{"document":{"slug":"rec-20260821-5215","title":"Comments of American Municipal Power, Inc. re PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5215","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Municipal Power, Inc.","kind":"comments","file":"sources/filings/text/20260821-5215_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5215","tier":"record","sha256":"9f464a52a820ddada249f9507079e966452110f0d24d52582e8f985723275c5d","pages":15,"tokens":2797,"emptyPages":[],"textThemes":["adequacy","registry"]},"pages":[{"page":1,"startToken":0,"endToken":286,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \n) \nDocket No. ER26-3380-000 \nCOMMENTS OF \nAMERICAN MUNICIPAL POWER, INC. \nAmerican Municipal Power, Inc. (“AMP”) hereby provides its comments on the July \n31, 2026 filing by PJM Interconnection, L.L.C. (“PJM”) in the above-captioned docket,1 in \nwhich PJM proposed revisions to its Open Access Transmission Tariff (“Tariff”) and \nReliability Assurance Agreement Among Load Serving Entities (“RAA”) to establish a \nReliability Backstop Procurement (“RBP”) for the PJM region. \nThe RBP is “a one-time time procurement of new capacity to address resource \nadequacy challenges in the PJM Region.”2 The mechanism is designed to procure a \ntargeted quantity of capacity under fixed agreements with terms up to fifteen years \nbeginning with the 2028/2029 Delivery Year and ending with the 2042/2043 Delivery \nYear.3 PJM has set this Initial RBP Target at 6,831.3 MW,4 which may be decremented \nto account for certain new offsetting capacity (Qualifying RBP Offset UCAP MW), as well \nas for any qualifying Electric Distributor zone/areas that opt out of procuring capacity \nthrough the RBP. While the RBP will procure capacity on an RTO-wide basis, the capacity \ntarget (and associated costs) will be allocated to specific Electric Distributor zone/areas \n1\nPJM, Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large \nLoads, Docket No. ER26-3380-000 (July 31, 2026) (“PJM Filing”). \n2  PJM Filing, Transmittal Letter at 1. \n3\nId. at 8. \n4  This quantity (in megawatts (“MW”) of Unforced Capacity (“UCAP”)) is the amount that PJM’s Base \nResidual Auction for the 2028/2029 Delivery Year cleared short of PJM’s RTO-wide reliability \nrequirement at the price cap of $325/MW-day. Id. at 7."},{"page":2,"startToken":286,"endToken":546,"text":"2 \nin PJM, with a further allocation of costs to Load Serving Entities (“LSEs”) located in the \nzone/areas that receive an allocation. \nPJM has effectively confirmed that neither AMP, nor any AMP member, will be \nallocated any of the costs of procuring the Initial RBP Target (i.e., RBP Charges) under \nPJM’s proposal, as all AMP members appear to be within zone/areas that do not receive \nany allocation of the Initial RBP Target. AMP strongly supports PJM’s proposal in this \nrespect, as any allocation of RBP Charges to AMP or its members would be inconsistent \nwith cost causation principles and the Ratepayer Protection Pledge. Because the PJM \nFiling is potentially ambiguous regarding allocation of the Initial RBP Target among the \nzone/areas, however, AMP submits these comments to clarify and complete the record. \nAdditionally, PJM’s Filing demonstrates an administrative error with regard to the \nzone/area definition that PJM should address. \nI. \nCOMMENTS \nA. \nPJM appropriately allocates the Initial RBP Target to zone/areas with \nlarge load growth documented in forecast load adjustments. \nThe critical first step in assigning cost responsibility for RBP Charges is PJM’s \nallocation of the Initial RBP Target, which PJM appropriately proposes to assign “to each \nElectric Distributor’s zone/area using that zone/area’s pro-rata share of the difference \nbetween the forecasted Load Adjustments for the 2026/2027 Delivery Year and the \n2028/2029 Delivery Year.”5 In other words, the Initial RBP Target of 6,831.3 MW will be \n5  PJM Filing, Attach. A, proposed Tariff, Attachment DD, section 18.3(a)."},{"page":3,"startToken":546,"endToken":973,"text":"3 \nallocated to those Electric Distributor zone/areas that have provided to PJM projections \nof large load growth between 2026 and 2028.6\nAlthough there are several more steps in determining ultimate liability for RBP \nCharges, zone/areas that do not receive any allocation at this first step are effectively \nexcluded from responsibility for RBP Charges. As PJM explains, this allocation framework \nis consistent with cost causation principles and the Ratepayer Protection Pledge.7\nB. \nPJM should clarify the definition of “zone/area” is the one accepted by \nthe Commission in Docket No. ER26-2447. \nWhile AMP supports PJM’s proposal to allocate the Initial RBP Target to \nzone/areas with large load growth, there appears to be a ministerial issue with the \ndefinition of “zone/area” in the PJM Filing. Specifically, the filing includes a definition of \nzone/area that does not reflect revisions accepted by the Commission in Docket No. \nER24-2447.8 In that proceeding, PJM proposed to amend the RAA to add the new defined \nterm “Large Load Adjustment,” which, in turn, included a definition of zone/area.9 In \n6\nSee, e.g., id., Attach. C, Croop Aff. at ¶¶ 41-43; Transmittal Letter at 96-97 (“PJM is proposing to allocate \ndaily RBP Charges to relevant Electric Distributor zones/areas, pro rata, based on the zone/area’s \nassigned share of the total, region-wide Final RBP Target MW, floored at zero, and in accordance with \nRAA Schedule 8, as revised in 2024 to incorporate Load Adjustments in equations that ‘specify that load \nforecasts will be adjusted by zone/area and specifically include a variable for Load Adjustments[.]’”); see \nid. at 101. \n7\nSee id., Transmittal Letter at 100-108. \n8\nSee PJM Interconnection, L.L.C., 188 FERC ¶ 61,200 (2024), compliance filing accepted, Letter Order, \nDocket Nos. ER24-2447-002, -003 (May 1, 2025). \n9  PJM originally proposed the following definition for Large Load Adjustment: \n\"Large Load Adjustment\" shall mean any MW quantity of adjustments to summer peak load \nat the \"zone/area\" level and summed by Zone as further detailed in PJM Manuals. For \npurposes of this definition, a \"zone/area\" is an area within a Zone for which the relevant \nElectric Distributor specifies a separate Obligation Peak Load MW value. A zone/area is a \nservice area of an Electric Distributor that is a separately identifiable, geographic area \nbounded by wholesale metering (e.g., the service territory of an operating company of a \nTransmission Owner). \nPJM Interconnection, L.L.C., 188 FERC ¶ 61,200 at P 6 (quoting PJM, Intra-PJM Tariffs, RAA Article 1 \n-- Definitions (48.0.0))."},{"page":4,"startToken":973,"endToken":1376,"text":"4 \nresponse to concerns raised by AMP that PJM’s proposed definition of zone/area was \npotentially ambiguous, the Commission required PJM to revise the definition.10 The \nCommission also directed PJM to remove the word “Large” from the proposed term \n“Large Load Adjustment.”11 PJM made the required compliance filing,12 which the \nCommission accepted in an unreported letter order on May 1, 2025.13\nThe RAA definitions included in the PJM Filing do not reflect the revised zone/area \ndefinition accepted by the Commission; rather, the Filing reflects the definitions for “Large \nLoad Adjustment” and “zone/area” included in PJM’s original filing in Docket No. ER24-\n2447.14 Although the PJM Filing appears to utilize the currently effective eTariff version \nof the RAA definitions,15 the Commission has made clear that the FERC-accepted version \nof a tariff is the filed rate, even if not reflected in eTariff.16\n10 Id. at P 41. \n11 Id. at P 42. \n12 PJM’s compliance filing proposed the following revised definition of “Load Adjustment:” \n“Load Adjustment” shall mean any MW quantity of adjustments to summer peak load at \nthe “zone/area” level and summed by Zone as further detailed in PJM Manuals. For \npurposes of this definition, a “zone/area” is the service area within a Zone for which the \nrelevant Electric Distributor specifies a separate Obligation Peak Load (OPL) MW value \nthat is a separately identifiable, geographic area bounded by wholesale metering (e.g., the \nservice territory of an operating company of a Transmission Owner). \nPJM, Amendment to Compliance Filing to Clarify Terms Related to Capacity Obligations for Load \nAdjustments, Docket No. ER24-2447-003, at Attach. A (Dec. 23, 2024). \n13 PJM Interconnection, L.L.C., Letter Order, Docket Nos. ER24-2447-002, -003 (May 1, 2025). \n14 See PJM Filing, Attach. A, RAA Article 1 – Definitions. \n15 See RAA Article 1 – Definitions (55.0.0), \nhttps://etariff.ferc.gov/TariffSectionDetails.aspx?tid=1731&sid=373284. The version accepted by the \nCommission in Docket No. ER24-2447-003 (48.2.0) was accepted on May 1, 2025 to be effective \nAugust 21, 2024, but it was superseded effective March 24, 2025 by RAA revisions submitted in \nDocket No. ER25-1022-000. PJM Interconnection, L.L.C., Letter Order, Docket Nos. ER25-1022-00 \n(March 4, 2025). \n16 Lackawanna Energy Ctr. v. PJM Interconnection, L.L.C., 187 FERC ¶ 61,089, at P 54, order on \nreh’g,189 FERC ¶ 61,029, at P 28 (2024)."},{"page":5,"startToken":1376,"endToken":1761,"text":"5 \nThe revisions to the definition of zone/area accepted in Docket No. ER24-2447-\n003 were for clarification purposes, and do not appear to materially impact the substantive \nmeaning of the term.17 Given the importance of zone/areas in the RBP Charge allocation \nframework, however, PJM should specifically address the discrepancy between the \ndefinition of zone/area in the PJM Filing and the version accepted by the Commission in \nDocket No. ER24-2447-003. \nC. \nThe PJM Filing is potentially ambiguous regarding the Initial RBP \nTarget allocation. \nBecause the allocation of the Initial RBP Target determines the Electric Distributor \nzone/areas that will be responsible for RBP Charges, clarity is essential regarding which \nzone/areas are receiving such an allocation, and those that are not.18 Unfortunately, the \nPJM Filing and related communications leave some ambiguity on this important issue.  \nThe affidavit of Danielle Croop accompanying the PJM Filing states that: \nthe total region-wide Initial RBP Target is allocated to each \nElectric Distributor zone/area in accordance with Schedule 8 \nof the RAA, which was revised in 2024 to incorporate Load \nAdjustments \nby \nElectric \nDistributor \nzone/area. \nMore \nspecifically, the allocation of RBP UCAP MW to specific \nElectric Distributor zones/areas will be based on the \nforecasted load growth from the 2026/2027 Delivery Year to \nthe 2028/2029 Delivery Year and incorporate the Load \nAdjustments set forth in PJM Table B9b from the 2026 PJM \n17  The Commission was principally concerned that, as originally proposed by PJM, “the two-sentence \ndefinition of ‘zone/area’ within the definition of Large Load Adjustment is ambiguous because the two \nsentences could be read together or separately, and it is therefore unclear whether a zone/area must \nmeet both conditions.” PJM Interconnection, L.L.C., 188 FERC ¶ 61,200 at P 41. PJM addressed this \nconcern by making the definition a single sentence. See supra note 12.  \n18 Cf., Sw. Power Pool, Inc., 182 FERC ¶ 61,100, at P 34 (2023) (explaining that “Section 205 of the FPA \nand the Commission's regulations require that rates be ‘clearly and specifically’ stated. These \nrequirements ensure that the public has adequate notice of the proposed rate, and that the Commission \nhas an opportunity to evaluate the proposal to ensure that it is just and reasonable and not unduly \ndiscriminatory or preferential.” (citation modified))."},{"page":6,"startToken":1761,"endToken":1947,"text":"6 \nLoad Forecast to ultimately determine the initial allocated pro-\nrata share to each relevant Electric Distributor zone/area.19\nThe affidavit also includes the following table showing the allocation of the Initial \nRBP Target:20\nFurther, PJM provided an additional table as part of an August 10, 2026 stakeholder \npresentation regarding the RBP process, which appears to confirm the positive \nallocations to specific zone-areas and added information regarding certain zone/areas \nthat will receive a zero obligation:21\n19  PJM Filing, Attach. C, Croop Aff. at ¶ 43 (citing 2026 PJM Load Forecast Report Data Tables, PJM \nInterconnection, \nL.L.C., \nTab \nTable \nB9b \n(Feb. \n2026), \nhttps://www.pjm.com/-\n/media/DotCom/planning/res-adeq/load-forecast/2026-load-report-tables.xlsx [https://perma.cc/SST2-\nEGUZ]; 2026 PJM Load Forecast Report, PJM Interconnection, L.L.C., 5-6 (Jan. 14, 2026), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2026-load-report.pdf \n[https://perma.cc/J24E-7CV7] (describing Table B9b results)). \n20 Id. ¶ 46. \n21  PJM and Charles River Assoc., Reliability Backstop Procurement Execution, at 11 (Aug. 10, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260810/20260810-pjm-\nand-cra-reliability-backstop-procurement-presentation.pdf."},{"page":7,"startToken":1947,"endToken":2077,"text":"7 \nThese tables account for the entire Initial RBP Target of 6,831.3 MW to be \nallocated across fourteen zone/areas, and the latter table notes fifteen other zone/areas \nspecifically identified as receiving an allocation of zero. PJM has, however, pointed to its \nPJM Long-Term Load Forecast EDC/LSE Submission Template as containing the \ndefinitive list of zone/areas within PJM, and there are 160 listed.22 PJM’s specific \nidentification of the Initial RBP Target allocation of zero for some, but not all, zone/areas \nin the table above (aside from those receiving an Initial Share of RBP Charges) creates \n22 See PJM Large Load adjustment request template, Zone-Areas tab, https://www.pjm.com/-\n/media/DotCom/committees-groups/subcommittees/las/postings/large-load-adjustment-request-\ntemplate-2027-load-forecast.xlsx (attached hereto as Exhibit A)."},{"page":8,"startToken":2077,"endToken":2261,"text":"8 \npotential confusion as to the treatment of zone/areas that should have an allocation of \nzero but are not listed.  \nEach of AMP’s members in PJM23 operates an electric distribution system for \nwhich the relevant Electric Distributor specifies (or could specify) a separate Obligation \nPeak Load, and is located within a separately identifiable, geographic area bounded by \nwholesale metering (i.e., each should qualify as a potential zone/area). PJM has \nconfirmed that only the zone/areas identified as receiving an Initial Share of RBP Charges \nin the tables above will face RBP Charges, and that RBP Charges will not be shifted from \none zone/area to another. None of AMP’s members appear to be situated within \nzone/areas to which PJM is allocating any portion of the Initial RBP Target, and therefore \nnone should bear any RBP Charges. Given the potential ambiguity on this issue, \nhowever, these comments are intended to ensure the record is clear regarding the \ntreatment of AMP and its members for purposes of the Initial RBP Target allocation.  \n23  Including AMP member Delaware Municipal Electric Corporation’s individual members."},{"page":9,"startToken":2261,"endToken":2361,"text":"9 \nII. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, American Municipal Power, Inc. submits \nits comments in this proceeding and asks that the Commission consider them in acting \non the PJM Filing.  \nRespectfully submitted, \n/s/ John McCaffrey                  \nJohn McCaffrey \nStinson LLP  \n1775 Pennsylvania Avenue NW  \nSuite 800  \nWashington, DC 20006  \n(202) 728-3026  \njohn.mccaffrey@stinson.com \nDated: August 21, 2026\n/s/ Gerit F. Hull                    \nLisa G. McAlister                               \nSenior Vice President & General Counsel  \nGerit F. Hull                                   \nDeputy General Counsel for Regulatory Affairs\nAmerican Municipal Power, Inc.                 \n1111 Schrock Road, Suite 100  \nColumbus, OH 43229                   \n(614) 540-1111 \nlmcalister@amppartners.org \nghull@amppartners.org"},{"page":10,"startToken":2361,"endToken":2373,"text":"Exhibit A \nPJM Long-Term Load Forecast EDC/LSE Submission Template \nZone-Areas Tab"},{"page":11,"startToken":2373,"endToken":2493,"text":"Zone/Areas defined in Capacity Exchange. This list was culled the posted Daily Zonal Scaling Factor file\nZONENAME AREANAME\nAECO\nAECO\nAECO\nVINELAND\nAEP\nAEP_INDIANA\nAEP\nAEP_MICHIGAN\nAEP\nAEPOHIO\nAEP\nAMPO\nAEP\nANDERFRANK\nAEP\nAPCO\nAEP\nAUBURN\nAEP\nAVILLA\nAEP\nBEDFORD\nAEP\nBLUFFTON\nAEP\nBUCKEYE\nAEP\nCBEC\nAEP\nCOLUMBUS\nAEP\nCVEC\nAEP\nDANVILLE\nAEP\nDOWAGIAC\nAEP\nELK\nAEP\nGARRETT\nAEP\nGLOUSTER\nAEP\nHOOSIER\nAEP\nIM\nAEP\nIMP_FIRM_SALE\nAEP\nKPCO\nAEP\nMARTINSVILLE\nAEP\nMIDWEST\nAEP\nMISHAWAKA\nAEP\nNEWCARLISLE\nAEP\nNILES\nAEP\nNORTHEAST\nAEP\nODEC\nAEP\nOLIVE\nAEP\nOMEG\nAEP\nPAWPAW\nAEP\nRADFORD\nAEP\nRICHLANDS\nAEP\nROCKPORT\nAEP\nSALEM\nAEP\nSHELBY\nAEP\nSOUTHHAVEN\nAEP\nSTCLAIRSVILLE\nAEP\nSTURGIS\nAEP\nVANCE\nAEP\nVATECH\nAEP\nWABASH\nAEP\nWABASH_AEP\nAEP\nWABASHSDI"},{"page":12,"startToken":2493,"endToken":2596,"text":"AEP\nWAPAKONETA\nAEP\nWAPAKONETA2\nAEP\nWAPAKONETA3\nAEP\nWARREN\nAEP\nWESTERVILLE\nAEP\nWHEELING\nAEP\nWVP\nAPS\nAP_AECI\nAPS\nAP_ODEC\nAPS\nCHAMBERSBURG\nAPS\nFRONTROYAL\nAPS\nHAGERSTOWN\nAPS\nHREA\nAPS\nLETTERKENNY\nAPS\nMON_POWER\nAPS\nMONTALTO\nAPS\nNEWMARTINSVILLE\nAPS\nPE\nAPS\nPHILIPPI\nAPS\nTARENTUM\nAPS\nTHURMONT\nAPS\nWILLIAMSPORT\nAPS\nWPP\nATSI\nAMPO\nATSI\nBUCKEYE\nATSI\nBUCKFE\nATSI\nCPP\nATSI\nOHIO\nATSI\nPP\nBGE\nBGE\nCOMED\nBATAVIA\nCOMED\nCOMED\nCOMED\nGENEVA\nCOMED\nNAPERVILLE\nCOMED\nROCHELLE\nCOMED\nROCKFALLS\nCOMED\nSTCHARLES\nCOMED\nWINNETKA\nDAY\nAMPO\nDAY\nBUCKEYE\nDAY\nDAY\nDEOK\nBETHEL\nDEOK\nBLANCHESTER\nDEOK\nBUCKCIN\nDEOK\nDEK\nDEOK\nDEOK\nDEOK\nEKPC\nDEOK\nGEORGETOWN\nDEOK\nHAMERSVILLE\nDEOK\nHAMILTON"},{"page":13,"startToken":2596,"endToken":2706,"text":"DEOK\nLEBANON\nDEOK\nRIPLEY\nDEOK\nWILLIAMSTOWN\nDOM\nCVEC\nDOM\nDOM\nDOM\nNCEMC\nDOM\nNVEC\nDOM\nODEC\nDOM\nREC \nDOM\nSEPA\nDPL\nDOVER\nDPL\nDPL\nDPL\nDPL_BERLIN\nDPL\nDPL_DEMEC\nDPL\nDPL_EASTON\nDPL\nDPL_LEWES\nDPL\nDPL_ODEC\nDUQ\nDUQ\nDUQ\nPITCAIRN\nEKPC\nEKPC\nEKPC\nLONGBRANCH\nJCPL\nBUTLER\nJCPL\nJCPL\nJCPL\nJCPL_AECI\nJCPL\nLAVALETTE\nJCPL\nMADISON\nJCPL\nPEMBERTON\nJCPL\nSEASIDEHTS\nMETED\nGOLDSBORO\nMETED\nKUTZTOWN\nMETED\nLEWISBERRY\nMETED\nMETED\nMETED\nMETED_AECI\nMETED\nMIDDLETOWN\nMETED\nROYALTON\nOVEC\nOVEC\nPECO\nPECO\nPENELEC\nEASTCONEMAUGH\nPENELEC\nGIRARD\nPENELEC\nHOOVERSVILLE\nPENELEC\nPENELEC\nPENELEC\nPENELEC_AECI\nPENELEC\nPENELEC_BERLIN\nPENELEC\nSMETHPORT\nPENELEC\nSUMMERHILL\nPENELEC\nWELLSBORO\nPEPCO\nPEPCO\nPEPCO\nSMECO\nPPL\nCITIZENS_ELECTRIC\nPPL\nEPHRATA"},{"page":14,"startToken":2706,"endToken":2733,"text":"PPL\nOLYPHANT\nPPL\nPERKASIE\nPPL\nPPL\nPPL\nPPL_AECI\nPPL\nPPL_MUNIS\nPPL\nPPL_UTILITIES\nPPL\nUGI\nPSEG\nMILLTOWN\nPSEG\nPARKRIDGE\nPSEG\nPSEG\nPSEG\nSOUTHRIVER\nRECO\nRECO"},{"page":15,"startToken":2733,"endToken":2797,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in this proceeding. \nDated at Washington, D.C., this 21st day of August, 2026. \n/s/ John McCaffrey                      \nJohn McCaffrey \nStinson LLP  \n1775 Pennsylvania Avenue NW  \nSuite 800  \nWashington, DC 20006  \n(202) 728-3026  \njohn.mccaffrey@stinson.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":956,"startToken":0,"endToken":439},{"p":2,"at":956,"title":"I. COMMENTS","method":"printed heading","endPage":2,"endAt":970,"startToken":439,"endToken":441},{"p":2,"at":970,"title":"A. PJM appropriately allocates the Initial RBP Target to zone/areas with","method":"printed heading","endPage":3,"endAt":483,"startToken":441,"endToken":620},{"p":3,"at":483,"title":"B. PJM should clarify the definition of “zone/area” is the one accepted by","method":"printed heading","endPage":5,"endAt":460,"startToken":620,"endToken":1449},{"p":5,"at":460,"title":"C. The PJM Filing is potentially ambiguous regarding the Initial RBP","method":"printed heading","endPage":9,"endAt":3,"startToken":1449,"endToken":2262},{"p":9,"at":3,"title":"II. CONCLUSION","method":"printed heading","endPage":15,"endAt":0,"startToken":2262,"endToken":2733},{"p":15,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":435,"startToken":2733,"endToken":2797}]}