{"document":{"slug":"rec-20260820-5187","title":"PJM Transmission Owners submits Notice of Partial Compliance with the Commission’s 06/18/2026 order","issued":"2026-08-20","accession":"20260820-5187","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Transmission Owners","kind":"notice","file":"sources/filings/text/20260820-5187_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5187","tier":"record","sha256":"4f0406d53b2e3c3f254413fad2ae62604790a8954bc62dfe86330962541f4176","pages":2,"tokens":305,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":242,"text":"Suite 500 East \n1301 K Street NW \nWashington, D.C.  20005-3317 \nAugust 20, 2026 \nHonorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, D.C. 20426 \nRe: \nPJM Interconnection, L.L.C., Docket No. EL25-49, et al.\nLarge Loads Co-Located at Generating Facilities, Docket No. AD24-11-001  \nConstellation Energy Generation, LLC v.  \n  PJM Interconnection, L.L.C., Docket No. EL25-20-001 \nPJM Interconnection, L.L.C., Docket No. ER26-1479-000 \nNotice of Partial Compliance Filing \nDear Secretary Reese: \nThis notice, being served on all parties to the above-referenced proceedings, confirms that \non August 17, 2026, the PJM Transmission Owners, acting through the Consolidated Transmission \nOwners Agreement,  submitted a filing in partial compliance with the Commission’s June 18, 2026 \norder in these proceedings.1  The PJM Transmission Owners submitted the partial compliance \nfiling in Docket No. ER26-3537-000. \nAs required under the June 18 Order, the PJM Transmission Owners submitted new and \nrevised tariff records to establish the rate for Interim Network Integration Transmission Service \n(“Interim NITS”).  The filing was a companion filing to PJM’s August 17, 2026 filing of the terms \nand conditions of Interim NITS. \nRespectfully submitted, \n/s/ Michael Kunselman \nMichael Kunselman \nRichard P. Sparling  \nNicholas J. Cicale \nDavis Wright Tremaine LLP  \n1301 K Street NW  \nSuite 500 East  \nWashington, DC 20005 \nAttorneys for The FirstEnergy  \n Transmission Companies \nOn behalf of the PJM Transmission Owners  \n1 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026) (“June 18 Order”)."},{"page":2,"startToken":242,"endToken":305,"text":"2 \nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary in these proceedings. \nDated at Washington, DC, this 20th day of August 2026. \n/s/ Richard P. Sparling\nRichard P. Sparling  \nDavis Wright Tremaine LLP  \n1301 K Street NW  \nSuite 500 East  \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":243},{"p":2,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":2,"endAt":389,"startToken":243,"endToken":305}]}