{"document":{"slug":"rec-20260821-5203","title":"Comments of FirstEnergy Service Company re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5203","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"FirstEnergy Service Company","kind":"comments","file":"sources/filings/text/20260821-5203_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5203","tier":"record","sha256":"463437c19289bcb0b3c6460778c42201f88c1a6a4e97df1a379359f72cd58dc3","pages":14,"tokens":3507,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":261,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \nPJM Governance and Stakeholder Reforms  \n) \n \nDocket No. AD26-7-000 \n \n \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \n \n \nCOMMENTS OF FIRSTENERGY SERVICE COMPANY \nPursuant to the Federal Energy Regulatory Commission’s (“Commission”) July 30, 2026, \nNotice Requesting Post Conference Comments on PJM governance and stakeholder processes,1 \nFirstEnergy Service Company (“FirstEnergy”)2 respectfully submits the following comments. \nI. \nINTRODUCTION \nThe key proposition that prompted the July Technical Conference is that PJM \nInterconnection, L.L.C. (“PJM”)’s governance and stakeholder process is not able to address \nsystem needs in a “timely and efficient manner.”3 This, however, is an incomplete characterization \nof the present challenges to the PJM system. The central problem in the PJM region is not \ngovernance itself; it is a shortage of generation needed to ensure resource adequacy.  PJM \ngovernance reforms may improve efficiency, but they will not, by themselves, produce any \nadditional generation capacity. Therefore, while FirstEnergy supports effectively tailored reforms \nto PJM governance, FirstEnergy believes that the most important reforms are improving the \ninterconnection framework and enhancing state level coordination, in order to enable PJM and the \n \n1  \nSee Notice Requesting Post-Conference Comments, FERC Docket AD26-7-000 (July 30, 2026).  \n2  \nFirstEnergy also submits these comments on behalf of its transmission owner affiliates American \nTransmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission \nLLC, The Potomac Edison Company, Monongahela Power Company, Keystone Appalachian Transmission Company, \nand Trans-Allegheny Interstate Line Company (hereinafter, collectively referred to herein along with FirstEnergy \nService Company as “FirstEnergy”).   \n3  \nSee Notice of Commission-Led Technical Conference, Docket No. AD26-7-000 (May 12, 2026)."},{"page":2,"startToken":261,"endToken":594,"text":"2 \n \nstates to address the resource adequacy challenge and close the widening gap between supply and \ndemand. \nII. \nRESOURCE ADEQUACY AND INADEQUATE CAPACITY ARE THE \nCENTRAL CHALLENGE \n \nA. The Current Resource Adequacy Challenge in the PJM Footprint Is Not \nthe Result of Poor Governance. \n \nAs the Commission and industry have recognized, electric load demand is outpacing supply \nat an unprecedented rate due to the rise in new large loads interconnection requests.4 Further \ncompounding the challenge is the premature retirement of existing generation and the delayed rate \nof entry of new generation resources.5 This mismatch between rapidly increasing demand and \ninadequate generation supply is the preeminent threat to grid reliability and affordability. \nPeak demand in PJM is projected to increase dramatically, driven largely by data center \ngrowth.6 At the same time, state policies have accelerated retirements of existing dispatchable \ngeneration. Since 2015, PJM has seen over 34 GW of generation retire.7 Even with PJM’s \ninterconnection queue reforms, the region still needs new dispatchable generation. Although PJM \nhas the authority to administer markets, plan transmission, and operate the transmission system, \nPJM does not have the authority to compel or otherwise direct the construction of generation \nresources.8 For that reason, governance reform alone cannot solve the capacity shortage. \n \n4  \nhttps://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-meeting-baltimore-\nmd-0; PJM 2026 Load Forecast (20251124-item-03---large-load-adjustment-requests-summary.pdf) \n5 See Powering Reliability Through Market Design: Addressing Rising Demand and Constrained Supply, and \nStimulating \nInvestment \nto \nSupport \nDurable \nReliability \n(May \n6, \n2026), \nhttps://www.pjm.com/ \n/media/DotCom/library/reports-notices/special-reports/2026/20260506-powering-reliability-through \nmarket-\ndesign.pdf [https://perma.cc/3W8Z-M4TQ] (“Powering Reliability Through Markets White Paper”). \n6  \nId. \n7  \nSee Prefiled Statement of Manu Asthana on Behalf of PJM Interconnection, L.L.C. Docket No. AD25-7-000 \n(May 20, 2025). \n8  \nPac. Gas & Elec. Co. v. State Energy Res. Conservation & Dev. Comm'n, 461 U.S. 190, 205 (1983) \n(explaining that the need for new power facilities and their economic feasibility are areas characteristically governed \nby the states)."},{"page":3,"startToken":594,"endToken":931,"text":"3 \n \nThe need to attract more megawatts is not unique to PJM. RTOs and ISOs across the \ncountry face similar pressure from rapid load growth, including data center development, and \naccelerated retirements driven by energy transition policies.9 Better governance in PJM may \nimprove process efficiency, but it will not materially change PJM’s supply/demand imbalance. \nSimply put, PJM governance did not cause the capacity shortage, and governance reform alone \ncannot produce the generation needed to solve the resource adequacy challenge. \nB. PJM Governance Reform Will Not Solve the Missing Megawatt Problem. \nSection 201 of the Federal Power Act reserves to the states the authority over generation \ndevelopment, siting, and resource adequacy.10 While PJM has limited tools to support resource \nadequacy, including administering markets to produce price signals and curtailment mechanisms, \nunder the cooperative federalism framework, ultimate direct authority over resource adequacy \nrests with the states. Thus, only the states have the authority to dictate whether sufficient generation \nis built on a timely basis. \nThe PJM interconnection queue reforms have done little to add new capacity to the system. \nAs a result, capacity prices for the two most recent Base Residual Auctions cleared at or near the \nadministrative cap producing record high prices.11 Yet PJM still faces regionwide reliability \nconcerns tied to insufficient new generation resources. As such, PJM governance is not the sole \nconstraint. The solution therefore must include state level action and state policy reforms that \naccount for large load growth and remove barriers to entry for new generation including permitting \n \n9  \nFederal Energy Regulatory Commission, Fact Sheet: FERC Takes Action to Supercharge America’s Grid \nfor Efficiency, Reliability, and a Bold Energy Future (June 18, 2026), available at https://www.ferc.gov/news-\nevents/news/fact-sheet-ferc-takes-action-supercharge-americas-grid-efficiency-reliability-and \n10  \n16 U.S.C. § 824(b)(1). \n11  \nSee 2027/2028 Base Residual Auction Results (Dec. 17, 2025) (auction cleared at administratively set cap of \n$333.44/MW-day); 2028/2029 Base Residual Auction Results (July 14, 2026) (auction cleared at FERC-approved cap \nof $325.00/MW-day)."},{"page":4,"startToken":931,"endToken":1210,"text":"4 \n \ndelays, local siting restrictions, financing challenges, equipment shortages and physical \nconstraints.  \nThe PJM governance reforms discussed during the July 23 technical conference, including \nBoard authority, nominating committee composition, stakeholder processes, state participation, \nand filing rights, do not answer the central question: who will build new generation, and how will \nit be adequately incentivized? The states must bridge the gap between the growing energy needs \nof large loads and the state policies that have encouraged generation retirements or created barriers \nto generation development. \nC. PJM’s Diverse Footprint is Distinct from Neighboring RTOs/ISOs and \nContributes to both Resource Adequacy and Governance Challenges. \n \nThere is no question that the states have the primary role in ensuring resource adequacy \nand have a significant influence on PJM governance. How that influence is exercised, however, \nraises complex and important considerations. The Commission should consider the noteworthy \nvariation across PJM when compared to other RTO regions. The geographic footprint of PJM \ncovers all or part of thirteen states and the District of Columbia. Those jurisdictions do not share \na single energy policy, regulatory structure, or resource adequacy model. PJM includes both \nvertically integrated and restructured states, and its states have different generation policies, retail \nstructures, load growth profiles, resource adequacy preferences, and political priorities. Those \ndifferences have affected regional infrastructure development and resource adequacy, including \nthrough generation retirements. \nThis diversity makes PJM materially different from RTOs/ISOs in which state engagement \ncan be represented by a shared, or at least substantially similar, set of state policies. The \ncoordination required to reach state consensus in PJM on complex market and transmission \nplanning issues would likely further delay efforts to bring new generation resources online. The"},{"page":5,"startToken":1210,"endToken":1501,"text":"5 \n \nCommission therefore should not assume that state governance models used in other RTOs/ISOs \ncan be transplanted into PJM without creating new opportunities for deadlock, gamesmanship, or \ninconsistent regional outcomes. The states in PJM need to enhance coordination among their \npublic utility commissions, state administrations, and other relevant state authorities such as the \nOrganization of PJM States, Inc. (\"OPSI”) and the Consumer Advocates of the PJM States \n(“CAPS”) so that the states have a more cohesive and effective voice in the PJM stakeholder \nprocess. \nIII. \nTHE COST OF ADDRESSING THE RESOURCE ADEQUACY \nCHALLENGE SHOULD NOT FALL TO EXISTING CUSTOMERS \n \nA. Existing Customers Are Bearing the Costs of the Growing Resource \nAdequacy Challenge. \n \nFirstEnergy recognizes the importance of protecting existing customers from dramatic cost \nincreases caused by the growth of data centers and new large loads. As the supply and demand \nimbalance persists, the costs increasingly appear in consumer bills. Despite soaring capacity \nauction prices which resulted in all-time high clearing prices or the market cap in multiple auctions, \nconsumers have paid $16 billion with minimal new generation resulting.12 The Commission should \nfocus any reforms on solutions that will equip PJM with the ability to implement solutions that \nimprove reliability and mitigate the costs customers are now shouldering. \nThe Commission should not rely solely on governance reforms to protect customers from \nincreased rates and reliability risks caused by the ongoing resource adequacy challenge. As \nexplained above, the most effective solution will require state level changes that support the \ndevelopment of and investment in new dispatchable generation. \n \n12  \nPJM Interconnection, L.L.C., 2027/2028 Base Residual Auction Results Report (Dec. 17, 2025) (reporting \nan RTO clearing price of $333.44/MW-day and total capacity costs of approximately $16.4 billion)."},{"page":6,"startToken":1501,"endToken":1788,"text":"6 \n \nB. New Large Load Customers Should Be Required to Bring the Generation \nNecessary to Serve Their Load or Take Service Through a Reliability \nBackstop Procurement Mechanism. \n \nNew large loads, including data centers, are driving much of the unprecedented growth in \nelectric demand. Under longstanding cost causation principles, the cost of meeting that demand \nshould be borne by the new large loads, not existing customers. As the Commission considers \nappropriate reforms to address the resource adequacy challenge, the central focus of any solution \nmust be to bring more generation online. \nA bring-your-own-generation construct protects existing customers from subsidizing new \nlarge loads while helping bring new generation online. Alternatively, new large loads that do not \nbring their own generation should take service through a targeted reliability backstop procurement \nconstruct. That backstop would secure the resources needed to meet increased demand and \nmaintain system reliability. \nThe current framework both raises affordability concerns and worsens the resource \nadequacy challenge. New large loads that materially increase system demand should be expected \neither to bring adequate supply resources or bear the costs of procuring adequate additional \ngeneration necessary to support their demand.  Under the status quo interconnection framework, \nnew large loads will continue to adversely impact existing customers that are currently absorbing \nthe increasing costs of generation. A construct that requires that new large loads either bring their \nown generation or bear the costs of targeted reliability backstop procurement better aligns cost \nresponsibility with cost causation and mitigates adverse impacts on existing customers. \nC. Generation Procured for Native Load Growth Should Flow Through a \nPass-Through Tariff. \n \nFirstEnergy supports a framework that ensures the customer causing the need for or \nbenefiting from the availability of increased generation bears the costs. The Commission should"},{"page":7,"startToken":1788,"endToken":2066,"text":"7 \n \nfurther consider reforms that allow costs to serve native load growth, separate from new large load \ndemand, to flow through to native-load customers through a pass-through tariff.  \nConsistent with cost causation principles, once a state, utility, or other responsible entity \ndetermines that new generation must be procured to serve native load growth, distinct from large \nload growth, the associated costs should be recovered through a transparent pass-through tariff. \nUnder a pass-through tariff, a state-regulated utility would recover the prudently incurred costs of \ngeneration resources procured to serve incremental native-load growth through a dedicated retail \nrider charged to the customers benefiting from that procurement. The rider would permit periodic \nrecovery of capacity, generation, and associated resource adequacy costs and would align cost \nresponsibility with the customers whose load growth necessitated the new generation investment. \nSuch a tariff would reduce the risk that customers not causing the need for or benefiting from the \nnew capacity procurement subsidize resources procured for incremental native load growth.  \nD. FirstEnergy Supports Resource Adequacy Solutions that Assign Costs to \nthe Customers Driving the Demand or Benefiting from the New \nGeneration. \n \nFirstEnergy shares the Commission’s goal of ensuring that customers have timely and \nefficient access to adequate, affordable, and reliable service. To meet that goal, FirstEnergy \ncontinues to support a transmission expansion framework that promotes affordability by requiring \nlarge load customers pay an expansion rate designed to recover network upgrade costs needed to \nsupport their interconnection.   \nThis framework requires the large load driving new demand to bear the cost of \ninterconnection and associated network upgrades. It also reduces costs to existing customers while \npreserving operational benefits for all customers.  FirstEnergy submitted in the large load"},{"page":8,"startToken":2066,"endToken":2344,"text":"8 \n \nrulemaking docket a whitepaper providing an overview of how a rate expansion framework would \nbe designed, and anticipates providing further details on this proposal in the near future.13 \nIV. \nGOVERNANCE REFORMS SHOULD BE LIMITED TO REFORMS \nTHAT IMPROVE EFFICIENCY WHILE RESPECTING EXISTING \nJURISDICTIONAL AND CONTRACTUAL BOUNDARIES \n \nFirstEnergy agrees that PJM governance is important and warrants Commission attention, \nparticularly because efficient decision-making is needed to address the resource adequacy \nchallenge threatening affordability and reliability. If the Commission directs reforms to PJM \ngovernance or the stakeholder process, those reforms should be targeted and should not diminish \nthe rights and responsibilities established under the Consolidated Transmission Owners \nAgreement (“CTOA”), which is the foundational agreement that created and defines PJM’s \nauthority over regional transmission planning and operation.  \nFirstEnergy supports limited reforms to the PJM governance structure in three respects.  \nFirst, FirstEnergy recommends that the stakeholder process be reformed to assume a purely \nadvisory role in PJM governance.  Second, FirstEnergy recommends that the states be given formal \nstanding at PJM with a defined right to bring issues directly to the Board. Finally, PJM governance \nreform should respect both the jurisdictional divide between the Commission and the states and \nthe balance of rights and obligations between PJM and PJM transmission owners established under \nthe CTOA.  \nFirstEnergy recommends that the stakeholder process transition to an advisory vote \napproach that is less capable of producing prolonged deadlock. The reformed process would follow \na course under which PJM would develop proposals, those proposals would be subject to \nstakeholder discussion and advice, and the Board would then, with the benefit of stakeholder input, \n \n13  \nSupplemental Comments of FirstEnergy Service Company, Docket No. RM26-4-000 (June 5, 2026)."},{"page":9,"startToken":2344,"endToken":2662,"text":"9 \n \ndetermine what to file at the Commission for acceptance.  The PJM Board should be the final \ndecision-maker on solutions to issues that are within the authority of the Board under the PJM \ngoverning documents including the CTOA. This streamlined process would retain PJM Board \naccountability while enabling quicker decision-making. \nFirstEnergy also recommends an enhanced role for states with a more meaningful “seat at \nthe table.” States currently have only a limited role in PJM governance despite the fact that they \nhave primary authority over resource adequacy and transmission siting.  States need a formal \ngovernance role rather than soft influence through fragmented OPSI interactions and one-off \ncommunications.  The PJM governance structure must incorporate meaningful input from the PJM \nstates. In order to provide the States with greater access to the PJM Board, the States should have \nformal standing at PJM, and a defined right to bring issues directly to the Board. Participation at \nformal meetings with the Board will give States greater access and will improve accountability \nand responsiveness. \nAs a threshold consideration to PJM governance reform, it is material to recall that the \nCTOA is the cornerstone upon which PJM obtained the authority to operate as an RTO.  Any \nmodification to the PJM governance rules must consider the implications for the division of rights \nand obligations established under the CTOA.  An essential and exclusive right of the PJM \nTransmission Owners is the FPA section 205 filing rights over transmission rates and rate design, \nincluding local and regional rates.14 Moreover, because FPA Section 205 grants filing rights to \n“public utilities,” independent Section 205 filing authority cannot be granted to the states absent a \nstatutory amendment by Congress. Consistent with the Federal Power Act, the CTOA assigns \nsection 205 rights and responsibilities to PJM and the Transmission Owners—both jurisdictional \n \n14  \nCTOA, Article 5, § 5.4, “Federal Power Act Rights”; Article 7, § 7.1, “Individual Transmission Owner \nRates.”"},{"page":10,"startToken":2662,"endToken":2866,"text":"10 \n \npublic utilities—and courts have repeatedly recognized that FERC cannot compel utilities to \nsurrender those rights or transfer them to non-jurisdictional entities.15 As such, the Commission \nshould not accept any reform proposal that would in any way violate or impinge upon the balance \nof rights and obligations established under the CTOA. \nV. \nCONCLUSION \nFor the reasons set forth above, FirstEnergy respectfully urges the Commission to issue an \norder that: (i) recognizes resource adequacy, not governance alone, as the central challenge facing \nPJM; (ii) directs PJM to pursue targeted governance reforms that improve efficiency while \npreserving CTOA rights; (iii) directs PJM to develop mechanisms under which new large loads \neither bring generation or bear the costs of reliability backstop procurement; and (iv) directs PJM \nto make a compliance filing proposing tariff revisions consistent with those principles. \n \nRespectfully submitted,  \n/s/ Amanda Parker \nMorgan Parke  \nVice President - Associate General Counsel \nAmanda P. Parker  \nCorporate Counsel  \nFirstEnergy Service Company  \n341 White Pond Drive  \nAkron, Ohio 44320  \n(330) 384-4592  \naparker@firstenergycorp.com  \nCounsel for FirstEnergy Service Company \n \nDate: August 21, 2026 \n \n \n \n15  \nMassachusetts v. FERC, 729 F.2d 886, 886-87 (D.C. Cir. 1984) (affirming FERC's determination that states \ncannot compel utilities to make Section 205 filings)."},{"page":11,"startToken":2866,"endToken":2920,"text":"11 \n \n \nCERTIFICATE OF SERVICE \nI certify that I have served the foregoing document on each person designated on the official \nservice list compiled by the Secretary of the Commission in this docket. \n \n \n \nRespectfully submitted,  \n/s/ Amanda Parker \nAmanda P. Parker  \nCorporate Counsel  \naparker@firstenergycorp.com  \nCounsel for FirstEnergy Service Company \n \nDate: August 21, 2026"},{"page":12,"startToken":2920,"endToken":3177,"text":"12 \n \nAPPENDIX RESPONSES \nPursuant to the Commission directive in the Appendix to the July 30, 2026, Notice Requesting \nPost Conference Comments on PJM governance and stakeholder processes, FirstEnergy as a \nmember of the TO Sector respectfully submits the following responses: \n \nPJM Board Independence \n \nQuestions/Comments \nYes \nNo \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments: FirstEnergy supports changing Board terms, but anything beyond a five-year term \nis too lengthy. \n2) \nShould there be a maximum number of years that a Board member may serve \n(e.g., 10 years)? \nX \n \n \nComments: \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \n \nComments: FirstEnergy does not consider a residency requirement to have the potential to \nmeaningfully change Board performance but is not opposed to having a residency preference. \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off period \nfor Board members from two years to one year? \nX \n \n \nComments: \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \n \nX \n \nComments: \n6) \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning? \n \nX \n \nComments: \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nX \n \n \nComments: \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \n \nX \n \nComments:"},{"page":13,"startToken":3177,"endToken":3371,"text":"13 \n \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX \n \n \nComments: FirstEnergy supports adding only 1 state representative to the Nominating \nCommittee. \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \nX \n \n \nComments: \nSection 205 Filing Rights \n \nQuestions/Comments \nYes \nNo \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only inform \nthe Board? \nX \n \n \nComments: \n12) \nShould PJM have section 205 filing rights over the energy market and ancillary \nservices unencumbered by the requirement to obtain approval of two-thirds of \nthe Members Committee? \nX \n \n \nComments: \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n \nComments: \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights over \nresource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \n \nX \n \nComments: \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority of \nstakeholders approves an alternative proposal? \n \nX \n \nComments:"},{"page":14,"startToken":3371,"endToken":3507,"text":"14 \n \nStakeholder Process \n \nQuestions/Comments \nYes \nNo \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \nX \n \nComments: \n17) \nShould the voting rules barring affiliate votes, which apply to senior standing \ncommittees, also apply to lower-level committees? \nX \n \n \nComments: \nState Participation \n \nQuestions/Comments \nYes \nNo \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \n \nX \n \nComments: \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes? \n \nX \n \nComments: \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \n \nX \n \nComments:"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":532,"startToken":0,"endToken":57},{"p":1,"at":532,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":111,"startToken":57,"endToken":278},{"p":2,"at":111,"title":"II. RESOURCE ADEQUACY AND INADEQUATE CAPACITY ARE THE","method":"printed heading","endPage":2,"endAt":188,"startToken":278,"endToken":288},{"p":2,"at":188,"title":"A. The Current Resource Adequacy Challenge in the PJM Footprint Is Not","method":"printed heading","endPage":3,"endAt":542,"startToken":288,"endToken":675},{"p":3,"at":542,"title":"B. PJM Governance Reform Will Not Solve the Missing Megawatt Problem.","method":"printed heading","endPage":4,"endAt":623,"startToken":675,"endToken":1014},{"p":4,"at":623,"title":"C. PJM’s Diverse Footprint is Distinct from Neighboring RTOs/ISOs and","method":"printed heading","endPage":5,"endAt":578,"startToken":1014,"endToken":1295},{"p":5,"at":578,"title":"III. THE COST OF ADDRESSING THE RESOURCE ADEQUACY","method":"printed heading","endPage":5,"endAt":681,"startToken":1295,"endToken":1310},{"p":5,"at":681,"title":"A. Existing Customers Are Bearing the Costs of the Growing Resource","method":"printed heading","endPage":6,"endAt":5,"startToken":1310,"endToken":1502},{"p":6,"at":5,"title":"B. New Large Load Customers Should Be Required to Bring the Generation","method":"printed heading","endPage":6,"endAt":1764,"startToken":1502,"endToken":1749},{"p":6,"at":1764,"title":"C. Generation Procured for Native Load Growth Should Flow Through a","method":"printed heading","endPage":7,"endAt":1161,"startToken":1749,"endToken":1951},{"p":7,"at":1161,"title":"D. FirstEnergy Supports Resource Adequacy Solutions that Assign Costs to","method":"printed heading","endPage":8,"endAt":194,"startToken":1951,"endToken":2096},{"p":8,"at":194,"title":"IV. GOVERNANCE REFORMS SHOULD BE LIMITED TO REFORMS","method":"printed heading","endPage":10,"endAt":350,"startToken":2096,"endToken":2715},{"p":10,"at":350,"title":"V. CONCLUSION","method":"printed heading","endPage":11,"endAt":8,"startToken":2715,"endToken":2867},{"p":11,"at":8,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":14,"endAt":995,"startToken":2867,"endToken":3507}]}