{"document":{"slug":"rec-20260821-5233","title":"Post-Conference Comments of Southern Maryland Electric Cooperative, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5233","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Southern Maryland Electric Cooperative, Inc.","kind":"comments","file":"sources/filings/text/20260821-5233_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5233","tier":"record","sha256":"5552f95346c356f154fd5285ab0b85060a16e376f5f02b8af907e42e522822f6","pages":5,"tokens":1337,"emptyPages":[],"textThemes":["adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":289,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Governance and Stakeholder Reforms \nDocket No. AD26-7-000 \n \nPOST-CONFERENCE COMMENTS OF \nSOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. \nPursuant to the Notice Requesting Post-Conference Comment issued by the Federal Energy \nRegulatory Commission (\"Commission\") on July 30, 2026 in the above-captioned docket, \nSouthern Maryland Electric Cooperative, Inc. (\"SMECO\") respectfully submits these post-\nconference comments. SMECO appreciates the opportunity to supplement the record developed at \nthe Commission's July 23, 2026 technical conference regarding the governance and stakeholder \nprocesses of PJM Interconnection, L.L.C. (\"PJM\"). \nI. STATEMENT OF INTEREST \nSMECO is a member-owned, not-for-profit electric distribution cooperative headquartered in \nHughesville, Maryland, serving customer-members in Calvert, Charles, Prince George's, and St. \nMary's Counties in Southern Maryland. SMECO is a PJM Member and participates in PJM's \nstakeholder process as a member of the Electric Distributor sector. Because SMECO's customer-\nmembers ultimately bear the costs of decisions made through PJM's governance and stakeholder \nprocesses, SMECO has a direct and substantial interest in ensuring that those processes operate in \na transparent, accountable, and timely manner consistent with the public interest. \nII. SMECO'S RESPONSES TO THE APPENDIX QUESTIONS \nSMECO's responses to the questions in the Appendix to the Notice are provided below. \nPJM Board Independence \n \n \nQuestions/Comments \nYes No \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments:  Southern Maryland Electric Cooperative, Inc. (SMECO) is open to \nrevisiting Board term length, but it is opposed to the specific alternative of a single, \nnon-renewable nine-year term. Indeed, in PJM’s recent poll of members, 71% of \nrespondents were opposed to a single nine-year term. As to an appropriate term length, \nSMECO believes something on the order of five (5) years, with the opportunity for \nrenewal, appears appropriate."},{"page":2,"startToken":289,"endToken":595,"text":"Questions/Comments \nYes No \n2) \nShould there be a maximum number of years that a Board member may \nserve (e.g., 10 years)? \nX \n \n \nComments:  SMECO is open to a maximum cumulative years-of-service cap; the \ndecision on the maximum years of Board service should be linked to Question #1, \nBoard term length. \n3) \nShould the Board member qualification rules be revised to provide a \npreference for some Board members that reside in the PJM region? \nX \n \n \nComments: None. \n4) \nShould the conflict-of-interest rules be revised to reduce the cooling off \nperiod for Board members from two years to one year? \nX \n \n \nComments: SMECO is amenable to a reduction in the cooling off period for Board \nmembers from two years to one year. \n5) \nShould restrictions on Board communications be relaxed to enable more \ncommunication between the Board and stakeholders? \nX \n \n \nComments:  SMECO is generally opposed to the removal of the current PJM Board’s ex \nparte rules but is amenable to exploring different ways to increase the manner with and \nfrequency of communication between the Board and Members.  \n6) \nIn order to increase transparency, should Board votes be made public or the \nBoard be required to explain its reasoning?  \nX \n \n \nComments: None. \n7) \nIn order to increase transparency, should some Board meetings be open or \navailable to the public? \nX \n \n \nComments:  None. \n8) \nShould PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? \nX \n \n \nComments:  SMECO supports adding a public interest principle to Operating \nAgreement Section 7.7(i), and it supports expressly incorporating “the principle that the \nelectric power markets in the PJM Region result in efficient outcomes at the lowest \nreasonable cost over the long-term”, or similar.  \n9) \nShould state representatives have at least one voting member on the \nNominating Committee? \nX"},{"page":3,"startToken":595,"endToken":918,"text":"Questions/Comments \nYes No \n \nComments:  None. \n10) \nShould PJM adopt public performance metrics and tie management \ncompensation to their achievement? \n \nX \n \nComments:  If the performance metric is poorly defined, and if the wrong goal is chosen \nor taken out of context with regards to Good Utility Practice, then linking management \ncompensation to achievement makes a bad situation even worse by dint of the public \nannouncement and compensation linkage. PJM’s recent successful winter operations \nprotocol is a perfect example: If “uplift” minimization was a goal unto itself, it may \nhave prevented PJM from committing gas units in advance of the Day-Ahead energy \nmarket, which has turned out to be a key evolution in PJM’s operating procedures to \nreduce winter loss of load risk. That said, SMECO supports conditioning any bonus or \nincentive compensation with satisfaction of a set of customer-focused performance \nmetrics.  \n \nSection 205 Filing Rights \n \n \nQuestions/Comments \nYes No \n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes only \ninform the Board? \n \nX \n \nComments: PJM currently has unilateral FPA section 205 rights on its capacity market. \nAccordingly, all stakeholder activities (e.g., votes and proposals) involving the \nRPM/capacity market are already advisory.   PJM current resource adequacy/RPM \nissues are not due to the stakeholders having “power” over the PJM RPM capacity \nmarket.  It is PJM that has failed to act.  For the energy, ancillary services and reserves \nproduct markets, see SMECO’s response to Question No. 12. \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain approval of \ntwo-thirds of the Members Committee? \n \nX \n \nComments: Perhaps PJM should have FPA section 205 rights over the energy, ancillary \nservices and reserves product markets unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee, but the question of whether \nMembers themselves should have equipoised rights in energy, ancillary services and \nreserves product markets is part of the decision."},{"page":4,"startToken":918,"endToken":1167,"text":"Questions/Comments \nYes No \n13) \nShould PJM have section 205 filing rights over Regional Transmission \nExpansion Planning (RTEP) unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \nX \n \n \nComments:  None. \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” rights \nover resource adequacy and transmission cost allocation filings when a \nsupermajority of OPSI agrees on an alternative proposal? \nX \n \n \nComments:  As noted, PJM currently has unilateral FPA section 205 rights on its \ncapacity market; accordingly, all stakeholder activities (e.g., votes and proposals) \ninvolving the RPM/capacity are already advisory.  Any Member “jump ball rights” over \nPJM RPM/resource adequacy/capacity market issues should belong to PJM members \n(via sector-weighted supermajority), not OPSI. As to transmission cost allocation, \nsection 205 filing rights should remain with Transmission Owners to protect cost \nrecovery. If OPSI reaches supermajority consensus on RPM/resource adequacy issues, it \nshould present its views to the PJM Membership (RPM/resource adequacy) or TOA-AC \n(transmission revenue requirement cost allocation) for consideration. \n15) \nShould the Members Committee have “jump ball” filing rights over the \nportions of the tariff where PJM has 205 filing rights when a supermajority \nof stakeholders approves an alternative proposal? \nX \n \n \nComments: None. \n \nStakeholder Process \n \n \nQuestions/Comments \nYes No \n16) \nShould the approval threshold in the Members Committee be lowered from \ntwo-thirds sector-weighted voting? \n \nX \n \nComments: None. \n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \nX \n \n \nComments: None."},{"page":5,"startToken":1167,"endToken":1337,"text":"State Participation \n \nQuestions/Comments \nYes No \n18) \nIn addition to OPSI, should there be a second state representative group \nconsisting of governors’ representatives and/or state legislators’ \nrepresentatives? \n \nX \n \nComments: None \n19) \nShould state representatives have a formal voting role in the stakeholder \nprocess (limited to certain topics, such as resource adequacy and regional \ntransmission cost allocation) in addition to the consumer advocate votes?   \nX \n \n \nComments: None. \n20) \nShould PJM be required to consult with OPSI prior to making a section 205 \nfiling related to resource adequacy and transmission cost allocation? \nX \n \n \nComments: None. \nIII. CONCLUSION \nSMECO respectfully requests that the Commission consider the responses above as it evaluates \nreforms to PJM's governance and stakeholder processes. SMECO appreciates the Commission's \ncontinued engagement with PJM members and stakeholders on these issues. \nRespectfully submitted, \n \nDamon Krieger \nSenior Vice President, Legal and Strategy, and  \nGeneral Counsel \nSouthern Maryland Electric Cooperative, Inc.  \n15035 Burnt Store Road \nP.O. Box 1937 \nHughesville, MD  20637-1937 \n301.274.4323  \nDamon.Krieger@SMECO.coop  \n \nDated: August 21, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":705,"startToken":0,"endToken":89},{"p":1,"at":705,"title":"I. STATEMENT OF INTEREST","method":"printed heading","endPage":1,"endAt":1377,"startToken":89,"endToken":180},{"p":1,"at":1377,"title":"II. SMECO'S RESPONSES TO THE APPENDIX QUESTIONS","method":"printed heading","endPage":5,"endAt":671,"startToken":180,"endToken":1261},{"p":5,"at":671,"title":"III. CONCLUSION","method":"printed heading","endPage":5,"endAt":1235,"startToken":1261,"endToken":1337}]}