{"document":{"slug":"rec-20260821-5194","title":"Post-Conference Comments of Duquesne Light Company re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5194","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Duquesne Light Company","kind":"comments","file":"sources/filings/text/20260821-5194_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5194","tier":"record","sha256":"42be38a3bd092fac53db103dfe6fcbb76c778f5e4469262315958f4b0094c338","pages":15,"tokens":3790,"emptyPages":[],"textThemes":["cost","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":172,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms \n      \n) \nDocket No. AD26-7-000 \n           \n \n \nPOST-CONFERENCE COMMENTS OF DUQUESNE LIGHT COMPANY \nI. \nINTRODUCTION \n \nDuquesne Light Company (“Duquesne Light”) respectfully submits the following \ncomments in response to the Notice Requesting Post-Conference Comment issued by the \nFederal Energy Regulatory Commission (“FERC” or “Commission”) on July 30, 2026, \nfollowing the July 23, 2026 Technical Conference on PJM Governance and Stakeholder \nReforms.1 The Technical Conference discussed important issues around how PJM \ngovernance works and the ability of the PJM stakeholders to work within that process to \ndevelopment consensus solutions for the betterment of the PJM region. Duquesne Light \ncommends the Commission for holding the technical conference.  \nII. \nDuquesne Light Company’s Interest in the Proceeding \n \nDuquesne Light is a FERC-jurisdictional Transmission and Distribution only utility \nthat serves over 600,000 customers and operates in parts of Allegheny and Beaver \nCounties, located in Western Pennsylvania, including the city of Pittsburgh. Duquesne \n \n1 Exploring The Current State of PJM Governance, Docket Number AD26-7-000 (FERC)."},{"page":2,"startToken":172,"endToken":433,"text":"2 \n \nLight operates over 670 miles of high-voltage transmission lines and over 7,200 miles of \ndistribution lines. Duquesne Light has transferred operational control of its electric \ntransmission facilities to the PJM Interconnection, L.L.C. (“PJM”), a Regional \nTransmission Operator (“RTO”). As a member of PJM, Duquesne Light is a Participating \nTransmission Owner (“PTO”) that operates in the PJM market and participates in the PJM \nStakeholder process. As a PJM stakeholder and a PTO in the PJM region, Duquesne Light \nhas unique interests that may be affected by the outcome of this proceeding and that cannot \nbe fully represented by any other participant. \nIII. \nCOMMENTS \nA. \nPJM Governance Reform is Needed \n \nThe PJM stakeholder process was developed over 20 years ago during a \ntime of excess supply, flat load growth and with far fewer stakeholders. In 2006, \nthe PJM stakeholder process had fewer than 400 members.2 To meet the needs of \nthe members and the environment at the time, a stakeholder process was built for \nslow, deliberate changes. The stakeholder process was not built to make quick \nchanges or to be able to respond to an environment that is rapidly changing. It was \nbuilt to allow significant time for all parties to consider issues, engage in lengthy \ndiscussion, conduct significant analysis and to ultimately reach consensus. One \nexample is that it typically takes four months to hold the votes necessary to pass a \ntypical proposal. Any proposal must go through a first read, before an \n \n2 PJM Interconnection, L.L.C., PJM Summer 2006 Outlook at 2 (June 2006)."},{"page":3,"startToken":433,"endToken":691,"text":"3 \n \nendorsement vote can be held, and this occurs at both the standing and senior \nstanding committees. For example, if a proposal comes through the Planning \nCommittee, in month one there would be a first read at the Planning Committee. In \nmonth two, there would be an endorsement vote at the Planning Committee. If \npassed at the Planning Committee, in month three, there would be a first read at \nthe Markets and Reliability Committee. In month four, there would be an \nendorsement vote at the Markets and Reliability Committee. A Members \nCommittee vote is also typically required and could happen in parallel with, \nstaggered with or after a successful endorsement vote at the Markets and \nReliability Committee. Therefore, if the Members Committee vote were to happen \nfollowing the Markets and Reliability Committee, the process could take six \nmonths, with the Members Committee first read happening in month five and the \nendorsement vote in month six. This process, while extremely effective at \nensuring there is sufficient review and opportunity for feedback, is not built to be \nnimble. By design the stakeholder process is slow and methodical, built for \ndeliberate consideration and consensus building. That design is at conflict with the \nchallenges PJM is facing today. \nToday, PJM membership includes over 1,100 members.3 Membership has \nmore than doubled in the last 20 years. In addition, the landscape is drastically \ndifferent from when the stakeholder process was designed. The explosive growth \n \n3 PJM Interconnection, L.L.C., PJM Members Committee, Draft Minutes of the 285th Meeting (July 28, 2026)."},{"page":4,"startToken":691,"endToken":977,"text":"4 \n \nof data centers and the retirement of significant portions of the generation fleet has \ncreated a capacity shortfall. The PJM region is at a crossroads and the ability to \nprovide customers with reliable and affordable service hangs in the balance.  \nThe PJM stakeholder process raises concerns regarding accountability and \ncontrol. Vince Duane and Tony Clark aptly described the problem well in their \n2021 whitepaper, “Who Owns the RTO?” \n“RTOs are organized such that their customers, in the broadest \nsense imaginable, are also their owners, with ownership rights \nvarying in practical degree and in all cases ambiguously stated \nlegally. These customers exercise shared control over RTO \ndecisions and RTO management – notwithstanding the supposed \nindependence of RTOs. The peculiar RTO corporate structure is \nakin to the organization of a cooperative corporation, to the extent \nthat each member typically exercises the same voting control, \nwithout regard to the member’s respective financial commitment \nand interest in the RTO. The structures have always been \nbureaucratic, but they also dissipate any locus of control, blur \nultimate accountability and not surprisingly, often fail to reach \nconsensus, leaving important questions of market design and \noperational protocol to be resolved by FERC through \nadministrative litigation.”4 \n \nThis lack of accountability is a key flaw in PJM's governance. PJM’s \nstakeholder process constrains PJM’s ability to effectuate change, leaving \noutcomes largely dependent on stakeholders who “lack a shared purpose and \nvision when it comes to the RTO’s”5 and whose individual interests are far from \naligned. Expecting this stakeholder body to compromise and reach consensus \n \n4 Vincent Duane & Tony Clark, Who Owns the RTO? Why RTO Governance is an Achilles Heel in the Clean Grid \nTransition at 1 (Nov. 2021). \n5 Id. at 2 (Nov. 2021)."},{"page":5,"startToken":977,"endToken":1216,"text":"5 \n \ntoday, when the stakes are high, when action is needed expeditiously, and when \ndoing so could materially affect members' business interests, is unrealistic. \nAccordingly, it is irresponsible to continue to allow this stakeholder body to serve \nas the final decision-maker on matters central to PJM's operation as an RTO. \nB. \nPJM as the RTO Should be the Entity Held Accountable. The \nStakeholder Process Should be Advisory. \n \nStakeholders play an important role in PJM's governance by contributing \ntheir expertise and helping inform solutions across a range of interests. However, \nstakeholders should not have the ability to prevent PJM from fulfilling its \nresponsibilities as the RTO, including submitting filings pursuant to Section 205 \nof the Federal Power Act (“Section 205” or “205”).  \nAs the RTO PJM should be the entity accountable to FERC and the region \nfor fulfilling RTO responsibilities, including making Section 205 filings related to \nits markets and regional planning processes. Currently, the stakeholder process \ninhibits PJM’s ability to make Section 205 filings at FERC to address issues or \nupdate its core functions, thereby limiting its ability to act and fulfill its role as an \nRTO.  \nAll stakeholders and states have the ability to make filings pursuant to \nSection 206 of the Federal Power Act (“Section 206” or “206”) at the Commission \nor to protest any filing made by PJM, providing an appropriate balance. As the \nRTO, PJM should be the entity submitting proposals and defending them before"},{"page":6,"startToken":1216,"endToken":1449,"text":"6 \n \nthe Commission. Those proposals should consider and incorporate feedback from \nPJM stakeholders through the stakeholder process. If consensus is not reached or \nstakeholders disagree with the decision of the RTO, they can take their arguments \nto FERC, either in response to a filing by PJM or by initiating a 206 filing. FERC \nis then able to make an informed decision based on the record and is the \nappropriate entity to do so. \nGiven this, PJM’s stakeholder process should become advisory. PJM \nshould have the Section 205 filing rights over the Tariff and Operating Agreement. \nPJM should continue to maintain its stakeholder process, but the ultimate \nconclusion of it would be advisory.  \nTransitioning to an advisory stakeholder process would also enable PJM to \nmove more expeditiously to address emerging reliability, market, and planning \nneeds when necessary. While there are many options for how this could work, \nPJM would be able to define a process that meets a moment, allowing it to move \nquickly to address emergent issues without being hamstrung by a lengthy \nstakeholder process, or vulnerable to rejection by stakeholders based on a \nprocedural issue. \nC. \nStates Should Have an Increased Role in the PJM Stakeholder Process  \n \nState input is critical to the success of the RTO; therefore Duquesne Light \nsupports providing states a larger role at PJM, including a seat on the Nominating \nCommittee and the ability to cast advisory votes."},{"page":7,"startToken":1449,"endToken":1692,"text":"7 \n \nAllowing one collective seat for all PJM state entities on the Nominating \nCommittee is appropriate. The Nominating Committee consists of “one \nrepresentative elected annually from each sector of the Members Committee \nestablished under Operating Agreement, section 8.1 and three voting Board \nMembers (provided that one such Board Member shall serve only as a non-voting \nmember of the Nominating Committee).”6 Each sector has a single representative \nand only the PJM Board has an additional voting representative. Therefore, it is \nappropriate for the states to have a single representative collectively representing \nall state interests. The PJM Board would continue to be the only entity with more \nthan one voting representative on the committee, which is appropriate because it \nbears ultimate responsibility and accountability for PJM's performance and \ngovernance and is therefore best positioned to identify the skills, expertise, and \nexperience needed in future Board candidates. \nStates having the ability to cast advisory votes in the stakeholder process is \nalso appropriate. In line with the recommendation above that the stakeholder \nprocess should become advisory; state votes should also be advisory and should be \nconsidered by the PJM Board to inform their decision making. States’ input is \ncritical and should be allowed to inform the PJM Board for its ultimate decisions.  \nDuquesne Light encourages an approach to increase state participation in \nPJM in a coordinated fashion, including using the existing Organization of PJM \n \n6 PJM Interconnection, L.L.C., Operating Agreement, Section 7.1"},{"page":8,"startToken":1692,"endToken":1955,"text":"8 \n \nStates, Inc (“OPSI”) as the body to represent all state entities at PJM. OPSI could \nbe expanded and structured to have separate internal groups, including individual \ngroups for governors’ offices, legislators, utility commissions, etc. Through OPSI, \nmeetings could be facilitated for each group individually and/or cross-functionally. \nThe groups would all roll up under OPSI and it would allow a single organization \nto house and represent the views of the PJM states. PJM’s 13 state jurisdictions \nwith disparate views is one of its biggest challenges. This should be considered as \nthe structure for increased state participation is developed. The more states are \nable to speak with a single voice, the more impactful they will be and the more \nvaluable their input for PJM’s consideration.  \n \nD. \nResponses to the Commission’s Polling Questions \n \n1. \nPJM Board Independence \n \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments: PJM Board members should serve five-year terms and be eligible for \none additional term, ensuring continuity while limiting service to a maximum of \n10 years. Individual terms longer than 5 years are too long. It could create a \nbarrier to finding new board members who may not be willing to commit to \nalmost a decade. Duquesne agrees Board members need more certainty and terms \nlonger than 3 years are needed for Board members to maintain their \nindependence. Five year terms with eligibility for one extension achieves an \nappropriate balance \n2) \nShould there be a maximum number of years that a Board member \nmay serve (e.g., 10 years)? \nX"},{"page":9,"startToken":1955,"endToken":2323,"text":"9 \n \n \nComments: PJM Board members should be limited to a maximum of 10 years. \nTen years is the appropriate balance to meet the need for PJM to have \nexperienced and knowledgeable board members and not provide unduly \nburdensome years. The average board member serves a term of 9 years, so a 10-\nyear maximum is appropriate to allow board members to develop deep industry \nand organizational expertise while maintaining a healthy balance between \ncontinuity and board refreshment.7  \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \n \nComments: A preference, but not a requirement, for a Board member to reside in \nPJM should be included. A potential Board member should not be disqualified \nfor not residing in PJM. PJM board members require a significant amount of \nknowledge about the PJM region and are expected to attend a variety of in-\nperson events. Therefore, residing in PJM could be a benefit and should be \nconsidered as one of the many factors the Nominating Committee reviews for \npotential Board members. \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling \noff period for Board members from two years to one year? \nX \n \n \nComments: A reduction of the cooling off period from two years to one year is \nappropriate to widen the candidate pool and identify qualified candidates to serve \non the PJM Board.  \n5) \nShould restrictions on Board communications be relaxed to enable \nmore communication between the Board and stakeholders? \nX \n \n \nComments: Board communications could be relaxed to allow Board members to \nget more feedback from stakeholders. This relaxation should be balanced with \nadditional transparency to ensure all members are receiving the same \nopportunities with the PJM Board. \n6) \nIn order to increase transparency, should Board votes be made public \nor the Board be required to explain its reasoning?  \nX \n \n \nComments: The PJM Board should provide reasoning behind votes, especially \nthose directing a 205 filing at the Commission. The PJM Board typically \nprovides this reasoning and should continue to do so. If the PJM Board’s filing \n \n7 Board Tenure Statistics: Average, Distribution, and What It Means for Open Seats (FindABoardSeat Research, \nMay 28, 2026)."},{"page":10,"startToken":2323,"endToken":2623,"text":"10 \n \nrights are expanded or the stakeholder process becomes advisory, then the \nrequirement should become mandatory to ensure transparency and balance PJM’s \nbroader authority. \n7) \nIn order to increase transparency, should some Board meetings be \nopen or available to the public? \n \nX \n \nComments: The PJM Board should continue to engage in the stakeholder process \nand be transparent about its decisions but should continue to be able to conduct \ntheir business privately to maintain its independence.  \n8) \nShould PJM’s governing documents be revised to explicitly state that \nthe responsibility of PJM and its Board is to serve the public interest? \nX \n \n \nComments: The safety, reliability and security of the bulk electric system and the \nfunctioning of wholesale power markets is at the core of the nation's economic \nprosperity, national security, and public welfare and it is appropriate for PJM, to \nconsider the public interest in its decisions to manage and operate these critical \nsystems and markets. If this is implemented, Duquesne recommends public \ninterest be well defined to manage the varied definitions of public interest \nthroughout the 13 jurisdictions PJM serves and is rooted in authority from FERC \nand the Federal Power Act.  \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX \n \n \nComments: All PJM states and their respective representatives, including utility \ncommissions, governors' offices, and legislatures, should collectively hold one \nseat and one vote on the Nominating Committee. Each sector has one member \nand one vote, and it is appropriate for the states to have an equal role in the \nNominating Committee. \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \nX \n \nComments: PJM should remain accountable to its stakeholders and continue to \nprovide transparency regarding its performance, but management compensation \nshould not be tied to public performance metrics."},{"page":11,"startToken":2623,"endToken":2981,"text":"11 \n \n2. \nSection 205 Filing Rights  \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes \nonly inform the Board? \nX \n \n \nComments: Yes, PJM as the RTO should be the entity accountable for PJM \nexecuting and delivering on its mission as the RTO. Therefore, PJM should have \nthe authority and filing rights to execute and implement changes necessary to \nfulfill its responsibilities and ensure the reliable operation of the bulk electric \nsystem and wholesale electricity markets.  \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n \nComments: PJM needs to have the ability to make 205 filings to improve or \nmodify all aspects it oversees, including the energy markets and ancillary \nservices. Running these markets is one of PJM’s core duties and it should not be \nbarred from seeking approval for improvements or changes to those markets it \nsees fit under a section 205 filing. Any 205 filing will have a record that all \nstakeholders are able to participate in and that the Commission to consider. \n13) \nShould PJM have section 205 filing rights over Regional \nTransmission Expansion Planning (RTEP) unencumbered by the \nrequirement to obtain approval of two-thirds of the Members \nCommittee? \nX \n \n \nComments: PJM needs to have the ability to make 205 filings to improve or \nmodify all aspects it oversees, including the RTEP. Conducting the RTEP is one \nof PJM’s core duties and stakeholders should not be able to bar PJM from \nseeking approval from the Commission for improvements or other changes it \nsees fit under a section 205 filing. Any 205 filing will have a record that all \nstakeholders are able to participate in and that the Commission to consider. \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” \nrights over resource adequacy and transmission cost allocation filings \nwhen a supermajority of OPSI agrees on an alternative proposal? \n \nX \n \nComments:  \nResource Adequacy: PJM as the RTO should maintain all the 205 rights for the \nTariff, OA and all of its core responsibilities. States should provide input that"},{"page":12,"startToken":2981,"endToken":3248,"text":"12 \n \n \nQuestions/Comments \nYes No \nshould be considered and are able to participate in any 205 proceeding initiated \nby PJM. \nTransmission Cost Allocation: PJM does not have the 205 filing rights for \ntransmission cost allocation. Therefore, PJM would not make such a filing and \nthere would be no need for OPSI to have “jump ball” filing rights. \n15) \nShould the Members Committee have “jump ball” filing rights over \nthe portions of the tariff where PJM has 205 filing rights when a \nsupermajority of stakeholders approves an alternative proposal? \n \nX \n \nComments: PJM as the RTO should be the entity with the 205 filing rights. \nStakeholders should provide input and are able to participate in any 205 \nproceeding or to make section 206 filings to address any concerns they may have \nwith a PJM proposal. \n \n3. \nStakeholder Process \n \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered \nfrom two-thirds sector-weighted voting? \n \nX \n \nComments: The two-thirds sector-weighted vote threshold remains appropriate \nand should not be lowered. The threshold requires agreement from 3.33 of the 5 \nsectors. Lowering it to allow less than three sectors to agree would no longer \nrepresent a consensus solution.  \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \n \nX \n \nComments: The current voting paradigm with affiliate voting in lower \ncommittees is appropriate. The committee structure was set up to allow technical \nexperts from the member companies with vested interest in PJM to express that \nexpertise to be considered by the senior standing committee and remains \nappropriate. \n \n4. \nState Participation"},{"page":13,"startToken":3248,"endToken":3614,"text":"13 \n \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative \ngroup consisting of governors’ representatives and/or state legislators’ \nrepresentatives? \n \nX \n \nComments: Ideally the different state entities are able to coordinate and work \nthrough an expanded Organization of PJM States, Inc. (OPSI). Duquesne Light is \nsupportive of OPSI being expanded. OPSI could be structured in a variety of \nways for the governors, legislators and utility commission representatives to \nwork separately or as collectively as they deem appropriate. Duquesne is \nsupportive of the states engaging more fully in the PJM process and looks \nforward to that engagement and dialogue.  \n19) \nShould state representatives have a formal voting role in the \nstakeholder process (limited to certain topics, such as resource \nadequacy and regional transmission cost allocation) in addition to the \nconsumer advocate votes?  \nX \n \n \nComments: Duquesne supports moving to an advisory stakeholder process and \nunder that paradigm a state vote, one per state, would be an important \ninformational item for the PJM Board. If the outcome is not to move to an \nadvisory process, then the states should be afforded a vote, one per state, that \nwould be informational to the PJM Board and would not be counted in the sector-\nweighted vote outcome.  \n20) \nShould PJM be required to consult with OPSI prior to making a \nsection 205 filing related to resource adequacy and transmission cost \nallocation? \n \nX \n \nComments:  \nResource Adequacy: PJM and the states have complementary authority around \nPJM markets. PJM runs the markets that incentivize resource entry and exit, but \nPJM has no authority to require a resource to enter or exit the market. The states \nhave the authority to direct a resource to be built or to retire but have no authority \nover the operation of PJM markets. Given these complementary authorities it is \nimportant for PJM and the states to be in regular communication. A consultation \nbefore making any 205 filing on resource adequacy is appropriate, but ideally \nstates have been engaged in the development of any proposal through the \nstakeholder process. \nTransmission Cost Allocation: PJM does not have the 205 filing rights for \ntransmission cost allocation. Therefore, PJM would not make such a filing and"},{"page":14,"startToken":3614,"endToken":3714,"text":"14 \n \n \nQuestions/Comments \nYes No \nthere would be no need for a consultation.  \n \n \n \nIV. CONCLUSION \nWhile the structure and governance of PJM met the needs of the time of its creation, \nthe complexity of issues faced, expanded membership, and need for expeditious action \nrequires revision to its stakeholder and governance structure. Duquesne Light appreciates \nthe opportunity to provide input and respectfully submits these comments for the \nCommission’s consideration. \n \nRespectfully Submitted, \n/s/David Fisfis \nDavid Fisfis  \nSpecial Council \nDuquesne Light Company  \nNova Place \n100 South Commons Suite 118  \nMail Drop OGC-L1 \nPittsburgh, PA 15212  \nTelephone: (412) 393-6924 \nEmail: dfisfis@duqlight.com"},{"page":15,"startToken":3714,"endToken":3790,"text":"15 \n \n/s/ C. James Davis \n \n \n \n \n \n/s/Christin Domian \nC. James Davis \n \n \n \n \n \nChristin Domian \nDirector, Rates, Energy Procurement and \n \n \nSr Manager, FERC/RTO Affairs \nFederal/RTO Affairs  \n \n \n \n \nDuquesne Light Company \nDuquesne Light Company  \n \n \n \n \nNova Place \nNova Place \n \n \n \n \n \n \n100 South Commons, Suite 118 \n100 South Commons, Suite 118 \n \n \n \nMail Drop OGC-L1 \nMail Drop OGC-L1  \n \n \n \n \nPittsburgh, PA 15212 \nPittsburgh, PA 15212  \n \n \n \n \nTelephone: (412) 393-6316 \nTelephone: (412) 393-6402  \n \n \n \nEmail: cdomian@duqlight.com \nEmail: jdavis4@duqlight.com \n \n \n \nDated: August 21, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":224,"startToken":0,"endToken":25},{"p":1,"at":224,"title":"I. INTRODUCTION","method":"printed heading","endPage":1,"endAt":889,"startToken":25,"endToken":117},{"p":1,"at":889,"title":"II. Duquesne Light Company’s Interest in the Proceeding","method":"printed heading","endPage":2,"endAt":665,"startToken":117,"endToken":276},{"p":2,"at":665,"title":"III. COMMENTS","method":"printed heading","endPage":2,"endAt":681,"startToken":276,"endToken":278},{"p":2,"at":681,"title":"A. PJM Governance Reform is Needed","method":"printed heading","endPage":5,"endAt":328,"startToken":278,"endToken":1027},{"p":5,"at":328,"title":"B. PJM as the RTO Should be the Entity Held Accountable. The","method":"printed heading","endPage":6,"endAt":1180,"startToken":1027,"endToken":1402},{"p":6,"at":1180,"title":"C. States Should Have an Increased Role in the PJM Stakeholder Process","method":"printed heading","endPage":8,"endAt":807,"startToken":1402,"endToken":1817},{"p":8,"at":807,"title":"D. Responses to the Commission’s Polling Questions","method":"printed heading","endPage":14,"endAt":87,"startToken":1817,"endToken":3627},{"p":14,"at":87,"title":"IV. CONCLUSION","method":"printed heading","endPage":15,"endAt":56,"startToken":3627,"endToken":3722},{"p":15,"at":56,"title":"C. James Davis","method":"printed heading","endPage":15,"endAt":608,"startToken":3722,"endToken":3790}]}