{"document":{"slug":"rec-20260821-5197","title":"Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re PJM Interconnection, L.L.C.'s 07/31/2026 revisions to the…","issued":"2026-08-21","accession":"20260821-5197","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Ohio Federal Energy Advocate","kind":"comments","file":"sources/filings/text/20260821-5197_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5197","tier":"record","sha256":"69c95c1cdc3266471d16ff30b2d53de30ed504c3700a23bde9058b4c38f818a1","pages":7,"tokens":1803,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":259,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n  \nPJM Interconnection, L.L.C.                                    )                          Docket No. ER26-3380-000 \n \n \n \n \nCOMMENTS OF THE PUBLIC UTILITIES COMMISSION OF OHIO’S \nOFFICE OF THE FEDERAL ENERGY ADVOCATE \n \nOn July 31, 2026, PJM Interconnection, L.L.C. (PJM) submitted, pursuant to section 205 \nof the Federal Power Act, revisions to the PJM Open Access Transmission Tariff and the \nReliability Assurance Agreement to establish a Reliability Backstop Procurement (RBP). In the \nfiling, PJM describes the RBP as a one-time procurement of new capacity that is part of a multi-\npronged, ongoing effort to address resource adequacy challenges in the PJM region driven \nprimarily by the unprecedented addition of large loads, most notably data centers.1 \nOver two consecutive Base Residual Auctions (BRA) for the 2027/2028 and 2028/2029 \nDelivery Years, an insufficient commitment of capacity was secured to meet the PJM Region \nReliability Requirement. As a result, PJM proposes an RBP, to be initiated on September 30, \n2026, that aims to procure the most recently identified shortfall of approximately 6,831 \nmegawatts (MW) of capacity less any quantities of qualifying credits (e.g., bilateral contracts) or \nother adjustments as specified in the filing.2  \nThe Office of the Federal Energy Advocate (Ohio FEA) of the Public Utilities \nCommission of Ohio (PUCO), fulfilling its statutory duty to advocate on behalf of Ohio’s retail \nelectricity consumers,3 offers the following comments for consideration by the Federal Energy \nRegulatory Commission (Commission). \n \n1 PJM Transmittal Letter at 1-2. \n2 Id. at 8-9. \n3 Ohio Revised Code 4928.24."},{"page":2,"startToken":259,"endToken":558,"text":"2 \nI. \nBackground \nPJM’s capacity market, called the Reliability Pricing Model (RPM), is designed to ensure \nlong-term grid reliability by procuring the appropriate amount of supply needed to meet \npredicted peak load, plus an adequate reserve margin, three years in the future. A primary \nobjective of the capacity market is to match (or balance) power supply with future demand, \nthereby creating long-term price signals to attract needed investments to ensure resource \nadequacy. Under the RPM, capacity resources are procured through an annual, competitive BRA. \nStarting in 2023, PJM warned of a growing imbalance between supply and demand in the \nregion, driven primarily by large load growth and resource retirements outpacing the buildout of \nnew generation.4 Actions such as delaying auctions or implementing price collars further \ndistorted the intended design of the RPM. Over the next three years, the seriousness of the \nchanging landscape became more widely understood and is now a central, dominant focus for \nPJM, state regulators, and many other stakeholders. In December 2025, the BRA conducted for \nDelivery Year 2027/2028 represented the first time in recent history that large load additions \nsignificantly increased PJM’s load forecast, which, in turn, significantly increased the PJM \nRegion Reliability Requirement, in megawatts, PJM sought to procure in the auction. The \nauction resulted in a capacity procurement that was 6,517 MW short of the PJM Region \nReliability Requirement and 5.6 percent below the target 20% Installed Reserve Margin (IRM).5 \n \n4 Energy Transition in PJM: Resource Retirements, Replacements, and Risks, February 24, 2023, available at  \nhttps://www.pjm.com/-/media/library/reports-notices/special-reports/2023/energy-transition-in-pjm-resource-  \nretirements-replacements-and-risks.ashx.  \n5 PJM 2027/2028 Base Residual Auction Reserve Target Shortfall Report, February 9, 2026, available at \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-reserve-\ntarget-shortfall-report.pdf at 1."},{"page":3,"startToken":558,"endToken":880,"text":"3 \nSimilarly, in July 2026, the BRA conducted for Delivery Year 2028/2029 cleared 6,831 MW \nbelow the PJM Region Reliability Requirement and 5.6 percent below the 20% IRM.6 \n \nOver this time, PJM undertook various efforts to address the increasingly urgent resource \nadequacy needs of the region, including establishing a Reliability Resource Initiative and then an \nExpedited Interconnection Track to expedite the interconnection of new capacity resources, and \ninitiating multiple Critical Issue Fast Path (CIFP) stakeholder processes to address the challenge \nof maintaining reliability while efficiently integrating new large loads. In August 2025, PJM \ninitiated a broad CIFP on Large Load Additions, which, among other endeavors, led to an April \n2026 CIFP on the RBP. The initial scope of the RBP CIFP was later expanded to include \nconsideration of an “Interim Resource Adequacy Service” framework, which heretofore was \nongoing in a PJM Connect and Manage Senior Task Force.  \nAfter lengthy discussion over two months and consideration of more than a dozen RBP \nsolution packages, the PJM stakeholders failed to endorse any package to the PJM Board to \nconclude the CIFP effort. As a result, on July 27, 2026, the PJM Board issued a decisional letter \nsetting forth the RBP mechanism contained in the instant docket.7 The Ohio FEA supports the \nfiling. \nII. \nComments \nA. \nData Centers Are the Large Loads Driving Historic Demand. \nAs an initial matter, the Ohio FEA maintains that data centers are the large loads driving \nhistoric demand in the PJM footprint and, therefore, the RBP should be specific to data center \n \n6 PJM 2028/2029 Base Residual Auction Report, July 14, 2026, available at https://www.pjm.com/-\n/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf at 3. \n7 PJM Board Decisional Letter on Critical Issue Fast Path – Reliability Backstop Procurement and Connect and \nManage, July 27, 2026, available at https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-\ndisclosures/2026/20260727-board-decisional-letter-on-cifp-reliability-backstop-procurement-and-connect-and-\nmanage.pdf."},{"page":4,"startToken":880,"endToken":1180,"text":"4 \nload, not all new loads of a designated size. We support the flexibility that the RBP proposal \naffords states to rely on their own definitions of data centers or large loads and to determine \nwhich retail customers should be allocated RBP Charges.8 The “Statement of Principles \nRegarding PJM,” as signed by the National Energy Dominance Council and the 13 PJM \ngovernors, specified that costs associated with a one-time procurement should be borne by data \ncenters. As this nation, under the current administration’s leadership, works to onshore and \nexpand domestic manufacturing, it is counterproductive to place additional constraints on our \ntraditional manufacturers and on other non-data center large loads. Further, it has become \nobvious to most that data centers are unique large loads that warrant distinction from other \ncommercial or industrial customers. Ohio was one of the first states to establish data center \ntariffs with a defined data center customer class. The PUCO has approved, or is currently in the \nprocess of reviewing, this tariff for each of its electric distribution utilities. \nB. \nA Parallel Path Is Necessary to Ensure Reliability.  \nThe rate of change in demand/supply conditions in the PJM region warrants a central \nprocurement to comprehensively address the more than six gigawatts of capacity shortfall seen in \nthe last two BRAs. First, it is important to note that the Ohio FEA strongly supports bilateral \ncontracting between data center loads and new capacity resources, as well as PJM’s ongoing \nbilateral matchmaking effort, to address resource inadequacy in the region caused by data center \nloads. Bilateral contracting directly assigns the cost of new capacity to new load, removing any \nrisk of cost shifting to other customers. However, bilateral contracting takes time, which will not \nmitigate escalating reliability concerns in the near term. \n \n8 PJM Transmittal Letter at 98."},{"page":5,"startToken":1180,"endToken":1500,"text":"5 \nTo incent new resources to address the capacity shortfall, PJM proposes to procure long-\nterm capacity for a fixed term of up to 15 years, running from Delivery Year 2028/2029 to \nDelivery Year 2042/2043. Critically, only new megawatts (e.g., new resources, uprates to \nexisting resources, capacity transfers from deactivating resources) will be eligible to participate \nin the RBP, ensuring that the effort results in new capacity and does not simply shift existing \nresources from one capacity product to another. Under the RBP, new resources must be online \nno later than June 1, 2032, assume the obligations of any PJM capacity resource, and assume a \nmust-offer obligation in the RPM at $0 (price taker), along with other supply obligations \nidentified in the filing. PJM proposes a pay-as-bid structure for committed resources in the RBP \nand establishes a maximum willingness to pay structure set at $555/MW-day on a MW-weighted \naverage basis, which is Point 1 on the Variable Resource Requirement demand curve \n(unconstrained) for Delivery Year 2028/2029.  \nA vital and non-divisive component of the RBP is who should pay the costs. While the \nallocation of any wholesale costs to retail customers is within the purview of each state, the Ohio \nFEA asserts it is widely agreed that the costs of the RBP should be paid by the data centers \nseeking new capacity during this time of regional demand/supply constraint. To accomplish this, \nPJM highlights in the filing that PJM and states must work cooperatively.9 First, PJM will \nallocate the RBP costs to each zone/area based on the megawatts of load additions each \nzone/area is forecasted to serve (i.e., pro rata share of the procurement target). The zone/area will \nthen allocate costs pro rata to Load Serving Entities, which, in turn, will allocate them to retail \ncustomers consistent with state directives. “PJM’s proposed methodology for allocating RBP \n \n9 Id. at 99-100."},{"page":6,"startToken":1500,"endToken":1710,"text":"6 \nCharges sets the table for states . . . by empowering them to make decisions about how to best \nfurther allocate RBP Charges to data centers and other retail customers.”10  \nThe Ohio FEA acknowledges that successful implementation of the RBP means that, \nupon Commission approval, states and utilities must work expeditiously to align state regulations \nand cost-allocation frameworks (i.e., tariffs) with the RBP structure, as needed, to ensure that the \ncost of procuring long-term capacity under the RBP is appropriately assigned to the cost causers.  \nIII. \nConclusion \nPJM’s RBP is a timely effort to address reliability concerns caused by significant data \ncenter load growth in the region. We urge the Commission to approve the filing to secure long-\nterm capacity commitments from new resources to meet escalating demand and to mitigate any \ncompounding effect on PJM’s energy and capacity markets or other ratepayers. \nRespectfully submitted,  \nD. Andrew Wilson \nOhio Attorney General  \n \nJohn H. Jones  \nSection Chief \n \n  \n \n \n \n \n/s/ Thomas G. Lindgren \n \n \n \n \nThomas G. Lindgren  \nAssistant Attorney General  \nPublic Utilities Section  \n30 East Broad Street, 16th Floor  \nColumbus, Ohio 43215-3414  \n614.644.8768 (telephone)  \n866.818.6152 (facsimile)  \nThomas.Lindgren@OhioAGO.gov  \n \nOn Behalf of the Public Utilities  \nCommission of Ohio’s Office of the  \nFederal Energy Advocate  \n \nAugust 21, 2026 \n \n \n10 Id."},{"page":7,"startToken":1710,"endToken":1803,"text":"7 \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have on this date caused a copy of the foregoing document to be \nserved on each person included on the official service list maintained for this proceeding by the \nCommission’s Secretary, by electronic mail or such other means as a party may have requested, \nin accordance with Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § \n385.2010. Dated this the 21st day of August 2026, at Columbus, Ohio. \n \n/s/ Thomas G. Lindgren \n \nThomas G. Lindgren  \nAssistant Attorney General"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":260},{"p":2,"at":3,"title":"I. Background","method":"printed heading","endPage":3,"endAt":1363,"startToken":260,"endToken":773},{"p":3,"at":1363,"title":"II. Comments","method":"printed heading","endPage":3,"endAt":1378,"startToken":773,"endToken":775},{"p":3,"at":1378,"title":"A. Data Centers Are the Large Loads Driving Historic Demand.","method":"printed heading","endPage":6,"endAt":559,"startToken":775,"endToken":1585},{"p":6,"at":559,"title":"III. Conclusion","method":"printed heading","endPage":6,"endAt":957,"startToken":1585,"endToken":1645},{"p":6,"at":957,"title":"D. Andrew Wilson","method":"printed heading","endPage":7,"endAt":3,"startToken":1645,"endToken":1711},{"p":7,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":7,"endAt":552,"startToken":1711,"endToken":1803}]}