hours should approximately equal resource class \nELCCs as calculated by the model.41 \nPJM currently uses the following methodology to identify critical hours: \n1. PJM identifies all loss-of-load hours in a base case and classifies these hours as \ncritical \n2. PJM runs another simulation with an incremental 100 MW of perfect capacity in all \nhours to identify the reduction in unserved energy in each hour. When the reduction \nof unserved energy in a loss of load hour exceeds 100 MWh, this indicates that there \nare additional critical hours that precede this hour  \n3. PJM then identifies preceding hours where the dispatch of energy storage changes \nbetween the base case and the case with 100 MW of incremental perfect capacity. \nThese are hours where the addition of perfect capacity either allows energy storage \nto save charge for later in the day or charges energy storage when it was otherwise \nunable to. PJM terms these “energy benefit” hours and classifies them as critical \nPJM’s process is a reasonable method to identify critical hours, but there is opportunity to \nimprove accuracy. For example, PJM’s process identifies each hour as critical or non-\ncritical, but does not measure the “criticality” of each hour. This is particularly important for \n“energy benefit hours” where the addition of 1 MWh of energy may reduce system unserved \nenergy by less than 1 MWh due to energy storage roundtrip losses. Options for more \nrigorously identifying critical hours and their criticality include: \n• Using an optimization model that identifies the “shadow price” of energy in each hour \ntoward the objective function of minimizing system unserved energy. \n• Using a brute force method that adds energy in each hour and observes the impact on \nsystem unserved energy. This would, however, require many model runs. Smart \nstrategies to parallelize or only test during plausible critical hours would be required. \nPJM could consider enhancements to refine its approach to identifying critical hours. \nIdeally, the model would produce the criticality of each hour as a direct output without any \npost-processing or heuristic approximation. \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 1: Improve identification of critical hours \nAccuracy \nN/A  \nObjectivity \nMore robustly identifying critical hours removes the need for a heuristic \nmethod to approximately identify critical hours \nStability \nN/A \nTransparency \nImproved identification of critical hours supports a more transparent \nmodel by facilitating stakeholder vetting and understanding \n \n41 The link between these is only “approximate” because PJM identifies critical hours using a heuristic that does not \nmeasure the criticality of each hour"},{"page":72,"startToken":21081,"endToken":21454,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n69\nTractability \nAn automatic model process to identify critical hours (as opposed to a \npost-processing heuristic) reduces burden on the modeler and \nimproves tractability \nImplementing optimization or a “brute force” method into the model \nincreases computational requirements and decrease tractability \nImpact Level \nWhile identifying critical hours would not have any direct impact on \nresults, identifying critical hours would improve transparency and have \na significant impact on stakeholder understanding of the model and the \nability to vet and check results \nEase of \nImplementation \nMore rigorously identifying critical hours through optimization requires \na moderate to large implementation effort \nConsideration 2: Publish critical hours, including load and resource availability data during \nthese hours \nThe key results of the model (e.g., FPR and ELCCs) are fundamentally driven by conditions \nsimulated during critical hours. Specifically, load during critical hours determines the FPR, \nand resource availability during critical hours determines ELCC values. \nLOLP modeling has traditionally been used to produce planning reserve margin and ELCC \nresults without explicitly associating these results with critical hours. The publishing of \nresults without publishing the underlying drivers of these results has contributed to some \nPJM market participants, stakeholders, and policymakers arguing that the model is “black \nbox.”42   \nAccurately identifying and publishing critical hours (both loss-of-load and “energy benefit” \nhours), including all load and resource availability during these hours, is the single biggest \nstep that PJM can take to increase model transparency. Currently, PJM only publishes load \nand resource class dispatch for loss-of-load hours. Including all critical would allow market \nparticipants, stakeholders, and policymakers to review the underlying data that drives FPR \nand ELCC values. This consideration will be increasingly important as storage penetrations \nincrease and expand the set of non-loss-of-load periods that are also critical to system \nreliability. \nE3’s “Critical Hours Review” earlier in this report demonstrated some of the results and \ninsights that would be available to stakeholders if PJM were to make this data publicly \navailable, including better understanding of: \n The timing and duration of critical hours \n The distribution of load levels during critical hours \n The distribution of resource class availability during critical hours \n \n42 For example, see IMM Dec. 21, 2023 Answer to PJM Deficiency Letter Response, Docket No. ER24-99"},{"page":73,"startToken":21454,"endToken":21813,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n70\nIn particular, publishing critical hours would provide stakeholders with useful information \nto inform an understanding of why different resource classes receive a specific marginal \nELCC, since marginal ELCCs are equal to weighted average43 resource class availability \nduring critical hours. Additionally, weighted average load during critical hours will equal the \ntotal Forecast Pool Requirement.  \nPJM could consider publishing all critical hours, including load and resource availability data \nduring these hours. PJM could also consider publishing calculations demonstrating how \nmodel results (FPR and ELCC) align with load and resource availability during critical hours. \nIt should be noted that this supplemental informational posting to improve transparency \nwould not change the implementation or outcomes of PJM’s approach and would therefore \nnot require changes to PJM’s tariff.  \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 2: Publish critical hours, including load and resource availability data during \nthese hours \nAccuracy \nN/A  \nObjectivity \nN/A \nStability \nN/A \nTransparency \nPublishing critical hours allows stakeholders to scrutinize and\nunderstand how FPR and ELCC results are derived, reducing the “black \nbox” element of LOLP modeling. This is the single most important step \nPJM can take to increase model transparency \nTractability \nN/A \nImpact Level \nN/A \nEase of \nImplementation \nSmall to moderate effort to publish critical hours and load and \nresource availability during these hours \nConsideration 3: Update the scrambling process to draw resource performance from the \nsame weather conditions used to synthesize load \nThe current PJM modeling approach samples resource performance values for each day \nfrom the weather bin associated with that particular date. A concern with this approach is \nthat PJM rotates different weather through that same day for the purpose of introducing \ndifferent loads. This leads to misalignment between the weather conditions reflected in the \nload profile and the weather conditions reflected in the resource performance assumptions \nfor certain load scenarios. For example, resource performance conditions from non-\nextreme weather conditions might be paired with load profiles from extreme weather \nconditions when rotation introduces a more severe weather pattern.  \n \n43 Weighted by the “criticality” of each hour"},{"page":74,"startToken":21813,"endToken":22199,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n71\nAs demonstrated earlier in this report, this over-scrambling overstates the reliability of the \nsystem and should be corrected. PJM could instead consider drawing resource \nperformance values from the same weather bin that was used to synthesize the load on each \nday. This approach would more accurately capture the correlation between temperature, \nload, and resource performance.   \nThis consideration for improvement is aligned with PJM Package C. PJM studied the impact \nof this change for 2026/2027 BRA inputs and determined that when implemented on a \nstandalone basis, there is a measurable increase in overall system risk (IRM increases 3.3%) \nand a decrease in accreditation for most resource classes. The improved alignment \nbetween resource performance and loads also results in over 96% of loss-of-load hours \noccurring in the winter season.44  \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 3: Update the scrambling process to draw resource performance from the \nsame weather condition used to synthesize load \nAccuracy \nImproved model accuracy by ensuring load and resource performance is \ndrawn from consistent weather conditions to capture correlations.  \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nN/A \nImpact Level \nModest to high impact on IRM and ELCC values as indicated by PJM \nsensitivity analysis  \nEase of \nImplementation \nLow implementation effort given that PJM has already built this \nfunctionality to test impacts as part of Package C  \nConsideration 4: Use more temporal granularity to model capability and deliverability of \nunlimited resources \nPJM currently limits the deliverability and resulting modeled availability of “unlimited” \nresources to their ICAP rating in all hours, with additional de-rates applied based on ambient \nconditions. As described earlier in this report, the ICAP rating of unlimited resources is the \nlesser of each resource’s Summer Net Capability and its Capacity Interconnection Rights \n(CIRs),45  both of which are tied to summer peak conditions. However, the PJM ELCC/RRS \n \n44  See PJM Executive Summary and ELCCSTF Presentation on PJM Package C: https://www.pjm.com/-\n/media/DotCom/committees-groups/task-forces/elccstf/2025/20250711/20250711-item-03---pjm-proposal---\nexecutive-summary.pdf \nand \nhttps://www.pjm.com/-/media/DotCom/committees-groups/task-\nforces/elccstf/2025/20250522/20250522-item-02---elcc-accreditation-methodology-update-on-sensitivity-analyses--\n-pjm-presentation.pdf  \n45 For more information on Capacity Interconnection Rights (CIR), see page 22 of PJM Manual 21b"},{"page":75,"startToken":22199,"endToken":22668,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n72\nModel simulates unlimited resources across all hours of the year, not just summer peaks. \nUnlimited resources generally have higher availability outside of summer peak conditions \ndue to colder ambient temperatures. Capping resource availability at ICAP, therefore, \nunder-represents the potential deliverability and resulting modeled availability of unlimited \nresources in periods outside of summer peak conditions. To more fully and accurately \nrepresent the availability of unlimited resources, PJM could consider representing potential \ndeliverability and resulting modeled availability with more temporal granularity, specifically \non a “seasonal” or “daily” basis. These options are both described and illustrated below. \nSeasonal Granularity \nOne option to improve the current methodology is to introduce different resource capability \nratings for summer and winter (where summer is defined as May - Oct and winter is defined \nas Nov - Apr). Winter capability ratings would be higher due to colder ambient conditions. \nPJM studied this modification as part of the ELCCSTF Package C, where in non-summer \nmonths, PJM increased maximum thermal availability to a newly termed “winter ICAP” \nrating, defined as Winter Net Capability with all deliverability constraints removed.46 The \nremoval of all deliverability constraints in this study was a simplifying assumption that \npresented a bookend of how much available capacity could possibly increase. The result of \nthis change, when implemented on a standalone basis, yielded 8,561 MW of additional \nunlimited resource ICAP in the winter months, 33% less unserved energy in winter months, \nand a 1.1  lower IRM relative to the 2 2 /2  BRA model results. PJM’s study demonstrates \nthe potential upper-bound impact of replacing the current use of ICAP ratings with seasonal \nICAP ratings. \nIn this option, PJM would still implement downward ambient de-rates from seasonal ICAP \nvalues during higher temperature periods.  \nDaily Granularity \nAnother option to improve the current methodology is to introduce a daily maximum \ncapability approach. Even the “seasonal” approach described above still caps summer \navailability at the capability of a resource during summer peak periods, with additional \nambient de-rates applied when the temperature increases. However, many periods of the \nsummer are cooler than peak conditions and a seasonal approach does not reflect \nincreased capability due to cooler ambient conditions. A “daily” approach could more \naccurately represent resource capabilities changing with ambient conditions throughout \nthe year by applying ambient de-rates to a resource’s Maximum Facility Output, with \nappropriate more granular treatment of deliverability.47  \n \n46 For more information on the seasonal capability assessment in ELCCSTF Package C, see: https://www.pjm.com/-\n/media/DotCom/committees-groups/task-forces/elccstf/2025/20250522/20250522-item-02---elcc-accreditation-\nmethodology-update-on-sensitivity-analyses---pjm-presentation.pdf \n47 Currently, ambient derate profiles are developed from the historical record of generator ambient derates reported in \neDART from 2012-2024 and applied to ICAP. Additional data may be required to develop ambient derate profiles which \napply to Maximum Facility Output."},{"page":76,"startToken":22668,"endToken":22940,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n73\nThe figure below illustrates these three potential approaches: Summer Capability Rating \n(Current PJM Approach), Seasonal Capability Rating, and Daily Capability Rating.  \nFigure 30: Consideration to Increase Temporal Granularity of Deliverability and \nresulting Availability Inputs of Unlimited Resources \n \n \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 4: Use more temporal granularity to model capability and deliverability of \nunlimited resources \nAccuracy \nReflects \nresource \ncapability \nchanging \nwith \ntemperature \nconditions, increasing model accuracy \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nMore granular data increases complexity of model \nImpact Level \nHigh impact. Approximately ~8 GW of additional unlimited \nresource capability in the winter months, ~1% IRM reduction.  \nEase of Implementation\nLow difficulty to implement a seasonal approach (which PJM has \nalready done) \nHigh difficulty to implement daily approach \nConsideration 5: Schedule planned maintenance based on net load  \nMany resources have a pre-defined number of weeks per year where they must be offline to \nperform regular maintenance. As described earlier in this report, the PJM model currently \nSeasonal Ca ability Rating\n aily  Ca ability Rating\nS   er Ca ability Rating\n     n  PJM     o   \nS   er \n et \nCa ability\n inter \n et \nCa ability\n       \n      \n C P\n  n    \n      \nMa i    \n acility \nO t  t\n     n        s \n      o M x     \n               \n   o g    s o      \n    s     ng  n \n o   \n     n        s \n       o          \n               \n    ngs    o g  \n  s o          \ns     ng  n  o   \n     n        s \n       o  s       \nI       o g  \n  s o          \ns     ng  n  o   \n              \nM            \n                 \n                 \n                   \n       \n      \n  so     \n                s \ns        o       \ns  son  s ng \n           \n                s\n  so     \n                s \ns             o   \ng  n          s   \non           \n               s"},{"page":77,"startToken":22940,"endToken":23289,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n74\n“schedules” maintenance outages in a manner intended to both mimic actual operations \nand minimize system risk by concentrating maintenance during periods of lower risk, \ntypically the spring and fall shoulder seasons. The PJM model currently performs scheduling \nbased on periods of lowest gross load. However, as renewable penetration increases and \nsystem risk patterns evolve, gross load may no longer serve as the biggest predictor of \nsystem risk. Instead, PJM could consider scheduling maintenance into periods of lowest net \nload. In making any potential changes, PJM will need to ensure that its LOLP modeling is \nconsistent with expected system operations.  \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 5: Schedule planned maintenance based on net load  \nAccuracy \nScheduling planned maintenance based on net load rather than \ngross load improves accuracy by better aligning maintenance with \nperiods of lower reliability risk. However, modeling maintenance \ninconsistently with operational practices could reduce accuracy. \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nN/A \nImpact Level \nLikely small to moderate impact level in the near-term \nLarger impact in the long-term as risk periods become increasingly \ndissociated with gross load peaks and more associated with \nperiods of low resource availability \nEase of \nImplementation \nSmall to moderate implementation effort; dependency exists for\noperational practices \nConsideration 6: De-weight historical resource performance events as new resource \nperformance events under similar weather conditions occur \nThe current PJM model methodology draws resource performance profiles from historical \nperformance during the years 2012-2024. Any resource performance day within that time \nperiod is selectable by the model with equal probability (provided it falls within the \nappropriate weather bin). A potential concern with this approach is that it does not consider \nthat more recent performance observations may be a better indicator of upgrades and \nenhancements that units can make to improve their performance over time. For example, a \ndispatchable (or “unlimited” in PJM terminology) resource that performs poorly but \nimplements weatherization, better fuel security, or other enhancements would still be \nmodeled with its pre-enhancement performance."},{"page":78,"startToken":23289,"endToken":23693,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n75\nThis methodological decision has multiple impacts. First, it may understate the reliability of \nthe system. Second, if units do not perceive an economic benefit (such as increased \naccreditation) to undertaking performance enhancement measures, then they may not, to \nthe detriment of system reliability.  \nOn the other hand, using only the most recent data after purported resource enhancements \nhave been undertaken is also problematic. Verifying the impact of resource enhancements \nis difficult, and the most objective way to do this is to observe actual performance during \nchallenging system conditions. Resource enhancements do not always perform as \nexpected given the high level of outages that occurred during cold snaps in 2019 and 2022 \nafter many resources undertook enhancements after wide-spread outages during the cold \nsnap of 2014. Disregarding historical data after purported resource enhancements can \nactually disincentivize resources to implement quality enhancements if they know that they \npoor historical performance will be disregarded. It is therefore important that risks that have \nmaterialized multiple times in recent history are included in the model.  \nOne option to provide a balanced pathway to reflect performance enhancement measures \nis to allow recent unit performance to gradually replace old performance data. Under this \nframework, unit performance would be probabilistically de-weighted based on how many \nevents have occurred in the interim. Such an approach would only de-weight historical \nperformance events if a sufficient number of more recent events have occurred for the \nresource to “prove” its enhanced performance. A formulaic representation of the current \nPJM process and E3’s proposed consideration is provided in the figure below \nThis consideration for improvement is aligned with PJM Package C. PJM studied the impact \nof implementing different weights and determined that when implemented on a standalone \nbasis, there is a minor impact on overall system risk (IRM increases by less than 0.4%, with \nthe exact magnitude varying by alpha value assumption). However, the lower weights placed \non high forced outage observations in the hottest bins that occurred in the past resulted in \na higher loss of load risk contribution from the winter season. \nTable 9: Example Formulaic De-Weighting of Historical Events \nEvent \nYear \nWeight \nCurrent PJM Approach \nE3 Consideration \n1 (most recent) \n2024 \n1 \n \n2 \n2024 \n1 \n \n3 \n2022 \n1 \n(1- ) \n4 \n2022 \n1 \n(1- ) \n5 \n2018 \n1 \n(1- )2 \n6 \n2018 \n1 \n (1- )2 \n7 \n2014 \n1 \n(1- )3 \n8 (oldest) \n2014 \n1 \n(1- )3"},{"page":79,"startToken":23693,"endToken":24033,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n76\nUltimately, implementing any framework that reflects performance enhancement \nmeasures will introduce some level of subjectivity into the modeling. Nonetheless, sending \nan economic signal that performance enhancement is rewarded incentivizes units to \nundertake these measures. Therefore, PJM could consider a resource performance \nweighting approach that de-weights historical resource performance events as new \nresource performance events under similar weather conditions occur, without fully \ndisregarding historical performance data.  \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 6: De-weight historical resource performance events as new resource \nperformance events under similar weather conditions occur \nAccuracy \nWeighting more recent resource performance events likely \nimproves accuracy by reflecting performance enhancement \nmeasures \nObjectivity \nDe-weighting historical performance necessarily requires some \nlevel of subjectivity to decide how to de-weight these events \nStability \nDe-weighting historical performance as new events occur \ngradually phases out historical performance relative to removing \nspecific historical events in a manner that is not clear or \nsystematic. This has the potential to increase model stability \nTransparency \nN/A \nTractability \nDe-weighting historical performance is more complex than all \nperformance days being equally probable, which decreases \ntractability \nImpact Level \nModest impact on IRM as showed in Package C sensitivity \nanalysis; higher impact on seasonal risk allocation depending on \nhow much forced-outage observations in the most extreme \nhistorical bins are de-weighted. \nEase of \nImplementation \nModerate effort to develop appropriate weighting factors and \nimplement in model \nConsideration 7: Increase the number of load rotations to balance days-of-week  \nPJM currently develops load profiles using 30 years of historical weather data. PJM \nadditionally “rotates” the weather forward and backward by   calendar days for a total of 13 \nload rotations. This weather rotation method ensures that historical weather days will be \nsimulated across all days of the week as opposed to just the date from the original load \nprofile. This is important because an extreme weather day that occurred on a Sunday may \nnot yield high load whereas that same weather on Monday would yield high load. PJM’s"},{"page":80,"startToken":24033,"endToken":24321,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n77\nweather rotation appropriately reflects that extreme weather can occur on any day of the \nweek.  \nAn issue with PJM’s approach is that rotating weather   days forward and   days backward \nmeans that each day of the week is represented twice except for the actual day of week for \nthe historical date. An overview of PJM’s load rotation methodology is provided in the figure \nbelow. \nPJM could consider increasing the number of weather rotations to 7 calendar days forward \nand 6 calendar days backward for a total of 14 weather rotations, so that each day of the \nweek is represented twice. Since PJM’s model currently handles 13 rotations, adding one \nmore rotation would not substantially increase computational complexity, but it would \nprovide a more balanced representation of all days of a week. However, because the hourly \nload scenarios are developed by the PJM Load Forecast team outside of the ELCC/RRS \nmodeling process, any adjustments to the number of load rotations would need to remain \nconsistent with the Load Forecast team. An illustration of this consideration is provided \nbelow. \nFigure 31: E3 Load Rotation Consideration \n \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 7: Increase the number of load rotations to balance days-of-week \nAccuracy \nImproved accuracy due to uniformly sampling the days of the week \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nN/A \nImpact Level \nModest impact on reliability statistics and ELCC values  \nEase of \nImplementation \nWould require coordination with PJM Load Forecast team to ensure \nconsistency \n   rs\n ri\nSat\nS n\nMon\n  es\n ed\n   rs\n ri\nSat\nS n\n  es\nMon\n ct al  istorical  ay\n          \nE                              \nE                              \n          \n          \n          \n          \n          \n          \n          \n          \n          \n           \n           \n           \n ed"},{"page":81,"startToken":24321,"endToken":24706,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n78\nConsideration 8: Calculate solved load by adding or subtracting “flat” load instead of scaling \nload \nPJM’s current approach to calibrating the system to the target reliability of 0.1 days/year \nloss-of-load-expectation is to scale load up or down. The 50/50 peak of the scaled load \nprofile that yields target reliability is called the “solved load.”  This approach yields slightly \ndifferent results from an approach where an equal amount of “flat” load is added or \nsubtracted in all hours. The benefit of adding flat load in all hours is that it more similarly \nrepresents the addition or subtraction of firm generation and preserves the original load \nshape and relative magnitude of load across hours. Because flat generation is the least \ninteractive resource, adding flat load will shift critical hours in the lowest possible manner. \nFor this reason, it is the most neutral and non-interactive means of calibrating system \nreliability. An approach where flat load is added or subtracted is consistent with a commonly \nused approach in other studies. PJM could consider updating its methodology to calibrate \nsystem reliability by adding or subtracting flat load across all hours. \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 8: Calculate solved load by adding or subtracting “flat” load instead of \nscaling load \nAccuracy \nImproved accuracy by calibrating target reliability without shifting \ncritical hours \nObjectivity \nN/A \nStability \nN/A \nTransparency \nFlat load addition or subtraction is more transparent than a scaling \nfactor \nTractability \nN/A \nImpact Level \nLikely minimal impact on results  \nEase of \nImplementation \nLow implementation effort \nConsideration 9: Stochastically model hydro resources and extend hydro record  \n nlike variable and unlimited resources, PJM models hydro resources (i.e. the “hydro \nintermittent” resource class) by matching each load year (1  3 – 2024) to one specific hydro \nyear (2012 – 2024). For load years between 2012 and 2024, dedicated historical hydropower \ngeneration data are used; for load years without a corresponding hydro year, PJM selects a \nhydro year based on the similarity of the peaks in the load years. These pairings are then \nused across all simulations. In other words, PJM does not scramble load and hydro years to \nincorporate situations where historical hydro generation data were matched with different \nload years."},{"page":82,"startToken":24706,"endToken":25099,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n79\nThe primary issue with PJM’s approach is that hydroelectric conditions and peak demand \nare driven by different fundamentals that would not suggest a strong natural correlation: \nhydro conditions are driven by multi-month precipitation or drought patterns, while peak \nloads are driven by weather events that are relatively short duration (e.g. less than one week) \nthat may occur during entirely different times of year than the precipitation patterns that \ndrive hydro production. Therefore, matching each load year to a single hydro year may \noverlook plausible reliability risks, such as a drought year coinciding with an exceptionally \nhigh-load year, which could occur and meaningfully affect system reliability but are \nexcluded in the simulation due to the fixed pairing. \nAdditionally, PJM’s hydro dataset which includes the years 2012 – 2024 may not capture the \nfull range of potential interannual hydrological variability. Hydro availability can fluctuate \nsignificantly on a year-to-year basis. If data is available, extending the hydro dataset back to \n1993, consistent with the period covered by load and weather data, would allow a broader \nsample of wet, dry, and average conditions to be represented in PJM modeling. \nPJM could consider stochastically pairing hydro years with load years and extending the \nhydro record to capture a wider range of potential hydro conditions, if data is available. \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 9: Stochastically model hydro resources and extend hydro record \nAccuracy \nStochastically representing hydro years and extending the hydro \nrecord would improve the accuracy of the model \nObjectivity \nN/A \nStability \nStochastically representing hydro years and extending the hydro \nrecord would increase stability of the model by reducing the influence \nof any single wet or dry year on reliability outcomes across \nsimulations.  For reference, the Northwest Power and Conservation \nCouncil utilizes an 80-year water record for use in reliability modeling \nTransparency \nN/A \nTractability \nN/A \nImpact Level \nLikely a small to moderate impact given hydro’s relatively small share \nof the resource portfolio \nEase of \nImplementation \nModerate implementation effort to develop extended hydro record \nConsideration 10: Stochastically model forced outages for storage resources  \nPJM currently uses three approaches to represent forced outages that vary by resource type:  \n1. Unlimited resources: forced outages are explicitly modeled by stochastically \nsampling historical forced outage data via the scrambling process"},{"page":83,"startToken":25099,"endToken":25453,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n80\n2. Variable resources: forced outages are captured implicitly through stochastically \nsampling historical availability days, where forced outages are represented in the \navailability profiles  \n3. Storage resources:48 forced outage resources are modeled by statically de-rating \nthe maximum discharge and charge rate by the historical Equivalent Forced Outage \nRate on  emand (“EFORd”) in all hours \nThe approaches above demonstrate that while unlimited and variable resource outages are \nmodeled stochastically, storage resource outages use a static de-rate that is always equal \nto the average outage level. While this approach approximates average levels of forced \noutages for storage resources, it does not capture expected periods where battery storage \nforced outages are higher than average that can occur in real operations. As a result, the \nmodel may overstate available battery capacity during challenging system conditions and \nunderrepresent periods of elevated reliability risks due to stochastic storage outages, which \nwill become increasingly important as storage penetrations grow over time. \nPJM could consider enhancements to represent storage resource forced outages \nstochastically, consistent with the treatment of other resource classes. Several options \ncould be considered: \n1. One potential enhancement is to draw battery forced outages from a historical \nsample of days, similar to the approach used for thermal resources. However, \nimplementing this approach would require a significant amount of data that PJM may \nneed to gather and develop. \n2. In the absence of extensive operational data, another potential enhancement is to \ndevelop generic assumptions to model storage forced outages stochastically. This \napproach would increase subjectivity to the extent that these assumptions are not \ntied to actual historical data.  \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 10: Stochastically model forced outages for storage resources \nAccuracy \nStochastically modeling battery forced outages improves \naccuracy of the model \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nStochastic modeling battery forced outages modestly increases \nmodel complexity  \nImpact Level \nLow impact in the near term while batteries comprise a small \nshare of the system portfolio \n \n48 This includes 4-hour, 6-hour, 8-hour, and 10-hour duration storage resource classes."},{"page":84,"startToken":25453,"endToken":25883,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n81\nGrows to moderate impact in the longer term once battery \npenetrations increase to a larger share of the portfolio \nEase of \nImplementation \nModerate effort, primarily due to gathering and developing battery \nforced outage data or making generic outage assumptions \n \nConsideration 11: Evaluate improved mapping of deliverability constraints to system \nconditions \nGenerator deliverability represents the ability of the transmission system to deliver \ngeneration from a particular resource to load. When PJM performs capacity accreditation \ncalculations, it limits resource availability profiles by deliverability constraints developed in \nPJM’s Regional Transmission Expansion Plan (RTEP). These deliverability constraints are a \nfunction of network congestion which vary throughout the year based on underlying system \nconditions. For example, conditions with higher load mean more resources are generating \nand congesting the transmission system, reducing deliverability (all else equal).  \nPJM’s RTEP study calculates deliverability constraints across three different conditions: \n“Summer”, “Winter”, and “Light-Load”. 49  As described earlier in this report, “Summer \n eliverability” applies to all hours from May through October, “Winter  eliverability” applies \nfrom 6pm- am from November through April, and “Light-Load  eliverability” applies from \n9am-6pm from November through April. As an example of these constraints, the “Light-\nLoad” deliverability constraint for solar is 53% of Effective Nameplate Capacity, while the \n“Winter” deliverability constraint for solar is 5% of Effective Nameplate Capacity.  \nFor variable resource classes, PJM maps these RTEP deliverability constraints to hours in \nthe model using a “time-of-year” methodology. For non-variable resources, PJM currently \nmaps “Summer” deliverability constraints to all hours of the year. However, PJM is in the \nprocess of introducing “Winter” deliverability constraints to non-variable resource classes \nin future versions of the PJM Model.50 \nTo improve its representation of deliverability constraints, PJM could consider improved \nmapping of RTEP deliverability constraints to hours in the model based on system \nconditions rather than “time-of-year.” Specifically, deliverability constraints could be \nassigned to hours in the PJM model with the most similar system conditions (i.e. load levels \nor resource performance). As an example, this could lead to conditions where “Light Load” \ndeliverability constraints are applied to all hours of a winter day if the day is mild. \nAlternatively, “Winter” deliverability constraints could be applied to all hours of a winter day \n \n49 For more information on tests on Deliverability of Generation, see page 92 of PJM Manual 14b: https://www.pjm.com/-\n/media/DotCom/documents/manuals/m14b.pdf  \n50 For more information on the introduction Winter Deliverability for non-variable resources, see: https://www.pjm.com/-\n/media/DotCom/committees-groups/task-forces/elccstf/2025/20250403/20250403-item-05---reflecting-winter-\ncapability-in-accreditation-education--design-considerations---pjm-presentation.pdf"},{"page":85,"startToken":25883,"endToken":26252,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n82\nif it is a cold peak winter day. Determining appropriate mapping of deliverability constraints \nto hours in the model would require evaluation and study by PJM. \nThis consideration is based on the premise that PJM has a set of deliverability constraints \nthat are developed through a process outside of LOLP modeling, namely the RTEP process. \nIt thus assumes that the LOLP model is limited by available inputs. To the extent that more \ngranular deliverability constraints were available, that would improve the accuracy of the \nmodel, but this would come with the tradeoff of more complexity and less tractability. \nE3 does not recommend that increasing the temporal granularity of deliverability \nconstraints be a near-term priority but does expect this issue to become more important in \nthe long-term for two reasons. First, the magnitude and variability in grid congestion is higher \non systems with higher quantities of variable resources. Second, as the system evolves to \nhigher penetrations of variable and energy-limited resources, the timing of critical hours will \nexpand beyond just peak hours to an increasingly diverse set of hours driven by low \ngeneration availability. Deliverability constraints that are primarily tied to peak conditions \nwill impact the model’s ability to accurately calculate resource class ELCCs. \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 11: Evaluate improved mapping of deliverability constraints to system \nconditions  \nAccuracy \nImproved mapping of deliverability constraints would more \naccurately represent congestion in the LOLP model. \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nDetermining appropriate mapping of deliverability constraints to \nmodel hours would likely be a difficult and ongoing process, \nreducing model tractability  \nImpact Level \nMedium impact from updating assignment of deliverability \nconstraints to hours in PJM Model \nEase of ImplementationMedium to high implementation difficulty given large volume of \ndata and cross-functional organizational coordination  \nConsideration 12: Represent “Capacity Benefit of Ties” on a more time-granular basis \nThe Capacity Benefit of Ties (CBOT) is an assumption that is utilized in the PJM ELCC/RRS \nmodel that represents the ability of PJM to import uncommitted resources from external \nneighboring electricity systems during times of system stress. The current CBOT value is"},{"page":86,"startToken":26252,"endToken":26619,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n83\nadministratively set to 1.5% of 50/50 peak load that is available in all hours of the year.51 This \nvalue has remained constant for several years. The Installed Reserve Margin (IRM) would be \n1.5% higher if the CBOT were set to zero. \nTo improve the accuracy of this model parameter, PJM could consider representing CBOT \non a more time-granular basis. In the past, a static CBOT assumption may have been \nreasonable if it represented the ability to lean on neighbors during PJM’s peak load periods. \nHowever, critical hours for system reliability are increasingly occurring across a broader set \nof hours, including hours outside of peak load conditions. Levels of neighbor support during \nthese different conditions may vary, just as the availability of different resource classes \nvaries on a time-granular basis. Utilizing time-granular values for CBOT would more \naccurately capture these dynamics. \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 12: Represent “Capacity Benefit of Ties” on a more time-granular basis \nAccuracy \nRepresenting CBOT on a more time-granular basis would improve \nthe accuracy of the model \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nIncreasing time granularity of CBOT would increase complexity of \nmodel \nImpact Level \nLikely a modest impact in the near-term, but representing CBOT \non a more time-granular basis could yield larger impacts over time \nas critical hours shift \nEase of ImplementationHigh effort to conduct study of external zones to understand ability \nto support PJM in different time periods \n \nConsideration 13: Study updates to resource performance sampling methodology to capture \nmulti-day events \nPJM’s current methodology draws resource performance for each day based on that day’s \ntemperature without taking into account the prior day’s resource performance. This \napproach accurately replicates the historical distribution of low/med/high resource \nperformance across all days on average, but the days are not necessarily clustered together \nin ways that mimic history, as demonstrated earlier in this report. In actuality, high \n \n51  See page 11 of PJM 2025 PJM Effective Load Carrying Capability and Reserve Requirement Study (ELCC/RRS): \nhttps://www.pjm.com/-/media/DotCom/planning/res-adeq/elcc/2025-pjm-elcc-rrs.pdf"},{"page":87,"startToken":26619,"endToken":26977,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n84\nperformance days (e.g., sunny or windy days) are more likely to be followed by high \nperformance days (and vice versa).  \nWhether or not this potential shortcoming impacts results depends on the resource \nportfolio. To the extent that the resource portfolio contains large quantities of energy \nstorage, particularly long-duration energy storage, PJM’s current approach may \noverestimate system reliability (and by extension resource ELCCs). This is because the \nunder-representation of multi-day low resource performance events can deplete energy \nstorage and expose important reliability risks.  \nSeveral potential modeling changes could help better reflect multi-day resource \nperformance patterns in PJM’s simulations. One option is to introduce the prior day’s \nresource performance as a factor in drawing the resource performance profile for a \nparticular day. In other words, instead of drawing from a set of resource performance days \nwith equal probability with a particular THI-bin, resource performance days that are most \nsimilar to the prior day could be weighted higher. Determining specifically how to structure \nthis weighting would require study to observe which approaches most accurately mimic \nhistorical multi-day patterns. While such an approach would reflect multi-day resource \nperformance patterns, it would also increase model complexity. \nPJM could consider studying an approach to capture multi-day resource performance \nevents. Publishing the results such as how well simulated multi-day resource performance \nevents mimic historical events will help inform appropriate model design decisions. \nA summary of the evaluation criteria for this consideration is provided in the table below. \nConsideration 13: Study updates to resource performance sampling methodology to \ncapture multi-day events \nAccuracy \nReflecting multi-day resource performance events increases model \naccuracy and exposes potential reliability risks and resource \nlimitations in some resource portfolios \nObjectivity \nN/A \nStability \nN/A \nTransparency \nN/A \nTractability \nImplementing a persistence factor introduces some additional \ncomplexity \nImpact Level \nThe potential impact is likely to be small at present due to limited \nquantities of long-duration storage. As storage penetrations grow, the \nimpact is likely to become larger \nEase of \nImplementation \nModerate to high implementation effort. Capturing multi-day events \nwill require study to identify different approaches and the performance \nand tradeoffs of those approaches"},{"page":88,"startToken":26977,"endToken":27376,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n85\nConsideration 14: More optimally dispatch energy storage, demand response, and hydro  \nDispatching energy-limited resources is a key function of loss-of-load-probability models. \nUnlike other resources, using energy-limited resources in one hour means they are less \navailable to serve load in other hours. Therefore, the model must decide how to use these \nresources in a manner that maximizes system reliability. The theoretically optimal approach \nto dispatching energy-limited resources is to use an optimization framework with the \nobjective of minimizing unserved energy. However, the number of years to optimize in a loss-\nof-load-probability model often makes this approach intractable. Instead, many loss-of-\nload-probability models use a heuristic dispatch approach that approximates optimization \nbut is much faster computationally.  \nThe PJM ELCC/RRS model uses a heuristic that they describe as “more available resources \nare dispatched first”, with more available resources defined as those with longer durations. \nDischarging longer duration resources first is often a smart decision because it maximizes \nthe amount of remaining capacity from energy-limited resources by retaining both longer \nand shorter-duration resources. However, a fully optimized dispatch approach can account \nfor other factors beyond just duration. Longer-duration resources often have lower roundtrip \nefficiency which means they take more energy to re-charge when they are dispatched. If, \nduring multi-day winter risk periods with low renewable output, longer-duration resources \nare discharged first, the system may have insufficient surplus energy to recharge these more \ninefficient resources, and as a result encounter a loss-of-load event. This risk of limited \nenergy is not typically seen on systems without high penetrations of long-duration storage \nbut is relevant to consider when planning for future systems with significant storage and \nrenewables. \nAdditionally, deciding how to stagger the dispatch of energy storage and demand response \nis often a non-trivial decision that requires optimization. The PJM model dispatches demand \nresponse before energy storage based on the fact that demand response in PJM is a 24/7 \nresource with no dispatch limitations. Even so, PJM’s approach does not fully utilize demand \nresponse to maximize system reliability because it does not allow the system to dispatch \ndemand response to free up other generating resources to charge storage if storage is not \nfully charged. It is this phenomenon that explains why PJM forecasts that demand response \nsees declining forecasted capacity accreditation even though it is a 24/7 resource, as shown \nin the figure below."},{"page":89,"startToken":27376,"endToken":27529,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n86\nFigure 32: ELCC Forecast for Demand Response Class52 \n \nDispatching energy-limited resources is complex and one that heuristic approaches will be \nincreasingly ill-suited for as the resource portfolio becomes more saturated with these \nresources. PJM could investigate implementing a more optimal dispatch of energy-limited \nresources, while considering tradeoffs among accuracy, tractability, and ease of \nimplementation. This is an important area of research that the industry is currently \nexploring, that PJM could lead in.  \nA summary of the evaluation criteria for this consideration is provided in the table below. \n \n52 See Discussion of Preliminary ELCC Class Ratings for Period 2027-2028 through 2035-2036: https://www.pjm.com/-\n/media/DotCom/planning/res-adeq/elcc/discussion-of-preliminary-elcc-class-ratings-for-period-2027-2035.pdf  \n  \n1  \n2  \n3  \n   \n   \n   \n   \n8  \n   \n1   \n2 2 \n2 28\n2 2 \n2 3 \n2 31\n2 32\n2 33\n2 3 \n2 3 \n e and Res onse ELCC for  eliver  ears          \n of ICAP"},{"page":90,"startToken":27529,"endToken":27704,"text":"Considerations for Improvement  \nPJM ELCC / RRS Model Evaluation  \n87\nConsideration 14. More optimally dispatch energy storage, demand response, and hydro \nAccuracy \nImproved accuracy of model due to more optimal dispatch, \nalthough PJM will need to ensure modeling is consistent with \noperational practices \nObjectivity \nOptimized dispatch is more objective than a heuristic \napproximation that requires estimations and subjective ordering \nof resource dispatch \nStability \nN/A \nTransparency \nN/A \nTractability \nImplementing optimization would likely increase computational \nrequirements of the model and increase run-time. Maintaining \ntractability would require smart modeling strategies such as \nparallelization of different dispatch windows \nImpact Level \nIn the near term, the impact of this change is likely to be small to \nmoderate, as energy storage penetrations are still relatively low \nIn the medium and longer term, the impact of this change is likely \nto be large as energy storage penetrations grow and coordination \nbetween demand response and storage dispatch becomes more \nimportant \nEase of \nImplementation \nImplementing optimization would likely require significant effort to \nbuild the functionality and develop strategies to ensure it is \ntractable"},{"page":91,"startToken":27704,"endToken":27938,"text":"Conclusion  \nPJM ELCC / RRS Model Evaluation  \n88\nConclusion \nE3’s independent evaluation concludes that PJM’s Effective Load Carrying Capability / \nReserve Requirement Study (ELCC/RRS) Model is a technically sound, well-structured, and \ntransparent reliability modeling framework that accurately determines PJM’s capacity \nrequirements and resource capacity accreditation values. The model aligns closely with \nestablished industry best practices for Loss-of-Load-Probability (LOLP) modeling and \nprovides a robust foundation for ensuring that PJM is positioned to achieve its “one day in \nten years” reliability standard. \nThe ELCC/RRS model effectively captures a wide range of weather, load, and resource \nperformance conditions through its use of 31 years of weather data, 12 years of resource \nperformance data, stochastic outage simulation, and probabilistic resource performance \nsampling. E3’s validation testing confirms that the model’s core reliability metrics, including \ntiming of critical risk periods, the Forecast Pool Requirement, and Effective Load Carrying \nCapability values are consistent with theoretical expectations and observed system \nperformance. E3 also identifies opportunities to strengthen its accuracy and transparency \nas PJM’s resource mix evolves.  \nOverall, E3 finds that the PJM ELCC/RRS model is fit for its intended purpose and well-\npositioned to facilitate efficient capacity market outcomes. Considerations for model \nimprovements will ensure the model continues to reflect the realities of an evolving grid. \nThese continuous improvements will help PJM sustain its leadership in reliability planning \nand uphold its commitment to a reliable, cost-effective, and equitable capacity market \nframework."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":93,"startToken":0,"endToken":72},{"p":3,"at":93,"title":"Table of Contents","method":"printed heading","endPage":5,"endAt":40,"startToken":72,"endToken":423},{"p":5,"at":40,"title":"Executive Summary","method":"printed heading","endPage":6,"endAt":0,"startToken":423,"endToken":786},{"p":6,"at":0,"title":"Executive Summary","method":"printed heading","endPage":7,"endAt":0,"startToken":786,"endToken":1150},{"p":7,"at":0,"title":"Executive Summary","method":"printed heading","endPage":8,"endAt":0,"startToken":1150,"endToken":1466},{"p":8,"at":0,"title":"Executive Summary","method":"printed heading","endPage":8,"endAt":1039,"startToken":1466,"endToken":1605},{"p":8,"at":1039,"title":"Summary","method":"printed heading","endPage":9,"endAt":0,"startToken":1605,"endToken":1675},{"p":9,"at":0,"title":"Introduction","method":"printed heading","endPage":9,"endAt":52,"startToken":1675,"endToken":1682},{"p":9,"at":52,"title":"Introduction","method":"printed heading","endPage":10,"endAt":0,"startToken":1682,"endToken":2104},{"p":10,"at":0,"title":"Introduction","method":"printed heading","endPage":91,"endAt":0,"startToken":2104,"endToken":27704},{"p":91,"at":0,"title":"Conclusion","method":"printed heading","endPage":91,"endAt":50,"startToken":27704,"endToken":27711},{"p":91,"at":50,"title":"Conclusion","method":"printed heading","endPage":91,"endAt":1743,"startToken":27711,"endToken":27938}]}
