{"document":{"slug":"rec-20260821-5133","title":"Comments of Sierra Club et al. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5133","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Sierra ClubNatural Resources Defense CouncilEARTHJUSTICE ,Southern Environmental Law Center ,RMI ,","kind":"comments","file":"sources/filings/text/20260821-5133_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5133","tier":"record","sha256":"8ba1cfbedda2e1e40e9b63ad5285714b1ce76b0694eb16d79832972709a485fc","pages":17,"tokens":7722,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":404,"text":"UNITED STATES OF AMERICA  \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, LLC​ ​\n​\n​\n​\n) ​\nDocket No. AD26-7-000  \n \nComments on PJM Stakeholder Governance Reform  \nof Public Interest Organizations  \nIntroduction \n \nFERC’s July 23rd Technical Conference was a Constitutional Convention for PJM, the need for \nwhich we have seen evinced time and again in this most recent year of upheaval. Indeed, the \nfirst-of-its-kind Multi-state Summit on the State of PJM, held last September at the National \nConstitution Center, featured calls for such an event from across the political and stakeholder \nspectrum. We applaud the Commission’s timely attention to the problems plaguing PJM’s \ncurrent governance structures, and focus on identifying substantive solutions, fast.  \n \nAs we celebrate 250 years since our nation’s founding, we must credit the institutional ideals \nand governing documents that underpin America’s longevity. Today, with electricity such a \ncritical part of a functional, modern society, our grid governance requires a similar North Star to \nguide us. Nowhere is that need more evident than in PJM, our nation’s largest and \nlongest-standing regional grid, which, as Chair Swett well noted, is facing “a grave legitimacy \ncrisis.”  PJM is also approaching a momentous anniversary – its 100th birthday – and we must \nensure the RTO sets itself up to thrive for the new century to come. We are ready to work with \nPJM and stakeholders to do so. \n \nOur organizations – RMI, Sierra Club, Earthjustice, Natural Resources Defense Council, \nand Southern Environmental Law Center (collectively “Public Interest Organizations”) – \nrepresent a coalition of regular participants in the PJM stakeholder process. Many of the \nundersigned organizations are members of the PJM Public Interest Environmental Organization \nUser Group (PIEOUG). While other signatories are not members of the PIEOUG, all of the \nundersigned organizations are participants in PJM stakeholder processes and are affected by \nPJM’s governance practices. For all of us, PJM governance issues have been a long-standing \nconcern that have impacted our efforts, and we value the opportunity to respond to the specific \nissues raised at the conference.1 We are encouraged to see the issues so clearly identified by \nthe Commission for further public comment. We look forward to continued dialogue in the \nDispute Resolution Service process and building on PJM’s proposal. \n \nBefore addressing the questions individually, we introduce our principal concerns and remedies \nfor PJM’s governance: \n \n1 Simeone, Christina. Kleinman Center for Energy Policy. 2017. “PJM Governance: Can Reforms Improve \nOutcomes?” Report. Available at \nhttps://kleinmanenergy.upenn.edu/research/publications/pjm-governance-can-reforms-improve-outcomes/  \n1 of 17"},{"page":2,"startToken":404,"endToken":964,"text":"First, PJM must embed the public interest within its governance structure. By public \ninterest, we are thinking expansively about the interests of the 67 million people who reside and \npay electric bills in the PJM region, as well as the region’s businesses – large and small. Making \na commitment to the public interest explicit is key, and underpins many of the other \ncontemplated changes. Three specific reforms would help achieve this end: \n \n1.​ PJM’s governing documents should clearly state that the RTO has an obligation to \nserve the public interest. This idea is reflected in several pre-conference comments, \nincluding those of former FERC Chair Pat Wood.2 What’s more, other RTOs already do \nthis, as Abe Silverman noted during the July 23rd event: MISO is set up as a 501(c)(4) \norganization “operated exclusively to promote social welfare,” while CAISO is set up as a \n“nonprofit public benefit corporation.”3 \n2.​ It is equally critical that the PJM Board, leadership, and staff maintain an \norientation towards serving the public interest, and not merely PJM members. The \nIndependent Market Monitor, Joe Bowring, emphasized this in his conference remarks, \nnoting not only the importance of the Board acting in the public interest, but also their \ndirecting PJM leaders and staff to do the same.4 Pat Wood suggests adopting public \nannual performance metrics, and tying compensation to their achievement, as in MISO. \nWe agree that performance metrics linked to ensuring that PJM leadership serves the \npublic interest would offer value in the form of both clearly defined outcomes and \naccountability in pursuing them.  \n3.​ Finally, explicit inclusion of the public interest in PJM’s mission would necessitate \na more substantive and formal role for states and consumer advocates within the \nstakeholder process, as representatives of the public. The breadth and diversity of \nstate voices in the PJM region presents both challenge and opportunity in this regard, \nbut the need for a stronger voice is real. Pat Wood notes that, among the four multi-state \nRTOs, he views PJM states’ voice within stakeholder and decision-making processes as \n“the most muted.” We therefore see merit to the idea of a PJM States’ Committee on \nElectricity (PJM-SCOE), with defined rights that could include issue identification and \nprioritization via a direct channel to the Board, consultative authority (particularly around \nmatters regarding resource adequacy, over which states have significant \nresponsibilities), and jump ball filing rights.5  \n \nCentering the public interest is urgently needed to address the growing energy \naffordability concerns affecting many American families. Polling by Third Way recently \nfound that one in four Americans say they already struggle to pay their utility bills, and another \n40 percent said they would have difficulty paying if costs increased further.6 Meanwhile, in July, \nthe average US residential electric bill hit a record of $217 – with some of the biggest price \n6 https://www.thirdway.org/memo/asking-americans-whats-causing-high-energy-prices-and-how-do-we-fix-it  \n5 Further details on how this body could function within existing structural and decision-making processes are \nprovided within the detailed question responses (specifically questions 18 and 19). \n4 Comments by PJM Independent Market Monitor, Joe Bowring, ibid. \n3 Comments by panelist, Abe Silverman, Johns Hopkins, July 23rd, FERC Technical Summit on PJM Stakeholder \nGovernance, https://www.ferc.gov/news-events/events/PJM-Governance-Stakeholder-Reforms  \n2 Pre-conference comments by Pat Wood, July 2026, posted on personal platform, available at \nhttps://lnkd.in/p/e8BJsVjV  \n2 of 17"},{"page":3,"startToken":964,"endToken":1518,"text":"spikes occurring in the mid-Atlantic.7 The price of electricity cannot continue to be a source \nof financial strain for the majority of Americans, or PJM residents. To address this growing \nissue, PJM should adopt cost impact analyses to evaluate many of the proposed rule changes \nand reforms it is contemplating today, to ensure they do not further exacerbate (and ideally \nmitigate) these rising price pressures. This is just one public interest issue among several that \nwould be better addressed by an RTO where these concerns are core to the mission. \n \nSecond, PJM must remedy the dysfunction of its current stakeholder process. We have \nparticipated in enough PJM committee and task force meetings to be able to say with certainty \nthat they leave much room for improvement, as DOE Deputy Secretary Danly similarly raised in \nhis opening remarks.8 Meetings are frequently side-tracked and bogged down by unwieldy \nquestion/comment queues, and lack the requisite procedural and decision-making structures to \npromote meaningful dialogue. Instead, obfuscation and grandstanding proliferate. Unresolved \ndisputes, outstanding questions, and lack of clarity on future direction are common at meetings’ \nend, even if the meeting has taken up an entire day. The end result of this is an inability to act, \neven when issues demand immediate attention.  \n \nThe CIFP process (which literally has “Fast Path” in the name) initiated by the PJM Board last \nAugust is a case in point: set up to yield a decision by the end of 2025, it instead resulted in a \ndozen or so solution proposals, an inconclusive vote at year’s end, and a second round of CIFP \nstakeholder discussions initiated early this year, continuing into summer 2026. After PJM \nstakeholders debated – inconclusively – what to do for nearly a year, the issue of large load \nintegration is just now approaching resolution, with serious implications for the capacity prices \nand reliability threats the region is facing. To fix this, PJM must address two tandem types of \nreform: structural changes and administrative/operational enhancements. \n \nStructural changes \n1.​ At the highest level, this entails a shift to an advisory stakeholder structure. The \nstakeholder process has become dominated by incumbent interests and far too prone to \ninertia and delay. By removing decision-making authority from the collective stakeholder \nbody, the incentive to stonewall or slow-walk needed changes (especially insofar as they \npreserve the current status quo or protect incumbents) is lessened, and the whole \nprocess stands to become more streamlined and collaborative. Former FERC Chair \nMark Christie recently noted that “those who stand to profit from the rules should not be \nwriting them.” 9 We agree. We acknowledge that this shift might entail corresponding \nreforms to ensure efficacy, for which we provide more detailed thoughts in our response \nto question 11 below.  \n2.​ Streamline the committee structure and meeting schedules. PJM has altogether too \nmany meetings, and an overhaul could facilitate more cohesive, transparent, and \naccountable decision-making around a set of prioritized issues for stakeholders to be \n9 Former FERC Chair Mark Christie, personal comments via Linkedin on the FERC technical summit on PJM \ngovernance, July 24th, 2026, available at: https://lnkd.in/p/gPdJRYfe  \n8 Comments by guest speaker James Danly, DOE Deputy Secretary, July 23rd, 2026, FERC Technical Summit on \nPJM Stakeholder Governance, https://www.ferc.gov/news-events/events/PJM-Governance-Stakeholder-Reforms  \n7 https://heatmap.news/sparks/average-electricity-bills-july-2026  \n3 of 17"},{"page":4,"startToken":1518,"endToken":2056,"text":"considering at a particular time. As one specific example, a “shot clock” or clear sunset \ndates should be added to stakeholder deliberations. While the timing could be varied \nbased on the complexity of the issue, we propose a deadline of a year for coming to \nresolution on bigger issues, and a 6-month process for smaller issues to be resolved. \nEmbedded in this structural reform must be a recognition that when the time for \ndecision-making expires (i.e., the end of a CIFP window), then the decision must be \nmade, not the process extended.  \n3.​ PJM should refresh and rebalance its stakeholder sectors, to correct for imbalances \nin representation that we see present in the PJM stakeholder community today. The \nnumber of sectors should be expanded to reflect the growing diversity of PJM’s \nmembers, and voting shares must accordingly be updated. As a first order, consider \nprovisions for the creation of new sector(s) to reflect specific stakeholder member \ngroups. For example, a “public interest sector” should be created that offers an \naccessible, expanded participation role for organizations such as ours, many of which \nhave contributed meaningfully to stakeholder discussions for years.10 Additionally, \ndistributed energy resources and demand response providers, as a unique type of \nmarket participant, could benefit from their own sector. In ISO-NE, NEPOOL’s industry \nsectors include “Alternative Resources,” designed to provide a voice for distributed \ngeneration and other emerging technologies. There is also precedent for an expanded \nnumber of stakeholder sectors in MISO, which has 11 sectors, including one specifically \nfor environmental organizations. ​\n \nAdministrative and operational enhancements \n1.​ Issue prioritization must become a core feature of the stakeholder process, as \nseveral noted during the Technical Conference. This will support both making most \neffective use of PJM staff’s valuable time, as well as giving PJM stakeholders the clarity \nand discipline they need to participate most effectively in informing issue resolution. The \nrecently proposed stakeholder process for the Regional Organization for Western \nEnergy (ROWE) –  the result of collaborative discussion and a look across the existing \nRTO landscape in search of pitfalls and best practices – offers a compelling model.11 The \nprocess they describe for the annual development of an Issue Catalogue and Roadmap \ncould support more focused stakeholder discussions for the PJM region. \n2.​ The time is ripe to reconsider how input is solicited in the stakeholder process – in \nwhat form, and by whom.  \na.​ To the question of form, greater reliance on notice and comment, as exemplified \nby CAISO, may be appropriate at times in PJM.12 PJM staff seem to be trialing \nthis with the call for white papers recently announced as part of the Powering \nReliability Through Market Design workshops, which we find to be a more \ncompelling way of gathering informed input on this topic from an array of \n12 CAISO Stakeholder Center, “Policy initiatives and stakeholder process” and December 2025 Stakeholder Process \nGuide, available at https://www.caiso.com/documents/stakeholder-process-guide.pdf  \n11 https://www.westernenergyboard.org/wp-content/uploads/JunePUBLIC_StakeholderProcessNarrative.pdf  \n10 This includes sponsoring issue charges, crafting solution proposals, and working collaboratively with PJM \nmembers and staff on an array of issues, from the recent CIFP discussions, to surplus interconnection service \nenhancements, capacity market reforms, and more. \n4 of 17"},{"page":5,"startToken":2056,"endToken":2497,"text":"stakeholders. Rules should also be established for the manner and timing of PJM \nresponse to such stakeholder contributions.  \nb.​ When it comes to who should be providing input, stakeholder representatives \nmight offer a useful model, and here again the ROWE stakeholder process offers \na promising example: they introduce the idea of a Stakeholder Representatives \nCommittee, as a forcing mechanism for similar stakeholder types to coordinate \nand find alignment where possible.13 This would both streamline meetings by \nkeeping attendance to more manageable numbers of directly affected and \nengaged stakeholders, and spare PJM staff the job of parsing hundreds of \nperspectives in search of alignment that might prove elusive. Stakeholder \nrepresentatives would be shouldering some of that responsibility themselves, and \ncreating alignment from the ground up. \n3.​ Finally, PJM meetings require internal facilitation reforms, as well as transparency \nand accessibility improvements. Based on some of our facilitation expertise, we see \nroom for more structure and more diversity in the discussion formats that PJM uses; for \nexample, more reliance on panels, and other forms of mediated, interactive dialogue, \nrather than presentations followed by lengthy Q&As that do not fully resolve questions. \nIn addition, to support transparency and accessibility, PJM should post meeting \ntranscripts or detailed summary notes, recordings, and votes on a better-organized PJM \nwebsite.  \n \nThe work that PJM is undertaking, and that FERC and a wide array of stakeholders now aim to \nshape, is critical to the ongoing success and ultimate functionality of the RTO in a rapidly \nchanging world. As plainly stated by panelists at the technical conference, both sitting and \nformer FERC commissioners, and across the stakeholder membership at PJM, things cannot \ncontinue as they are. We are grateful for the opportunity to weigh in as a collaborative of \nmultiple members within a key PJM sector on how these reforms should take shape, and are \nexcited for swift transition from strategy development to implementation this fall.  \n \nResponses to Individual Questions​\n \nTopic: PJM Board Independence \n \n1) Should Board members’ terms be extended to five or more years? Yes \n \nComments: \nWe support five-year terms, but not longer. Longer Board terms will help Board members \nremain more independent, in the sense they are not subject to as frequent “re-election \npressures,” and allow the Board to serve as a more stabilizing, decisive force. However, if the \nterm extends too long, members may become too divorced from accountability, and the stakes \nof individual Board member elections too large. A five-year term would already put the PJM \n13 Western Interstate Energy Board, West-Wide Governance Pathways Initiative, Draft Chapter 8: “ROWE \nStakeholder Process,” August 14, 2026. Available at: https://www.westernenergyboard.org/wwgpi/  \n5 of 17"},{"page":6,"startToken":2497,"endToken":3008,"text":"Board term as the longest of any RTO; the vast majority of RTOs cycle on a 3-year Board \nterm.14 The term length cannot be considered in isolation, however. Individual members should \nbe elected in a staggered fashion, to ensure some degree of continuity for serving Board \nmembers, and to prevent wholesale turnover and loss of institutional experience during the \nonboarding of any new Board member. Per the subsequent question, Board members should \nalso be limited to a maximum service term, and a maximum of two (2) consecutive terms.  \n \nIt is also important to set rules for the removal of Board members for cause, to mitigate against \nthe risk that a longer Board term engenders. The Board should be set up to be self-policing in \nthis way, such that a super-majority vote could remove a sitting Board member, and we also \nbelieve that a unanimous vote of the Nominating Committee should be able to effect a Board \nmember’s departure.  \n \n2) Should there be a maximum number of years that a Board member may serve (e.g., 10 \nyears)? Yes​\n \nComments: \nSetting a maximum number of years for Board service helps ensure the Board keeps up with \nthe changing times. Too long a term duration could dampen the incentive to act quickly, and lock \nin perspectives that could become myopic. The change to the overall service limit should reflect \nthe specifics of the extended term length. For example, if five years is chosen for a Board term, \na reasonable limit would be ten (10) years, reflecting two consecutive terms. This is consistent \nwith the proposal put forth by PJM themselves.15 \n \nIn extenuating circumstances, Board members should be able to apply for an exemption to a \nterm limit. The criteria for extenuating circumstances should be defined in coordination with PJM \nstaff. Examples could include their ability to contribute unique or extraordinary perspective, \nunique insight into a PJM geography or subregion, or unique insight into a key aspect of \nbusiness operations. A Board member should only be eligible for one application and approval \nfor exemption. If a Board member applies for an exemption and is not approved, they are not \neligible to apply again. Unless another alternative is brought forward, the approval should \nremain within the purview of the Nominating Committee, which currently oversees Board \nappointments. Further discussion is necessary on whether the Nominating Committee should be \nable to approve the exemption with or without the Member vote that typically follows a \nNominating Committee appointment determination.  \n \n3) Should the Board member qualification rules be revised to provide a preference for \nsome Board members that reside in the PJM region? Yes \n \n15 PJM, FERC Mediation Term Sheet, August 14, 2026, available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20260819/20260819-item-08---1-ferc\n-mediation-term-sheet.pdf  \n14 PJM’s current 3-year term is consistent with other RTOs/ISOs. ISO-NE, CAISO, MISO, SPP all have 3-year Board \nterms, though re-election varies. NYISO directors (their board members) serve for 4-year terms, and are restricted to \na maximum of three terms (totaling 12 years).  \n6 of 17"},{"page":7,"startToken":3008,"endToken":3420,"text":"Comments: \nMore specifically, we see value in stating a preference for a Board member (or members) from a \nstate regulator and/or consumer advocate background in the PJM region. This would help to \nensure that state regulatory and consumer perspectives are represented on the Board \nadequately. Implemented in this fashion, this reform also supports our prerogative of better \ncentering the public interest across PJM governance structures. \n4) Should the conflict-of-interest rules be revised to reduce the cooling off period for \nBoard members from two years to one year? No \n \nComments: \nThe conflict-of-interest rules are one of the few precautionary protections in place to ensure that \nPJM Board decisions are unencumbered by bias and prior loyalties. We see no justification or \nadvantage to reducing the cooling off period. ​\n \n5) Should restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? Yes \n \nComments: \nWhile some restrictions make sense and were enacted for a reason – to prevent undue \ninfluence – we worry the PJM Board has become too aloof to be able to discharge its duties \noptimally. Thus, while “relaxed” is a somewhat vague term to convey the nature of necessary \nreform, reform to current communications between Board and stakeholders offers potential \nbenefit. As inspiration, we can look to examples from other RTOs: \n \n1.​ MISO: MISO heavily funnels communication through an Advisory Committee and 11 \ndistinct stakeholder sectors. Board communication is restricted outside of structured \npublic updates or explicit board retreats. Under its updated governance guides, decorum \nand official channels are tightly policed by committee chairs. \n2.​ SPP: SPP features a built-in Regional State Committee (RSC) made up of state utility \ncommissioners. Because state regulators hold primary authority over cost allocations, \nSPP’s board communications are uniquely exposed to state political/regulatory \nviewpoints, requiring high transparency to ensure individual market participants are not \nfrozen out of multi-state negotiations. \n3.​ ISO-NE and NYISO: Both New England and New York utilize highly structured, \nformalized rules where the independent board acts as a separate entity from the \nstakeholder committees. Private communication regarding pending market rules or \nactive appeals is generally prohibited; stakeholders must rely on formal, scheduled joint \nboard-stakeholder symposia to air grievances collectively. \n4.​ CAISO: Because CAISO manages a single-state grid but operates a multi-state Western \nEnergy Imbalance Market (WEIM), it balances strict California state transparency \nrequirements with broader western stakeholder engagement. Ex parte protocols are \ndeeply influenced by whether a topic involves a CPUC docket or a FERC market filing. \n \n7 of 17"},{"page":8,"startToken":3420,"endToken":3928,"text":"These demonstrate that there are ample ways that the communication between the Board and \nstakeholders could be different. One specific improvement we recommend is that the PJM \nBoard annually invites sector(s) to sit down and discuss general sector concerns or consider \neducational materials. These regular-cadence meetings can offer an incredibly informative and \nimportant space for dialogue and relationship building. The PJM Board has historically and \nshould continue to host these, however, they should be revised so that all sector-specific \nmeetings are open to attendance by observers, including the media.  \n6) In order to increase transparency, should Board votes be made public or the Board be \nrequired to explain its reasoning? Yes \n \nComments: \nIf the Board is to be granted more decision-making authority, corresponding transparency and \naccountability enhancements are warranted. As the saying goes, with great power comes great \nresponsibility, and stakeholders must be able to monitor and evaluate the extent to which the \nBoard is discharging their responsibilities well. However, this question asks two things.  \n●​ First, should Board votes be made public: Yes, as a general rule, Board votes should be \nmade public. This is a useful transparency measure, and, if Board members’ \nre-nomination worries are lessened due to longer term lengths, there should be little to \nfear from making votes on the record.  \n●​ Second, should the Board be required to explain its reasoning? Yes. Regardless of the \npublic nature of the vote, the Board should be required to explain its reasoning; this is \ncore to good governance and a reasonable requirement to ask of PJM’s leaders. \n7) In order to increase transparency, should some Board meetings be open or available \nto the public? Yes \n \nComments: \nYes, as above, increasing transparency into Board proceedings offers meaningful improvements \nthat will help (re)build trust in PJM leadership and the stakeholder process. Board meetings \nshould be public, with limited exception for discussion on sensitive or confidential items, \nand any related private votes. This hybrid model is not new. PJM can look to other RTOs to \nsee models of where this works. SPP MISO, ERCOT, and CAISO all practice a combination of \nclosed and public Board meetings. At present, only NYISO and PJM have closed meetings. \nHowever, efforts to increase Board transparency cannot stop here.  \nPJM can go one step further and in adopting a primarily open (or hybrid) model, enhance some \nof the inefficiencies seen at other RTOs with similar practices. For example, in SPP, meetings \nmay be characterized as open, and any stakeholder is allowed to register and attend to a point \n(i.e., when discussing confidential or sensitive information). However, the transition from open to \nclosed meeting is not always clear on the meeting agendas, and without attending every \nmeeting, one may not know that a portion of the meeting was closed at all. Explicit labeling \n(public/closed) in meeting agendas, and potentially creating a “hybrid” meeting designation in \nthe PJM stakeholder event center would offer significantly improved clarity on what parts of a \nmeeting are open (though again, the default should be most).  \n8 of 17"},{"page":9,"startToken":3928,"endToken":4437,"text":"8) Should PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? Yes \n \nComments: \nThis is a linchpin reform, which could flow through to an array of additional governance and \nstakeholder process enhancements, and deliver materially better outcomes for the region. As \nnoted in our introductory remarks, by public interest, we are thinking expansively about the \ninterests of the 67 million people who reside and pay electric bills in the PJM region, as well as \nthe region’s businesses – large and small. Making the obligation to serve the public interest \n(defined in this way) an explicit feature of PJM’s governing documents is key; it cannot merely \nbe implied. Doing so is essential for enabling some of the other, complementary reforms \nenvisioned, such as developing performance metrics for the Board and leadership, which could \ninclude accountability to public interest provisions. There is support for this idea in several \npre-conference comments, including those of former FERC Chair Pat Wood. What’s more, other \nRTOs already do this, as Abe Silverman noted during the July 23rd event: MISO is set up as a \n501(c)(4) organization “operated exclusively to promote social welfare,” while CAISO is set up \nas a “nonprofit public benefit corporation.”  \n \nThis should also manifest as another attempt to update the PJM mission. An attempt was \nmade to update the mission statement on January 27, 2026 that would have explicitly \nincorporated affordability and public interest language. The draft language read:  “As the primary \ntask, to ensure the safety, reliability and security of the bulk electric power system. [In addition], \nunderstand customer needs and deliver valued service to meet those needs in an affordable \nand cost-efficient manner. Create and operate robust, competitive and non-discriminatory \nelectric power markets. Achieve productivity through the efficient union of superior knowledge \nworkers and technology advances.” 16 \n \nWhile that update to the mission was not adopted, it serves as a blueprint for the type of thinking \nthat needs to be encouraged to ensure the mission of PJM reflects not only affordability, but also \nthe public interest. An example of a further updated mission statement that explicitly integrates \nboth could be the following: “As the primary task, to ensure the safety, reliability, affordability \nand security of the bulk electric power system on behalf of the public interest…” \n9) Should state representatives have at least one voting member on the Nominating \nCommittee? Yes \n \nComments: \nState representatives and consumer advocates should have a presence on the Nominating \nCommittee. Specifically, we support the consumer advocate proposal to have one seat for a \nstate executive branch appointee, one for a state regulator, and one for a consumer advocate. \nThis is another reform that would help make the public interest a living value within PJM. \n16 PJM Draft Mission Statement. Updated January 27, 2026 to include “an affordable and cost-efficient manner,” to \nthe secondary objective, ultimately was not adopted. Draft language available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/user-groups/arrcug/2026/20260127/20260127-item-03---pj\nm-mission-statement---affordability-redline.pdf  \n9 of 17"},{"page":10,"startToken":4437,"endToken":4841,"text":"10) Should PJM adopt public performance metrics and tie management compensation to \ntheir achievement? Yes \n \nComments: \nTying executive leadership compensation directly to a series of performance metrics is industry \nbest practice for many of the businesses and organizations that comprise PJM’s membership. \nSome combination of inability, lack of incentive, or unwillingness of current leadership to execute \namidst complicated stakeholder headwinds has made itself evident. Without a clear nexus \nbetween PJM’s performance and direct consequences for leadership, it is unlikely that change \nwill organically emerge.  \nDevelopment of the public performance metrics should follow the work done in devising the \nFERC Order 1920 benefit metrics, which sought to holistically capture the value that wholesale \nmarkets offer the region. PJM (either at the Board or leadership level) should similarly be \nempowered to articulate performance metrics that recognize the holistic set of roles articulated \nin their own updated mission statement, in which they aim to address four objectives:  \n1.​ To ensure the safety, reliability and security of the bulk electric power system. \n2.​ Understand customer needs and deliver valued service to meet those needs in an \naffordable and cost-efficient manner. \n3.​ Create and operate robust, competitive and non-discriminatory electric power markets.  \n4.​ Achieve productivity through the efficient union of superior knowledge workers and \ntechnology advances.”17 \nBuilding on our response to Question 8, we would like to see inclusion of the public interest in \nthis mission statement, and thus tied in to PJM’s performance metrics. \nTopic: Section 205 Filing Rights \n \n11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform the \nBoard? Yes \n \nComments: \nThe stakeholder process should be advisory to streamline and clarify decisional authority, which \nis uniquely fractured in PJM today. The stakeholder process has become dominated by \nincumbent interests and far too prone to inertia and delay. By removing decision-making \nauthority from the collective stakeholder body, the incentive to stonewall or slow-walk needed \nchanges (especially insofar as they preserve the current status quo or protect incumbents) is \nlessened, and the whole process stands to become more streamlined and collaborative. Former \nFERC Chair Mark Christie recently noted that “those who stand to profit from the rules should \nnot be writing them.” We agree. The shift to advisory voting further offers opportunity for urgently \n17 PJM Updated Mission Statement, updated January 27, 2026, available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/user-groups/arrcug/2026/20260127/20260127-item-03---pjm-mission-\nstatement---affordability-redline.pdf  \n10 of 17"},{"page":11,"startToken":4841,"endToken":5271,"text":"needed improvements to decision-making processes. PJM staff and the Board should be \ndeveloping and deciding on the rules for the regional grid and its markets, not the members \nthemselves.  \nThat said, this change cannot be considered in isolation. There are critical accompanying \ntransparency and accountability measures that are necessary to making this shift efficacious. \nThis includes opportunities for jump ball filing rights that should be developed in tandem with the \ntransition to an advisory role. As is often true on contentious issues, we believe the best answer \nmight be found when FERC has several well-founded filings to consider, and not just one. The \naccompanying reforms necessary for making this shift work include: \n●​ Performance metrics for PJM leadership, and periodic evaluation of Board \ndecision-making efficacy by the Nominating Committee \n●​ Transparency enhancements to PJM meetings, including Board meetings, that enable \ndiscussions and decisions to be more easily understood and audited \n●​ Jump ball filing rights for PJM members (who have authentically valuable perspectives to \ncontribute, and whose voice should not simply be ignored as soon as member voting \nbecame advisory); these should be conditional on a two-thirds sector-weighted majority \n●​ Jump ball filing rights for states (as described in response to question 18).18 \n12) Should PJM have section 205 filing rights over the energy market and ancillary \nservices unencumbered by the requirement to obtain approval of two-thirds of the \nMembers Committee? Yes \n \nComments: \nPJM should have section 205 filing rights over the energy markets and ancillary services. This \nsupports the streamlined decision-making authority we noted as necessary in question 11. \n \n13) Should PJM have section 205 filing rights over Regional Transmission Expansion \nPlanning (RTEP) unencumbered by the requirement to obtain approval of two-thirds of \nthe Members Committee? Yes \n \nComments: \nPJM should have section 205 filing rights over the RTEP process. Effective regional \ntransmission planning is essential to PJM’s mission to provide reliable and affordable electric \nservice to the region. However, as explained in response to other questions, PJM’s independent \nexercise of section 205 filing rights should be balanced by providing jump-ball filing rights to \nOPSI and to PJM Members where those entities achieve super-majority support for an \nalternative filing. \n \nIn addition, we should reconsider which section 205 filing rights are retained by the PJM \nTransmission Owners and whether certain filing rights need to be shifted to PJM. For instance, \nthe PJM Transmission Owners’ retention of section 205 filing rights over local transmission \n18 From our responses to question 18: Any state representatives’ groups should have jump-ball filing rights, provided \nthey reach a super-majority threshold of support for their jump-ball filing.  \n11 of 17"},{"page":12,"startToken":5271,"endToken":5671,"text":"planning can make it more difficult for PJM to effectively execute smart regional transmission \nplanning.19 Consolidating more transmission-related section 205 filing rights with PJM would \nlead to more efficient regional planning outcomes.   \n \n14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over \nresource adequacy and transmission cost allocation filings when a supermajority of \nOPSI agrees on an alternative proposal? Yes \n \nComments:  \nPJM’s governance has, for too long, been effectively isolated from legitimate state concerns \nabout how market rules interact with state authority over elements of resource adequacy, \nincluding generation siting, procurement, and other elements of energy policy. PJM’s \ngovernance has also all but ignored states' real political exposure to the consequences of \nmarket disorder and the current affordability crisis within PJM’s footprint. While we are \ninterested in several institutional and cultural changes to give states a greater role in \nrepresenting the public interest during PJM proceedings, we view jump ball filing rights \nas a critical method for states to make themselves heard when necessary. This would \nincent both the Board and the members to communicate proactively with OPSI throughout the \nstakeholder process and integrate state perspectives within relevant proposals. In short, a jump \nball for OPSI should complement other reforms to give states, as agents of the public, a greater \nvoice in PJM governance.  \n \n15) Should the Members Committee have “jump ball” filing rights over the portions of the \ntariff where PJM has 205 filing rights when a supermajority of stakeholders approves an \nalternative proposal? Yes \n \nComments: ​\nIn tandem with fully advisory stakeholder voting, yes. \n \nAs further described in response to question 11: There are critical accompanying transparency \nand accountability measures that are necessary to make a shift to an advisory role for \nstakeholders efficacious. This includes opportunities for jump ball filing rights that should be \ndeveloped in tandem with the transition to an advisory role. As is often true on contentious \nissues, we believe the best answer might be found when FERC has several well-founded filings \nto consider, and not just one.  \n \nThe accompanying reforms necessary for making this shift work include:  \n●​ Performance metrics for PJM leadership, and periodic evaluation of Board \ndecision-making efficacy by the Nominating Committee,  \n●​ Transparency enhancements to PJM meetings, including Board meetings, that enable \ndiscussions and decisions to be more easily understood and audited, and  \n19 RMI, Mind the Regulatory Gap, 2024, https://rmi.org/insight/mind-the-regulatory-gap/  \n12 of 17"},{"page":13,"startToken":5671,"endToken":6063,"text":"●​ Jump ball filing rights for PJM members (who have authentically valuable perspectives to \ncontribute, and whose voice should not simply be ignored as soon as member voting \nbecame advisory); these should be conditional on a two-thirds sector-weighted majority,  \n●​ Jump ball filing rights for states: Any state representatives’ groups should have jump-ball \nfiling rights, provided they reach a super-majority threshold of support for their jump-ball \nfiling. Providing jump-ball filing rights to multiple state representative groups could result \nin multiple competing filings before the Commission if state representative groups have \ndiffering views. However, such competing jump-ball filings would benefit the public by \nproviding FERC with greater discretion to choose the most just and reasonable option \namong the competing jump-ball filings. Any new state representative entity must have \n“jump ball” 205 filing rights to do anything meaningful.​\n \nTopic: Stakeholder Process \n \n16) Should the approval threshold in the Members Committee be lowered from two-thirds \nsector-weighted voting? N/A​\n \nComments: \nWe do not have a strong view on this, given our preference for member voting to be advisory.  \n \n17) Should the voting rules barring affiliate votes, which apply to senior standing \ncommittees, also apply to lower-level committees? Yes \n \nComments: \nPJM’s stakeholder process is overly captured by incumbent interests, and reforms such as this \n– in tandem with expanded stakeholder sectors (more on this below) – would help to re-weight \nstakeholder representation in a manner more reflective of the growing, diversifying range of \nperspectives seeking insight and input into PJM rules. PJM should also consider how to \nregularly assess and refresh its mechanisms for responding to evolving needs of stakeholders, \nrecognizing that voting sectors and member types may evolve, and representation structures \nshould not be allowed to become outdated or ineffective. Examples of these types of durable \nprocess reforms include:  \n●​ Make votes at every level public \n●​ Introduce a process for new sector designation, including any criteria or threshold that \nsuch a sector might be required to meet  \n●​ Create clear rules for attendance for “Open” versus “Closed” meetings \n●​ Establish standard expectations for participation during meetings \n●​ Expand report-out requirements from working group decisions to clarify the composition \nof the vote \n●​ Establish protocols for representation of meeting outputs in subsequent stakeholder and \ndecision-making bodies \nA number of additional reform opportunities, at both the structural and administrative levels, \nexist to address the stakeholder process. As noted in the introduction, these include: \n13 of 17"},{"page":14,"startToken":6063,"endToken":6603,"text":"●​ Streamline the committee structure and meeting schedules. PJM has altogether too \nmany meetings, and an overhaul (including elimination of some lower level committees) \ncould facilitate more cohesive, transparent, and accountable decision-making around a \nset of prioritized issues for stakeholders to be considering at a particular time. For one \nspecific example, a “shot clock” or clear sunset dates should be added to stakeholder \ndeliberations. While the timing could be varied based on the complexity of the issue, we \npropose a deadline of a year for coming to resolution on bigger issues, and a 6-month \nprocess for smaller issues to be resolved. Embedded in this structural reform must be a \nrecognition that when the time for decision-making expires (i.e., the end of a CIFP \nwindow), then the decision must be made, not the process extended. ​\n \n●​ PJM should refresh and rebalance its stakeholder sectors, to correct for imbalances \nin representation that we see present in the PJM stakeholder community today. The \nnumber of sectors should be expanded to reflect the growing diversity of PJM’s \nmembers, and voting shares must accordingly be updated. As a first order, a “public \ninterest sector” should be created that offers an accessible, expanded participation role \nfor organizations such as ours, and many of which have contributed meaningfully to \nstakeholder discussions for years.20 Additionally, distributed energy resources and \ndemand response providers, as a unique type of market participant, could benefit from \ntheir own sector. In ISO-NE, NEPOOL’s industry sectors include “Alternative Resources,” \ndesigned to provide a voice for distributed generation and other emerging technologies. \nThere is also precedent for an expanded number of stakeholder sectors in MISO, which \nhas 11 sectors, including one specifically for environmental organizations.  \n \n●​ Issue prioritization must become a core feature of the stakeholder process, as \nseveral noted during the Technical Conference. This will support both making most \neffective use of PJM staff’s valuable time, as well as giving PJM stakeholders the clarity \nand discipline they need to participate most effectively in informing issue resolution. The \nrecently proposed stakeholder process for the Regional Organization for Western \nEnergy (ROWE) –  the result of collaborative discussion and a look across the existing \nRTO landscape in search of pitfalls and best practices – offers a compelling model on \nthis front.21 The process they describe for the annual development of an Issue Catalogue \nand Roadmap could support more focused stakeholder discussions for the PJM region.​\n \n●​ The time is ripe to reconsider how input is solicited in the stakeholder process – in \nwhat form, and by whom. Key PJM stakeholder meetings can be tremendously \novercrowded with hundreds of attendees, making practical discussions unlikely. To the \nquestion of form, greater reliance on notice and comment, as exemplified by CAISO, \nmay be appropriate at times in PJM.22 PJM staff seem to be trialing this with the call for \n22 CAISO Stakeholder Center, “Policy initiatives and stakeholder process” and December 2025 Stakeholder Process \nGuide, available at https://www.caiso.com/documents/stakeholder-process-guide.pdf  \n21 https://www.westernenergyboard.org/wp-content/uploads/JunePUBLIC_StakeholderProcessNarrative.pdf  \n20 This includes sponsoring issue charges, crafting solution proposals, and working collaboratively with PJM \nmembers and staff on an array of issues, from the recent CIFP discussions, to surplus interconnection service \nenhancements, capacity market reforms, and more. \n14 of 17"},{"page":15,"startToken":6603,"endToken":7038,"text":"white papers recently announced as part of the Powering Reliability Through Market \nDesign workshops, which we find to be a more compelling way of gathering informed \ninput on this topic from an array of stakeholders. Rules should also be established for \nthe manner and timing of PJM response to such stakeholder contributions. When it \ncomes to who should be providing input, stakeholder representatives might offer a useful \nmodel, and here again the ROWE stakeholder process offers a promising example: they \nintroduce the idea of a Stakeholder Representatives Committee, as a forcing mechanism \nfor similar stakeholder types to coordinate and find alignment where possible.23 This \nwould both streamline meetings by keeping attendance to more manageable numbers of \ndirectly affected and engaged stakeholders, and spare PJM staff the job of parsing \nhundreds of perspectives in search of alignment that might prove elusive. Stakeholder \nrepresentatives would be shouldering some of that responsibility themselves, and \ncreating alignment from the ground up.​\n \n●​ Finally, PJM meetings require internal facilitation reforms, as well as transparency \nand accessibility improvements. In our experience, meetings are routinely derailed \nfrom their agendas and delayed by individual participants who, knowingly or \nunknowingly, speak at excessive length, wasting countless stakeholders’ time. Based on \nsome of our facilitation expertise, we offer the following suggestions:  \n○​ Concrete agendas with objectives should be published in advance of meetings \nand strictly enforced by facilitators, who should be empowered to head off \ninterruptions and tangents in the interest of said agenda;  \n○​ Discussions should be more structured based on an array of possible formats (for \nexample, more reliance on panels, and other forms of mediated, interactive \ndialogue, rather than presentations followed by lengthy Q&As that do not fully \nresolve questions); \n○​ Committee meetings should be open, recorded (with recordings published \nonline), and summarized with detailed, easy-to-follow transcripts on a \nbetter-organized PJM website.  \n \nTopic: State Participation \n \n18) In addition to OPSI, should there be a second state representative group consisting \nof governors’ representatives and/or state legislators’ representatives? No \n \nComments: \nGovernors and legislators should have a clear role in the PJM stakeholder process. However, it \nis our view that there should not be two bodies offering or purporting to serve the role of the \nstates’ perspective. We believe just one state representative group, that includes or subsumes \nOPSI, will best support a greater state role in the region and coherent, streamlined \ndecision-making. This new entity (which we refer to as “PJM-SCOE” to link it conceptually to the \n23 Western Interstate Energy Board, West-Wide Governance Pathways Initiative, Draft Chapter 8: “ROWE \nStakeholder Process,” August 14, 2026. Available at: https://www.westernenergyboard.org/wwgpi/  \n15 of 17"},{"page":16,"startToken":7038,"endToken":7501,"text":"NESCOE model) should include the option for representation from state Governor’s offices, \nenergy offices, and legislators, as well as regulators. OPSI could remain a sub-group within \nPJM-SCOE, with defined roles and responsibilities of its own, selected to reflect OPSI members’ \nvaluable technical and regulatory expertise. Here, Pat Wood’s suggestions for “clarifying the \nRSC’s authority” in his pre-filed comments are compelling.24  \n \nThe new entity should be staffed and funded sufficiently to enable it to discharge its expanded \nresponsibilities. Additionally, any state representatives’ group(s) should have jump ball \nfiling rights, provided they reach a super-majority threshold of support for their jump ball filing. \nWe view jump ball filings generally as benefitting the public by providing FERC with greater \ndiscretion to choose the most just and reasonable option among the competing jump ball filings. \n \n19) Should state representatives have a formal voting role in the stakeholder process \n(limited to certain topics, such as resource adequacy and regional transmission cost \nallocation) in addition to the consumer advocate votes? No \n \nComments:​\nState representatives are not ordinary stakeholders in the PJM process and should not be \nlimited to expressing their views through voting in the PJM stakeholder process. Instead, state \nrepresentatives should have jump ball section 205 filing rights where they reach super-majority \nsupport for a proposal that differs from one that PJM wishes to advance. Providing state \nrepresentatives with jump ball filing rights better recognizes the important role of the states, \nespecially with regard to issues such as resource adequacy that are in large part subject to \nstate jurisdiction. In contrast, limiting state representatives to a voting role within the PJM \nstakeholder process creates inappropriate risks that state perspectives may be ignored and that \nthe Commission will not have the opportunity to evaluate and approve policies that states in the \nPJM region support. \n \n20) Should PJM be required to consult with OPSI prior to making a section 205 filing \nrelated to resource adequacy and transmission cost allocation? Yes​\n \nComments: \nGiven the direct impact to states, and the role that states would ultimately play in implementing \nfilings on such matters, consultation is appropriate. PJM staff and/or the Board should be \nconsulting with OPSI (or the new state entity) throughout the process of developing resource \nadequacy and transmission cost allocation rules, and certainly, at minimum, before making the \nfiling. The direct engagement PJM is pursuing with states on the questions of market design \nassociated with the Powering Reliability Through Market Design effort is a laudable example of \nthis.  \nThe relationship between PJM and states has become strained in recent years, and establishing \ndirect consultation channels on topics of overlapping jurisdiction represents one clear \nopportunity to rebuild it. Collaborative RTO-state relations, in which each party acknowledges \n24 Pre-filed comments of Former FERC Chair Pat Wood \n16 of 17"},{"page":17,"startToken":7501,"endToken":7722,"text":"the valuable role the other plays in matters affecting the regional grid, are essential for \nstabilizing PJM and executing the needed changes before the RTO with efficacy. Furthermore, \nthere may be cases in which OPSI lacks the two-thirds majority necessary for its own jump ball \nfiling, but the states should still be consulted on the relevant filings.  \n \nSincerely, \n/s/ Katie M. Siegner \nKatie M. Siegner \nManager, Markets & Grids \nRMI \n1100 15th St. NW \nWashington, DC 20005 \nksiegner@rmi.org \n \n/s/ Nick Lawton \nNick Lawton \nSenior Attorney \nEarthjustice \n1400 L St NW Lobby 2, Unit 34117  \nWashington DC 20005 \nnlawton@earthjustice.org  \n \n/s/ Justin Vickers \nJustin Vickers \nSenior Attorney \nSierra Club \n50 F St NW,  \nWashington, DC 20001 \nJustin.Vickers@SierraClub.Org​\n​\n/s/ Jessi Eidbo \nJessi Eidbo \nSenior Strategic Advisor \nSierra Club \n50 F St NW,  \nWashington, DC 20001 \nJessi.Eidbo@SierraClub.Org \n/s/ Nicholas J. Guidi \nNicholas J. Guidi \nSenior Attorney \nSouthern Environmental Law Center \n500 New Jersey Avenue NW, Suite 600 \nWashington, DC 20001​\nnguidi@selc.org \n \n/s/ Claire Lang-ree \nClaire Lang-Ree \nAdvocate, Sustainable FERC Project \nNatural Resources Defense Council \n40 W 20th St. \nNew York, NY, 10011 \nclangree@nrdc.org  \n \n/s/ Katherine L. Rogers \nKatherine L. Rogers \nAssociate Attorney \nSouthern Environmental Law Center \n500 New Jersey Avenue NW, Suite 600 \nWashington, DC 20001 \nkrogers@selc.org \n \n \n \n \n \n \n \n \n17 of 17"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":227,"startToken":0,"endToken":26},{"p":1,"at":227,"title":"Introduction","method":"printed heading","endPage":17,"endAt":1458,"startToken":26,"endToken":7722}]}
