{"document":{"slug":"rec-20260821-5152","title":"Post-Conference Comments of Illinois Municipal Electric Agency re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5152","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Illinois Municipal Electric Agency","kind":"comments","file":"sources/filings/text/20260821-5152_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5152","tier":"record","sha256":"683c454be576a9ef8aef14d9f2535dfb60beac539088bdc57a07ae86fd3f6531","pages":7,"tokens":2062,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":263,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \nPJM Governance and Stakeholder Reforms \n) \n \nDocket No. AD26-7-000 \n \n \n \n \n \n \n \n) \n) \n \nPOST-CONFERENCE COMMENTS OF ILLINOIS MUNICIPAL ELECTRIC AGENCY \n \nIllinois Municipal Electric Agency (“IMEA”) respectfully submits these comments in \nresponse to the Federal Energy Regulatory Commission’s (“FERC’s”) Notice Requesting Post-\nConference Comment (“Notice”).1  IMEA is an intervenor in the instant proceeding.2 \nIMEA is a municipal joint action agency organized under Illinois law as a municipal \ncorporation and unit of local government of the State of Illinois.3  IMEA is comprised of thirty-\ntwo municipal members, all of which own and operate their own municipal electric systems in the \nState of Illinois and provide electricity to their end-use customers.  IMEA load is split roughly \nevenly between PJM Interconnection, L.L.C. (“PJM”) and Midcontinent Independent System \nOperator, Inc.  IMEA provides a fully bundled and delivered, full-requirements service to each of \nits members and as such is the Load Serving Entity responsible for meeting certain obligations \nimposed by the Regional Transmission Organizations (“RTOs”) such as PJM. \nIMEA is a member of PJM’s  Electric Distributor sector.  In an effort to best facilitate \nreforms to PJM’s governance structure and stakeholder processes as a member thereof, IMEA \nsubmits answers to the questions found in the Appendix to the Commission’s Notice,4 and provides \nclarifying comments in each applicable question below. \n \n \n \n1 Notice Requesting Post-Conference Comment, Docket No. AD26-7-000 (July 30, 2026). \n2 (doc-less) Motion to Intervene of Illinois Municipal Electric Agency under AD26-7-000 (August 21, 2026). \n3 65 ILCS 5/11-119.1-1 et seq. (2026). \n4 Notice at 3-6."},{"page":2,"startToken":263,"endToken":658,"text":"2 \n \nI. \nPJM BOARD OF INDEPENDENCE \n \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \nComments: Three years is too short, but five or more years is too long.  Four is \nappropriate. \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nX \n \n \nComments: A Board member should serve, as long as they are elected by stakeholders, no \nlonger than two terms of four years each (i.e., maximum of eight years of service). \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \nComments: It is not necessary that a Board member reside in the PJM region, although \nmaintaining a residence in the PJM region may be prudent.  In-person attendance at \nmeetings with an in-person option should be encouraged. \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \nX \n \n \nComments: So long as the restrictions on financial interests are maintained or \nstrengthened, a one-year cool off period is sufficient and would aid in expanding the \ncandidate pool. \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \nX \n \n \nComments: Yes, Board communication with stakeholders is essential. \n6) \nIn order to increase transparency, should Board votes be made public or \nthe Board be required to explain its reasoning? \nX \n \n \nComments: The Board should be required to explain its reasoning, especially in the \ninstances in which it proceeds with a proposal that differs in substance from what passes \nthrough the stakeholder process. \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nX \n \n \nComments: Though Board Decisional Letters are a useful tool in understanding the Board’s \nthought process, these come only after the decision has been made.  Opening some Board \nmeetings to the public would increase transparency and strengthen communication. \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \n \nX \n \nComments: PJM’s primary purpose is to maintain reliability through its markets and \nplanning processes.  Expanding its scope only risks further complicating its current outlook \nat a time when operations need to be streamlined."},{"page":3,"startToken":658,"endToken":1059,"text":"3 \n \n \nQuestions/Comments \nYes \nNo \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \n \nX \n \nComments: PJM covers a large service territory comprised of states each with their own \nresource adequacy, transmission, and energy outlooks.  The inclusion of a state \nrepresentative on the Nominating Committee risks politicizing a process which needs to be \ngeared towards PJM’s north star – maintaining reliability.  That would be more difficult if a \nprocess already as challenging as finding qualified Board members was made more so by \nexpanding the criteria for inclusion on the Nominating Committee.   \n10) Should PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \nX \n \nComments: Public performance metrics tied to compensation can lead to compensation-\noriented thinking in a way that sacrifices quality of work product.  For example, if “Target \nA” is tied to compensation, an organization may priority “Target A” at the expense of other \nmeaningful “Targets” which are not tied to compensation.  PJM should work with \nstakeholders and the Board to prioritize a work plan, and all parties involved should stick \nto it. \n \nII. \nSECTION 205 FILING RIGHTS \n \n \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \n \nX \n \nComments: As an electric distributor and load serving entity which participates in an RTO \nwith an advisory stakeholder process, MISO, IMEA strongly disagrees with the idea of \nmaking the PJM stakeholder process advisory.  The tasks that PJM is faced with on a \ndaily basis – keeping the lights on for the 67,000,000 Americans within its service \nterritory – is enormous.  As the bulk electric system becomes more complex, that job only \nbecomes more difficult.  The stakeholder process in PJM offers enormous benefit through \nthe communication and collaboration it enables by allowing both PJM and stakeholders to \nthoughtfully work through issues that are too demanding, too important, and too complex \nto be solved by any one party individually.  While it is clear that reforms to the \nstakeholder process are necessary for the sake of efficiency, these changes can be found \nwithin the process itself, not the rights held by stakeholders.  A purely advisory process \nwould erode the checks and balances which exist today and greatly diminish the ability \nfor stakeholders to contribute to the decisions which will ultimately affect their interests, \nand the downstream effect would be lessened transparency, trust, and balance in PJM’s \nday-to-day proceedings."},{"page":4,"startToken":1059,"endToken":1490,"text":"4 \n \n \nIII. \nSTAKEHOLDER PROCESS \n \n \nQuestions/Comments \nYes No \n16) Should the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \nX \n \n \nComments: Interests are too diverse today to expect a two-thirds majority with the \nfrequency necessary to move important items along.  For that reason, yes, the approval \nthreshold in the Members Committee should be lowered to a simple majority. \n \n \nQuestions/Comments \nYes \nNo \n12) Should PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \n \nX \n \nComments: The two-thirds majority is a threshold which promotes consensus building \namongst stakeholders and ultimately results in proposals which have been subjected to \nincreased scrutiny for the betterment of the RTO as a whole.  Nonetheless, two-thirds is a \ndemanding statute in today’s environment and lowering it to a simple majority would foster \nefficiency gains without sacrificing needed rigor.  Further, PJM already has 205 filing \nrights over the energy and ancillary services market, which are not the subject of current \nreforms.  Current reform efforts are aimed at the capacity market. \n13) Should PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \n \nX \n \nComments: Just as with the energy and ancillary service markets, the need to obtain a two-\nthirds supermajority is a requirement which promotes collaboration amongst stakeholders \nand PJM.  With that said, two-thirds is a high mark, and lowering it to a simple majority \nwould promote collaboration while facilitating greater efficiency. \n14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \n \nX \n \nComments: While OPSI should have an augmented role in PJM’s stakeholder process, it \nshould not have “jump ball” rights over resource adequacy and transmission cost allocation \nfilings, given the outsized influence this would provide, which would diminish the need for \ncollaboration. \n15) Should the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \nX \n \n \nComments: The need for this can be best illustrated using PJM’s recent Reliability \nBackstop Auction filing (ER26-3380).  PJM’s filing did not incorporate many of the key \nelements that were approved by stakeholders.  The ability for a supermajority of \nstakeholders to have “jump ball” filing rights would allow for the Commission to consider \na more fulsome panorama of opinions, at no detriment to the Commission."},{"page":5,"startToken":1490,"endToken":1918,"text":"5 \n \n17) Should the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \n \nX \n \nComments: This would be a simple solution to allow for affiliate members to have an \nincreased voice in the stakeholder process. \n \nSTATE PARTICIPATION \n \n \nQuestions/Comments \nYes No \n18) In addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \n \nX \n \nComments: The states have funding and representation through the Organization of PJM \nStates, Inc. (OPSI).  If PJM wishes to emulate the method of state participation in MISO, it \nmight consider augmenting the role of OPSI to mirror that of the Organization of MISO \nStates (OMS), in lieu of splintering and diluting the states' voice through the creation of \nanother new stakeholder group.  OMS is highly regarded and operates in conjunction with \nMISO, the MISO Board, and stakeholders, on many issues.  It is important for states to \nhave their voices heard, but a second state organization may actually have the unintended \nconsequences of complicating the conversation and adding to the confusion.  PJM needs to \nbe streamlining its process to make it more efficient if it wants to be more effective.  A \nsecond entity could have the opposite effect, and in fact, PJM already has the tools today to \nbolster the states through OPSI.  Doing so would not necessitate the creation of a new \nstakeholder body nor the funding thereto.  Additionally, as PJM stated at the Technical \nConference, within the same state PJM tends to hear differing viewpoints on the same \nissue. Maintaining OPSI as the states' vector of communication and participation, perhaps \nin an enhanced role, would solidify and amplify the state's voice through the usage of an \nalready existing, funded, and respected entity.  An augmented OPSI could, for example, be \nadjusted to reflect a broader group of government/state representatives. \n19) Should state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes? \n \nX \n \nComments: State jurisdiction lies at the retail, not wholesale level.  Communication \nbetween states and PJM, as exists with OPSI, is important.  But voting rights on FERC-\njurisdictional issues would be inappropriate. \n20) Should PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \nX \n \n \nComments: In light of diversifying needs across the region, consultation with OPSI is a \nrequirement that would give both PJM and OPSI a beneficial opportunity for \ncommunication."},{"page":6,"startToken":1918,"endToken":1979,"text":"6 \n \nIV. \nCONCLUSION \n \nWHEREFORE, for the reasons set forth herein, IMEA does hereby submit the instant \ncomments pursuant to the Commission’s Notice. \n \n \nRespectfully Submitted, \n \n/s/ Troy A. Fodor \nTroy A. Fodor \nVice President & General Counsel \nDaniel T. Chung \nStaff Attorney \nIllinois Municipal Electric Agency \n3400 Conifer Drive \nSpringfield, IL 62711 \n(217) 789-4632 \ntfodor@imea.org \ndchung@imea.org \n \n \n \nAugust 21, 2026"},{"page":7,"startToken":1979,"endToken":2062,"text":"CERTIFICATE OF SERVICE \n \nIn accordance with 18 C.F.R. 385.2010, I hereby certify that I have, on this 21st day of \nAugust 2026, caused a copy of the foregoing Comments of Illinois Municipal Electric Agency to \nbe sent to each person designated on the official service list compiled by the Secretary of the \nCommission in Docket No. AD26-7-000. \n \n \n/s/ Mary Ann Todd \nMary Ann Todd \nLegal/Regulatory Specialist \nIllinois Municipal Electric Agency \n3400 Conifer Drive \nSpringfield, IL 62711 \nmtodd@imea.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":5,"startToken":0,"endToken":264},{"p":2,"at":5,"title":"I. PJM BOARD OF INDEPENDENCE","method":"printed heading","endPage":3,"endAt":1215,"startToken":264,"endToken":839},{"p":3,"at":1215,"title":"II. SECTION 205 FILING RIGHTS","method":"printed heading","endPage":4,"endAt":7,"startToken":839,"endToken":1060},{"p":4,"at":7,"title":"III. STAKEHOLDER PROCESS","method":"printed heading","endPage":6,"endAt":5,"startToken":1060,"endToken":1919},{"p":6,"at":5,"title":"IV. CONCLUSION","method":"printed heading","endPage":7,"endAt":0,"startToken":1919,"endToken":1979},{"p":7,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":7,"endAt":506,"startToken":1979,"endToken":2062}]}