{"document":{"slug":"rec-20260821-5185","title":"Post-Technical Conference Comments of PSEG Companies re PJM Governance and Stakeholder Reform","issued":"2026-08-21","accession":"20260821-5185","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PSEG CompaniesPSEG Energy Resources & Trade LLCPSEG Power LLC ,Public Service Electric and Gas Company ,","kind":"comments","file":"sources/filings/text/20260821-5185_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5185","tier":"record","sha256":"a9567924907e4e59946e5ea9654de43bcdb347fb7f2a350a6b666be246ff79ff","pages":15,"tokens":3870,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":233,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms  \n  \n \nDocket No. AD26-7-000  \n \nPOST-TECHNICAL CONFERENCE COMMENTS OF \nTHE PSEG COMPANIES \n \nI. \nIntroduction \nThe PSEG Companies appreciate the opportunity to provide comments in this proceeding \nfollowing the July 23, 2026 PJM Governance Reform technical conference (“July technical \nconference”).  These comments address the questions posed in the Commission’s July 30 “Notice \nRequesting Post-Conference Comment.”1  \nAs both a founding member and significant Transmission Owner (“TO”) in PJM, PSEG \noffers a unique and informed perspective on PJM’s flawed governance structure.  As we have \nemphasized in this proceeding, and as the Commission has recognized, the current effort to \neffectuate governance changes in PJM is not, and cannot be, an academic exercise or one that \nonly addresses “low hanging fruit.”  In this regard, not all changes are created equal; for \nexample, whether all or only certain PJM Board meetings are open to the public is not as \nsignificant from a governance reform perspective as deciding who should have filing rights or \nhow votes should be taken or how to establish clear and workable rules around the future role of \nthe states in resource adequacy decision-making. \nGiven the magnitude of the resource adequacy problem facing PJM, governance changes \nmust be meaningful and advance better outcomes across the RTO – measured by (i) long-term \n \n1 Notice Requesting Post-Conference Comment, Docket No. AD26-7 (July 30, 2026)."},{"page":2,"startToken":233,"endToken":474,"text":"2 \n \nsystem reliability for customers; (ii) stable and sustainable market rules; (iii) a bold, empowered \nand accountable PJM leadership and Board; and (iv) and a role for the states that reflects their \nfundamental responsibility for resource adequacy.  Specifically, we support the following as part \nof a comprehensive effort to revise PJM governance rules: \n• Amending the Consolidated Transmission Owners Agreement (“CTOA”) and the PJM \nOperating Agreement (“OA”) to move regional transmission planning rules into PJM’s \nTariff, thereby empowering PJM to make regional planning decisions; \n• Revising the current voting rules to either (i) reflect members’ actual stake in, and \naccountability for, PJM outcomes or (ii) employ full advisory voting; \n• Establishing enhanced accountability for PJM senior management and for its Board, \nwhich may include clear and transparent performance metrics and third-party evaluations \nof Board and management performance conducted on a regular cadence; and \n• Granting states a clear, defined role in PJM resource adequacy decisions to reflect their \nprimary legal responsibility in this area, which could entail “jump ball” filing rights on \nmatters pertaining to resource adequacy.  \nWe look forward to continuing to participate in shaping PJM governance rules as part of \nthis proceeding, including as part of the upcoming Commission Alternative Dispute Resolution \n(“ADR”) process.2  With the fundamental objective of advancing better long-term outcomes at \nPJM, we offer the following responses to the Commission’s questions:  \n \n \n \n2 See PJM Governance and Stakeholder Reforms, Docket No. AD26-7, Notice Regarding Dispute \nResolution Procedures (Aug. 10, 2026)."},{"page":3,"startToken":474,"endToken":697,"text":"3 \n \n \nII. \nQUESTIONS \nPJM Board Independence \n1) Should Board members’ terms be extended to five or more years? \nAnswer: Yes \nComments: With the caveat that, in our view, the length of Board member terms is not a root \ncause of the current problems PJM is facing, there is a benefit to giving Board members \nsufficient time in their roles to acquire necessary expertise so that they can effectively understand \nthe challenges facing the PJM region and provide meaningful direction to PJM leadership.  \n2) Should there be a maximum number of years that a Board member may serve (e.g., 10 \nyears)?  \nAnswer: Yes \nComments:  Establishing a term limit for Board members should encourage bold, independent \nthinking and fresh perspectives on PJM’s ongoing challenges.  \n3) Should the Board member qualification rules be revised to provide a preference for some \nBoard members that reside in the PJM region? \nAnswer: Yes \nComments: It is appropriate to consider a multitude of factors when evaluating candidates for the \nPJM Board.  These factors could include (i) residency; (ii) other “significant ties” to the region; \n(iii) knowledge of PJM operations and/or markets; and (iv) other requirements to help select \nBoard members with requisite expertise and independent decision-making. \n4) Should the conflict-of-interest rules be revised to reduce the cooling off period for Board \nmembers from two years to one year?"},{"page":4,"startToken":697,"endToken":900,"text":"4 \n \nAnswer: Yes \nComments: The existing two-year cooling-off period may make it difficult to find qualified \nBoard members.  Having rules in place that limit the available pool of Board candidates is \ncounter-productive, particularly given the current challenges facing PJM.  \n5) Should restrictions on Board communications be relaxed to enable more communication \nbetween the Board and stakeholders?  \nAnswer: Yes \nComments: We support appropriately bounded enhancements that will enable stakeholders to \nbetter understand the PJM Board’s decision-making process and to bolster confidence in this \nprocess. \n6) In order to increase transparency, should Board votes be made public or the Board be \nrequired to explain its reasoning?  \nAnswer: Yes  \nComments: As explained in response to Question 5 above, it is important for PJM stakeholders to \nbe able to understand Board decisions.  Therefore, at a minimum the Board should be required to \nexplain its reasoning.  As part of the upcoming ADR process, PJM and its stakeholders should \ndiscuss whether making Board votes public would chill decision-making at the Board level or \nwhether it instead makes sense to publicize these votes given that Members Committee votes are \npublicly recorded.  \n7) In order to increase transparency, should some Board meetings be open or available to the \npublic? \nAnswer: Yes"},{"page":5,"startToken":900,"endToken":1197,"text":"5 \n \nComments: There is a balance that needs to be struck between establishing needed transparency \nand avoiding chilling independent Board decision-making.  As such, this question merits \nconsideration as part of the upcoming ADR process. \n8) Should PJM’s governing documents be revised to explicitly state that the responsibility of \nPJM and its Board is to serve the public interest?  \nAnswer: This question requires further consideration as to whether adding this responsibility is \nneeded on top of PJM’s existing, FERC-approved responsibilities and whether/how “serving the \npublic interest” would be defined in this context.  \nComments:  In Order No. 2000, the Commission established the following requirements for an \nRTO: independence from market participants; a region of sufficient scope and configuration to \npermit the RTO to effectively perform its required functions and to support efficient and \nnondiscriminatory power markets; possession of operational authority for all transmission \nfacilities under the RTO's control; and exclusive authority to maintain short-term reliability.3  \nSignificantly, Order No. 2000 did not include a “public interest” requirement governing RTO \nresponsibilities. \n  \nPJM, which became a FERC-approved RTO in 2001,4 is not a regulator but is instead a \npublic utility under the Federal Power Act, subject to Sections 205 and 206 of the Federal Power \nAct.  Both statutory provisions require that public utility jurisdictional rates and services must be \n \n3 Reg'l Transmission Orgs., Order No. 2000, FERC Stats. & Regs. ¶ 31,089 (1999) (cross-referenced at 89 \nFERC ¶ 61,285), order on reh'g, Order No. 2000-A, FERC Stats. & Regs. ¶ 31,092 (2000) (cross-\nreferenced at 90 FERC ¶ 61,201), aff'd sub nom. Pub. Util. Dist. No. 1 of Snohomish Cty. v. FERC, 272 \nF.3d 607 (D.C. Cir. 2001). \n4 PJM Interconnection, L.L.C., et al., 96 FERC ¶ 61, 061 (2001), order on reh’g, 101 FERC ¶ 61,345 \n(2002)."},{"page":6,"startToken":1197,"endToken":1471,"text":"6 \n \n“just and reasonable.”5  These provisions do not superimpose a “public interest” standard on top \nof the “just and reasonable” standard. \nUnder the PJM Operating Agreement, PJM’s core responsibilities include (1) ensuring the \nsafe and reliable operation of the PJM Region; (2) establishing and operating a “robust, \ncompetitive, and non-discriminator electric power markets in the PJM Region;” and (3) ensuring \nthat “a member shall not have undue influence over the operation of the PJM Region.”6  Each of \nthese core elements aligns with its responsibilities under Order No. 2000 and its FERC-approved \ngoverning documents.  \nPJM’s May 2026 whitepaper on market design reforms, entitled “Powering Reliability \nThrough Market Design,” illustrates the challenges that occur when PJM seeks to make decisions \nthrough a nebulous “public interest” lens rather than through a lens that focuses on its core \nfunctions.  In our view, it simply creates indecision.  Rather than presenting a recommended \nmarket design to address the ongoing and critical resource adequacy problem, PJM’s whitepaper \nstates that decisions on future market design “belong to the people and institutions with \ndemocratic accountability for their consequences – to state regulators and legislatures, to FERC, \nto consumers and the advocates who represent them.”7  What this really means is that PJM is not \nfocusing on discharging its core, FERC-approved responsibilities but is instead creating \ndecisional paralysis by trying to ascertain what regulators, legislators, consumers and \n“advocates” believe is in the “public interest.”  \n \n5 16 U.S.C. §§ 824d and 824e. \n6 See Operating Agreement, Section 7.7(i).   \n7 See PJM’s May 6, 2026 Whitepaper entitled “Powering Reliability Through Market Design” at 1 \n(available at  20260506-powering-reliability-through-market-design.pdf) (“PJM May 2026 Whitepaper”)."},{"page":7,"startToken":1471,"endToken":1732,"text":"7 \n \nThere are a myriad of fundamental questions and challenges that would flow from \noverlaying an ill-defined “public interest” standard on top of PJM’s responsibilities.  A few \nexamples: \n• Given PJM’s Order No. 1920-required 20-year transmission planning cycle, how would \nthe “public interest” be measured in that context?  More fundamentally, what do “public \ninterest” outcomes look like in the Regional Transmission Expansion Process (“RTEP”) \nprocess where there are significant upfront capital costs associated with infrastructure \nprojects but long-term reliability and economic benefits? \n• What is a “public interest” outcome in the capacity or energy markets, and who gets to \ndecide that and over what time frame? \n• Would the overlay of a “public interest” lens on planning, operations and markets \ndecisions ultimately result in a less reliable system? \nWe are not suggesting that acting in the “public interest” should be ignored, as it cannot \nbe ignored.  From the Transmission Owner perspective, we are a fully regulated utility tasked \nwith providing reliable customer service at just and reasonable rates.  We make reliability and \ncost effectiveness a central consideration in all of our decision-making.  However, we challenge \nthe notion that PJM should be tasked with ownership of a “public interest” standard.  Asking \nPJM to morph from a public utility to a “quasi-regulator” is establishing a role for PJM that is \noutside of its FERC-determined authority and, most importantly, will not produce better \noutcomes at PJM.  Instead, it will bog down PJM decision-making even further, and inhibit bold, \nindependent, timely and decisive action.  \n9) Should state representatives have at least one voting member on the Nominating \nCommittee?"},{"page":8,"startToken":1732,"endToken":1982,"text":"8 \n \nAnswer: Yes \nComments: Given the states’ responsibility for resource adequacy, we support a more formal role \nfor the states in PJM governance as pertains to resource adequacy.  While that role can take many \nforms, it must be linked to the broader goal of improved outcomes in PJM in the areas of reliable \nsystem planning and stable, well-functioning markets, an effective stakeholder process and \nmeasurable PJM accountability.  Within that framework, providing state representatives with \nmembership on the Nominating Committee is one avenue to offer the states a concrete “seat at \nthe table” on resource adequacy issues.   \n10) Should PJM adopt public performance metrics and tie management compensation to their \nachievement?  \nAnswer: Yes \nComments: As we explained in our pre-technical conference comments, it is important for PJM \nto be empowered to make independent, difficult and sometimes unpopular but necessary \ndecisions.  We specifically noted the existence of corporate governance principles that PJM and \nthe Board could adopt to foster accountability and responsiveness from PJM leadership to the \nstakeholders, and clear, transparent performance metrics should be part of the equation.  As an \nexample, we recommend the use of a third party to regularly evaluate the performance and \neffectiveness of its senior leadership.  Figuring out all of the mechanics of establishing \nperformance metrics and monitoring those metrics is less important at this juncture than \nengaging in an earnest effort to increase organizational accountability for PJM.  \nSection 205 Filing Rights \n11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform the Board?"},{"page":9,"startToken":1982,"endToken":2235,"text":"9 \n \nAnswer: Yes.  Current PJM voting rules must change; however, our preferred approach would be \nto equate voting strength with membership responsibility for PJM outcomes, including system \nreliability.  Our alternative approach would be advisory voting, along with enhanced PJM \naccountability for its decision making. \nComments: As highlighted in our pre-technical conference comments, PJM’s voting structure no \nlonger works to produce effective outcomes.  The current voting structure should be revised so \nthat votes reflect a member’s actual stake in PJM outcomes, and we have proposed various ways \nto revise the voting structure accordingly (see our response to Question 16 below).  Alternatively, \nwe understand that other ISOs/RTOs utilize a full advisory voting construct and that one could be \nadopted by PJM.  Such an approach would shift the ultimate responsibility for decision-making \nonto PJM.  We are wary of the challenges PJM has faced with its capacity market rules, an area \nwhere stakeholder voting is already advisory.  However, we are willing to consider an advisory \nvoting construct in PJM to encourage its independence and decisiveness.  However, this \napproach must be accompanied by enhanced accountability, including for the PJM Board, so that \nmembers have confidence in the decisions PJM is making.  \n12) Should PJM have section 205 filing rights over the energy market and ancillary services \nunencumbered by the requirement to obtain approval of two-thirds of the Members \nCommittee?  \nAnswer: Yes \nComments: If accompanied by measures to ensure bold, independent and reliability-focused \ndecision-making by PJM, we could consider this change as part of a comprehensive, negotiated \nresolution."},{"page":10,"startToken":2235,"endToken":2513,"text":"10 \n \n13) Should PJM have section 205 filing rights over Regional Transmission Expansion \nPlanning (RTEP) unencumbered by the requirement to obtain approval of two-thirds of the \nMembers Committee?  \nAnswer: Yes \nComments: As we stated in our pre-technical conference comments, PJM is the only RTO that \ndoes not have independent Section 205 filing rights over transmission planning, and this \nundermines PJM’s independence to plan the grid.  Both the CTOA and the OA must be revised to \nempower PJM to make effective regional planning decisions.  In addition, the PJM Transmission \nOwners must have audit rights to hold PJM accountable for its performance under the CTOA.   \n14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource \nadequacy and transmission cost allocation filings when a supermajority of OPSI agrees on an \nalternative proposal? \nAnswer: Yes, as pertains to resource adequacy.  No, as pertains to transmission cost allocation. \nComments: Resource adequacy is the most significant problem currently confronting PJM and its \nstakeholders.  As we noted in our pre-technical conference comments, in contrast to the states \nPJM has only “indirect responsibility for resource adequacy through its use of market pricing \nsignals,” and “(t)here is a pressing need for clarity on the respective responsibilities between \nPJM and the states on resource adequacy.”8  Because the states have primary responsibility for \nresource adequacy, in this limited situation, allowing OPSI to have “jump ball” rights or a \ncomparable mechanism is a logical and appropriate step towards enhanced state accountability \non the issue.   \n \n8 See PJM Governance and Stakeholder Reforms, Docket No. AD26-7, Pre-Technical Conference \nComments of the PSEG Companies at 15 (July 14, 2026) (“PSEG’s July 14, 2026 Pre-Technical \nConference Comments”)."},{"page":11,"startToken":2513,"endToken":2978,"text":"11 \n \nAt the same time, we do not support state “jump ball” filing rights on transmission cost \nallocation.  FERC and appellate court precedents have established that public utilities possess \nstatutorily granted Section 205 filing rights with respect to transmission cost allocation, and that \nthese rights cannot be modified or altered without the utility’s voluntary consent.9   \n15) Should the Members Committee have “jump ball” filing rights over the portions of the \ntariff where PJM has 205 filing rights when a supermajority of stakeholders approves an \nalternative proposal? \nAnswer: Yes \nComments: A “jump ball” provision (or some other comparable mechanism) for the Members \nCommittee over resource adequacy could provide an appropriate balance to PJM’s filing rights.  \nThis is because the Federal Power Act preserves state authority over generation facilities,10 and \ngrants states primary jurisdiction over generation matters such as integrated resource planning \nutility generation mix, and retail procurement choices.11  Because PJM’s capacity market rules \n \n9 See Atlantic City Electric Co. v. FERC, 329 F.3d 856 (DC Cir. 2003)(“holding that Section 205 of the \nFPA confers utilities the right to file rates and terms for services rendered, and that FERC cannot require \ntransmission providers to relinquish those statutory rights);  See also Order No. 1920 at P 1363 and P \n1430 (“Transmission providers retain ultimate responsibility for transmission planning and as discussed \nbelow, they have FPA section 205 filing rights to propose tariff changes to rates, which the Commission \ncannot deprive them of via this final rule” and “[w]e further clarify that unless voluntarily waived, a \ntransmission provider retains its FPA section 205 filing rights.”); Order No. 1920-B at P 52 (“FPA section \n205 expressly provides public utilities with statutory filing rights.”). In Order No. 1920-A, as part of the \nstate engagement process, while the Commission directed public utilities to include as an “attachment” in \ntheir Order No. 1920 compliance filing the states’ cost allocation proposal, the Commission strongly \nemphasized it was invoking its authority under Section 206 of the FPA and was not intruding upon the \ntransmission owners’ section 205 filing rights, emphasizing that “public utilities retain all of their right to \nfile proposed rate changes under FPA section 205.  See Order No. 1920-B at PP 52-53, 55.  \n10 FPA Section 201(b)(1) (providing that the Commission has jurisdiction over all facilities used for the \ntransmission or sale of electric energy in interstate commerce but “shall not have jurisdiction . . . over \nfacilities used for the generation of electric energy.”). \n11 See, e.g., PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at P 48 (2026) (recognizing the bifurcation \nof jurisdiction under the FPA and that FERC has “exclusive authority” with respect to the rates, terms, and \nconditions of transmission service while the FPA “expressly reserves to the states the authority over,”"},{"page":12,"startToken":2978,"endToken":3245,"text":"12 \n \ndirectly affect state generation decisions, a “jump ball” over resource adequacy properly \nrecognizes these statutorily reserved state rights over generation and resource mix issues.  We \nwould expect, however, that any “jump ball” mechanism would be triggered infrequently, \nfunctioning as a tool for accountability and helping to ensure that PJM works effectively with its \nstakeholders including the states.  \nAs explained above, we do not support a “jump ball” provision with respect to \ntransmission cost allocation filings.  \nStakeholder Process \n16) Should the approval threshold in the Members Committee be lowered from two-thirds \nsector-weighted voting? \nAnswer: Yes \nComments: PJM’s voting structure results in asset owners with responsibility for customer \nreliability having a significantly diluted vote. Sector-weighted voting must change to reflect the \ncurrent membership composition, voting behaviors (including “sector blocking” that occurs \nwhen two of the five sectors vote together under the two-thirds construct) and the daunting \nchallenges PJM is facing.  There are multiple approaches that may be considered, ranging from a \nrealignment of voting interests to reflect member responsibilities/accountabilities12 to an \nadvisory voting construct.  In addition, revising the current senior voting committee threshold to \na lower value (e.g., NYISO employs a 58% threshold for Management Committee votes) would \n \namong other things, retail sales as well as “facilities used for the generation and distribution of \nelectricity.”).  \n12 See PSEG’s July 14, 2026 Pre-Conference Comments at 9-11 (discussing proposed changes to the \nvoting structure to reflect members’ actual economic and operational stake in PJM outcomes, such as \nmatching voting interest with member responsibilities under the default cost allocation methodology \ncontained in Section 15.2.2 of the OA)."},{"page":13,"startToken":3245,"endToken":3476,"text":"13 \n \navoid the sector blocking issue and help to at least mitigate asset owner “dilution of vote” \nconcerns.  \n17) Should the voting rules barring affiliate votes, which apply to senior standing committees, \nalso apply to lower-level committees?  \nAnswer: No \nComments: Although PSEG’s vote constitutes only about 1.5% of the total vote in PJM senior \nstanding committees, it only accounts for 0.4% of the vote in the lower committees where \naffiliate voting is employed.  We do not view affiliate voting as a significant issue that needs to \nbe addressed at this time to achieve better outcomes in PJM. \nState Participation \n18) In addition to OPSI, should there be a second state representative group consisting of \ngovernors’ representatives and/or state legislators’ representatives?   \nAnswer: Yes, subject to comments below \nComments: We are less concerned with the exact number of regional state committees that are in \nplace and more concerned that any committee(s) established to address resource adequacy have \nclearly defined roles and responsibilities vis-à-vis those of PJM and the transmission owners. \nAbsent that clarity, additional voices from the states in a new state representative group will lead \nto confusion and delay.  \n19) Should state representatives have a formal voting role in the stakeholder process (limited \nto certain topics, such as resource adequacy and regional transmission cost allocation) in \naddition to the consumer advocate votes?  \nAnswer: Yes, subject to comments below"},{"page":14,"startToken":3476,"endToken":3779,"text":"14 \n \nComments: Noting the response to the prior question concerning clearly defined roles and \nresponsibilities, we would support a formal voting role for state representatives in the PJM \nstakeholder process with respect to resource adequacy.  The PJM states have authority to address \nresource adequacy through the planning of generation and a vested interest in ensuring that, to \nthe extent they continue to rely on PJM’s markets, rules for those markets are transparent and \nwill procure sufficient supply to maintain reliability.  However, OPSI – or other state \nrepresentatives – cannot have a voting role over transmission cost allocation unless voluntarily \nagreed to by the transmission owners since this would contravene established precedent \nbestowing exclusive Section 205 filing rights over transmission cost allocation on the PJM \ntransmission owners.13 \n20) Should PJM be required to consult with OPSI prior to making a section 205 filing related \nto resource adequacy and transmission cost allocation?  \nAnswer: Yes, with respect to resource adequacy.  No, with respect to transmission cost \nallocation. \nComments: Under the current rules, PJM is under no specific obligation to consult with OPSI in \na manner that is unique relative to other stakeholders.  Given the states’ responsibility for \nresource adequacy, however, it may make sense for PJM to consult with OPSI before it makes a \nSection 205 filing addressing resource adequacy.  PJM and OPSI would need to develop a \nworkable and efficient process for consultation.  We do not support formal consultation with \nOPSI with respect to transmission cost allocation filings (over which the Transmission Owners, \nnot PJM, have decision-making authority).  At the same time, the transmission owners will \n \n13 See Atlantic City Electric Co. v. FERC, 329 F.3d 856 (DC Cir. 2003).  See also Order No. 1920 at P \n1430 (“We further clarify that unless voluntarily waived, a transmission provider retains its FPA section \n205 filing rights.”)."},{"page":15,"startToken":3779,"endToken":3870,"text":"15 \n \ncontinue to work collaboratively with OPSI – as is currently occurring in the context of the Order \n1920 PJM Area Relevant State Entities Committee (PARSEC) process – to ensure that the states \nfully and timely understand any future cost allocation changes and the impacts to customers. \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n Jodi L. Moskowitz \nJodi L. Moskowitz \nVice President – Law, Deputy General Counsel & \nRTO Strategy Officer \nPSEG Services Corporation \n80 Park Plaza, T20 \nNewark, NJ 07102 \n(973) 985-7958 \nJodi.Moskowitz@PSEG.com \nOn behalf of the PSEG Companies \n \nDated: August 21, 2026 \nNewark, New Jersey"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":216,"startToken":0,"endToken":26},{"p":1,"at":216,"title":"I. Introduction","method":"printed heading","endPage":3,"endAt":7,"startToken":26,"endToken":475},{"p":3,"at":7,"title":"II. QUESTIONS","method":"printed heading","endPage":15,"endAt":637,"startToken":475,"endToken":3870}]}