{"document":{"slug":"rec-20260820-5164","title":"Comments of Ceres re PJM Governance and Stakeholder Reforms","issued":"2026-08-20","accession":"20260820-5164","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Ceres","kind":"comments","file":"sources/filings/text/20260820-5164_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5164","tier":"record","sha256":"832ee9c869ff302a45f4a78635665e1733bb8cbaa0099fe1d4822b979d0b4ec8","pages":3,"tokens":1012,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":407,"text":"Ceres’ Comments RE: PJM Governance \nThank you for convening the recent technical conference to examine governance and \nstakeholder reforms at PJM Interconnection. I submit these comments on behalf of Ceres, \na nonprofit advocacy organization dedicated to ensuring a sustainable economy. \nBelow are our suggestions for reforms to PJM’s governance structures to ensure energy \nreliability, affordability, and sustainability throughout the region:  \n1. Reflect affordability and the public interest in PJM’s mission and governing \ndocuments. Decisions made at PJM impact 67 million ratepayers across 13 states \nand the District of Columbia. At the same time, PJM has no formalized commitment \nto serve the public interest or to consider electric affordability on the same footing \nas electric reliability. If the PJM Board is to have its independence and power \nexpanded, this should only happen if steps are taken to meaningfully commit PJM to \nserve the public, and not just its members, such as by explicitly including a public \ninterest mandate and affordability in the PJM mission and governing documents. \n \n2. Grant OPSI 205 jump ball filing rights. Currently, the states do not have a strong \nenough voice in PJM’s decision-making process. One way to strengthen the voice of \nthe states is to grant the Organization of PJM States, Inc. (OPSI) 205 “jump ball” \nfiling rights with the Federal Energy Regulatory Commission (FERC), so that they can \nadvance proposals to be considered on even footing with those from PJM. This is \nalready the case for other regional transmission organizations (RTOs) and PJM \nshould be brought into alignment with this standard. Additionally, 205 filing rights \nfor OPSI can serve as an oversight mechanism for a public interest mandate, as the \nstates will have a formal route to intervene. \n \n3. Formalize Board consultation with OPSI. Under the status quo, the PJM Board does \nnot sufficiently consult OPSI and the states prior to making major filings with FERC. \nPoor communication increases the likelihood that the states and the PJM Board will \nbe at odds on proposals, especially those that would increase costs substantially \nfor ratepayers. While granting OPSI 205 filing rights provides a backstop, increased \nconsultation between the PJM Board and the states - such as getting feedback on \ndraft filings - would foster trust, credibility, and avoid litigation. \n \n4. Require cost impact information. To evaluate whether PJM is serving the public \ninterest on the basis of affordability, it is necessary for states, advocates, \nstakeholders, and the public to have access to accurate cost impact information."},{"page":2,"startToken":407,"endToken":792,"text":"PJM should analyze all proposals for cost impact and make the results widely and \npublicly available so that interested parties can make informed decisions. Such \ntransparency will also serve to improve PJM’s accountability to the public.  \n5.  \nAppoint an Independent Transmission Monitor. For over 25 years, an Independent \nMarket Monitor has provided indispensable oversight of PJM’s power markets, \nperforming cost impact analysis and identifying structural problems. Just like the \nenergy and capacity markets, transmission planning at PJM has a significant impact \non ratepayer costs. During a time when transmission costs are consistently rising, \ncreating an Independent Transmission Monitor would provide necessary oversight \nof PJM’s approach to planning. \n \n6. Expand the Nominating Committee to include state representatives. If the PJM \nBoard is to better engage with the states, it would help to have more formalized \ninvolvement of the states in the nominating process for Board directors. Currently, \nthe Nominating Committee does not consistently include a consumer advocate, \nand the states do not get to appoint representatives. Along with reserving a \npermanent seat for a consumer advocate, the Nominating Committee should also \nallow for one appointee from OPSI and another from a governors’/legislators’ \norganization - as recommended by the Governors’ Collaborative. \n \n7. Expand the Board expertise requirements to include state and ratepayer \nexperience. Expertise requirements are an important guardrail to ensure the PJM \nBoard has the collective experience and insight necessary to do its job effectively. \nHowever, the current requirements do not include expertise in state regulatory \nwork, consumer advocacy, or clean energy. To have a Board that is equipped to \nunderstand how their decisions impact electric affordability for ratepayers, it is \ncritical to require that at least one Board member brings direct experience from \neach of these areas. Moreover, expanding requirements in this way would better \nequip PJM to adhere to a public interest and affordability mandate in its governing \ndocuments. \n \n8. Open Board meetings and publish Board votes. Perhaps the most straightforward \nreforms PJM can choose to make would be to open all Board meetings to the public \nand publish the results of individual Board votes. By increasing the transparency of \nBoard proceedings, PJM can concretely demonstrate accountability to its mission - \nwhich should include an explicit public interest and affordability mandate - rather \nthan merely asking PJM members and the public to trust the process. Moreover,"},{"page":3,"startToken":792,"endToken":1012,"text":"with published votes, all interested parties will be equipped to evaluate the \nperformance of individual Board directors. \n \n9. Expand sector-weighted voting to all Standing Committees and Senior Task Forces. \nAt higher committee levels in PJM the practice of sector-weighted voting helps \nensure that no individual sector overwhelms the others. However, this voting \nmethod is not employed in lower level standing committees and senior task forces, \nwhich leads to outsize influence by supply-side interests and their many affiliate \nmembers. Applying sector-weighted voting at all committee levels would ensure the \nvoice of end-use customers, including representatives of residential ratepayer \ninterests, are not drowned out. \n \n10. Require transparency of individual firm votes across all committee levels. In a body \nlike PJM, whose decisions ultimately impact the affordability of electricity for 67 \nmillion people, there is no justification for keeping the votes of PJM members under \nwraps. Just as votes by the Board should be made public, votes at all committee \nlevels of PJM should be transparent and accessible to oversight. If states are to \nconduct meaningful oversight of the utilities within their jurisdiction, PJM should not \nserve as an obstacle to that function by allowing member votes to remain obscured. \nIn the same spirit of transparency, all PJM meetings should be recorded and made \npublicly available. \n \nSincerely, \nJeff Mauk \nDirector, State Policy, East"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 3","method":"page range","endPage":3,"endAt":1487,"startToken":0,"endToken":1012}]}