{"document":{"slug":"rec-20260821-5187","title":"Comments of Edison Electric Institute re PJM Governance and Stakeholder Reform","issued":"2026-08-21","accession":"20260821-5187","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Edison Electric Institute","kind":"comments","file":"sources/filings/text/20260821-5187_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5187","tier":"record","sha256":"f7201dd0c2857b5e03c14d84857d9f4ed37d8f570bf3e4760f808390ff9d5c56","pages":9,"tokens":2393,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":216,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms \n \nDocket No.  AD26-7-000 \nCOMMENTS OF THE EDISON ELECTRIC INSTITUTE \nEdison Electric Institute (“EEI”) respectfully submits these comments regarding \ngovernance and stakeholder reforms in PJM Interconnection, L.L.C. (“PJM”).1   \nEEI’s member companies are the nation’s investor-owned electric utilities.  \nTogether, we provide electricity to nearly 250 million Americans, operate in all 50 states \nand the District of Columbia, and support over seven million jobs in communities across \nthe country.  EEI member companies work every day to provide reliable energy to their \ncustomers at the lowest cost possible.  EEI member companies also form the backbone of \nour nation’s electric power industry, which is essential to advancing our economic and \nnational security priorities.  Over the next five years, investor-owned electric companies \nwill invest more than $1.3 trillion to enhance the electric grid, building critically needed \nnew generation and transmission and distribution infrastructure required to power \neconomic prosperity. \nEEI commends the Commission for undertaking a structured effort to reform PJM’s \ngovernance and stakeholder processes.  This initiative is timely and necessary, arriving at \na genuine inflection point in PJM’s history.  The issues being confronted in this proceeding \n \n1 See PJM Governance & Stakeholder Reforms, Notice Requesting Post-Conf. Comment, Docket \nNo. AD26-7-000 (July 30, 2026)."},{"page":2,"startToken":216,"endToken":470,"text":"2 \nhave persisted for more than a decade yet went largely unaddressed, as PJM’s wholesale \nmarket conditions yielded surplus capacity in an era of flat or declining load.  Those \nconditions masked PJM’s governance and structural resource adequacy flaws. \nToday, the region is experiencing capacity scarcity in the face of significant growth.  \nPJM’s unwieldy governance structures cannot produce the types of bold market reforms \nrequired to transform today’s challenges into opportunity for the region.  There is an acute \nneed for “concrete, actionable reforms to improve PJM’s ability to address operational and \nmarket needs in a timely and efficient manner.”2   \nWe file these comments to underscore one message:  governance reforms in PJM \nare a necessary and important, but insufficient, step.  An improved, more transparent \nstakeholder process cannot procure the new capacity that is needed to meet customer needs \nin PJM.  For this reason, governance reforms must proceed alongside—and in service of—\nmarket reforms.  EEI members stand ready to tackle these interrelated challenges.   \nI. \nPJM’S GOVERNANCE STRUCTURES FAIL TO DELIVER TIMELY, \nIMPACTFUL SOLUTIONS TO THE CRISIS FACING PJM’S MARKETS \nConditions within PJM have fundamentally changed in recent years due to several \nfactors, creating urgency for meaningful reform.  After years of stagnation, demand growth \nis accelerating again.  Summer peak load growth is now projected to average 2.4 percent \nper year over twenty years, while winter peak load growth is projected to average 2.7 \n \n2 PJM Governance and Stakeholder Reforms, Second Suppl. Notice of Commission-Led Tech. \nConf., Docket No. AD26-7-000, at 1 (July 2, 2026)."},{"page":3,"startToken":470,"endToken":752,"text":"3 \npercent per year over the same period.3  The causes of this growth are well known:  rapidly \nincreasing demand for artificial intelligence infrastructure, including data centers, in \naddition to advanced manufacturing and broader electrification.4  Serving this new demand \nwhile protecting other electricity customers is critical for national security and economic \ndevelopment across the region.5  But demand is outpacing the market’s ability to bring on \nnew supply options—a troubling dynamic exacerbated by supply chain constraints.  The \nresult is a resource adequacy shortfall that PJM leadership anticipates will “persist for some \ntime.”6 \nThe pressure that demand growth has placed on PJM’s resource adequacy construct, \nand the risks that it creates, are not theoretical.  Since January 2025, PJM has entered into \nNERC EEA emergency alert conditions multiple times,7 and has sought and received \n \n3 PJM INTERCONNECTION, LLC, 2026 PJM Load Forecast Rep., at 6 (Jan. 14, 2026), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2026-load-\nreport.pdf. \n4 See PJM Governance & Stakeholder Reforms, Pre-Filed Statement of Stacey Burbure on Behalf \nof Am. Elec. Power Co., Inc., Docket No. AD26-7-000, at 3 (filed July 15, 2026) (“July 15, 2026 \nPre-Filed Statement of Stacey Burbure”). \n5 Id.  \n6 PJM INTERCONNECTION, LLC, Powering Reliability Through Mkt. Design, at 4 (May 6, 2026) \n(“Powering Reliability”), https://www.pjm.com/-/media/DotCom/library/reports-notices/special-\nreports/2026/20260506-powering-reliability-through-market-design.pdf. \n7 Per PJM’s Emergency Procedures website, PJM issued RTO-wide NERC EEA alerts on January \n21, 2025; between June 22-24, 2025; between July 14-15, 2025; between July 23-24, 2025; \nbetween July 27-29, 2025; on January 26, 2026; between May 17-19, 2026; between June 30, 2026 \nand July 2, 2026; and between July 14-15, 2026."},{"page":4,"startToken":752,"endToken":1094,"text":"4 \nmultiple emergency authorizations from the U.S. Department of Energy to preserve \nreliability.8   \nEEI applauds the operational excellence of PJM personnel who have navigated these \ndifficult conditions.  But frequent emergency conditions underscore how little margin \nremains in the system. \nAddressing this challenge will require near-term measures, as well as longer-term, \nfundamental changes to PJM’s stakeholder and governance processes.  As PJM recognizes, \nthe stakeholder process was not “built for speed or operational agility”—the very \ncapabilities that current conditions demand.9  The process is slow, opaque, and vulnerable \nto quagmire.10  The result is oftentimes deadlock, producing incremental adjustments when \ndecisive action is needed.  EEI does not offer this observation as criticism, but as \n \n8 See U.S. Dep’t of Energy, Order Authorizing Emergency Grid Reliability Actions, Docket No. \n202-26-02 (Jan. 25, 2026) (authorizing PJM to direct generating units to operate up to maximum \noutput notwithstanding environmental emissions limitations during Winter Storm Fern); U.S. \nDep’t of Energy, Order Authorizing Deployment of Backup Generation Res., Docket No. 202-26-\n06 (Jan. 26, 2026) (permitting PJM to dispatch data center backup generation); U.S. Dep’t of \nEnergy, Order Authorizing Emergency Grid Reliability Actions, Docket No. 202-26-23 (May 18, \n2026) (permitting PJM to dispatch data center backup generation); U.S. Dep’t of Energy, Order \nAuthorizing Emergency Operations, Docket No. 202-26-35 (July 14, 2026) (granting PJM \nauthority to dispatch permit-limited units and backup generation). \n9 See PJM Governance & Stakeholder Reforms, Comments from PJM Interconnection, L.L.C., \nDocket No. AD26-7-000, at 1 (filed July 14, 2026). \n10 See FERC, Chairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, MD, at \n2 (May 12, 2026) (observing that the “current stakeholder process is slow where it must be fast, \nopaque where it must be transparent, and vulnerable to vetoes and agenda control exactly when \nthe region needs immediate action”); see also PJM Governance & Stakeholder Reforms, Pre-filed \nStatement of Jodi L. Moskowitz on Behalf of the PSEG Companies, Docket No. AD26-7-000, at \n2 (filed July 14, 2026) (“July 14 Pre-filed Statement of Jodi L. Moskowitz”) (citation omitted)."},{"page":5,"startToken":1094,"endToken":1374,"text":"5 \nrecognition of our shared challenge.  For these reasons, EEI fully supports the Commission \nmoving forward in a structured and time-bound manner in cooperation with states. \nII. \nGOVERNANCE AND STAKEHOLDER REFORMS ARE NECESSARY BUT \nINSUFFICIENT TO MEET THE RESOURCE ADEQUACY CHALLENGE \nWhile governance and stakeholder reform is essential, resolving these challenges \nwill not, by itself, solve the larger and more critical resource adequacy problems facing the \nregion.  The core problem confronting PJM in 2026 is underinvestment in generation.  And \nthere is a real risk that conditions could deteriorate before they improve.  Accordingly, \ngovernance reform is a necessary first step.  But governance reform must be in service of \nfacilitating genuine reforms to address the underlying supply shortfall. \nA. \nThe resource adequacy challenge threatens PJM’s fundamental charge \nto serve customers reliably \nPJM’s “core responsibility” is maintaining reliability.11  And PJM has long \n“operated on the principle that all customers share in a common standard of reliability and \nwillingness to pay to meet it.”12  But current resource adequacy conditions are undermining \nPJM’s ability to meet these standards.  The problem is documented in PJM’s own \n“Powering Reliability Through Market Design” whitepaper and in comments filed in this \ndocket.13  PJM explains that the current shortage is structural rather than cyclical—not a \ntemporary supply gap that will close on its own, but the predictable result of several \n \n11 PJM INTERCONNECTION, LLC, Interim Res. Adequacy Serv. Proposal (Aug. 13, 2026), \nhttps://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-sheets/interim-resource-\nadequacy-service-proposal.pdf. \n12 Powering Reliability at 6.  \n13 See generally id.; see also July 14, 2026 Pre-filed Statement of Jodi L. Moskowitz at 3-4; July \n15, 2026 Pre-Filed Statement of Stacey Burbure at 2."},{"page":6,"startToken":1374,"endToken":1675,"text":"6 \nstructural shifts occurring at once.14  Demand is surging faster than supply has followed.  \nThe timing gap between when demand arrives and when supply responds lies at the very \ncore of the shortage.  Compounding the problem, PJM observes that building new \ngeneration now costs roughly twice as much and takes twice as long as before.15  Capital \ncosts for a new combined-cycle plant have roughly doubled and those for a combustion \nturbine have increased by more than fifty percent, even as supply chain backlogs, \npermitting timelines, and equipment scarcity show every sign of persisting.16  In short, the \nbarriers to entry are far higher today than when the market was designed. \nThe consequences of the resource adequacy gap are visible in the region’s core \nreliability metrics.  For example, the 2027/28 Base Residual Auction failed to procure \nsufficient capacity to satisfy the required reserve margin, clearing at an Installed Reserve \nMargin of 14.4 percent—5.6 percentage points below PJM’s 20 percent reliability target—\nand leaving a physical deficit of more than 6,000 MW.17  That shortfall places direct \npressure on the region's long-standing “1-in-10” loss-of-load standard, which, absent \ncorrective action, risks eroding into a far weaker level of service for every customer.18 \n \n14 Powering Reliability at 9-10 (describing “a rapid convergence of three structural forces”—\nsurging demand, accelerated retirements, and supply-chain and permitting frictions—and the \nresulting “transition from an era of managing surplus to an era of managing scarcity”); see also id. \nat 16 (“PJM is facing a period of structural scarcity, a fundamental mismatch between how fast \ndemand is growing and how fast new supply can follow.”). \n15 Id. at 16. \n16 Id. at 16-20. \n17 Id. at 16. \n18 Powering Reliability at 37-38 (explaining how, absent corrective action, service will continue to \ndegrade)."},{"page":7,"startToken":1675,"endToken":2045,"text":"7 \nB. \nNew supply in PJM has been slow to come online despite record-high \ncapacity auction prices \nThe existing PJM resource adequacy construct cannot address the current resource \nadequacy shortfall.  New supply has been slow to come online despite record-high capacity \nauction prices.  Recent Base Residual Auction results demonstrate the shortfall in new \ncapacity.  The 2027/28 auction procured only 774 MW of new generation and uprates, \nconsisting of 350.7 MW UCAP from new generation and 423.6 MW UCAP from uprates.19  \nThe 2028/29 auction procured even less—only 524.7 MW UCAP, consisting of 317.1 MW \nUCAP from new generation and 207.6 MW UCAP from uprates.20  In both instances, the \nauctions failed to procure sufficient capacity to meet the required reserve margin.  \nCustomers are paying drastically more for (largely) existing generation capacity.  \nThis shortfall persisted even though prices reached maximum levels21 in both \nauctions, meaning that customers are paying record prices—and incumbent generation \n \n19 PJM Auction Procures 134,479 MW of Generation Resources, PJM INSIDE LINES (Dec. 17, \n2025), \nhttps://insidelines.pjm.com/pjm-auction-procures-134479-mw-of-generation-resources/ \n(“Dec. 17, 2025 PJM Auction Procures 134,479 MW of Generation Res. as Work Continues To \nAddress Growing Elec. Demand”). \n20 PJM Capacity Auction Procures 138,318 MW of Generation Res. as Work Continues To Address \nGrowing Elec. Demand, PJM INSIDE LINES (July 14, 2026), https://insidelines.pjm.com/pjm-\ncapacity-auction-procures-138318-mw-of-generation-resources-as-work-continues-to-address-\ngrowing-electricity-demand (“July 14, 2026 PJM Capacity Auction Procures 138,318 MW of \nGeneration Res. as Work Continues To Address Growing Elec. Demand”). \n21 In both the 2027/28 Base Residual Auction and the 2028/29 Base Residual Auction, prices \nreached and were constrained by the price cap set by the Commission.  See Dec. 17, 2025 PJM \nAuction Procures 134,479 MW of Generation Res. as Work Continues To Address Growing Elec. \nDemand (“The price came in at the FERC-approved cap, $333.44/MW-day (UCAP) for the entire \nPJM footprint . . . .”); July 14, 2026 PJM Capacity Auction Procures 138,318 MW of Generation \nRes. as Work Continues To Address Growing Elec. Demand (“The price came in at the FERC-\napproved cap, $325/MW-day (UCAP) for the entire PJM footprint,” and noting “the third \nconsecutive auction with the price collar”)."},{"page":8,"startToken":2045,"endToken":2343,"text":"8 \nowners are reaping benefits—while reliability risks mount.  EEI members in the region feel \na specific urgency to resolve these critical issues because they have an obligation to serve \ncustomers in the region, unlike almost all other members and stakeholders in the region. \nThese market failures reinforce EEI’s central point:  even a faster and more \ntransparent stakeholder process cannot procure capacity that the market’s price signals are \nnot calling forth, which is why governance reform must proceed alongside, and in service \nof, substantive market reform.  Such reforms should include a commitment to developing \na more flexible and nimble approach to procurement.22  \nAs the Commission evaluates changes to governance and stakeholder processes, \nEEI urges that it remain focused on the larger goal of accelerating the development of \nsupply and transmission infrastructure to ensure reliable service to customers in the region. \nIII. \nEEI MEMBERS STAND READY TO PLAY A PRODUCTIVE ROLE \nEEI and its members in the PJM region have worked, and will continue to work, \nproductively with PJM, state policymakers, the Commission, and others to ensure that the \nregion’s 67 million consumers continue to enjoy reliable and affordable service.  Efforts to \nreform governance and stakeholder processes are a welcome step in the right direction \ntoward solving the larger resource adequacy challenges PJM and customers in the region \nface.  EEI urges the Commission to act with speed and to pursue governance reform as a \n \n22 See EDISON ELEC. INST., EEI Statement on President Trump–Gov. Proposal to Protect Customers \n& \nEnsure \nData \nCenters \nPay \nTheir \nFair \nShare \n(Jan. \n16, \n2026), \nhttps://www.eei.org/en/news/news/all/statement-on-president-governor-proposal-to-protect-\ncustomers-and-ensure-data-centers-pay-fair-share; see also Letter from Drew Maloney, President \n& CEO of EEI (Oct. 7, 2025), https://www.eei.org//-/media/Project/EEI/Documents/Resources-\nand-Media/Newsroom/FINAL-Letter---EEI-to-OPSI-PJM_100725_PJM-Execs.pdf."},{"page":9,"startToken":2343,"endToken":2393,"text":"9 \nnecessary complement to—not a substitute for—the fundamental market and state-policy \nchanges required to resolve the region’s resource adequacy crisis. \n \nRespectfully submitted, \n \n   /s/     \n \n \nRachael Marsh \nKevin Huyler \nEdison Electric Institute \n701 Pennsylvania Ave., N.W. \nWashington, D.C.  20004 \nrmarsh@eei.org \nkhuyler@eei.org \n \nAugust 21, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1096,"startToken":0,"endToken":378},{"p":2,"at":1096,"title":"I. PJM’S GOVERNANCE STRUCTURES FAIL TO DELIVER TIMELY,","method":"printed heading","endPage":5,"endAt":177,"startToken":378,"endToken":1120},{"p":5,"at":177,"title":"II. GOVERNANCE AND STAKEHOLDER REFORMS ARE NECESSARY BUT","method":"printed heading","endPage":5,"endAt":813,"startToken":1120,"endToken":1210},{"p":5,"at":813,"title":"A. The resource adequacy challenge threatens PJM’s fundamental charge","method":"printed heading","endPage":7,"endAt":3,"startToken":1210,"endToken":1676},{"p":7,"at":3,"title":"B. New supply in PJM has been slow to come online despite record-high","method":"printed heading","endPage":8,"endAt":945,"startToken":1676,"endToken":2186},{"p":8,"at":945,"title":"III. EEI MEMBERS STAND READY TO PLAY A PRODUCTIVE ROLE","method":"printed heading","endPage":9,"endAt":362,"startToken":2186,"endToken":2393}]}