{"document":{"slug":"rec-20260820-5015-3","title":"Attachment_B_PJM_ELCC_Sensitivity_Analyses_May2025","issued":"2026-08-20","accession":"20260820-5015","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20260820-5015_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5015","tier":"record","parent":"rec-20260820-5015","sha256":"91575e5e2af4d2cb29988a9d6a663a3e399abbc7dc9e04a1ae7f967bd0503586","pages":30,"tokens":1701,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":17,"text":"PJM © 2025\nwww.pjm.com | Public\nELCC Accreditation Methodology:\nUpdate on Sensitivity Analyses\nELCCSTF\nMay 22, 2025"},{"page":2,"startToken":17,"endToken":64,"text":"PJM © 2025\n2\nwww.pjm.com | Public\nELCC Sensitivity Analyses\n• This presentation provides ELCC sensitivity analyses that were requested by \nstakeholders and/or initiated by PJM to help inform the discussion and \ndevelopment of accreditation proposals at the ELCCSTF\n• All values are presented for informational purposes only"},{"page":3,"startToken":64,"endToken":215,"text":"PJM © 2025\n3\nwww.pjm.com | Public\nList of Sensitivity Analyses\nELCC Sensitivity Runs\nReview Results\nBase \nCase\n2026/27 BRA ELCC run that also includes the DR modeling and accreditation \nreforms recently accepted by FERC in Docket No. ER25-1525\nToday (May 22nd meeting)\n1\nRemove 1993/94 from historical weather period\nToday\n2\nExtend historical weather period back to 1970s *\nToday\n3\nRemove WSE and 2014 Polar Vortex performance\nToday\n4\nAlternative approach to better align load scenarios and temp. / performance (new)\nToday\n5\nIncorporate thermal winter capability above CIRs\nToday\n6\nCombine sensitivities 1 and 3 (No 1993/94 or WSE/PV1)\nToday\n7\nCombine sensitivities 4 and 5 (Improved temp/load alignment and WICAP)\nToday\n8\nCombine sensitivities 3 and 5 (WICAP with no WSE/PV1)\nToday\n9+\nPerformance Weighting sensitivities with est. 2025 winter performance data\nMay 30th\n* Sensitivity based on run done during CIFP stakeholder process"},{"page":4,"startToken":215,"endToken":258,"text":"PJM © 2025\n4\nwww.pjm.com | Public\nBase Case\n• 26/27 BRA Case run during the first quarter of 2025\n• Plus DR changes recently accepted by FERC in Docket No. ER25-\n1525\n– No limited DR Performance Window\n– Changes to DR winter performance shape"},{"page":5,"startToken":258,"endToken":267,"text":"PJM © 2025\n5\nwww.pjm.com | Public\nBase Case"},{"page":6,"startToken":267,"endToken":308,"text":"PJM © 2025\n6\nwww.pjm.com | Public\n1. Removing DY 1993/94 Load Scenarios (“No93”)\n• The load scenarios associated with weather from DY 1993/94 were \nremoved from the model\n• Weather data starts on June 1st 1994\n• Weather bins were recalculated"},{"page":7,"startToken":308,"endToken":350,"text":"PJM © 2025\n7\nwww.pjm.com | Public\n1. Removing DY 1993/94 (“No93”)\n-\nDecrease in overall system \nrisk (IRM drops and system \nis less tight)\n-\nMajority of LOLH remains in \nthe winter season\n-\nClass ratings increase for all \nclasses except wind classes"},{"page":8,"startToken":350,"endToken":443,"text":"PJM © 2025\n8\nwww.pjm.com | Public\n2. Weather history back to 1970s\n• During the CIFP stakeholder process, sensitivity analyses was run using an extended weather \nhistory back to 1973 and compared to the base case at that time\n• The following shows the relative shift in seasonal risk for different loss-of-load metrics that were \nprovided when this analysis was run:\nCIFP Base Case \n(Back to 1993)\nWeather History \nBack to 1973\nDiff\nLOLE Winter Share (%)\n31%\n42%\n+11% Winter\nLOLH Winter Share (%)\n49%\n57%\n+8% Winter\nEUE Winter Share (%)\n64%\n71%\n+7% Winter"},{"page":9,"startToken":443,"endToken":539,"text":"PJM © 2025\n9\nwww.pjm.com | Public\n3. Removing Forced Outages\nfrom PV1 and WSE (“NoPV1WSE”)\n• The forced outage data from Polar Vortex 1 (PV1) and Winter \nStorm Elliott (WSE) were removed from the model\n– PV1 was defined as including 3 days Jan 6 – Jan 8, 2014\n– WSE was defined as including 4 days Dec 23 – Dec 26, 2022\n• After removing those days from the respective bin, the rest of the \nbin was left unmodified. This means that the probability of drawing \nperformance from other days in the bin increased, after the removal \nof the days"},{"page":10,"startToken":539,"endToken":591,"text":"PJM © 2025\n10\nwww.pjm.com | Public\n3. Removing Forced Outages\nfrom PV1 and WSE (“NoPV1WSE”)\n-\nDecrease in overall system \nrisk (IRM drops and system \nis less tight)\n-\nMajority of LOLH is in the \nsummer season\n-\nClass ratings significantly \nincrease and are consistent \nwith a system with majority \nof risk in summer"},{"page":11,"startToken":591,"endToken":756,"text":"PJM © 2025\n11\nwww.pjm.com | Public\nTarget \nForecast \nDay 26/27\nA1993\nB1993\nC1993\n….\n….\n….\nM2023\nJune 1, \n2026\n140,000\n139,500\n138,000\n….\n….\n….\n145,000\nJune 2, \n2026\n137,000\n134,000\n136,000\n….\n….\n….\n140,000\n….\n….\n….\n….\n….\n….\n….\n….\nMay 31, \n2027\n133,000\n134,000\n132,000\n….\n….\n….\n135,000\n4. Improve Alignment of Load Scenarios \nwith Temperature Bins (“Align”)\nCurrently, to identify the temperature bin from which to sample resource performance,\nwe use the target forecast date (e.g., June 2) combined with the delivery\nyear of the scenario under consideration (e.g., 1993 in the case of A1993, B1993,\nor C1993). We then find the bin that contains the resulting date. Therefore,\nJune 2, 2026 under A1993        June 2, 1993            Bin containing June 2, 1993\nJune 2, 2026 under B1993        June 2, 1993            Bin containing June 2, 1993\nJune 2, 2026 under C1993        June 2, 1993            Bin containing June 2, 1993\nJune 2, 2026 under M2023        June 2, 2023            Bin containing June 2, 2023"},{"page":12,"startToken":756,"endToken":932,"text":"PJM © 2025\n12\nwww.pjm.com | Public\nTarget \nForecast \nDay 26/27\nA1993\nB1993\nC1993\n….\n…..\n….\nM2023\nJune 1, \n2026\nJune 1, \n1993\nJune 2, \n1993\nJune 3, \n1993\n….\n….\n….\nMay 26, \n2023\nJune 2, \n2026\nJune 2, \n1993\nJune 3, \n1993\nJune 4, \n1993\n….\n….\n….\nMay 27, \n2023\n….\n….\n….\n….\n….\n….\n….\n….\nMay 31, \n2027\nMay 31, \n1994\nJune 1, \n1994\nJune 2, \n1994\n….\n….\n….\nMay 25, \n2024\nHowever, the actual weather that is used to calculate the forecasted loads in the\nweather scenarios is as shown below. PJM is proposing to better align each forecasted\nload with the temperature bin that contains the weather that was used to calculate the\nforecasted load per the following example:\nJune 2, 2026 under A1993     June 2, 1993      Bin containing June 2, 1993\nJune 2, 2026 under B1993     June 3, 1993     Bin containing June 2June 3, 1993\nJune 2, 2026 under C1993     June 4, 1993     Bin containing June 2June 4, 1993\nJune 2, 2026 under M2023     May 27, 2023     Bin containing June 2 May 27, 2023\n \n \n \n \n \n \n \n4. Improve Alignment of Load Scenarios \nwith Temperature Bins (“Align”)"},{"page":13,"startToken":932,"endToken":1075,"text":"PJM © 2025\n13\nwww.pjm.com | Public\nImprove Alignment of Load Scenarios \nwith Temperature Bins (“Align”)\nTarget \nForecast \nDay 26/27\nA1993\nB1993\nC1993\n….\n…..\n….\nM2023\nJune 1, \n2026\nJune 1, \n1993\nJune 1, \n1993\nJune 1, \n1993\n….\n….\n….\nJune 1, \n2023\nJune 2, \n2026\nJune 2, \n1993\nJune 2, \n1993\nJune 2, \n1993\n….\n….\n….\nJune 2, \n2023\n….\n….\n….\n….\n….\n….\n….\n….\nMay 31, \n2027\nMay 31, \n1994\nMay 31, \n1994\nMay 31, \n1994\n….\n….\n….\nMay 31, \n2024\nTarget \nForecast \nDay 26/27\nA1993\nB1993\nC1993\n….\n…..\n….\nM2023\nJune 1, \n2026\nJune 1, \n1993\nJune 2, \n1993\nJune 3, \n1993\n….\n….\n….\nMay 26, \n2023\nJune 2, \n2026\nJune 2, \n1993\nJune 3, \n1993\nJune 4, \n1993\n….\n….\n….\nMay 27, \n2023\n….\n….\n….\n….\n….\n….\n….\n….\nMay 31, \n2027\nMay 31, \n1994\nJune 1, \n1994\nJune 2, \n1994\n….\n….\n….\nMay 25, \n2024\nCurrent Approach\nto identify temperature\nBin\nProposed Approach\nto identify temperature\nBin (aligned with\ndevelopment of PJM Load\nForecast)"},{"page":14,"startToken":1075,"endToken":1171,"text":"PJM © 2025\n14\nwww.pjm.com | Public\n4. Improve Alignment of Load Scenarios \nwith Temperature Bins (“Align”)\n• The graph shows the current forced \noutage distribution for one of the \ncoldest days in the model (Jan 19, \n1994) vs how the distribution would \nlook like under the PJM proposal\n• Each distribution was plotted using the \n1,300 sampled forced outage values \nassociated with Jan 19, 1994 \n–\n13 weather scenarios (A through M) x \n100 performance draws = 1,300\n• For Jan 19, 1994, the current \nimplementation samples higher forced \noutage levels less frequently than \nunder the proposed implementation"},{"page":15,"startToken":1171,"endToken":1216,"text":"PJM © 2025\n15\nwww.pjm.com | Public\n4. Improve Alignment of Load Scenarios \nwith Temperature Bins (“Align”)\n-\nSignificant increase in \noverall system risk (IRM \nincreases and system is \ntight)\n-\nAlmost all of LOLH is in the \nwinter season\n-\nClass ratings decrease for \nmajority of classes"},{"page":16,"startToken":1216,"endToken":1340,"text":"PJM © 2025\n16\nwww.pjm.com | Public\n5. Additional Winter Capability Overview\nTo recognize additional output above a \nsummer based ICAP, PJM estimated a \n“Winter ICAP” for Unlimited Resources \nequal to:\n– Max Winter Net Capability Test \nsubmitted since 22/23 DY, capped at \nMFO\n– Winter ICAP was assumed to be fully \ndeliverable\nELCC \nClass\nSummer\nICAP\nWinter\nICAP\nDelta\nNuclear\n32,144\n33,592 \n1,448 \nCoal\n35,779\n36,441 \n662 \nGas CC \n(Single and Dual Fuel)\n57,664\n60,766 \n3,102 \nGas CT\n11,030\n11,955 \n925 \nGas CT Dual Fuel\n13,158\n15,099 \n1,941 \nDiesel\n329\n332 \n3 \nSteam\n10,004\n10,189 \n185 \nOther Thermal\n3,041\n3,336 \n295 \n163,149\n171,710\n8,561"},{"page":17,"startToken":1340,"endToken":1362,"text":"PJM © 2025\n17\nwww.pjm.com | Public\n5. Reflect higher Winter output \nfor Unlimited Resources (“WICAP”)\nWinter Months include November through April"},{"page":18,"startToken":1362,"endToken":1408,"text":"PJM © 2025\n18\nwww.pjm.com | Public\n5. Reflect higher Winter output \nfor Unlimited Resources (“WICAP”)\n-\nDecrease in overall system \nrisk (IRM drops and system \nis less tight)\n-\nLOLH is almost evenly split \nbetween winter and summer\n-\nClass ratings increase for all \nclasses except wind classes"},{"page":19,"startToken":1408,"endToken":1467,"text":"PJM © 2025\n19\nwww.pjm.com | Public\n6. Removing Forced Outages from PV1 and WSE \nand removing DY 1993/94 (“NoPV1WSE & No93”)\n-\nDecrease in overall system \nrisk (IRM drops and system \nis less tight)\n-\nLarge majority of LOLH is in \nthe summer season\n-\nClass ratings significantly \nincrease and are consistent \nwith a system with majority \nof risk in summer"},{"page":20,"startToken":1467,"endToken":1515,"text":"PJM © 2025\n20\nwww.pjm.com | Public\n7. “WICAP & Align”\n-\nIncrease in overall system \nrisk (IRM increases and \nsystem is tighter)\n-\nMajority of LOLH remains in \nthe winter season\n-\nClass ratings increase \nsignificantly for storage and \nGas CT Dual\n-\nImpact of “Align” is stronger \nthan impact of “WICAP”"},{"page":21,"startToken":1515,"endToken":1552,"text":"PJM © 2025\n21\nwww.pjm.com | Public\n8. “WICAP & NoPV1WSE”\n-\nDecrease in overall system \nrisk (IRM drops and system \nis less tight)\n-\nAlmost of LOLH is in the \nsummer season\n-\nSignificant class ratings \nincreases (except for wind)"},{"page":22,"startToken":1552,"endToken":1617,"text":"PJM © 2025\n22\nwww.pjm.com | Public\nComparison of All Sensitivity Results\n•\nRemoving PV1 and WSE \nforced outages eliminates \nthe majority of winter risk \n(even when paired with the \n“Align” sensitivity)\n•\nThe “Align” sensitivity \nincreases winter risk and \noverall risk. However, this \nincrease is mitigated when \ncoupled with the “WICAP” \nsensitivity\n•\nRemoving 1993/94 reduces \nrisk and winter risk but less \nso than previously \nestimated"},{"page":23,"startToken":1617,"endToken":1624,"text":"PJM © 2025\nwww.pjm.com | Public\nAppendix"},{"page":24,"startToken":1624,"endToken":1635,"text":"PJM © 2025\n24\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"},{"page":25,"startToken":1635,"endToken":1646,"text":"PJM © 2025\n25\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"},{"page":26,"startToken":1646,"endToken":1657,"text":"PJM © 2025\n26\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"},{"page":27,"startToken":1657,"endToken":1668,"text":"PJM © 2025\n27\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"},{"page":28,"startToken":1668,"endToken":1679,"text":"PJM © 2025\n28\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"},{"page":29,"startToken":1679,"endToken":1690,"text":"PJM © 2025\n29\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"},{"page":30,"startToken":1690,"endToken":1701,"text":"PJM © 2025\n30\nwww.pjm.com | Public\nELCC Class Ratings - Sensitivities"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":258},{"p":5,"at":0,"title":"Pages 5 to 8","method":"page range","endPage":9,"endAt":0,"startToken":258,"endToken":443},{"p":9,"at":0,"title":"Pages 9 to 12","method":"page range","endPage":13,"endAt":0,"startToken":443,"endToken":932},{"p":13,"at":0,"title":"Pages 13 to 16","method":"page range","endPage":17,"endAt":0,"startToken":932,"endToken":1340},{"p":17,"at":0,"title":"Pages 17 to 20","method":"page range","endPage":21,"endAt":0,"startToken":1340,"endToken":1515},{"p":21,"at":0,"title":"Pages 21 to 24","method":"page range","endPage":25,"endAt":0,"startToken":1515,"endToken":1635},{"p":25,"at":0,"title":"Pages 25 to 28","method":"page range","endPage":29,"endAt":0,"startToken":1635,"endToken":1679},{"p":29,"at":0,"title":"Pages 29 to 30","method":"page range","endPage":30,"endAt":69,"startToken":1679,"endToken":1701}]}