{"document":{"slug":"rec-20260821-5102","title":"Post-Technical Conference Joint Comments of the Organization of PJM States, Inc. and the PJM Governors' Collaborative re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5102","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Organization of PJM States, Inc.PJM Governors' Collaborative","kind":"comments","file":"sources/filings/text/20260821-5102_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5102","tier":"record","sha256":"85a05fbf79ecae76a5bf4eda5628a5e730250296ac76e6b0f881b1db59f09eb8","pages":12,"tokens":3511,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":382,"text":"1 \n \n \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n \nPost Technical Conference Comments on PJM  \n) \nGovernance and Stakeholder Reforms \n \n)  \n \nDocket No. AD26-7-000 \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nPost-Technical Conference Joint Comments \nOrganization of PJM States, Inc. and PJM Governors’ Collaborative  \n \n \nThe Organization of PJM States, Inc. (“OPSI”)1 and PJM Governors’ Collaborative \n(“Collaborative”) 2 unanimously support these joint comments and would like to thank the \nCommission for convening the July 23 technical conference, soliciting post-conference \ncomments, and announcing the beginning of an alternative dispute resolution (“ADR”) process, \nall aimed at addressing the urgent challenges our region faces by improving PJM’s current \ngovernance and stakeholder processes. OPSI and the Collaborative submit these brief joint post-\nconference comments and responses to the Commission’s questionnaire to support the ADR \nprocess and the Commission’s future decision making. \nRTOs remain well suited to accomplish their core mission: “to promote efficiency in \nwholesale electricity markets and to ensure that electricity consumers pay the lowest price \npossible for reliable service.”3 That is because competitive markets, designed properly, deliver \n \n1 OPSI is a 501(c)(4) nonprofit corporation whose membership consists of the 14 retail electric regulatory \nauthorities in the PJM Region, with one Commissioner from each jurisdiction serving on OPSI’s Board of \nDirectors. The following OPSI members support these comments: the Delaware Public Service \nCommission, Public Service Commission of the District of Columbia, Illinois Commerce Commission, \nIndiana Utility Regulatory Commission, Kentucky Public Service Commission, Maryland Public Service \nCommission, Michigan Public Service Commission, New Jersey Board of Public Utilities, North Carolina \nUtilities Commission, Public Utilities Commission of Ohio, Pennsylvania Public Utility Commission, \nTennessee Public Utility Commission, Virginia State Corporation Commission, and Public Service \nCommission of West Virginia. \n2 The PJM Governors’ Collaborative was constituted by the region’s governors in September 2025 at the \nSummit on the Future of PJM in Philadelphia, PA.  The Collaborative members unanimously support \nthese comments: Delaware Governor Matt Meyer, District of Columbia Mayor Muriel Bowser, Illinois \nGovernor JB Pritzker, Indiana Governor Mike Braun, Kentucky Governor Andy Beshear, Maryland \nGovernor Wes Moore, Michigan Governor Gretchen Whitmer, New Jersey Governor Mikie Sherrill, North \nCarolina Governor Josh Stein, Ohio Governor Mike DeWine, Pennsylvania Governor Josh Shapiro, \nTennessee Governor Bill Lee, Virginia Governor Abigail Spanberger, and West Virginia Governor Patrick \nMorrisey.  \n3 Regional Transmission Orgs., Order No. 2000, FERC ¶ 31,089, 30,993 (1999)."},{"page":2,"startToken":382,"endToken":724,"text":"2 \n \n \nreal value to customers. But experience in recent years has shown repeatedly that PJM’s current \ngovernance process is failing to facilitate this mission. Improved governance will not by itself \nstabilize confidence in PJM’s markets, nor will it spontaneously resolve the resource adequacy \nchallenges we must collectively address in short order. But it would be self-defeating to attempt \nto modify those markets without first addressing the governance shortcomings that led us to this \njuncture. For that reason, OPSI and the Collaborative strongly support this Commission’s focus \non governance, not as the end goal, but as a necessary first step to ultimately improve market \nconfidence and functions.   \nA core component of the PJM governance reforms must be to make it abundantly clear \nthat PJM’s duty is to advance the public interest, not the private interests of any individual \nmember. This includes but is not limited to PJM’s current mission of ensuring the safety, \nreliability, and security of the bulk power system, and goes beyond the Board avoiding conflicts \nthat interfere with this public interest duty and dispelling any perception of conflicts as they \ncarry out this duty. Promotion of the public interest requires two integrated categories of \nreforms: first, PJM must be empowered to act more independently from its financially self-\ninterested Members and more decisively, and second, the states – who represent the public \ninterest - must have a larger role in reaching decisions of shared importance.  \nGreater involvement from the states is critical to inform PJM about what is in the public \ninterest. For example, OPSI was specifically formed to “promote the public interest and social \nwelfare” by, among other things, “[m]aintaining an organization” of the PJM States and \n“[p]roviding a means for the PJM States to act in concert, when deemed to be in the common \ninterest of their affected publics,” on matters including “(i) PJM operations; (ii) the electricity \ngeneration and transmission system serving the PJM States; (iii) related FERC matters; and (iv) \nthe jurisdiction and role of the PJM States to regulate and promote the electric utilities and"},{"page":3,"startToken":724,"endToken":1108,"text":"3 \n \n \nsystems within their respective boundaries.”4 OPSI’s Articles of Incorporation further state that \nits purpose is “[t]o take or refrain from taking such other actions as are deemed to be in the \npublic interest of the PJM States.”5 Consistent with that purpose, OPSI entered into a \nMemorandum of Understanding with PJM establishing a structure “to facilitate communication \nand, when appropriate, cooperative action… to promote and protect the public interest in the \nprovision of reliable and reasonably priced electric service within the PJM Control Area.”6  \nThe role of OPSI’s members is clearly critical to represent the public interest, especially \non the highly technical matters regularly debated at PJM. As technologies, public preferences, \nand power grid needs evolve, the lack of gubernatorial representation of each state in which \nPJM operates (and the Mayor of D.C.) has become a glaring gap in public interest representation \nat PJM. Defining what is in the public interest can be challenging, as the definition can change \nover time, location, and depending on socio-economic circumstances and other factors.  There \nare certain matters that are consistently in the public interest, such as keeping costs low for \nresidential ratepayers, which is why the Consumer Advocates of the PJM States (“CAPS”) was \nestablished. But on matters of public policy, economic development, and other broader \nstatewide priorities, the public interest may be dynamic over time, differ by location, and \nchallenging to define. Governors, as the publicly elected Chief Executive of each state, represent \nthe prevailing preferences of the public at a given time and location, and are held accountable by \nthe public. Therefore, as PJM grapples with developing proposals that have wide-ranging \nsocietal and economic impacts, it must have a governance structure that meaningfully \nincorporates perspectives from state governors. Otherwise, PJM risks advancing solutions that \nwill face strong public and political backlash - and may eventually be mitigated - all because \n \n4 OPSI, State of Delaware Certificate of Incorporation: A Non-Stock Corporation (May 18, 2005), available \nat https://opsi.us/wp-content/uploads/2018/08/OPSI-Articles-of-Incorporation.pdf.  \n5 Id. \n6 OPSI and PJM Interconnection, L.L.C., Memorandum of Understanding Between PJM Interconnection, \nL.L.C. and the Organization of PJM States, Inc. (June 8, 2005), available at https://opsi.us/wp-\ncontent/uploads/2020/02/OPSI_PJM_MOU_executed_June_8_2005-1-1.pdf."},{"page":4,"startToken":1108,"endToken":1460,"text":"4 \n \n \nthese solutions did not incorporate early and meaningful involvement from all the types of state \nvoices that were needed.  \nAs the Commission requested, we will not restate our entire package of recommended \nreforms here, but note the detailed package of reforms endorsed by OPSI are in its pre-\nconference comments7 and by the Collaborative as described in the pre-filed statements of both \nJacob Finkel (Deputy Secretary of Policy, Commonwealth of Pennsylvania, Office of Josh \nShapiro)8 and Suzanne Jaworowski (Secretary of Energy and Natural Resources, State of \nIndiana, Office of Governor Mike Braun).9 Both OPSI and the Governors’ Collaborative envision \na stronger, more nimble PJM decision-making structure, with more independence for the PJM \nBoard to make tough decisions on behalf of the region and a streamlined process for important \ninput from the Members. Alongside these essential improvements to PJM’s own structure, it is \nnecessary for PJM to find ways to more meaningfully include input from the states—aligning \nauthority with accountability as described at the technical conference—bringing PJM’s \nengagement with its states into line with the more collaborative relationships, with real \nauthority for the states, that exists in every other multi-state RTO in the nation. \nThis includes a substantial increase in funding that will support more specialist and \ntechnical expertise to support OPSI’s ongoing work and will fund the engagement of the \nCollaborative: representatives appointed by the governors to reflect the input of the \npolicymakers (including governors, legislators, and other state advocates) whose input is \nnecessary to create durable and successful policy constructs in our multi-state region. In order \nto give the states a role with “teeth” as Commissioner Rosner described it in his opening \nremarks at the technical conference, the PJM Board must grant OPSI jump ball 205 filing rights \nover areas of core shared responsibility, and the PJM Board Nominating Committee must \n \n7 OPSI, Pre-Conference Comments of the Organization of PJM States, Inc., Docket No. AD26-7-000 (July \n20, 2026).  \n8 Jacob Finkel, Pre-Filed Statement of Jacob Finkel, Docket No. AD26-7-000 (July 16, 2026). \n9 Suzanne Jaworowski, Pre-Filed Statement of Suzanne Jaworowski, Docket No. AD26-7-000 (July 15, \n2026)."},{"page":5,"startToken":1460,"endToken":1484,"text":"5 \n \n \ninclude three representatives of the states, appointed by the Collaborative, to balance the private \ninterest of the Members who currently dominate that group."},{"page":6,"startToken":1484,"endToken":1879,"text":"6 \n \n \nPost-Technical Conference Questionnaire Responses \nPJM Board Independence \n \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments:  \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nX \n \n \nComments:  \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \n \nComments: In addition, any conflict-of-interest rules perceived to serve as a barrier to \nin-region Board candidates should be removed or otherwise adjusted. \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \nX \n \n \nComments: Yes, the 1-year cooling off period is in line with, or more stringent than, \nBoard conflict of interest requirements for other RTO/ISOs.10 \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \nX \n \n \nComments: Yes, provided that all communications are appropriately disclosed to the \npublic, and that no Member or class of Members has inequitable access to the Board. \n6) \nIn order to increase transparency, should Board votes be made public or \nthe Board be required to explain its reasoning?  \nX \n \n \nComments: Board votes should be made public. When issuing a decision, the board \noften does explain its decision-making process,11 and we encourage further expansion of \nthis practice. And further, as described below, hearing the concerns and comments of \n \n10 Today, MISO has a 1-year cooling off period for their Board members following \nemployment/directorship of a Member, Affiliate, or other associated company before they can serve on \nthe Board (source link). None of the other RTOs in the country -  including SPP (link), ISO-NE (link 1, link \n2), NYISO (link 1, link 2), CAISO (link 1, link 2), and ERCOT (link 1, link 2) - have cooling off periods \nbefore prospective Board members can serve on the Board. \n11 PJM Board of Managers, Board Decisional Letter on Critical Issue Fast Path – Large Load Additions \n(Jan. 16, 2026), available at: https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-\ndisclosures/2026/20260116-pjm-board-letter-re-results-of-the-cifp-process-large-load-additions.pdf. \nPJM Board of Managers, Board Decisional Letter on Critical Issue Fast Path – Reliability Backstop \nProcurement and Connect and Manage (July 27, 2026), available at: https://www.pjm.com/-\n/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260727-board-decisional-letter-on-\ncifp-reliability-backstop-procurement-and-connect-and-manage.pdf"},{"page":7,"startToken":1879,"endToken":2243,"text":"7 \n \n \n \nQuestions/Comments \nYes No \nPJM Board Members in open Board meetings as they make their decisions could \ngreatly improve the perception of the PJM Board’s independence. \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nX \n \n \nComments: Yes. Board meetings should be open to the greatest extent possible, \nrecognizing exceptions for conversations on sensitive topics like CEII information and \npersonnel decisions, for example. \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \nX \n \n \nComments: Yes. PJM and its Board should have an obligation to serve the public \ninterest rather than the private interests of any Member or class of Members. The \nobligation to serve the public interest should be limited to PJM’s core responsibilities to \nmaintain a reliable, secure, and resilient bulk power system and efficient wholesale \nmarkets that provide electricity at just, reasonable, and affordable rates. This public \ninterest obligation should not be construed to expand PJM’s jurisdiction or authority.  \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX \n \n \nComments: To safeguard the public interest, states must have no fewer than three \nseats on the Nominating Committee. Currently, the nominating committee is \ndominated by the 5 member-sector votes, with only two independent voting board \nseats. Adding three state appointee votes to the Nominating Committee would allow the \ncombination of Board and state votes to equal the five member-sector votes.  This \nwould put independent and public interest voting influence on equal footing with the \ninfluence of financially self-interested members. \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \nX \n \n \nComments: Yes. MISO’s short-term incentive plan structure is a possible model PJM \ncould adopt.12 \n \nSection 205 Filing Rights \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \nX \n \n \n12 An example of MISO’s 2025 Short-Term Incentive Plan with end of year performance review is included \n(link). This plan is developed by MISO, then reviewed and approved by the MISO Board of Director’s \nHuman Resources Committee, after taking stakeholder input."},{"page":8,"startToken":2243,"endToken":2661,"text":"8 \n \n \n \nQuestions/Comments \nYes No \n \nComments: If states are given an unencumbered pathway to exercising PJM’s 205 \nrights on certain matters and under certain conditions (e.g., supermajority OPSI vote), \nwe believe PJM Member votes should be advisory-only as they are in every other \nRTO/ISO. \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \nX \n \n \nComments: Yes, but only if states are given an unencumbered pathway to exercising \nPJM’s 205 rights on certain matters and under certain conditions (e.g., supermajority \nOPSI vote), we believe PJM Member-stakeholder votes should be advisory-only as they \nare in every other RTO/ISO. This means providing PJM with 205 rights over all aspects \nof the Operating Agreement.  \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n \nComments: Yes, but only if states are given an unencumbered pathway to exercising \nPJM’s 205 rights on certain matters and under certain conditions (e.g., supermajority \nOPSI vote), we believe PJM Member-stakeholder votes should be advisory-only as they \nare in every other RTO/ISO. This means providing PJM with 205 rights over all aspects \nof the Operating Agreement. \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \nX \n \n \nComments: Yes. Experience in each of PJM’s sister multi-state RTOs has shown that \nsuch arrangements are effective in producing more collaborative state/RTO \npartnerships and that, in practice, alternative filings are rarely necessary because state \ninput is afforded respect as RTO proposals are developed, enabling superior \ncoordination with the states and reducing regulatory uncertainty. These rights and this \ncoordination makes sense given that the States are responsible for assigning the costs \nassociated with PJM’s resource adequacy construct and transmission planning process, \npromoting resource adequacy to enable PJM to maintain reliability in real time and \nsiting much of the transmission the PJM Board approves. The OPSI jump ball 205 \nfiling rights should be informed by the perspectives of Members and the PJM Board but \nshould not be encumbered by or contingent upon the approval of either. \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \n \n \n \nComments:"},{"page":9,"startToken":2661,"endToken":3044,"text":"9 \n \n \nStakeholder Process \n \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \nX \n \n \nComments:  \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \nX \n \n \nComments: Yes, the current voting framework is misaligned and results in wasted \ntime and resources. The current PJM stakeholder process voting rules at the lower level \n– where solution proposals are developed - allow for affiliate voting, no sector-weighted \nvoting, and only a simple majority is needed to pass. The result is supply-side members \ncontrol over 80% of the total lower-level votes. As such, supply-biased solutions pass \nout of the lower level, but typically fail at the higher-level committees where load is \nmore evenly represented because affiliates aren’t allowed to vote, sector-weighted \nvoting is used, and a supermajority is needed to pass. The voting rules should be \naligned so that compromise between supply and load is emphasized throughout the \nprocess. \n \nState Participation \n \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \nX \n \n \nComments: Absolutely. The Governors’ proper role should be big-picture: working \nwith the Board to establish the long-term strategic direction of the RTO, \ncommunicating preferences that serve the public interest, and encouraging action, \nagreement, and forward progress, not to block ideas. This complements the technical \nexpertise of OPSI’s utility regulators — making OPSI the best-suited state entity to \nexercise jump-ball filing rights—and complements the more narrowly focused \nresidential ratepayer advocacy of the Consumer Advocates of the PJM States. We also \nwelcome expanded engagement from state and local legislative officials to inform \ndebates about policy, siting, and other relevant matters, while also recognizing the \nchallenges associated with organizing and representing the hundreds-to-thousands of \nstate and local legislative officials representing districts across the region. \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?   \n \nX \n \nComments: Enhanced state involvement is critical in several areas that are beyond the \nstandard stakeholder process and rights afforded to Members and stakeholders. \nRelegating the states to the same voting rights as Members marginalizes the role that"},{"page":10,"startToken":3044,"endToken":3113,"text":"10 \n \n \n \nQuestions/Comments \nYes No \nstates play in defining and representing the public interest, as implementation partners \nand as co-regulators. \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \nX \n \n \nComments: Yes, but this should not be limited to merely a consultation, it must \ninclude unencumbered “jump ball” filing rights paired with a consultation."},{"page":11,"startToken":3113,"endToken":3342,"text":"11 \n \n \nAppendix A - Addressing Key Questions from the Technical Conference \nOPSI and the Collaborative would like to take this opportunity to address several key \nquestions raised by the Commissioners or other panelists at the technical conference. \n \n1. Should FERC grandfather existing PJM board members if there are \nchanges to the Board nomination processes, terms of service, eligibility \ncriteria, etc.?  \nFERC should immediately allow PJM to add the three new state seats to the Board \nNominating Committee and should ensure that the next Board Nominating Committee \naction includes the three state-appointed votes. Terms and eligibility criteria for existing \nBoard members should be grandfathered, but new Board members arising from Nominating \nCommittee actions that include the three state-appointed members should incorporate the \nrevised terms and criteria.  \n \n2. Are there confidentiality concerns with having states on the Nominating \nCommittee? \nAbsolutely not. States have significant experience managing protected information, \nincluding but not limited to critical energy infrastructure information, personally \nidentifiable information, cybersecurity vulnerabilities, internal deliberative materials, etc. \n \n \n3. Should the Board prioritize the stakeholder process agenda? \nWe believe the stakeholder process is cumbersome and takes on too many issues to \nsimultaneously manage at a high level of quality. PJM has developed annual Member’s \nCommittee plans that identify priorities, but these do not seem to be monitored, enforced, or \nadjusted. As such, the PJM executive team should play a greater role in overseeing and"},{"page":12,"startToken":3342,"endToken":3511,"text":"12 \n \n \ndirecting the stakeholder process agenda, but this should not be the direct responsibility of \nthe Board \n \n4. Why is it critical to tackle Governance issues first before addressing \nresource adequacy concerns? \nPJM needs to identify durable solutions to the resource adequacy crisis and needs to do so \nquickly to restore confidence in new market solutions that are being developed. Without \ngovernance reforms, the essential improvements to the markets cannot occur credibly and \nsuccessfully. This means a new process that leads to faster and more effective solutions from \nPJM. It also means a greater role for states as key implementation partners on resource \nadequacy matters. Today, states are afforded inadequate representation in PJM’s \ngovernance process when compared with the role of the states in every other multi-state \nRTO. The PJM states must have a meaningful seat at the table as changes to the resource \nadequacy construct are developed. Failure to create a more meaningful role for states risks \nheightened litigation risk, investor uncertainty, and delay realizing new supply development."}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1460},{"p":5,"at":0,"title":"Pages 5 to 8","method":"page range","endPage":9,"endAt":0,"startToken":1460,"endToken":2661},{"p":9,"at":0,"title":"Pages 9 to 12","method":"page range","endPage":12,"endAt":1119,"startToken":2661,"endToken":3511}]}