{"document":{"slug":"rec-20260820-5104","title":"Comments of Chesapeake Climate Action Network re PJM Governance and Stakeholder Reforms","issued":"2026-08-20","accession":"20260820-5104","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Chesapeake Climate Action Network","kind":"comments","file":"sources/filings/text/20260820-5104_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5104","tier":"record","sha256":"e56ba4bb5ba75512a37063ec350abeac35b9e2546c80c3a26ddd9f11bd5c7343","pages":3,"tokens":1119,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":280,"text":"August 20, 2026  \nFederal Energy Regulatory Commission (FERC) \nComment Submitted to FERC Docket No. Docket No. AD26-7-000 \n \nDear FERC Chairman Laura V. Swett, \n \nChesapeake Climate Action Network represents tens of thousands across the PJM \nterritory from Virginia to Illinois. Our network’s families and business owners are facing rapidly \nrising electricity bills because of a number of contributing factors including the proliferation of \ndata centers. One thing is clear: the current PJM stakeholder process for decision making is not \ndelivering the responsiveness that consumers deserve. \nEvery year of unnecessary delay means consumers lose access to lower-cost energy \nresources, reliability improvements are postponed, and states are prevented from implementing \nthe clean energy policies their citizens have chosen. We cannot afford governance structures \nthat slow the transition to a more reliable, affordable, and cleaner electric grid. \nFERC and PJM have an opportunity to strengthen public confidence in PJM by \nmodernizing its governance and ensuring that the voices of consumers and states carry \nappropriate weight alongside market participants. We urge FERC and PJM to consider the \nfollowing reforms: \n1.​ Reflect affordability and the public interest in PJM’s mission and governing \ndocuments. Decisions made at PJM impact 67 million ratepayers across 13 states \nand the District of Columbia. At the same time, PJM has no formalized commitment to \nserve the public interest or to consider electric affordability on the same footing as \nelectric reliability. If the PJM Board is to have its independence and power expanded, \nthis should only happen if steps are taken to meaningfully commit PJM to serve the \npublic, and not just its members, such as by explicitly including a public interest \nmandate and affordability in the PJM mission and governing documents."},{"page":2,"startToken":280,"endToken":808,"text":"2.​ Grant OPSI 205 jump ball filing rights. Currently, the states do not have a strong \nenough voice in PJM’s decision-making process. One way to strengthen the voice of \nthe states is to grant the Organization of PJM States, Inc. (OPSI) 205 “jump ball” filing \nrights with the Federal Energy Regulatory Commission (FERC), so that they can \nadvance proposals to be considered on even footing with those from PJM. This is \nalready the case for other regional transmission organizations (RTOs) and PJM should \nbe brought into alignment with this standard. Additionally, 205 filing rights for OPSI can \nserve as an oversight mechanism for a public interest mandate, as the states will have \na formal route to intervene. \n3.​ Formalize Board consultation with OPSI. Under the status quo, the PJM Board \ndoes not sufficiently consult OPSI and the states prior to making major filings with \nFERC. Poor communication increases the likelihood that the states and the PJM \nBoard will be at odds on proposals, especially those that would increase costs \nsubstantially for ratepayers. While granting OPSI 205 filing rights provides a backstop, \nincreased consultation between the PJM Board and the states - such as getting \nfeedback on draft filings - would foster trust, credibility, and avoid litigation. \n4.​ Require cost impact information. To evaluate whether PJM is serving the public \ninterest on the basis of affordability, it is necessary for states, advocates, stakeholders, \nand the public to have access to accurate cost impact information. PJM should \nanalyze all proposals for cost impact and make the results widely and publicly \navailable so that interested parties can make informed decisions. Such transparency \nwill also serve to improve PJM’s accountability to the public.  \n5.​ Appoint an Independent Transmission Monitor. For over 25 years, an Independent \nMarket Monitor has provided indispensable oversight of PJM’s power markets, \nperforming cost impact analysis and identifying structural problems. Just like the \nenergy and capacity markets, transmission planning at PJM has a significant impact \non ratepayer costs. During a time when transmission costs are consistently rising, \ncreating an Independent Transmission Monitor would provide necessary oversight of \nPJM’s approach to planning. \n6.​ Expand the Nominating Committee to include state representatives. If the PJM \nBoard is to better engage with the states, it would help to have more formalized \ninvolvement of the states in the nominating process for Board directors. Currently, the \nNominating Committee does not consistently include a consumer advocate, and the \nstates do not get to appoint representatives. Along with reserving a permanent seat for \na consumer advocate, the Nominating Committee should also allow for one appointee \nfrom OPSI and another from a governors’/legislators’ organization - as recommended \nby the Governors’ Collaborative. \n7.​ Expand the Board expertise requirements to include state and ratepayer \nexperience. Expertise requirements are an important guardrail to ensure the PJM \nBoard has the collective experience and insight necessary to do its job effectively. \nHowever, the current requirements do not include expertise in state regulatory work, \nconsumer advocacy, or clean energy. To have a Board that is equipped to understand \nhow their decisions impact electric affordability for ratepayers, it is critical to require \nthat at least one Board member brings direct experience from each of these areas."},{"page":3,"startToken":808,"endToken":1119,"text":"Moreover, expanding requirements in this way would better equip PJM to adhere to a \npublic interest and affordability mandate in its governing documents. \n8.​ Open Board meetings and publish Board votes. Perhaps the most straightforward \nreforms PJM can choose to make would be to open all Board meetings to the public \nand publish the results of individual Board votes. By increasing the transparency of \nBoard proceedings, PJM can concretely demonstrate accountability to its mission - \nwhich should include an explicit public interest and affordability mandate - rather than \nmerely asking PJM members and the public to trust the process. Moreover, with \npublished votes, all interested parties will be equipped to evaluate the performance of \nindividual Board directors. \n9.​ Expand sector-weighted voting to all Standing Committees and Senior Task \nForces. At higher committee levels in PJM the practice of sector-weighted voting \nhelps ensure that no individual sector overwhelms the others. However, this voting \nmethod is not employed in lower level standing committees and senior task forces, \nwhich leads to outsize influence by supply-side interests and their many affiliate \nmembers. Applying sector-weighted voting at all committee levels would ensure the \nvoice of end-use customers, including representatives of residential ratepayer \ninterests, are not drowned out. \n10.​Require transparency of individual firm votes across all committee levels. In a \nbody like PJM, whose decisions ultimately impact the affordability of electricity for 67 \nmillion people, there is no justification for keeping the votes of PJM members under \nwraps. Just as votes by the Board should be made public, votes at all committee \nlevels of PJM should be transparent and accessible to oversight. If states are to \nconduct meaningful oversight of the utilities within their jurisdiction, PJM should not \nserve as an obstacle to that function by allowing member votes to remain obscured. In \nthe same spirit of transparency, all PJM meetings should be recorded and made \npublicly available."}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 3","method":"page range","endPage":3,"endAt":2082,"startToken":0,"endToken":1119}]}
