{"document":{"slug":"rec-20260821-5216","title":"Post-Conference Comments of Advanced Energy United re the technical discussion of Governance and Stakeholder Reforms in the PJM Interconnection region on…","issued":"2026-08-21","accession":"20260821-5216","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Advanced Energy United","kind":"comments","file":"sources/filings/text/20260821-5216_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5216","tier":"record","sha256":"754ef4f4cc29db5fa40ce4084d0f085c086c45bdc5b81d55f89622e189dbce1b","pages":14,"tokens":5100,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":259,"text":"1\n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n) \nPJM Governance and \n \n \n) \n \n \n Docket No. AD26-7-000 \nStakeholder Reforms \n  \n \n)  \n) \n \n \nPOST-CONFERENCE COMMENTS OF ADVANCED ENERGY UNITED \n \nAdvanced Energy United (“United”)1 appreciates the opportunity to provide post-\nconference comments following the Federal Energy Regulatory Commission’s (“FERC” or \n“Commission”) technical discussion of Governance and Stakeholder Reforms in the PJM \nInterconnection (“PJM”) region on July 23, 2026. The Commission should be commended for \nfacilitating a constructive and candid exchange of ideas and for setting a clear plan for the region \nto take swift and decisive action. \nThe comments below expand upon pre-conference comments submitted by United in this \ndocket, which outlined our perspective on the root causes of the challenges PJM faces and \noffered recommendations with respect to the role of states, the PJM Board, and PJM \nstakeholders.2 United’s primary objective in this proceeding is to ensure that PJM retains its role \n \n1 Advanced Energy United is a national association of businesses that are making the energy we use secure, clean \nand affordable. Advanced Energy United is the only industry association in the United States that represents the full \nrange of advanced energy technologies and services, both grid-scale and distributed. Advanced energy includes \nenergy efficiency, demand response, energy storage, wind, solar, hydro, nuclear, electric vehicles, and more. The \ncomments expressed in this filing represent the position of Advanced Energy United but may not represent the views \nof any particular member. \n2 Comments of Advanced Energy United re PJM Governance and Stakeholder Reforms, Docket No. AD26-7-000 \n(July 15, 2026). (“United Pre-Conference Comments”)"},{"page":2,"startToken":259,"endToken":517,"text":"2\nas the independent grid operator for the region it currently serves. Despite current challenges in \nthe PJM region, we remain confident that the RTO model is the best platform to foster \ninnovation and competition, and thus to deliver value added and reliable electricity. But we also \nrecognize that for PJM to play that role going forward, trust in PJM as an institution and in the \nmarkets it operates must be restored. Changes to governance and the stakeholder process are \ncritical to restoring this trust, but will not be sufficient; they must be paired with a renewed \ncommitment to transparent, fair, and functional markets that foster robust investment through \nenhanced market and regulatory certainty. Governance reforms can either serve to bolster this \ncommitment to markets or cast further doubt on its durability. We must ensure that reforms \npursued through this process achieve the former. \nUnited’s comments below seek to strike a balance between objectives that could be seen \nas competing:  \n• Ensuring that the PJM board and leadership are disciplined in setting priorities \nand completing reforms on schedule, but also more open to exploring new ideas \nand solutions;  \n• Maintaining the critical role of stakeholders in informing PJM’s actions without \nallowing incumbent stakeholder interests to stall beneficial reforms in favor of \nmaintaining the status quo; and \n• Strengthening opportunities for states to weigh in on priorities and outcomes at \nPJM that impact their citizens while avoiding chaotic or undue political \ninterference that would undermine market certainty. \nCarefully calibrated governance and stakeholder process changes can and must keep these \nobjectives in balance."},{"page":3,"startToken":517,"endToken":803,"text":"3\nSince United has already shared our general perspectives on PJM’s governance and \nstakeholder process in pre-conference comments, below we focus primarily on responding to the \npost-conference questions raised by the Commission in its July 30, 2026 Notice Requesting Post-\nConference Comment (“Notice”).3 \n \nI. \nCOMMENTS \nThe Commission’s Notice requests that respondents “indicate the PJM member sector to \nwhich your company or organization belongs.”4 As stated in pre-conference comments, \nAdvanced Energy United is a national trade association that represents a wide range of market \nparticipants in the PJM region and beyond. United itself is an “Associate” member of PJM, \nwhich means we pay a nominal annual fee and participate in PJM stakeholder meetings, but do \nnot cast votes or belong to a sector. Our member companies span multiple sectors of PJM \nmembership, primarily the Generation Owner and Other Supplier sectors. United’s membership \nalso includes companies that are not yet PJM market participants, but that aspire to be in the \nfuture, subject to either expansion of their business into the region or implementation of market \nreforms that remove barriers to participation.  \nA. PJM Board Independence \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \nComments: \nThere is a significant learning curve associated with service on the PJM Board, given the \ntechnical complexity of RTO operations, planning procedures, market design, and the interplay \nbetween reliability and market rules. New Board members generally require substantial time \nsimply to become well versed enough in the issues to be meaningfully engaged and to \nchallenge the decisions of RTO leadership.  Longer terms would allow Board members to \n \n3 Notice Requesting Post-Conference Comment, Docket No. AD26-7-000 (July 30, 2026). (“Notice”) \n4 Notice at 3."},{"page":4,"startToken":803,"endToken":1301,"text":"4\n \nQuestions/Comments \nYes No \ndeliver more value after advancing up this learning curve, therefore extending the period \nduring which the organization benefits from an experienced, well-informed Board. Terms that \nare too long, on the other hand, remove the opportunity to replace disengaged or ineffective \nboard members, and may serve as a deterrent to some prospective Board members not willing \nto make a longer upfront commitment to serve PJM. In light of the benefits and drawbacks of \nlonger terms, five years is a reasonable term length, whereas PJM’s proposed nine year Board \nterm is too long.5 If Board terms are extended, there must be consideration of how longer \nterms would interact with other proposed reforms—particularly term limits. \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nX \n \nComments: \nTerm limits can be a useful tool for ensuring turnover, guarding against directors becoming too \nclosely aligned with incumbent management or entrenched market participants, and creating \nopportunities to refresh the Board’s mix of skills and perspectives over time. Extending terms \nto five years and setting a two-term limit (i.e., 10 years total) would be a reasonable approach. \nAt the same time, a rigid cap could force out a Board member who has become particularly \neffective. If a term limit is imposed, PJM should consider a mechanism to override the limit to \nextend the term of a particularly effective Board member where there is a demonstrated case \nthat continuity of that member's service is in the best interest of PJM and its stakeholders. \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \n \nX \nComments: \nWhile there is valid underlying logic to the idea of a residency preference, the priority in \nidentifying Board candidates should be to find individuals with the right mix of qualifications, \nexpertise, and independence, and adding a residency preference risks undermining those goals. \nPJM’s existing conflict-of-interest and independence restrictions already narrow the eligible \ncandidate pool, and adding a residency requirement risks narrowing it further. Furthermore, a \nresidency requirement should not be necessary to ensure that Board members have the best \noutcomes for the PJM region as their top priority; Board members’ fiduciary and statutory \nobligations, not their address, should be the operative check on their decision-making. \nOutside perspective is a genuine asset to the Board, so if a residency preference is added, it \nshould apply to some seats rather than the Board as a whole to avoid robbing the Board of \nexpertise from other regions and even other countries with different market structures. We \nwould have no concern with a residency preference used only as a tie-breaker among similarly \nqualified finalists. \nSeparately, if PJM’s Board qualification criteria are going to be reopened, we would suggest \n \n5 PJM, FERC Mediation Term Sheet, https://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mc/2026/20260819/20260819-item-08---1-ferc-mediation-term-sheet.pdf (“PJM Term Sheet”), \nat 2."},{"page":5,"startToken":1301,"endToken":1731,"text":"5\n \nQuestions/Comments \nYes No \nadding a preference that at least one Board member have expertise in energy transition and \ngrid innovation, given the pace of technological change affecting the PJM footprint.6  \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \nX \n \nComments: \nHaving Board members who understand the industry in sufficient depth to meaningfully \nchallenge and engage with PJM leadership on substantive issues is critical to effective \ngovernance. The current two-year cooling-off period, while well-intentioned, meaningfully \nnarrows the pool of candidates with recent, hands-on industry experience. Relaxing the \nrestriction, even modestly, should help expand the pool of eligible, well-qualified candidates \nwithout unduly compromising Board independence. A one-year cooling-off period would be \nan appropriate middle ground to allow for eligible candidates that are not too closely aligned \nwith a member perspective.  \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \nX \n \nComments:  \nIt is preferable for Board members to have greater direct exposure to the commercial realities \nand practical implications of PJM’s rules, as well as visibility into new innovations, \ntechnologies, and ideas emerging among stakeholders. Expanded communication between the \nBoard and stakeholders, with guardrails to preserve Board independence and avoid improper \ninfluence, would promote exactly this kind of exposure and should result in a better-informed, \nmore engaged Board. United supports further discussion as to what guardrails must be put in \nplace. \n6) \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning?  \nX \n \nComments:  \nGreater transparency and a requirement to “show its work” will, at minimum, increase \nstakeholder and public confidence in the Board’s decision-making; the requirement to offer \nsuch public explanation may also sharpen the Board’s reasoning. For example, it has been \nextremely helpful to stakeholders to see the Board’s explanation and reasoning in connection \nwith Critical Issue Fast Path (CIFP) decisions. That practice has improved stakeholder \n \n6 PJM’s Operating Agreement at Section 7.2 currently states, “ Of the nine Board Members, four shall have \nexpertise and experience in the areas of corporate leadership at the senior management or board of directors level, or \nin the professional disciplines of finance or accounting, engineering, or utility laws and regulation, one shall have \nexpertise and experience in the operation or concerns of transmission dependent utilities, one shall have expertise \nand experience in the operation or planning of transmission systems, and one shall have expertise and experience in \nthe area of commercial markets and trading and associated risk management.”"},{"page":6,"startToken":1731,"endToken":2209,"text":"6\n \nQuestions/Comments \nYes No \nunderstanding of, and confidence in, the Board’s decision-making process. \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nX \n \nComments:   \nPublic Board meetings would be most beneficial if they are used as a forum between \nstakeholders and the Board, as they are in SPP, where Board meetings are used to review and \nvote on all revision requests. Those revision requests that are more controversial are generally \nallocated extra discussion time to allow stakeholders to share their arguments with the Board; \nbefore a final vote, Board members can choose to share how they will vote and explain their \nreasoning. Making some Board meetings open to the public is also a no regrets reform: it costs \nlittle, increases the visibility of the Board to stakeholders and the public, and is consistent with \na broader push toward greater transparency. \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \n \nX \nComments:  \nWhile PJM and its Board should act in accordance with the public interest, adding a public \ninterest responsibility into PJM’s governing documents is not a necessary revision, as PJM \nalready has a duty—which FERC has an independent obligation to enforce—to ensure that \nPJM’s rates are just and reasonable and not unduly discriminatory, and that PJM's operations \nmaintain reliability. Faithful execution of those duties is consistent with serving the public \ninterest. A freestanding “public interest” mandate is susceptible to being interpreted or invoked \nin ways that go beyond PJM’s and the Board’s existing statutory obligations, potentially \njustifying actions or interventions that undermine market certainty and confidence and that are \nultimately inconsistent with PJM’s role. If a public interest provision were to be adopted, its \nintent must be a clearly defined, and PJM should offer an explanation of why and how such a \nmandate is not covered under the existing obligations of PJM and FERC. \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX \n \nComments:  \nAllowing states to participate and vote in the Nominating Committee would appropriately \nreflect the important role states have in ensuring PJM’s success, and the impact that PJM’s \ndecisions have on outcomes at the state level. Giving states a seat on the Nominating \nCommittee would also increase confidence in the integrity of the Board selection process by \nexposing states to this closed process. However, states should be granted one, or at maximum \ntwo, voting member(s) on the Nominating Committee. Adding more than two state votes to the \neight seats on the Nominating Committee risks introducing a perception of undue political \ninfluence into the process. There is strong precedent for an RTO to include states in this way; \nISO-NE and MISO both include states as voting members but limit the number of votes"},{"page":7,"startToken":2209,"endToken":2627,"text":"7\n \nQuestions/Comments \nYes No \navailable to states.7 \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \n \nComments: \nThis proposal could be beneficial or could have unintended consequences, depending heavily \non which public performance metrics are adopted and how they are measured. For example, \ntying compensation to public performance metrics could inadvertently reinforce risk aversion, \nwhich is already generally well rewarded. Tying compensation to performance could also \npromote more short-term thinking among management, when many beneficial RTO initiatives \nrequire a long-term view that may not pay off within a single compensation cycle. Rather, \ncompensation could be tied to accomplishment of annual goals detailed in the RTO’s strategic \nplan, like what is done in MISO.8 Should this reform be adopted, it will be important to ensure \nthat any resulting metrics support a shift toward a culture that embraces innovation and new \ntools and technologies and promotes good outcomes in the long-term as well as the near-term.  \n \nB. Section 205 Filing Rights \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \n \nX \nComments:  \nIn United's experience, a purely advisory stakeholder process sidelines the legitimate concerns \nof market participants—ultimately resulting in a more contentious debate when a proposal \nreaches the Commission. Stakeholders bring valuable perspective on the commercial and \npractical realities of proposed changes that PJM management and the Board do not always \nhave direct visibility into. Listening to these concerns supports an investable and reliable \nmarket; proposals that are not workable in practice tend to generate downstream problems \nregardless of how sound they look on paper. Additionally, policies with stakeholder support \nare more durable, and less prone to legal challenges or significant changes from either \nstakeholders or leadership. While stakeholder perspectives can still be shared in an advisory \n \n7 ISO-NE's Joint Nominating Committee includes 1 out of roughly 14 seats representing the 6 New England States. \nMISO’s Nominating Committee is comprised of two representatives of the Advisory Committee, which includes \nState representatives; while there is no guaranteed seat for states, state representatives are eligible to be appointed to \nthe Nominating Committee as any other Advisory Committee member. See, Chrisopher Parent, Katherine Fisher, \nWilliam Cotton, and Cali Clark, Governance Structure and Practices in the FERC-Jurisdictional ISOs/RTOs, at 3-\n12, 4-10,  (Feb. 2021).  \n8 MISO, 2026 Short-Term Incentive Plan Proposed Metrics (Dec. 9, 2025). \nhttps://cdn.misoenergy.org/20251209%20Human%20Resources%20Committee%20of%20the%20BOD%20Item%2\n004b%202026%20Short-Term%20Incentive%20Plan730306.pdf"},{"page":8,"startToken":2627,"endToken":3050,"text":"8\n \nQuestions/Comments \nYes No \nprocess, it becomes much easier for the RTO to brush them aside. Relegating stakeholders to a \npurely advisory role would change the entire tenor of the stakeholder process and allow PJM \nmanagement and the Board to ignore stakeholder concerns whenever they choose, even when \nthey are broadly shared across the stakeholder body.  \nThat said, United is sympathetic to concerns that the incumbent-dominated stakeholder \nprocess can be biased toward maintaining the status quo. Resistance to change can result in \nstalling or blocking reforms that would enhance competition or facilitate new market entry, \nthereby undermining reliability and just and reasonable rates. Rather than preventing \nstakeholder logjams by making the process purely advisory, we would propose the following \ntargeted solutions to ensure progress is made while preserving a substantive stakeholder role: \n• \nChange the voting process to reduce the ability of a small set of market participants to \nblock beneficial proposals, and to prevent outright blocks of proposals at the lower \ncommittees before consideration by the full stakeholder body; \n• \nRe-examine and consider reforms of the sectors to ensure meaningful participation of non-\nincumbent interests—as NEPOOL did through the creation of its Alternative Resources \nsector, which gave dedicated representation to renewable generation, distributed \ngeneration, and load response interests that might otherwise have been underrepresented; \n• \nEliminate the complex “solutions matrix” to simplify and streamline the stakeholder \nfeedback process, and consider instead a simpler \"amendment\" process, as used in ISO-\nNE, to increase the likelihood of alignment among PJM members;  \n• \nIntroduce discipline into the agenda setting and schedule of stakeholder discussions via an \nannual work plan administered by PJM, and stronger PJM management of the stakeholder \nprocess; and \n• \nEnsure that stakeholders have \"jump ball\" filing rights in areas where they do not have \ndirect Section 205 filing rights, as discussed further below. \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \n \nX \nComments:  \nFor all the reasons above, United does not support “unencumbering” PJM of its obligation to \nwork with stakeholders. If PJM moves in this direction, any expansion of PJM's unilateral \nSection 205 filing rights over the energy market and ancillary services must be paired with \njump ball rights for stakeholders, to avoid effectively converting the stakeholder process into a \npurely advisory one in this area. \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \n \nX"},{"page":9,"startToken":3050,"endToken":3537,"text":"9\n \nQuestions/Comments \nYes No \nComments:   \nTransmission planning is a core role of the RTO, and it is critical that the planning process be \noriented toward outcomes that are efficient, cost-effective, competitive, and aligned with \nregional needs. Removing the input of the Members Committee and granting section 205 filing \nrights to PJM may appear consistent with those goals, but would instead grant outsize \ninfluence to transmission owners, who have a direct financial stake in the outcome of RTEP. \nBy virtue of the threat to withdraw from PJM, TOs wield enormous influence over PJM’s \ndecisions, independent of their voting share. Indeed, PJM’s own polling on proposed \ngovernance changes indicates that TOs are overwhelmingly supportive of transferring 205 \nrights over RTEP to PJM, while the end use customer sector is nearly unanimously opposed. \nThis breakdown indicates that TOs generally view this shift as favorable to their interests \nwhile consumers do not see it as a means to improve outcomes for the region.9 \nPJM has also not identified a specific issue or reliability need that was stalled by the Members \nCommittee in RTEP matters. In fact, PJM was the first region to submit Order No. 1920 \nregional compliance. Removing section 205 filing rights from the Members Committee would \ndo little to speed up the planning process, and would remove important stakeholder feedback \nthat will otherwise be expressed at FERC. \nRegardless of who has 205 rights over RTEP, United agrees with the Independent Market \nMonitor’s (“IMM”) argument that TO influence must be kept in check and supports the \nIMM’s call for a clearly defined process and set of requirements governing transmission owner \ndeparture from PJM.10 Without a defined process for leaving PJM, a TO’s departure could \ncreate such upheaval that it could “bring an end to PJM as it currently exists.”11 This looming \nthreat gives TOs an unparalleled influence over the decision making process, and places PJM \nin the delicate position of having to appease TOs while trying to maintain broad stakeholder \nsupport. A defined exit process would diminish this leverage, while also ensuring that PJM \nand its remaining members are not harmed in the event a transmission owner departs.  \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \n \n \nComments:  \nStates have a clear role and interest in both resource adequacy and transmission cost \nallocation. United does not take a position on granting OPSI jump ball rights over these issues \nat this time, and looks forward to reviewing the perspectives of states and other stakeholders \non this issue as part of this proceeding.    \n \n9 PJM, Governance and Stakeholder Process Poll Results, https://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mc/2026/20260819/20260819-item-10---1-governance-and-stakeholder-process-poll-results.pdf, \nat 18. \n10 Comments of the Independent Market Monitor for PJM, Docket No. AD26-7-000, at 3. \n11 Id. at 13."},{"page":10,"startToken":3537,"endToken":3837,"text":"10\n \nQuestions/Comments \nYes No \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \nX \n \nComments:  \nAs discussed above, stakeholders bring critical perspective on market rules and planning \nprocesses that should not be ignored. Granting the Members Committee “jump ball” rights is \none way to ensure that stakeholder perspectives are not just acknowledged, but meaningfully \ntaken into account. Stakeholder jump-ball rights in ISO-New England have been an effective \nmechanism to: (1) incentivize ISO-NE to work proactively with stakeholders to resolve their \nconcerns with its proposals before filing, and (2) encourage stakeholders to work together to \nbuild consensus around solutions to concerns rather than simply opposing proposals. Without \njump ball rights, the Commission is only presented one proposal that must meet the relatively \nlow bar of “just and reasonable.”  Allowing more parties to file will give the Commission the \nability to decide which proposal is more “just and reasonable.” Alternatively, the fact that \nstakeholders have jump ball rights does not necessarily result in a jump ball filing at FERC, \nbut rather ISO-NE’s adoption of stakeholder-supported amendments. United believes a similar \ndynamic would benefit PJM's stakeholder process. \nA “jump ball” mechanism would be beneficial in any portion of the tariff where PJM has 205 \nfiling rights, but will be particularly important if stakeholder filing rights are reduced \nelsewhere in connection with other reforms.12 If PJM's own unilateral filing rights expand, \njump ball rights for stakeholders should be correspondingly enhanced in their place, to \npreserve a meaningful stakeholder check on PJM’s proposals. \n \n \nC. Stakeholder Process \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \n \n \n12 See Questions 12 and 13."},{"page":11,"startToken":3837,"endToken":4154,"text":"11\n \nQuestions/Comments \nYes No \nComments:  \nWhile the two-thirds threshold sets a high bar to reach consensus that may block some \nbeneficial proposals, it also appropriately protects against advancement of reforms that raise \nlegitimate stakeholder concerns. Prior to lowering the threshold, PJM should take all possible \nsteps to address stakeholder gridlock through mechanisms that would create stronger pathways \nand incentives for stakeholder alignment, such as: \n• PJM taking greater control over the stakeholder timeline to force stakeholder \nalignment, e.g., by making clear that it will file under section 206 by a certain date if \nstakeholder agreement is not reached; \n• Introducing an annual work plan process to align upfront on what needs to be \naccomplished in a given year; \n• Improving and streamlining the “solutions matrix” process by adopting a simpler \n“amendment” process, as used in ISO-NE, to increase the likelihood of alignment \namong PJM members;  \n• Fixing the CIFP process that gives stakeholders no incentive to converge, since the \nBoard reviews every package regardless of support; to fix this issue, a preliminary vote \ncould be used to narrow the field to the top two or three stakeholder proposals before \nthe final CIFP vote, so fewer options means less-diluted votes and clearer alignment.  \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \n \n \nComments:  \nUnited does not have input on this question at this time. \n \nD. State Participation \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \n \nX \nComments:  \nUnited supports giving states a better-defined and stronger role at PJM,13 which may help \nrestore trust in market outcomes, and welcomes participation by governors’ representatives \nand state legislators’ representatives. However, United strongly recommends, to the extent \npossible, consolidating these perspectives under the umbrella of a single regional state entity. \n \n13 Pre-Conference Comments, at 6."},{"page":12,"startToken":4154,"endToken":4613,"text":"12\n \nQuestions/Comments \nYes No \nWe are encouraged by PJM’s initial proposal “to enhance OPSI to include in a bicameral \nstructure for both the state commissions and the executive branches of each state” and to \nsupport additional funding for the expanded OPSI.14 \nThe core benefit of a single regional state entity, rather than multiple, is the consolidation of \nstate input and the pooled resources and support necessary for states to have meaningful \nengagement. Creating two or more separate state entities risks introducing multiple, potentially \nconflicting state voices on the same issues, ultimately diluting rather than strengthening the \nimpact of state input. \nFurther, the notion that these two groups would naturally divide their focus—with governors’ \nrepresentatives weighing in on strategic, big-picture issues and utility commissioners focusing \non implementation details—will likely be difficult to sustain in practice. There is too much \ntopic overlap and interaction to create and sustain clearly defined lanes; and a single issue will \noften require both kinds of input at once.  \nState representation as a single entity, rather than multiple separate bodies, could encompass \nrepresentatives from governors' offices and/or state legislators, in addition to state \ncommissioners. NESCOE (the New England States Committee on Electricity) is a good model \nto follow in this regard, as it brings together utility commissioners and gubernatorial \nappointees to represent the interests of the six New England states in a single, well-resourced \norganization.15 Both governors'/legislators' offices and state utility commissions bring \nvaluable, and different, perspectives and the aim should be to capture both. OPSI should be \nbetter resourced, allowing for a permanent staff in a single organization to more efficiently \nequip the states to reach consensus and engage meaningfully with PJM's stakeholder process.16 \nPJM’s initial proposal is consistent with these observations. \nIn any scenario, individual states and bodies within states retain their right to lobby PJM \ndirectly and to file at the Commission directly under Section 206, regardless of how a \ncollective state entity or entities are structured. \nTo the extent the states themselves cannot align on forming a single entity, United respectfully \nrequests that, at a minimum, any resulting multiple state groups be closely coordinated, act \ntogether wherever relevant and possible, and have clearly defined and non-overlapping roles \nand responsibilities. \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?   \n \nX \nComments:  \nUnited is supportive of efforts to uplift the voices and perspectives of states, but did not hear \n \n14 PJM Term Sheet, at 3. \n15 New England States Committee on Electricity, About NESCOE- Regional States Committee (Last Accessed Aug. \n21, 2026). https://nescoe.com/about-nescoe/  \n16 United Pre-Conferenced Comments at 8."},{"page":13,"startToken":4613,"endToken":5022,"text":"13\n \nQuestions/Comments \nYes No \nany real interest in states having a formal stakeholder vote, including from the states \nthemselves.  \nGiving states a formal vote within the stakeholder process risks putting state perspectives \nthrough the same sector-based filter as all other stakeholder perspectives, which may dilute \nrather than amplify the impact of state voices. In cases where the states have been able to reach \ntheir own consensus position, this should not simply be factored in as a 1/5 or 1/6 vote. A state \nvote folded into the ordinary stakeholder process would carry no more weight than any other \nsingle sector's vote, notwithstanding the states’ unique regulatory role and interest in outcomes \nlike resource adequacy and cost allocation. \nA formal state vote in the stakeholder process also risks inserting politics directly into the \nstakeholder process in a way that is ultimately more likely to undermine investor confidence in \nthe markets rather than promote more durable market outcomes.  \nIf states express interest in having voting rights in the stakeholder process, one model to look \nat would be SPP’s Regional State Committee (“RSC”). The RSC has one designated \ncommissioner from each state regulatory commission having jurisdiction over an SPP \nmember; any issues that pertain to resource adequacy and transmission cost allocation \nultimately go to the RSC for a final vote. While commissioners get voting rights at the RSC, \nthey do not vote with members at the Market and Operations Policy Committee—equivalent to \nPJMs MRC/MC.17 \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \nX \n \nComments:  \nPJM's proactive consultation with OPSI should be increased across the board, and in particular \non issues related to resource adequacy and transmission cost allocation, where states have a \ndirect and well-established interest. As PJM develops its strategic planning process to produce \nan annual work plan, PJM should also be required to consult with OPSI on the priorities \nreflected in that work plan, so that state input is incorporated upstream—at the stage where \npriorities are being set—rather than only at the point of a specific filing. \n \n \nII. \nCONCLUSION \nAdvanced Energy United appreciates the opportunity to weigh in on next steps for the \nCommission, the PJM states, PJM stakeholders, and PJM itself to consider as the region pursues \n \n17 SPP Bylaws Section 7.2. \nhttps://www.spp.org/documents/13272/current%20bylaws%20and%20membership%20agreement%20tariff.pdf."},{"page":14,"startToken":5022,"endToken":5100,"text":"14\nimprovements to governance and the stakeholder process. We appreciate the Commission’s bias \ntoward action, and remain optimistic that governance reforms will contribute to a more \naffordable, reliable, fair, and competitive PJM. \n \n \n \n \n \n \nRespectfully submitted, \n/s/ Caitlin Marquis  \n \nCaitlin Marquis, Managing Director  \nJon Gordon, Senior Director \nMike Haugh, Director \nKelsey Koenig, Policy Associate \nAdvanced Energy United  \n1801 Pennsylvania Ave. N.W., Suite 410 \nWashington, D.C. 20006  \ncmarquis@advancedenergyunited.org  \njgordon@advancedenergyunited.org \nmhaugh@advancedenergyunited.org \nkkoenig@advancedenergyunited.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":310,"startToken":0,"endToken":561},{"p":3,"at":310,"title":"I. COMMENTS","method":"printed heading","endPage":3,"endAt":1199,"startToken":561,"endToken":698},{"p":3,"at":1199,"title":"A. PJM Board Independence","method":"printed heading","endPage":7,"endAt":1101,"startToken":698,"endToken":2371},{"p":7,"at":1101,"title":"B. Section 205 Filing Rights","method":"printed heading","endPage":10,"endAt":1854,"startToken":2371,"endToken":3809},{"p":10,"at":1854,"title":"C. Stakeholder Process","method":"printed heading","endPage":11,"endAt":1544,"startToken":3809,"endToken":4068},{"p":11,"at":1544,"title":"D. State Participation","method":"printed heading","endPage":13,"endAt":2285,"startToken":4068,"endToken":4972},{"p":13,"at":2285,"title":"II. CONCLUSION","method":"printed heading","endPage":14,"endAt":641,"startToken":4972,"endToken":5100}]}