{"document":{"slug":"rec-20260821-5060","title":"Comment of Terry Headley in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/21/2026","issued":"2026-08-21","accession":"20260821-5060","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260821-5060_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5060","tier":"record","sha256":"4d9f682eb5c21648c92c8d3b1135e47fc8aa0d10e34b5fe1a2141d7d20787e84","pages":null,"tokens":1412,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":1412,"text":"Terry Headley, Ona, WV, WV.\nGovernment and regulatory submission portals are notorious for stripping out formatting like bold text, bullet points, and tables, which can turn a well-structured document into an unreadable wall of text.\n\nTo fix this, I have converted the comments into a strict Plain Text version. I removed all Markdown (no bolding, no special bullet points) and converted the Appendix table into a simple, stacked text list so that it will remain perfectly readable even in a basic text box.\n\nYou can copy and paste the text below directly into the submission tool:\n\nUNITED STATES OF AMERICA\nBEFORE THE FEDERAL ENERGY REGULATORY COMMISSION\n\nPJM Governance and Stakeholder Reforms\nDocket No. AD26-7-000\n\nPOST-CONFERENCE COMMENTS OF THE SENECA CENTER FOR ENERGY AND CRITICAL MINERALS POLICY\nAugust 21, 2026\n\nI. INTRODUCTION AND SUMMARY OF POSITION\nPursuant to the Commission's July 30, 2026 Notice, The Seneca Center for Energy and Critical Minerals Policy (\"Seneca Center\") submits these comments on PJM governance. Writing from the generation side of the PJM footprint (the Appalachian and Ohio Valley corridor), we emphasize that governance reform is only valuable if it changes physical outcomes--specifically, ensuring firm, dispatchable, fuel-secure capacity is built, retained, and dispatched. Procedural elegance that leaves the region short by 6,623 MW for the 2027/2028 delivery year, and 6,831 MW for 2028/2029, is a failure.\n\nOur core propositions:\n\nThe sole test for any reform is whether it improves resource adequacy.\n\nBoard independence must be permanently tethered to accountability.\n\nState regulators require a formal, structurally strengthened role.\n\nTransferring Section 205 filing rights warrants conditional support at most.\n\nPJM must measure whether existing firm capacity is being dispatched before procuring more.\n\nStructural remedies, including breaking up PJM, must remain a backstop.\n\nII. STATEMENT OF INTEREST AND COMMUNICATIONS\nThe Seneca Center is a 501(c)(3) nonprofit researching electricity market design, resource adequacy, and dispatch economics. We are not a market participant. Our interest is the reliability and affordability of electric service and the integrity of PJM's governance.\n\nCommunications to:\nT.L. Headley, MBA\nFounder and Vice President of Communications\n169 Raceview Drive, Ona, WV 25545\n681.356.1776 | tlheadley@hedleycompany.com\n\nIII. THE STANDARD THE COMMISSION SHOULD APPLY\nChairman Swett and Deputy Secretary Danly accurately diagnosed PJM's grave legitimacy crisis, a physical problem with a procedural cause. We propose one evaluative standard for every reform: Does it make it more likely that firm, dispatchable capacity gets built, retained, and run? Speed to a bad decision solves nothing.\n\nIV. BOARD AUTHORITY, INDEPENDENCE, AND ACCOUNTABILITY\nWe support strengthening board independence through six-to-nine year staggered terms. However, independence without accountability creates a referee chosen by the players but answerable to no one. Expanded board authority must include:\n\nA codified public interest mandate in governing documents running directly to retail consumers.\n\nPublished annual reliability metrics (e.g., reserve margins, cold-weather outage rates, undispatched capacity).\n\nAn independent nominating process to prevent regulatory capture.\n\nV. SECTION 205 FILING RIGHTS AND DOCUMENT ARCHITECTURE\nPJM proposes moving Operating Agreement Schedules 1 and 6 to the Tariff, granting it unilateral Section 205 authority. Given PJM already holds Section 205 authority over the capacity construct--where the region's shortfall has occurred--we offer conditional support only. This transfer must be strictly paired with:\n\nThe codified public interest mandate.\n\nA formal state counterfiling right.\n\nA mandatory reliability impact statement for any Section 205 filing, reviewed by the Independent Market Monitor.\n\nVI. THE ROLE OF THE STATES\nThe central governance defect in PJM is a federalism problem: states bear responsibility for resource adequacy and retail rates but lack structural power. We support:\n\nNominating Committee: Three state seats on PJM's Nominating Committee. Furthermore, removing a sitting board member should require the supermajority concurrence of PJM states via OPSI.\n\nCounterfiling Right: A formal, Commission-enforceable right for a supermajority of states to file an alternative proposal alongside a PJM Section 205 filing. We reject informal, non-binding agreements, which failed to enforce the January 2026 statement of principles.\n\nFunding: Tariff-based funding for OPSI and a governors' designee group to ensure independent technical capacity.\n\nVII. STAKEHOLDER PROCESS DESIGN, VOTING, AND TRANSPARENCY\n\nVoting Alignment: We support conforming lower-committee voting to senior committee sector weighting and ending affiliate multi-voting.\n\nCommittee Consolidation: We oppose wholesale elimination of lower committees. A task force meeting 1.17 times per month during a resource crisis is a scheduling failure, not a structural one. We recommend a strict shot clock on critical issues.\n\nWork Plan: Codify the Manual 34 annual work plan into the Tariff to make it Commission-enforceable.\n\nAdvisory-Only Voting: We oppose converting to an advisory model unless the state governance package is adopted simultaneously. We also support increasing the sector weight for state consumer advocates.\n\nRecorded Positions: We strongly support Commissioner LaCerte's proposal to circulate a formal, public ballot on reform proposals to establish accountability.\n\nVIII. THE MISSING MEASUREMENT: UTILIZATION OF EXISTING CAPACITY\nNo PJM committee measures whether existing firm, accredited capacity is being dispatched before the region procures replacement capacity. In the Ohio Valley, fully depreciated, low-marginal-cost coal units often sit idle while utilities recover high replacement power costs from ratepayers.\n\nWe recommend the Commission direct PJM to produce an annual Capacity Utilization and Dispatch Prudence Report, subject to Independent Market Monitor review. It must identify economically available, undispatched firm capacity during peak load events and the cost of replacement energy procured in its place.\n\nIX. STRUCTURAL SCOPE, EXIT RIGHTS, AND THE ENFORCEABLE BACKSTOP\nPJM coordinates two divergent economies: an Atlantic seaboard of data-center load growth and an Appalachian generation corridor absorbing the costs.\n\nExit Rights: We adamantly oppose restricting member withdrawal rights. The right to exit is the only functional market discipline currently operating on PJM.\n\nA Date Certain: The Commission must establish March 31, 2027, as the absolute deadline for a Section 205 reform package. Failure to file must trigger a Section 206 proceeding examining if PJM's footprint and governance remain just and reasonable--keeping RTO division explicitly on the table.\n\nX. SUMMARY OF RECOMMENDATIONS\n\nCodify an Order No. 2000 public interest duty to retail consumers.\n\nAdopt six-to-nine year staggered board terms.\n\nRequire OPSI supermajority concurrence for board member removal.\n\nProvide three state seats on the Nominating Committee.\n\nFund OPSI and a governors' designee group through the Tariff.\n\nEstablish a formal state counterfiling right on Section 205 filings.\n\nCondition Section 205 transfers on a public interest mandate, counterfiling right, and reliability impact statement.\n\nRequire published annual reliability performance metrics.\n\nOrder an annual Capacity Utilization and Dispatch Prudence Report.\n\nApply senior committee sector-weighted voting at lower committees.\n\nCodify the Manual 34 work plan in the Tariff.\n\nImpose resolution shot clocks rather than eliminating committees.\n\nIncrease the consumer advocate sector weight.\n\nCirculate a recorded, public stakeholder ballot before ADR commences.\n\nReject any restrictions on member withdrawal rights.\n\nSet March 31, 2027, as a Section 206 backstop deadline.\n\nXI. CONCLUSION\nThe Appalachian and Ohio Valley communities will measure the outcome of this proceeding against one question: whether the lights stay on and what it costs. We stand ready to participate in the Alternative Dispute Resolution process commencing September 1, 2026.\n\nRespectfully submitted,\n\nT.L. Headley, MBA\nFounder and Vice President of Communications\nThe Seneca Center for Energy and Critical Minerals Policy\n169 Raceview Drive, Ona, West Virginia 25545\n681.356.1776 | tlheadley@hedleycompany.com\nDated: August 21, 2026\n\nAPPENDIX A -- ISSUES LIST\n\nIssue: Board authority to act unilaterally\nPosition: Support, conditioned on public interest mandate, reliability metrics, and independent nominating.\nPriority: High\n\nIssue: Board term length and removal protection\nPosition: Support 6-9 year staggered terms. Removal requires supermajority of PJM states.\nPriority: High\n\nIssue: Nominating Committee composition\nPosition: Support three state seats. Oppose member-company control of board selection.\nPriority: High\n\nIssue: Public interest mandate\nPosition: Support. Codify duty to 67 million retail consumers.\nPriority: High\n\nIssue: Section 205 rights over Schedules 1 and 6\nPosition: Conditional support, paired with counterfiling right, impact statements, and public interest mandate.\nPriority: Medium\n\nIssue: State counterfiling right\nPosition: Support as a formal, FERC-enforceable right.\nPriority: High\n\nIssue: Formalized OPSI role and tariff funding\nPosition: Support. Fund OPSI and governors' designee group with independent staff.\nPriority: High\n\nIssue: Advisory-only stakeholder process\nPosition: Oppose in isolation. Support only if state governance package is adopted simultaneously.\nPriority: High\n\nIssue: Lower-committee voting\nPosition: Support conforming to senior sector weighting; end affiliate multi-voting.\nPriority: Medium\n\nIssue: Committee consolidation\nPosition: Oppose wholesale elimination. Support meeting frequency rules and shot clocks.\nPriority: Medium\n\nIssue: Manual 34 work plan\nPosition: Support codifying work plan in the Tariff."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":822,"startToken":0,"endToken":129},{"p":1,"at":822,"title":"I. INTRODUCTION AND SUMMARY OF POSITION","method":"printed heading","endPage":1,"endAt":1927,"startToken":129,"endToken":290},{"p":1,"at":1927,"title":"II. STATEMENT OF INTEREST AND COMMUNICATIONS","method":"printed heading","endPage":1,"endAt":2400,"startToken":290,"endToken":360},{"p":1,"at":2400,"title":"III. THE STANDARD THE COMMISSION SHOULD APPLY","method":"printed heading","endPage":1,"endAt":2770,"startToken":360,"endToken":416},{"p":1,"at":2770,"title":"IV. BOARD AUTHORITY, INDEPENDENCE, AND ACCOUNTABILITY","method":"printed heading","endPage":1,"endAt":3337,"startToken":416,"endToken":487},{"p":1,"at":3337,"title":"V. SECTION 205 FILING RIGHTS AND DOCUMENT ARCHITECTURE","method":"printed heading","endPage":1,"endAt":3899,"startToken":487,"endToken":568},{"p":1,"at":3899,"title":"VI. THE ROLE OF THE STATES","method":"printed heading","endPage":1,"endAt":4663,"startToken":568,"endToken":676},{"p":1,"at":4663,"title":"VII. STAKEHOLDER PROCESS DESIGN, VOTING, AND TRANSPARENCY","method":"printed heading","endPage":1,"endAt":5567,"startToken":676,"endToken":802},{"p":1,"at":5567,"title":"VIII. THE MISSING MEASUREMENT: UTILIZATION OF EXISTING CAPACITY","method":"printed heading","endPage":1,"endAt":6231,"startToken":802,"endToken":893},{"p":1,"at":6231,"title":"IX. STRUCTURAL SCOPE, EXIT RIGHTS, AND THE ENFORCEABLE BACKSTOP","method":"printed heading","endPage":1,"endAt":6898,"startToken":893,"endToken":991},{"p":1,"at":6898,"title":"X. SUMMARY OF RECOMMENDATIONS","method":"printed heading","endPage":1,"endAt":7955,"startToken":991,"endToken":1135},{"p":1,"at":7955,"title":"XI. CONCLUSION","method":"printed heading","endPage":1,"endAt":10027,"startToken":1135,"endToken":1412}]}