{"document":{"slug":"rec-20260821-5201","title":"Post-Technical Conference Comments of PPL Electric Utilities Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5201","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PPL Electric Utilities Corporation","kind":"comments","file":"sources/filings/text/20260821-5201_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5201","tier":"record","sha256":"7e77c17775a1aaac72ef16607382da77860fa1ae8662b9835c29a3d99aaec18d","pages":18,"tokens":5800,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":222,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Governance and Stakeholder \nReforms \nDocket No. AD26-7-000 \n \nPOST-TECHNICAL CONFERENCE COMMENTS  \nOF PPL ELECTRIC UTILITIES CORPORATION \n \nThe Federal Energy Regulatory Commission (FERC or Commission) held a technical \nconference July 23, 2026, to discuss PJM Interconnection, L.L.C. (PJM) governance and stake-\nholder processes, focusing on potential reforms to improve PJM’s ability to address operational \nand market needs in a timely and efficient manner.1 It now invites post-conference comments re-\nlated to issues raised that interested persons believe would benefit from further discussion.2 \nFERC also includes an Appendix listing 20 yes/no questions focused on the themes, concerns, \nand potential points of consensus that emerged during the conference.3 PPL Electric Utilities \nCorporation (PPL Electric) thanks the Commission for raising these important questions and re-\nsponds as follows: \nI. \nINTRODUCTION \n \nAs Chairman Swett said at the onset of the technical conference, “We need change. The \nmarket is facing change, and we’re not going to succeed without it.”4 Deputy Secretary Danly \n \n1 See PJM Governance and Stakeholder Reforms, Notice of Commission-Led Technical Conference, \nDocket No. AD26-7 (May 12, 2026).  \n2 See PJM Governance and Stakeholder Reforms, Notice Requesting Post-Conference Comment, Docket \nNo. AD26-7 (Jul. 30, 2026) (“Post-Conference Notice”).  \n3 Id. at 3–6.  \n4 Swett, Tr. at 11:7–16."},{"page":2,"startToken":222,"endToken":551,"text":"2 \n \nhighlighted the need for change, saying “PJM is a mess … [with] two auctions in a row that \nfailed to meet the capacity requirement. That is not a functioning market.”5 Several panelists fo-\ncused on potential changes to governance authority and decision-making roles.  Deputy Secre-\ntary Danly, however, framed the core issue more directly:  “Who is responsible for what?”6 and \nthe “number one priority” being the resource adequacy crisis (how can we “get[] as much supply \nonline as quickly as possible … while protecting ratepayers”7). Deputy Secretary Danly also \nhighlighted the filing rights issue: saying “we are deviating from the basic premise of the Federal \nPower Act and, indeed, basically every state commission law, which is you have a utility that \nfiles its tariff revisions.”8  \n \nFollowing the technical conference, the region is now discussing deep changes to PJM’s \nstructure, governing documents, and decision-making processes. Proposals include changes to \nboth Board function and makeup, changes to the stakeholder process and Member control, \nchanges to the interaction between the states and the Regional Transmission Organization \n(RTO), and reallocation of federal filing rights. In response, PPL Electric reiterates many of the \npoints it made in its Pre-Technical Conference Comments: (1) The PJM Board must be empow-\nered with full control over all substantive roles of PJM delegated to PJM by the PJM Transmis-\nsion Owners.9 This includes moving the Planning Protocol and other substantive language out of \nthe Operating Agreement where it is purportedly under Member control, in tension with the \n \n5 Danly, Tr. at 32:23–33:18.  \n6 Danly, Tr. at 34:2–25 (recognizing that a public utility with a responsible Board operating under the \noversight of a public utility commission is a model that works; RTOs have a “different model” where “it’s \nunclear exactly who it is that’s responsible for what”).  \n7 Danly, Tr. at 38:21–39:3.  \n8 Danly, Tr. at 36:8–21.  \n9 PPL Electric Pre-Technical Conference Comments at 5."},{"page":3,"startToken":551,"endToken":858,"text":"3 \n \nFederal Power Act. (2) FERC has limited authority over internal governance of the RTOs, but it \nshould encourage PJM to pursue changes that empower the Board and increase its independ-\nence.10 These changes may include longer terms for Board members, reducing restrictions on \nMember-affiliated individuals serving or shortening the “cooling off” period, and allowing more \ncommunication between Board members and Stakeholders. (3) The stakeholder process should \nbe changed from a governance role to an advisory role.11 Other changes to the stakeholder pro-\ncess, like reducing the number of sectors or changing the voting rules would then be less im-\nportant but may still be valuable. Finally, (4) The states must increase their role at PJM, espe-\ncially if the deregulated states change their energy policies to address resource adequacy and del-\negate some of their authority in that realm to PJM.12 Although PPL Electric remains open to dis-\ncussions of formal state governance roles or changes to filing rights, the Commission should be \naware these are likely to create significant litigation risk and delay that will distract from the co-\nordination necessary to address Deputy Secretary Danly’s “number one priority.”13  PPL Electric \nalso notes that many PJM Transmission Owners support several of these core reforms, including \nmoving toward a more advisory stakeholder process and providing PJM with section 205 filing \nrights over core RTO functions such as the energy and ancillary service markets and the RTEP \nprocess.  At the same time, stakeholders have expressed differing views regarding proposals to \ngrant states or stakeholder bodies alternative filing rights or other formal roles in the section 205 \nprocess.  PPL Electric submits these comments separately to address those issues and the legal \nand policy considerations they present.   \n \n10 Id. at 6.  \n11 Id. at 7, 11.  \n12 Id. at 8.  \n13 See Note 7, supra."},{"page":4,"startToken":858,"endToken":1249,"text":"4 \n \nII. \nCOMMENTS \nA. \nBoard Makeup, Selection, and Independence  \n \nMany commentators across the spectrum support changes to the PJM Board makeup and \nselection process. One relatively straightforward change is extending the term of individual \nBoard members. This was proposed or supported by Mr. Finkel,14 Mr. Mills,15 and Ms. Philips,16 \namong others. PPL Electric agrees with extending the Board term.17 Relatedly, there was some \ndiscussion of a preference for Board members who live in the region.18 This, however, must be \ntied to loosening of rules restricting potential Board members from serving because of business \nconnections to PJM Members. In other words, knowledgeable, qualified people dedicated to the \nsuccess of PJM and the PJM markets are exactly the people who are excluded by the current con-\nflicts rules.19 One option for resolving this would be to move from a two-year stay out to a one-\nyear stay out.20 PPL Electric supports this commonsense change, and would add a slight prefer-\nence for Board candidates with some geographic connection to the region, so long as it does not \nimpact candidate quality.21 \n \n14 Finkel, Tr. at 77:10–12 (“I think we all agree on longer board terms”). \n15 Mills, Tr. at 70:4–16; 71:1–16; 72:22–73:6 (preference for “six to nine years” for a term).  \n16 Philips, Tr. at 72:4–15 (“Maybe five years sounds very reasonable”).  \n17 See PPL Electric Pre-Technical Conference Comments at 6.  \n18 See Commissioner See, Tr. at 20:13–18 (getting \"more members in the PJM region … with direct expe-\nrience\" is low-hanging fruit); Commissioner Rosner, Tr. at 224:18–21 (\"some amount of the board lives \nin the region, to get that better understanding and more engagement with the states\"); Moskowitz, Tr. at \n255:4–8 (“there probably should be requirements, to tie more board members – to make sure that they \nhave connections to the PJM region”).  \n19 See Thomas, Tr. at 225:9–21 (“it is challenging finding qualified candidates that pass all the screens in \nterms of conflicts …”); Bruce, Tr. at 249:4–13; 250:4–7 (“people that have expertise in the energy space, \nthey touch in some respects PJM. So, that limits the pool.”).  \n20 Bruce, Tr. at 250:17–251:10.  \n21 See PPL Pre-Technical Conference Comments at 6."},{"page":5,"startToken":1249,"endToken":1614,"text":"5 \n \n \n More contentious is the question of who selects the Board. Some state representatives \nhave proposed  a significant voting role for state representatives on the PJM Nominating Com-\nmittee, including a proposal for three voting seats.22  Mr. Finkel defended that proposal at the \ntechnical conference as  designed to achieve “rough parity” with other interests represented on \nthe Committee.23 Others supported some form of state representation in the nomination process, \nalthough not necessarily the same structure, number of seats, or level of voting authority.24 Left \nunsaid at the technical conference is the fact that roughly half of the existing PJM Members al-\nready represent customers or customer-aligned interests (including state actors like consumer ad-\nvocates voting in the End Use Customer sector and municipal entities voting in the Electric Dis-\ntribution Sector) rather than “private interests.” This means that companies investing billions of \ndollars in PJM would be left with at most three, and more likely two (Generation Owners and \nTransmission Owners), of ten seats—a materially reduced role in contested votes. This is not a \nrecipe for an independent Board, nor one likely to establish market rules that invite the signifi-\ncant investment in the transmission and generation systems necessary to solve the resource ade-\nquacy crisis.  \n \nBut setting aside whether it is a good idea for the states to control the energy markets via \na working majority on the Nominating Committee, FERC has no authority to order this change. \nAs laid out in PPL Electric’s pre-technical conference comments, FERC cannot dictate the \n \n22 PJM Governance and Stakeholder Reforms, Pre-Technical Conference Statement of Jacob Finkel, Of-\nfice of Governor Josh Shapiro, on behalf of the PJM Governors’ Collaborative, Docket No. AD26-7-000 \n(Jul. 16, 2026) (“Finkel Pre-Technical Conference Statement”) at 9. \n23 See Finkel, Tr. at 101:13–102:1. This controlling stake is even deeper if the individual Nominating \nCommittee members can veto a proposed Board member absent their unanimous support.  \n24 See Bagot, Tr. at 109:20–110:4 (“it makes sense for the governors to play a role on the nominating \ncommittee”); Commissioner See, Tr. at 21:5–10 (“State representation on the nominating committee \nseems an obvious step forward”)."},{"page":6,"startToken":1614,"endToken":1940,"text":"6 \n \ninternal governance mechanisms of entities under its regulatory oversight.25 A Commission order \ngiving the states control over the Nominating Committee would fly in the face of the holding in \nthe CAISO case and invite almost certain and immediate litigation.26 Regardless of the strength \nor prominence of the proposals, or the number and fervor/salience of the voices raising them, \nCongress has simply not delegated FERC the power to force this change.  \n \nLuckily there are compromises available that will accomplish many of the same goals \nwithout opening the litigation floodgates or introducing massive uncertainty into the PJM mar-\nkets. There was extensive support at the technical conference for increased coordination between \nthe Board and the states, and limited opposition to more reasonable proposals such as a state rep-\nresentative (OPSI or the governors) participating in the Nominating Committee as a non-voting \nmember.27 This can, at minimum, be considered a reasonable first step to help deepen the com-\nmunication and coordination paths between the states and PJM while deeper changes are held for \na (hopefully) less volatile future. PPL Electric supports such a compromise.  \nB. \nStakeholder Process Changes \n \nSignificant time at the technical conference was devoted to the stakeholder process itself. \nConcerns focused on a variety of issues, including failure to move issues forward,28 voting \n \n25 See PPL Electric Pre-Technical Conference Comments at 6 (FERC has a limited role in “how the Board \nis selected and how it exercises power”).  \n26 See California Independent System Operator Corp. v. FERC, 372 F. 3d 395, 403 (2004). \n27 This is similar to the ISO-NE proposal as described by Ms. Gulluni. See Tr. at 79:8–80:8 (proposing a \nnon-voting OPSI member “to get confidence in the integrity of the process” but also recognizing issues \nwith state participation including confidentiality, FOIA, and politization).  \n28 Danly, Tr. at 37:18–22 (“issue charges that are critical cannot make it over the threshold even to be \nconsidered”)."},{"page":7,"startToken":1940,"endToken":2397,"text":"7 \n \ntransparency,29 the relevance of lower-level committees,30 meeting cadence,31 and voting rules.32 \nThe most important proposed change though, and one that PPL Electric wholeheartedly en-\ndorses, is a move to advisory voting.33 Making the stakeholders advisory to the Board would dra-\nmatically reduce fights over procedure and voting rules, because filings over the Board’s objec-\ntion (or Member vetoes of Board actions) would be off the table. Instead, stakeholder discussions \nwould be reframed into an effort to provide the best answer to the Board.34  \n \nMaking the stakeholder process advisory on substantive matters is a relatively easy fix. \nStakeholders are already advisory over most of the PJM Tariff, other governing documents, and \nManuals.35 All that would be formally required is moving the substantive schedules (Schedules \n1, 2, 6, 6a, and 6b) from the Operating Agreement to the Tariff36 and some corresponding \nchanges to other governing documents, including to the CTOA.37 Although the discussion at the \ntechnical conference focused on whether this could be compelled due to Mobile-Sierra \n \n29 Commissioner LeCerte, Tr. at 28:21–24 (“PJM has a binding stakeholder process that is untransparent \nand designed to protect the interests of those who profit”).  \n30 Haque, Tr. at 145:18–22 (questioning lower committee relevance); but see Lieberman, Tr. at 147:12–\n148:5 (defending them as focusing “subject matter experts on a specific issue”).  \n31 Lieberman, Tr. at 148:8–149:7.  \n32 E.g., Quinn, Tr. at 156:24–158:8 (agreeing to conform lower-level affiliate voting with senior commit-\ntee sector-weighted voting).  \n33 Lake, Tr. at 48:24–49:4; see also id. at 50:21–22 (“They need a voice in the stakeholder process but it \ncannot be a veto”); Burbure, Tr. at 57:8–13 (“stakeholders should have a voice but not a veto”).  \n34 Jaworski, Tr. at 170:10–172:13 (arguing stakeholders can provide expertise and states can provide stra-\ntegic direction); Quinlan, Tr. at 151:12–153:2 (“there’s really no replacement for the breadth of the PJM \nstakeholders and their expertise”); Anders, Tr. at 245:5–11 (even in an advisory role, there is “tremendous \nvalue in the stakeholder processes”).  \n35 Quinn, Tr. at 179:2–21 (recognizing the capacity market, the reason behind the resource adequacy crisis \nand the focus on PJM, is already under the PJM Board’s control and subject to an advisory stakeholder \nprocess); but see PPL Electric Pre-Technical Conference Comments at 20 (highlighting PJM practice of \nfollowing stakeholder direction even where not strictly required).  \n36 PPL Electric Pre-Technical Conference Comments at 7, 16–18; Haque, Tr. at 196:22–197:24.  \n37 PPL Electric Pre-Technical Conference Comments at 17–18; Chandler, Tr. at 198:4–199:25."},{"page":8,"startToken":2397,"endToken":2734,"text":"8 \n \nprotections, the fact is that the PJM Transmission Owners largely (if not unanimously) support \nthe proposed movement of these schedules and stand ready to help facilitate. Indeed, as high-\nlighted in the technical conference discussion, it was the other sectors of the Members Commit-\ntee who opposed giving control of the planning protocol to the PJM Board.38 \nC. \nSection 205 Rights and “Jump Ball” Proposals \n \nAnother major topic at the technical conference was the allocation of Federal Power Act \nsection 20539 filing rights among PJM, the PJM Transmission Owners, the PJM Members, and \npotentially the states or other parties. As discussed above, the clearest and most straightforward \nchange would be to give PJM “205 rights over all of its core business functions.”40 Mr. Mills, \nspeaking for the Board, was clear: “We believe that the Board would be more independent and \nable to act more quickly if [it] had those 205 rights over the Operating Agreement, which is the \nenergy and ancillary services market.”41 Such a change would require either member support, or \nmore likely a section 206 complaint against the Operating Agreement.42 Unlike the more esoteric \ngovernance change proposals discussed throughout the technical conference, this change is \n \n38 Moskowitz, Tr. at 236:12–237:1; see also PPL Electric Pre-Technical Conference Comments at 17 and \nNote 33 (citing PJM Members Committee vote against moving Planning Protocol to Tariff despite over-\nwhelming transmission owner support). Notably, this vote did not include the more controversial lan-\nguage in the CTOA that led the formal opposition to the transmission owner / PJM amendments to that \nagreement.  \n39 FPA Section 205, 16 U.S.C. § 824d (governing how public utilities establish and change rates through \nCommission filings).   \n40 Haque, Tr. at 197:4–24.  \n41 Mills, Tr. at 68:9–69:16.  \n42 See Anders, Tr. at 231:1–234:5 (doubting member support for giving PJM filing authority over the sub-\nstantive schedules to the Operating Agreement and suggesting FERC could order a change under § 206)."},{"page":9,"startToken":2734,"endToken":3172,"text":"9 \n \ndirectly tied to FERC’s authority over substantive transmission and markets provisions, and \nmany stakeholders (including transmission owners) are committed to supporting the effort.43 \n \nThe second large, and more controversial, proposed change to filing rights was the pro-\nposal to give the states a “jump ball” or other form of filing rights, either over resource adequacy \nor more broadly. Again, Mr. Finkel’s proposal was the strongest assertion of state power, arguing \nthat “[f]or matters of shared responsibility, PJM should agree to file an alternative state proposal \nwhen the RTO intends to submit a 205 filing.”44 This is not a claim of filing rights for the states \nper se, which would be illegal under the Federal Power Act, but is still widely understood to be \nof questionable legality.45 PPL Electric’s position remains that, while states have a central role to \nplay in generation planning and resource adequacy—one that requires their deep coordination \nwith PJM—they cannot be assigned or exercise section 205 filing rights unless consistent with \nthe Federal Power Act and applicable precedent.46  \n \nHowever, PPL Electric remains open to further discussion of how the states can exert \nsome control over PJM in one specific scenario: If, as is necessary to address the resource ade-\nquacy crisis, the deregulated states significantly reform their generation planning and other en-\nergy policies, and in so doing delegate powers of their own to PJM and the PJM markets, it \n \n43 Surprisingly, this includes longstanding opponents of giving the PJM Board control over the Planning \nProtocols, such as AMP. See Lieberman, Tr. 201:23–202:3 (agreeing with Commissioner LaCerte that \n“the sous chefs should [not] have two-third voting rights authority over the chef”).  \n44 Finkel Pre-Technical Conference Statement at 7. Others agreed with some or all of this idea. See Silver-\nman, Tr. at 190:3–9 (§205 rights for states provides enforcement mechanism); Quinn, Tr. at 176:23–177:3 \n(New England states have a “very central role” and that is a “very positive dynamic”).  \n45 See Kelliher, Joseph, States cannot be granted filing rights under Section 205 of the Federal Power Act, \nUTILITY DIVE (Jul. 27, 2026), available at https://www.utilitydive.com/news/states-ferc-filing-rights-sec-\ntion-205-pjm/826170/ (arguing that even granting the states the ability to force PJM to exercise its own \nfiling rights under § 205—including forcing it to file a state proposal alongside its own—violates the \nlaw).  \n46 PPL Electric Pre-Technical Conference Comments at 5, 9; Atl. City Elec. Co. v. FERC, 295 F.3d 1, 9–\n11 (D.C. Cir. 2002), enforced, 329 F.3d 856 (D.C. Cir. 2003)."},{"page":10,"startToken":3172,"endToken":3477,"text":"10 \n \nmakes sense to think about ways that they can retain input and potentially a check over PJM’s \nuse of that power.47 This would be legally distinct from section 205 filing rights over the existing \nTariff, which PJM holds through legal delegation from the owners of FERC-regulated assets and \nwhich can only be exercised by a public utility. In practice, though, it may look similar.  \n \nPPL Electric offers a few additional considerations in this discussion:  \n• \nThe states, acting through OPSI, a governor’s collaborative, or any other group, \nalready exercise significant influence at FERC. They are already able to comment \non any PJM filing (or any other filing) and make clear their own interests and \nopinions. If they are persuasive, they can stop a PJM proposal they object to from \nmoving forward. The states also have section 206 authority, including to propose \nan alternative to PJM’s proposal.  \n• \n“Jump ball” filings are legally uncertain, change the nature of section 205 filings, \nand at best empower the Commission and its staff rather than their holders. The \nlaw on “jump ball” filings is, at best, undeveloped. While they have worked in \nother regions in extremely limited circumstances, as envisioned here, they are a \nrecipe for litigation. PJM’s filings, especially in key areas like the capacity mar-\nket, move tens of billions of dollars. If the Commission is awarded the ability to \n“select” which section 205 filing it (the Commission) prefers, the proponents of \nthe losing proposal have every incentive to object, forcing the region to wait for \nmonths or years as the process flows through the courts. This is not a recipe for \nmarket stability or investment. It also turns the Commission from a regulatory \nbody deciding section 205 filings pursuant to law, to the decider of which \n \n47 See PPL Electric Pre-Technical Conference Comments at 12, 15."},{"page":11,"startToken":3477,"endToken":3813,"text":"11 \n \npreferred alternative should move forward even when no section 206 complaint \nhas been made.  \n• \nTo be successful, “matters of shared responsibility” will have to be fleshed out a \ngreat deal more. Mr. Finkel’s proposal was limited to “matters of shared responsi-\nbility” between the states and PJM. This is clearly the right place to focus, but for \nthe states to legally have a degree of control over PJM, they must delegate their \nown powers and agree to an arrangement in contract and state law, not merely \nseize the section 205 powers of FERC-regulated utilities.48  \nD. \nPublic Interest \n \nFinally, PPL Electric offers comment on proposals to incorporate a “public interest” \nstandard into PJM’s governing documents or mission statement.49 Although that concept may ap-\npear straightforward at a high level, it raises significant questions unless carefully tied to PJM’s \nexisting statutory obligations, governing documents, and Commission-approved responsibili-\nties.50 \n \nStanding alone, a “public interest” mandate is vague and potentially difficult to adminis-\nter. It could mean anything that a particular advocate believes to be of value to its interests or its \nown view of the public’s needs. This inherently subjective standard risks unnecessarily \n \n48 See Mills, Tr. 120:5–8 (“it would be inconsistent from this independent discussion that we’re having for \nthe states to have a jump ball right on rights that the PJM board doesn’t even have”); Finkel, Tr. 121:5–10 \n(agreeing filing rights would be limited to resource adequacy and “not dealing with things the board \ndoesn’t have today”).  \n49 See Bowring, Tr. at 253:13–16 (“The staff should be charged with acting in the public interest”); Bruce, \nTr. at 251:24–252:6 (introducing the concept of amending the Operating Agreement to include a public \ninterest mandate).  \n50 As some proponents did better than others. See Wood, Tr. at 136:10–14 (calling for “board members \n[to] have a responsibility to the public interest consistent with the FPA, which draws in the just and rea-\nsonable rate”) (emphasis added)."},{"page":12,"startToken":3813,"endToken":4152,"text":"12 \n \nconfusing PJM’s mission. PJM is a public utility—by some measures the largest and most im-\nportant in the world—it is not a government actor. PJM is charged by existing statutory language \nand a member charter to operate the bulk electric system reliably and to administer efficient \ncompetitive wholesale energy markets at just and reasonable rates. It is also regulated by the \nCommission, which has its own legal standards to apply, and which is the proper democratically \naccountable actor. No matter how potentially beneficial, FERC cannot simply instruct PJM to \nadopt a different mandate not found in statute or the governing documents.51  \n \nSecond, because PJM is a stakeholder-driven organization, and many of those stakehold-\ners are themselves government organizations (PJM governors, OPSI and public utility commis-\nsions, legislators, consumer advocates, municipalities, environmental protection organizations, \netc.) with their own public interest mandates, adding “public interest” to PJM’s mandate intro-\nduces the potential for deep conflict. If the PJM Board is supposed to act in the public interest, \nbut in its independent judgment decides that standard calls for a different action than a gover-\nnor’s representative or consumer advocate urges (when they are also acting in the public inter-\nest), how should it resolve the matter? What if there is a conflict between the “public interest” \nand reliability? Or with just and reasonable rates? Introducing new legal concepts to complex le-\ngal entities like PJM, even seemingly benign ones, is problematic and should be avoided.  \n \nThird, “public interest” has a specific meaning in the context of the FPA incompatible \nwith imposing a public interest mandate on PJM. It is part and parcel of the Mobile-Sierra doc-\ntrine by which FPA contracts may not be disturbed by FERC unless those contracts are found \ncontrary to the public interest. This has been interpreted by the court to mean not anti-\n \n51 See NAACP v. FPC, 425 U.S. 662 (1976) (FERC has no mandate to pursue goals beyond the FPA, even \nif they are generally accepted by society as worthy)."},{"page":13,"startToken":4152,"endToken":4437,"text":"13 \n \ncompetitive or fraudulent.52 A mandate that PJM not act anti-competitively or fraudulently \nleaves open a wide swath of conduct and does nothing to guide PJM in discharging its responsi-\nbilities, unlike its more specific mandates to promote reliability and competition. \n \nIII. \nRESPONSES TO COMMISSION QUESTIONS \n \nPPL Electric responds below to the Commission’s specific questions in the Notice Re-\nquesting Post-Conference Comment:53  \nPJM Board Independence \n \nQuestions/Comments \nYes \nNo \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments:  Longer terms would promote continuity, independence, and accountability \nby allowing Board members sufficient time to develop institutional knowledge and \noversee longer-term market and reliability reforms. \n2) \nShould there be a maximum number of years that a Board member \nmay serve (e.g., 10 years)? \n \nX \n \nComments: The expectation may be that a Board member only serves two five-year \nterms, but in some cases it may be appropriate for someone to serve longer and the \nCommission should not set a blanket rule preventing this.  \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \n \nComments: PPL supports a qualified preference for geographic proximity, but not at the \ncost of candidate quality given the difficulties in finding candidates even under the cur-\nrent rules.54 It might make sense to pair the preference for residing in the PJM region \nwith a shortening of the cooling off period for Board members working for a Member to \none year.  \n \n52 Morgan Stanley Capital Group Inc. v. Public Util. Dist. No. 1 of Snohomish Cty., 554 U.S. 527 (2008). \n53 Post-Conference Notice.  \n54 See PPL Pre-Technical Conference Comments at 6."},{"page":14,"startToken":4437,"endToken":4780,"text":"14 \n \n \nQuestions/Comments \nYes \nNo \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling \noff period for Board members from two years to one year? \nX \n \n \nComments: See response to #3.  \n5) \nShould restrictions on Board communications be relaxed to enable \nmore communication between the Board and stakeholders? \nX \n \n \nComments: PPL Electric supports reasonable changes that permit more regular, struc-\ntured communication between the Board and stakeholders, provided those changes pre-\nserve Board independence, confidentiality where appropriate, and the Board’s ability to \ndeliberate candidly. \n6) \nIn order to increase transparency, should Board votes be made public \nor the Board be required to explain its reasoning?  \n \nX \n \nComments: The PJM Board is not a regulator or government body. It needs to retain the \nability to hold private, candid discussions related to the matters under its control and this \nrequires a level of discretion that is difficult to maintain in fully public deliberations.. \nRequiring disclosure of individual Board deliberations or votes would represent a signif-\nicant departure from the manner in which public utility boards generally conduct their \nbusiness and exercise independent judgment..  \nIn practice, the PJM Board regularly issues public letters explaining its decisions on \ncontentious items. This provides more than enough transparency without disclosing in-\ndividual votes.  \n7) \nIn order to increase transparency, should some Board meetings be open \nor available to the public? \n \nX \n \nComments: See response to #6. Opening Board meetings to the public would be coun-\nterproductive.  \n8) \nShould PJM’s governing documents be revised to explicitly state that \nthe responsibility of PJM and its Board is to serve the public interest? \n \nX \n \nComments: See detailed discussion in comments above. PJM is not a public body, and it \nwould be improper to give it a public interest mandate that would conflict with its man-\ndate under the Federal Power Act. It would also introduce the likelihood of conflict with \nmembers who also have public interest mandates, but who may disagree on certain PJM \ndecisions.  \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \n \nX"},{"page":15,"startToken":4780,"endToken":5068,"text":"15 \n \n \nQuestions/Comments \nYes \nNo \n \nComments: See detailed discussion in comments above. Numerous state representatives, \nsuch as consumer advocates and municipalities, are PJM Members and already have rep-\nresentation on the PJM Nominating Committee. Proposals to add representation from \nother state representatives, such as public utility commissioners, governors, and/or state \nlegislators are at best incomplete and premature, as none of these institutions are well-\ndefined in the PJM governing documents and it would be irresponsible to hand over a \nrole in selecting the PJM Board without much more information. Adding anything more \nthan one voting member also misunderstands the function of the Nominating Commit-\ntee, which seeks to operate by consensus and should not be subject to packing.  \nThat said, PPL Electric supports additional coordination between PJM and the states. A \nsingle non-voting state representative on the Nominating Committee may be an appro-\npriate compromise and avenue for this coordination.  \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \nX \n \n \nComments:  Public performance metrics may improve accountability and transparency.  \nThe design of any compensation framework, however, should remain within the Board’s \ndiscretion and support PJM’s operational and market responsibilities. \n \nSection 205 Filing Rights \n \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \nX \n \n \nComments: See detailed discussion above.  \n12) \nShould PJM have section 205 filing rights over the energy market and an-\ncillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \nX \n \n \nComments: See detailed discussion above. \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n \nComments: See detailed discussion above."},{"page":16,"startToken":5068,"endToken":5396,"text":"16 \n \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \n \nX \n \nComments: OPSI is not a public utility and cannot hold section 205 rights under the \nFederal Power Act. Any formalized role for OPSI that affects PJM filings or tariff ad-\nministration would need to be carefully addressed in PJM’s governing documents and \nreviewed for consistency with the Federal Power Act, Commission precedent, and the \nlimits on who may exercise public utility filing rights.  \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajor-\nity of stakeholders approves an alternative proposal? \n \nX \n \nComments: The PJM Members Committee is not a public utility and cannot hold sec-\ntion 205 rights under the Federal Power Act. The language in the PJM Operating Agree-\nment purporting to require stakeholder approval for changes to the substantive sched-\nules was a mistake and should be corrected.55 \nStakeholder Process \n \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \nX \n \nComments: The stakeholder votes should be advisory. Once this change is made, the \nthresholds for voting become irrelevant as the PJM Board will control the RTO.  \n17) \nShould the voting rules barring affiliate votes, which apply to senior stand-\ning committees, also apply to lower-level committees? \nX \n \n \nComments: Both sets of stakeholder voting rules (affiliate voting in the lower commit-\ntees and sector weighted voting in the senior committees) are arbitrary. PPL agrees with \nMr. Quinn of Vistra that the voting processes can be conformed to achieve a more effi-\ncient process.56 The real solution, again, is to make the stakeholder process advisory, \nwhich reduces the significance of voting rules entirely.  \n \nState Participation \n \n \n55 See PPL Electric Pre-Technical Conference Comments at 16.  \n56 Quinn, Tr. at 156:24–158:12."},{"page":17,"startToken":5396,"endToken":5741,"text":"17 \n \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ represent-\natives? \n \nX \n \nComments: Creating an organization for governors’ representatives and/or state legisla-\ntors’ representatives does not need FERC or PJM Member permission. The states are \nfree to organize themselves in any way that makes sense for them. However, as Mr. \nMills pointed out in the technical conference, “one organization would be ideal[] for \nPJM to deal with.”57 Also, the Commission should be cautious about funding more or-\nganizations with ratepayer money in an era of affordability concerns, noting that OPSI \nand CAPS are already funded.  \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?  \n \nX \n \nComments: The states are not PJM Members and should not have a voting role in the \nstakeholder process (unless they become Members, similar to their role in SPP). That \nsaid, PPL Electric has consistently called for more state coordination with PJM—as \nsovereigns, regulators, generation planners, etc.58 Rather than engage in fights over vot-\ning power, the states should focus on these areas within their jurisdiction.  \n20) \nShould PJM be required to consult with OPSI prior to making a section \n205 filing related to resource adequacy and transmission cost allocation? \n \nX \n \nComments: PJM already regularly consults with OPSI, and PPL Electric supports con-\ntinued coordination with the states.  However, converting consultation into a mandatory \nprerequisite to a section 205 filing could slow PJM’s ability to act, create procedural \ndisputes unrelated to the merits of the filing, and constrain PJM’s ability to exercise its \nindependent judgment.  In addition, to the extent PJM does not have the relevant section \n205 filing rights for certain transmission cost allocation matters, a mandatory OPSI con-\nsultation requirement would not provide a meaningful legal mechanism for influencing \nthose filings.  \n \n \n57 Mills, Tr. at 92:6–23.  \n58 See PPL Electric Pre-Technical Conference Comments at 8–10."},{"page":18,"startToken":5741,"endToken":5800,"text":"18 \n \nIV. \nCONCLUSION \n \nPPL Electric thanks the Commission for raising these important topics and asks that its \ncomments be considered part of the record.  \n \nRespectfully submitted,  \n \nSteven M. Nadel \nSenior Counsel \nPPL Services Corp.  \n645 Hamilton Street, Suite 601 \nAllentown, PA 18101 \nTel. 610.774.4775  \nSMNadel@pplweb.com \n \nCounsel for PPL Electric Utilities Corpora-\ntion. \nAugust 21, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":985,"startToken":0,"endToken":140},{"p":1,"at":985,"title":"I. INTRODUCTION","method":"printed heading","endPage":4,"endAt":5,"startToken":140,"endToken":859},{"p":4,"at":5,"title":"II. COMMENTS","method":"printed heading","endPage":4,"endAt":20,"startToken":859,"endToken":861},{"p":4,"at":20,"title":"A. Board Makeup, Selection, and Independence","method":"printed heading","endPage":6,"endAt":1207,"startToken":861,"endToken":1800},{"p":6,"at":1207,"title":"B. Stakeholder Process Changes","method":"printed heading","endPage":8,"endAt":368,"startToken":1800,"endToken":2456},{"p":8,"at":368,"title":"C. Section 205 Rights and “Jump Ball” Proposals","method":"printed heading","endPage":11,"endAt":581,"startToken":2456,"endToken":3573},{"p":11,"at":581,"title":"D. Public Interest","method":"printed heading","endPage":13,"endAt":280,"startToken":3573,"endToken":4194},{"p":13,"at":280,"title":"III. RESPONSES TO COMMISSION QUESTIONS","method":"printed heading","endPage":18,"endAt":6,"startToken":4194,"endToken":5742},{"p":18,"at":6,"title":"IV. CONCLUSION","method":"printed heading","endPage":18,"endAt":404,"startToken":5742,"endToken":5800}]}