{"document":{"slug":"rec-20260821-5229","title":"Motion to Intervene and Request for Clarification of Talen Energy Corporation re the Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5229","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Talen Energy Corporation","kind":"rehearing request","file":"sources/filings/text/20260821-5229_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5229","tier":"record","sha256":"1c887c5e39a2fde458d7c910201bf16073ece89c1ba9f2d34e572ee9830c89df","pages":8,"tokens":2194,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":265,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \n) \nDocket No. ER26-3380-000 \n \nMOTION TO INTERVENE AND REQUEST FOR CLARIFICATION OF \nTALEN ENERGY CORPORATION \n \nTalen Energy Corporation (“Talen”) hereby submits this motion to intervene and \nrespectfully requests the Commission clarify one provision of the Reliability Backstop \nProcurement (“RBP”) filing submitted by PJM Interconnection, L.L.C. (“PJM”).  PJM states in its \ntransmittal letter that the RBP filing is “not intended to disrupt existing commercial agreements,”1 \nwhich is consistent with the directive from the Federal Energy Regulatory Commission (“FERC” \nor “Commission”).  Yet, PJM’s proposal will unequivocally diminish the economic benefit secured \nby new load under previously negotiated contracts for the purchase and sale of capacity from \nexisting generation resources.  Accordingly, the Commission should clarify the proposed Tariff \nrevisions at Attachment DD, section 18.3(a) to include a reduction to the Electric Distributor’s \nzone/area’s pro-rata allocation of the Initial RBP Target MW equal to the contracted amount of \nlarge load that has executed a power purchase agreement (“PPA”) or similar supply contract with \nan existing generation resource prior to the January 16, 2026 Statement of Principles.2 \n     \n \n1  \nReliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads at 3, \nDocket No. EC26-3380-000 (filed July 31, 2026) (“PJM RBP Filing”). \n2  \nStatement of Principles Regarding PJM, NATL. ENERGY DOMINANCE COUNCIL (issued Jan. 16, 2026), available \nat https://www.energy.gov/documents/statement-principles-regarding-pjm.  Talen submits its Request for \nClarification pursuant to Rule 212 of the Commission’s Rules of Practice and Procedure.  18 C.F.R. § 385.212 \n(2026)."},{"page":2,"startToken":265,"endToken":570,"text":"2 \n \nI. \nMOTION TO INTERVENE \nPursuant to Rule 214 of the Commission’s Rules of Practice and Procedure,3 Talen \nrespectfully submits this motion to intervene in the above-captioned proceeding.  The formal legal \nname of Talen is Talen Energy Corporation.  Talen is a corporation organized and existing under \nthe laws of Delaware.  Talen maintains its principal place of business at 2929 Allen Parkway, 22nd \nFloor, Houston, Texas 77019. Talen is a leading independent power producer and energy \ninfrastructure company which owns and operates approximately 15.7 gigawatts of power \ninfrastructure in the United States.  Talen produces and sells electricity, capacity, and ancillary \nservices into wholesale U.S. power markets, including and primarily in PJM.  A subsidiary of \nTalen has entered into a bilateral contract for the sale of electric power from an existing generation \nresource to new load that will come online during the Delivery Years set forth in the PJM RBP \nFiling.  Accordingly, the actions taken by the Commission in this matter will directly affect the \ninterests of Talen.  Talen has a direct and material interest in the instant proceeding that no other \nparty can adequately represent.  Talen therefore requests that the Commission grant this motion to \nintervene and permit Talen to participate in this proceeding with full rights as a party thereto. \nII. \nREQUEST FOR CLARIFICATION    \nA. \nThe proposed Tariff revisions do not protect existing commercial agreements \nfrom disruption.  \nThe protection of existing private contracts is fundamental to the operations of state and \nfederal government, including FERC.4  The Commission has previously acknowledged that \n“uncertainties regarding rate stability and contract sanctity can have a chilling effect on \n \n3  \n18 C.F.R. § 385.214 (2026).  \n4  \nSee, e.g., U.S. Const, Art. I, § 10, clause 1 (setting forth that “[n]o State shall . . . pass any . . . [l]aw impairing the \n[o]bligation of contracts”)."},{"page":3,"startToken":570,"endToken":957,"text":"3 \n \ninvestments and a seller’s willingness to enter into long-term contracts and this, in turn, can harm \ncustomers in the long run.”5  The Commission has also recognized that electric industry innovation \ndoes not justify injecting uncertainty and upheaval into existing contracts.6   \nThe past few years have presented historic opportunities and novel challenges.  Although \nall market participants could have benefitted from regulatory certainty during this period, it was \nnot an option to wait idly for PJM and the Commission to enact generalized market reform that \nwould adequately address the evolving market dynamics and increasing load demand.7  Large load \ndevelopers were faced with three options:  bring their own power, rely on the market, or fix power \ncosts through a bilateral PPA.  Speed to power is paramount for new large load customers.  \nAccordingly, certain developers chose to fix their costs—or so they thought—by means of a \nbilateral PPA.  These contracts were executed at a time when the RBP was not known to be on the \nhorizon.  The PJM RBP Filing, without clarification, treats developers that chose Option No. 3 \n(bilateral PPAs) the same as developers that chose Option No. 2 (rely on the market).  Such an \noutcome upsets the reasonable, investment-backed expectations that FERC has historically sought \nto protect.   \nThe importance of reliance interests and the risk of chilling investment due to regulatory \ninstability are not lost on this Commission.  That is why Chairman Laura Swett recently explained \n \n5  \nMarket–Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities, \nOrder No. 697, 72 Fed. Reg. 39,904, 119 FERC ¶ 61,295, at P 6 (2007). \n6  \nPromoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public \nUtilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888 at p. 84, 61 \nFed. Reg. 21,540 (May 10, 1996) (“Order No. 888”) (holding that that “changes in the industry have been and \ncontinue to be dramatic,” but FERC “does not believe they compel generic abrogation of requirements and \ntransmission contracts”).  \n7  \nDelay could also be seen as a national security risk. See generally PJM Interconnection, L.L.C., 189 FERC ¶ \n61,078 (2024) (Chairman Phillips dissent at P 3) (explaining that “maintaining U.S. leadership in Artificial \nIntelligence (AI) is necessary to maintaining our national security”)."},{"page":4,"startToken":957,"endToken":1324,"text":"4 \n \nthat the Commission’s actions with respect to large load reforms and procedures “are not intended \nto disrupt existing commercial agreements.”8  PJM appeared to take note because PJM stated in \nits filing that its proposal “avoids disrupting existing commercial arrangements.”9  However, the \nPJM RBP Filing does not adequately implement this principle and requires further clarification.    \nUnder proposed Attachment DD, section 18.3(a), each Electric Distributor zone/area’s \nallocation of the Initial RBP Target may be reduced by the quantity of “Qualifying RBP Offset \nUCAP MW” or by an opt-out provision.10  This does not account for new load that has entered \ninto a bilateral PPA with an existing generation resource.  As a result, each Electric Distributor \nzone/area will continue to be allocated an inflated share of the Initial RBP Target.  Such new load \nwill be subject to RBP Charges, assuming states follow the Commission’s directive to implement \nRBP cost allocation mechanisms.11  Therefore, this “new load” must pay incremental capacity \ncharges resulting from the RBP, thereby minimizing the economic benefit the load freely \nnegotiated under its fixed-cost, bilateral PPA (essentially, paying twice for capacity).   \n \n8  \nStatement of FERC Chairman Laura Swett, FERC Open Meeting (June 18, 2026) at 10:42, https://ferc.gov/news-\nevents/events/june-18-2026-open-meeting-10082025.  \n9  \nProposed Tariff, Attachment DD, section 18.3(a).  Qualifying RBP Offset UCAP MW means unforced capacity \nthat has not received a reliability pricing model commitment or been committed in a Fixed Resource Requirement \nPlan as of the commencement date of the RBP, is supplied by new build or incremental generation that will \nperform based on PJM dispatch instructions by no later than June 1, 2032, and is evidenced by signed bilateral \ncontracts, signed commitment letters, or self-supply that is in a relevant electric retail regulatory authority-\napproved or accepted integrated resource plan.  See PJM RBP Filing at 35 (citing Proposed Tariff, Attachment \nDD, section 18.2(c)). \n10  Id. at 35 (citing Proposed Tariff, Attachment DD, section 18.2(c)).  \n11  Id. at 96-97 (“PJM is proposing to allocate daily RBP Charges to relevant Electric Distributor zones/areas, pro \nrata, based on the zone/area’s assigned share of the total, region-wide Final RBP Target MW . . . .”)."},{"page":5,"startToken":1324,"endToken":1612,"text":"5 \n \nB. \nThe Commission should clarify Attachment DD, section 18.3(a) to further \nreduce each Electric Distributor zone/area’s allocation of the Initial RBP \nTarget. \nPJM has expressly consented “to the Commission’s exercise of authority to modify and/or \nsever the proposed Tariff and RAA language, as needed and permitted under the FPA and NRG \nPower Marketing, where such modification is consistent with PJM’s overarching objectives in this \nfiling.”12  If the Commission exercises its authority to modify the PJM RBP Filing, then PJM \nrequested that “the Commission expressly prescribe the revised rate or rule in its order.”13  The \nCommission should do so here.  Specifically, Talen requests that the Commission require the \nfollowing underlined language to Attachment DD, section 18.3(a) in its approval of the PJM RBP \nFiling: \n(a) \nCost Allocation to Electric Distribution zone/area \nThe Office of the Interconnection shall allocate the Initial RBP \nTarget MW to each Electric Distributor’s zone/area pro-rata share of \nthe difference between the forecasted Load Adjustments for the \n2026/2027 Delivery Year and the 2028/2029 Delivery Year.  \nThe difference between the forecasted Load Adjustments for the \n2026/2027 and the 2028/2029 Delivery Years shall be reduced for \nthe purpose of this calculation to the extent: \n(i) \nan Electric Distributor, LSE, Transmission Owner, \nor other entity provides the Office of Interconnection \nwith evidence of Qualifying RBP Offset UCAP MW, \nin accordance with Tariff, Attachment DD, section \n18.2 and as may be further set forth in the PJM \nManuals; or  \n(ii) \nan Electric Distributor zonee[sic]/area meets one of \nthe opt-out provisions set forth in accordance with \nTariff, Attachment DD, section 18.1(d); and \n \n12  Id. at 131 (internal citations omitted). \n13  Id."},{"page":6,"startToken":1612,"endToken":1952,"text":"6 \n \n(iii) \nan Electric Distributor, LSE, Transmission Owner, \nor other entity provides the Office of Interconnection \nwith evidence of a bilateral contract executed prior \nto January 16, 2026, for the sale of capacity from an \nexisting Generation Capacity Resource to and \npurchased by load under a power purchase \nagreement or similar power supply contract \nindicating that the load will be coming online in the \n2027/2028 or 2028/2029 Delivery Year, for a term of \nat least five Delivery Years with a commercial \noperation date prior to the start of the 2032/2033 \nDelivery Year; provided that, such reduction shall be \nequal to the total quantity of capacity to be sold and \npurchased under such bilateral contract during the \n2027/2028 and 2028/2029 Delivery Years.   \nThe resulting reduced MW, floored at zero, is used to calculate the \nzone/area’s assigned pro-rata share of the Final RBP Target MW.  \nThe zone/area’s assigned share of the Final RBP Target MW shall \nremain constant throughout the fixed 15-year term.  \nThe Office of the Interconnection shall allocate the total RBP \nCharges, assessed daily, to an Electric Distributor’s zone/area on a \npro-rata basis using the zone/area’s assigned share of the total Final \nRBP Target MW across all zones/areas. \nThe proposed language would effectively treat capacity procured through previously \nexecuted bilateral contracts with existing generation resources the same as Qualifying RBP Offset \nUCAP MW for purposes of reducing an Electric Distributor zone/area’s allocation of the Initial \nRBP Target and, as a result, allocation of RBP Charges.  \nThis clarifying language does not reduce the Initial RBP Target such that capacity contracts \nwith existing generation resources would be treated as Qualifying RBP Offset UCAP MW.14  This \nmeans that PJM will continue to procure the amount of capacity it has deemed necessary under the \nInitial RBP Target; however, the allocation of RBP Charges would be fairly distributed such that \nnew load that has previously contracted for capacity with existing generators under qualifying \n \n14  See Proposed Tariff, Attachment DD, section 18.2(b)."},{"page":7,"startToken":1952,"endToken":2127,"text":"7 \n \nbilateral contracts would not have their previous negotiated economic bargains upset by the PJM \nRBP Filing.  This outcome is consistent with the directive from Chairman Swett to not “disrupt \nexisting commercial arrangements.”15 It is also consistent with PJM’s characterization of the PJM \nRBP Filing as revisions that “avoid[] disrupting existing commercial arrangements.”16 \nIII. \nCONCLUSION  \nFor the reasons discussed herein, Talen respectfully requests that the Commission clarify \nproposed Attachment DD, section 18.3(a), as discussed above, to bring the language in alignment \nwith PJM’s characterization of the PJM RBP Filing and directive from Chairman Swett.  \n \n \n \n \n \n \n \n       Respectfully Submitted, \n \n /s/ Jennifer Mansh \n \n \nJennifer Mansh \nSenior Vice President, Regulatory \nCounsel \nTalen Energy Corp. \n600 Hamilton Street, Suite 600 \nAllentown, PA 18101 \nJennifer.Mansh@talenenergy.com \n \n /s/ John Decker \n \nJohn Decker \nAndrew DeVore \nKirkland & Ellis LLP \n1301 Pennsylvania Avenue, N.W. \nWashington, D.C. 20004 \n(202) 389-3470 \n(202) 389-3117 \nJohn.decker@kirkland.com  \nandrew.devore@kirkland.com \n \n \n \n \n \nCounsel for Talen Energy Corporation \n \n \nDated: August 21, 2026 \n \n15  Supra at n.12. \n16  Supra at n.13."},{"page":8,"startToken":2127,"endToken":2194,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day caused to be served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in this docket. \nDated at Washington, D.C. this 21st day of August, 2026. \n \n \n \n \n \n \n  \n   /s/ Andrew DeVore  \n \n \n \n \n \n \n \nAndrew DeVore \nKirkland & Ellis LLP \n1301 Pennsylvania Avenue, N.W. \nWashington, D.C. 20004 \n \nCounsel for Talen Energy Corporation"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":5,"startToken":0,"endToken":266},{"p":2,"at":5,"title":"I. MOTION TO INTERVENE","method":"printed heading","endPage":2,"endAt":1377,"startToken":266,"endToken":478},{"p":2,"at":1377,"title":"II. REQUEST FOR CLARIFICATION","method":"printed heading","endPage":2,"endAt":1412,"startToken":478,"endToken":482},{"p":2,"at":1412,"title":"A. The proposed Tariff revisions do not protect existing commercial agreements","method":"printed heading","endPage":5,"endAt":5,"startToken":482,"endToken":1325},{"p":5,"at":5,"title":"B. The Commission should clarify Attachment DD, section 18.3(a) to further","method":"printed heading","endPage":7,"endAt":384,"startToken":1325,"endToken":2007},{"p":7,"at":384,"title":"III. CONCLUSION","method":"printed heading","endPage":8,"endAt":0,"startToken":2007,"endToken":2127},{"p":8,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":8,"endAt":451,"startToken":2127,"endToken":2194}]}