{"document":{"slug":"rec-20260821-5219","title":"Post-Conference Comments of CTC Global Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5219","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"CTC Global Corporation","kind":"comments","file":"sources/filings/text/20260821-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5219","tier":"record","sha256":"aab9e671374869012b752421efe03fb5aade5c3a053d230be89a724eaecfbbf7","pages":7,"tokens":1784,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":347,"text":"1\nUNITED STATES OF AMERICA \nBefore The \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Governance and Stakeholder Reforms \n) \n) \n) \n \nDocket No. AD26-7-000 \n \n \nPOST-CONFERENCE COMMENTS OF CTC GLOBAL \n \nCTC Global Corporation (“CTC”)1 respectfully submits these comments in response to the \nFederal Energy Regulatory Commission’s (“Commission” or “FERC”) Notice Requesting Post-\nTechnical Conference Comments concerning PJM Interconnection, L.L.C.’s (“PJM”) governance \nand stakeholder processes. \nI. \nComments  \nCTC agrees that governance structure, Board independence, stakeholder participation, \ntransparency, and clearly allocated decision-making authority are important. But governance \nreform should ultimately be judged by results: whether PJM is better able to identify urgent system \nneeds, evaluate available solutions, make decisions, and implement those decisions on timelines \nresponsive to the reliability and affordability challenges facing the region. \nOne of the clearest tests of effective governance is PJM’s ability to respond to the rapidly \nincreasing need for transmission capability. PJM faces extraordinary electricity demand growth \n \n1 CTC Global Corporation (“CTC”) is a U.S.-based manufacturer and technology company headquartered in Irvine, \nCalifornia, and the inventor and global leader in advanced transmission conductors. CTC manufactures the carbon \ncomposite core used in ACCC® Conductors, which have been deployed by utilities around the world in 70 countries \nto increase transmission capacity, reduce electrical losses, mitigate conductor sag, and make greater use of existing \ntransmission rights-of-way and structures. With 140,000 miles deployed over the last two decades, CTC’s \ntechnologies are designed to help utilities add meaningful grid capacity on timelines substantially shorter than those \ntypically required for new transmission development, while providing significant cost saving benefits like shorter \ntower height and longer spans on new greenfield projects and line rebuilds. CTC is also advancing real-time \ntransmission-system monitoring through GridVista®, which incorporates live, always-on, fiber-optic sensing within \nthe conductor system to provide operators with detailed information regarding line temperature, mechanical \nconditions, and other operating characteristics and conditions such as ice or wind load, line contacts, damage, or \nnear line events like lightning strikes or wildfires. Through these technologies, CTC works at the intersection of \ntransmission planning, grid modernization, and the rapid deployment of additional electric system capacity."},{"page":2,"startToken":347,"endToken":630,"text":"2\nwhile new generation, large loads, and existing customers increasingly depend on a transmission \nsystem that takes too long to expand. PJM itself has projected approximately 30 GW of load \ngrowth between 2025 and 2030 and substantial additional growth thereafter, adding 70 GW over \n15 years.2 Governance reforms that increase the speed and quality of PJM decision-making can \ntherefore make an important contribution to reliability and affordability if they enable PJM to gain \nmore capability from the transmission system sooner. \nA. Governance Reform Should Be Evaluated by Whether It Enables PJM to Address \nUrgent Reliability, Affordability, and Transmission Needs \nMany of the challenges currently confronting PJM—resource adequacy, generation \ninterconnection, large-load integration, affordability, and reliability—are closely linked to the \navailability of sufficient transmission capability. New generation cannot reliably serve customers \nif the transmission system cannot accommodate and deliver its output. Likewise, even well-\ndesigned energy and capacity markets cannot function, much less produce their full benefits, if \ninadequate transmission prevents resources from responding to market signals. Although PJM and \nthe PJM Board have taken steps to increase generation, neither has taken significant steps to either \naccelerate transmission development or hasten transmission capacity increases by upgrading \nexisting infrastructure in existing rights-of-ways.  \nWhile PJM needs to significantly increase the region’s transmission development, not \nevery transmission need requires a new transmission corridor. A central part of meeting PJM’s \nnear-term challenge should be to establish timely mechanisms to evaluate the full range of \ntechnically mature solutions that can maximize the capability of infrastructure already in service \nand of existing transmission rights-of-way. Mature, widely deployed advanced transmission \n \n2  PJM Inside Lines: 2025 Year in Review: Planning Prepares for Burgeoning Electricity Demand \nhttps://insidelines.pjm.com/2025-year-in-review-planning-prepares-for-burgeoning-electricity-demand/"},{"page":3,"startToken":630,"endToken":921,"text":"3\ntechnologies can increase capacity much faster than conventional greenfield development, as well \nas reduce the costs of new greenfield transmission while also increasing efficiency by reducing \nline losses.   \nAdvanced reconductoring is an important example. Carbon composite core advanced \nconductors can substantially increase the capacity of existing transmission corridors while \nreducing electrical resistance and conductor sag. In many applications, reconductoring can use \nexisting structures and existing rights-of-way to double the amount of electricity that can move on \nthe line while reducing system losses by up-to 40%.  Reconductoring, which can be done with live \nlines, can be implemented on timelines materially shorter than construction of new greenfield \ntransmission. These attributes are particularly important where the system is in critical need of \nsignificant additional capability within the next few years rather than the next decade.  These same \nattributes enabled by the carbon core of advanced conductors, allow for shorter towers and longer \nspans (fewer towers) on both line rebuilds and new transmission lines, reducing siting risk and \nproject costs while improving the performance capabilities of the line.   \nThe governance question for the Commission is therefore not whether PJM should select \nany particular technology. It is whether PJM’s governing structures and stakeholder processes \npermit the organization to identify urgent needs, evaluate the full range of technically mature \nsolutions, and reach timely decisions based upon capacity, reliability, cost and deployment \ntime. With these measures, PJM will be able to move resolutely past its current resource adequacy \nand governance crisis.  \nB. PJM Should Establish Time-Bound Processes for Critical System Needs and Ensure \nMature Transmission Technologies Receive Timely, Technically Sound Evaluation \nThe Commission specifically asked whether PJM should make greater use of fast-path or \ntime-bound procedures for matters of high importance. CTC believes it should. For designated"},{"page":4,"startToken":921,"endToken":1184,"text":"4\ncritical reliability, transmission-capacity, or load-growth issues, PJM should establish a process \ncontaining, at a minimum: \n1. Clearly defined system need and planning criteria that recognize that the speed at which \nnew transmission capacity can come online is a critical component for both reliability and \nconsumer costs; \n2. A defined, reasonably expedited timetable for technical analysis and stakeholder input; \n3. Technology-inclusive, performance-based evaluation of mature alternatives that is not \nskewed towards legacy technologies; \n4. Transparent assumptions and changes to modeling sufficient to permit meaningful \ncomparison of alternatives; \n5. Fixed and transparent decision date identified early in the process and adhered to; and \n6. Clearly identified decision authority if the stakeholder process does not produce \nconsensus within the prescribed period. \nThe objective should not be to circumvent stakeholder participation. It should be to prevent \nstakeholder process from becoming an indefinite substitute for decision-making.  \nFor transmission needs in particular, PJM’s analysis should be capable of comparing \nalternatives based not simply on initial capital cost, but on the amount of capacity delivered, time \nto deployment, lifecycle cost, electrical losses, reliability performance, constructability, use \nof existing structures and rights-of-way, and siting requirements.  Governance procedures \nshould also ensure that PJM has access to the models and technical information necessary to \naccurately represent mature transmission technologies like carbon composite core advanced \nconductors. \nThis is especially important for technologies that can materially increase the capability of \nexisting infrastructure.  PJM should have governance and planning processes that allow advanced \nconductors to be evaluated quickly and on comparable technical and economic terms when they \nmay provide a faster or less costly solution."},{"page":5,"startToken":1184,"endToken":1472,"text":"5\nThe Commission’s agenda specifically identified fast-path and time-bound review \nprocedures for critical issues as a potential governance reform. Such a process would directly \nadvance the objectives identified by the Commission in this proceeding: improving PJM’s \nresponsiveness, transparency and ability to take necessary action in a timely manner.  \nOther stakeholders raised, in their pre-technical conference comments, the need for greater \noversight of PJM’s transmission planning. Some asked that PJM consider an Independent \nTransmission Monitor.3 Others asked that PJM implement tariff reforms that would require the \nimmediate evaluation of alternative transmission technologies to maximize existing transmission \nsystem capacity.4 CTC broadly supports emphasizing the critical role of new technologies, \nincluding advanced conductors, in PJM governance, including the stakeholder process and before \nthe PJM Board.  The actions necessary to rapidly increase PJM’s transmission capacity to meet its \nburgeoning need will not occur without greater inclusion of advanced transmission technologies \nin the solution.  \nC.  The PJM Board's Collective Qualifications Should Include Transmission Planning, \nGrid Operations, and Technology Deployment Expertise \nCTC also believes that PJM’s Board qualification criteria should reflect the extraordinary \noperational and infrastructure challenges now facing the region.  This does not require every Board \nmember to possess the same technical background, nor should it diminish the importance of Board \nindependence. Rather, the Board should possess a mix of competencies sufficient to oversee one \nof the largest and most complex electric systems in the world. \n \n3 Commissioner Led Technical Conference on PJM Governance and Stakeholder Reform, Comments of \nthe PJM Cities and Communities Coalition at 16, Docket No. AD26-7-000 (filed July 22, 2026).  \n4 Commissioner Led Technical Conference on PJM Governance and Stakeholder Reform, Comments of \nthe PJM Legislators’ Collaborative at 31, 41 Docket No. AD26-7-000 (filed July 23, 2026)."},{"page":6,"startToken":1472,"endToken":1727,"text":"6\nThat competency matrix should expressly include meaningful experience in areas such as \nbulk-power-system operations, regional transmission planning, transmission development, utility \nregulation, and deployment of commercially mature grid technologies. These skills are particularly \nimportant in an environment where decisions involving transmission capability, resource \nadequacy, large-load growth, and technology deployment can have multibillion-dollar \nconsequences for customers. \nThe Board should also receive regular, transparent reporting on PJM’s performance in \naddressing critical system needs. Relevant metrics could include the time between identification \nof a system need and a planning decision; the alternatives evaluated; anticipated capacity provided; \nprojected cost; expected in-service date; and progress toward implementation. \nThis would connect governance reform to measurable outcomes rather than treating \ngovernance structure as an end. \nII. \nConclusion \nCTC supports reforms that make PJM more independent, responsive, transparent and \ncapable of timely action. The ultimate measure of those reforms should be whether they improve \nPJM’s ability to solve the operational and market challenges confronting the region. \nPJM faces a period in which electricity demand and transmission needs are growing much \nfaster than traditional infrastructure-development timelines can comfortably accommodate. \nGovernance reform should therefore empower PJM to identify urgent needs, evaluate the full range \nof mature solutions, make timely decisions, and hold itself accountable for implementation. \nFor transmission, that means not only planning new infrastructure where it is required but \nalso maximizing the capability of the infrastructure already in place. Mature, advanced \ntransmission technologies—including advanced conductors capable of substantially increasing \ncapacity within existing transmission corridors—can be an important part of that effort. A"},{"page":7,"startToken":1727,"endToken":1784,"text":"7\ngovernance structure capable of identifying, evaluating and acting on those opportunities \npromptly will better serve reliability, affordability and the customers that depend upon the \nPJM system. \nRespectfully submitted,  \n/s/ Theodore J. Paradise \nTheodore J. Paradise \nChief Policy and Grid Strategy Officer \n \nPaige Rodrigues \nSenior Manager, Policy and Grid Strategy \nprodrigues@ctcglobal.com \n \nDated: August 21, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":497,"startToken":0,"endToken":62},{"p":1,"at":497,"title":"I. Comments","method":"printed heading","endPage":2,"endAt":535,"startToken":62,"endToken":428},{"p":2,"at":535,"title":"A. Governance Reform Should Be Evaluated by Whether It Enables PJM to Address","method":"printed heading","endPage":3,"endAt":1745,"startToken":428,"endToken":875},{"p":3,"at":1745,"title":"B. PJM Should Establish Time-Bound Processes for Critical System Needs and Ensure","method":"printed heading","endPage":5,"endAt":1128,"startToken":875,"endToken":1335},{"p":5,"at":1128,"title":"C. The PJM Board's Collective Qualifications Should Include Transmission Planning,","method":"printed heading","endPage":6,"endAt":970,"startToken":1335,"endToken":1590},{"p":6,"at":970,"title":"II. Conclusion","method":"printed heading","endPage":7,"endAt":425,"startToken":1590,"endToken":1784}]}