{"document":{"slug":"rec-20260821-5235","title":"Post-Technical Conference Comments of Dominion Energy Services, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5235","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Dominion Energy Services, Inc.","kind":"comments","file":"sources/filings/text/20260821-5235_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5235","tier":"record","sha256":"90f43db4a312bdebd73a3041c97b9554eef17b3fcc78001cd75a775ab305f25b","pages":12,"tokens":4076,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":252,"text":"UNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n) \nPost Technical Conference Comments  \n \n) \n \non PJM Governance and Stakeholder Reforms \n) \nDocket No. AD26-7-000 \n \n \n \n \n \n \n \n) \n \n \n \nPOST TECHNICAL CONFERENCE COMMENTS OF DOMINION ENERGY \nSERVICES, INC. \n \nDominion Energy Services, Inc. (“DES”), on behalf of Virginia Electric and Power \nCompany doing business as Dominion Energy Virginia (“Dominion Energy Virginia”), submits \nthe following comments in response to the Federal Energy Regulatory Commission’s (“FERC” or \n“Commission”) Notice Inviting Post-Technical Conference Comments issued on the July 30, 2026 \nin this proceeding (“Notice”).  Dominion Energy Virginia supports the Commission’s focus on \nPJM Interconnection, L.L.C.’s (“PJM”) governance reforms to strengthen PJM’s independence as \nwell as explore ways to improve its stakeholder process so that PJM can quickly respond to \nemerging issues that require crucial reforms to maintain reliability of the bulk electric system.1 \nI. \nIntroduction \nDES is a wholly-owned subsidiary of Dominion Energy, Inc., and is a centralized services \ncompany providing administrative, management and support services to its associate companies.  \nDominion Energy Virginia, a subsidiary of Dominion Energy, Inc., is a public service \ncorporation organized under the laws of the Commonwealth of Virginia and a public utility subject to \nregulation by the Commission and does business in the Commonwealth of Virginia and in the State of \nNorth Carolina. It is a regulated, vertically integrated public utility engaged in the generation, \n \n1Dominion Energy Virginia submits these comments to help foster discussions but reserves the right to later \nchallenge the legality of the ultimate proposed revisions to PJM’s governing documents."},{"page":2,"startToken":252,"endToken":602,"text":"transmission, distribution, and sale of electric energy. Dominion Energy Virginia furnishes electric \nservice to approximately 2.8 million retail customers in its approximately 30,000 square miles of \ncertificated service territory covering parts of Virginia and North Carolina. To provide that service, \nDominion Energy Virginia owns and operates a diverse fleet of nuclear, oil, biomass, pumped \nstorage, hydro, coal, solar, wind and natural gas-fired electric generating capacity of approximately \n21,000 megawatts. Dominion Energy Virginia owns 6,800 miles of electric transmission lines in \nVirginia, North Carolina and West Virginia, which is operated by PJM. Dominion Energy Virginia \njoined PJM effective May 1, 2005, after obtaining prior approval from the Commission, the \nVirginia State Corporation Commission, and the North Carolina Utilities Commission.2 \n  \nII. \nComments \n1) Dominion Energy Virginia supports governance reforms that would reinforce PJM’s \nindependence as a core governance principle.  \n \nPJM’s independence is critical for operating a reliable regional grid across a diverse multi-state \nfootprint and for executing its responsibilities as an Independent System Operator and Regional \nTransmission Organization.  PJM must remain independent from any single market participant, sector, \nstate or group of states, consumer group, industry, or governmental entity. Panelists that participated \nin the July 23 technical conference and other parties broadly agree that establishing greater PJM \nindependence is a priority and one of the objectives should be to define the appropriate role for the \n \n2 PJM Interconnection, L.L.C., 109 FERC ¶ 61,012 (2004), on reh’g in part, 110 FERC ¶ 61,234 (2005); Ex Parte: \nIn the matter concerning the application of Virginia Electric and Power Company d/b/a Dominion Virginia Power \nfor approval of a plan to transfer functional and operational control of certain transmission facilities to a regional \ntransmission entity, V.S.C.C. Case No. PUE-2000-00551, Order Granting Approval (Nov. 10, 2004); In the Matter \nof Application of Virginia Electric and Power Company, d/b/a Dominion North Carolina Power, for Authority to \nTransfer Functional Control of Transmission Assets to PJM Interconnection, LLC, N.C.U.C. Docket No. E-22, Sub \n418, Order Approving Transfer Subject to Conditions (Apr. 19, 2005)."},{"page":3,"startToken":602,"endToken":972,"text":"states.3  The Organization of the PJM States, Inc. (“OPSI”) recommends that PJM “should have the \nauthority to independently and unilaterally propose changes to the Operating Agreement  under Section \n205 of the FPA” and that the Commission should “provide PJM with the independence and agency it \nneeds”.4 Chair Kelsey Bagot of the Virginia State Corporation Commission rightly asserts in her \ncomments, the Section 205 filing authority “should rest firmly with the PJM Board” and that allowing \nit “to tailor reforms, considering guidance received from stakeholders” would “allow it to act \ncomprehensively and independently”.5    Any governance reforms should be judged by whether they \nimprove PJM’s ability to make timely, technically grounded decisions while maintaining transparency \nand stakeholder engagement. PJM correctly asserts that its ability to act hinges on its “legal authority \nto file proposed changes to the Commission” and that it should “possess unconditioned section 205 \nrights across all its operational, market and transmission planning responsibilities” to strengthen its \nindependence.6  PJM can make a number of improvements to its current governance and stakeholder \nprocess that would enable it to perform its duties and responsibilities more effectively through a \ncombination of 1) making member votes advisory by granting PJM sole Federal Power Act (“FPA”), \nSection 205 filing rights over its resource adequacy, electric transmission planning protocols and \nenergy and ancillary service rules, 2) establishing a limited jump-ball mechanism for PJM Members \nonly, and 3) implementing changes that would provide the states the means to more effectively engage \nin the PJM stakeholder process. Each of these recommendations will be discussed in more detail below.  \n \n2) Stakeholder votes should become advisory while preserving meaningful stakeholder \nrights.  \n \n3 See Pre-Conference Comments of Kelsey A. Bagot, Chair, Virginia State Corporation Commission, Docket No. \nAD26-7-000 (July 21,2026) (“Pre-conference comments of Chair Bagot”) at p.2.  See also Comments from OPSI, \nDocket No. AD26-7-000 (July 21, 2026) (“Pre-Conference of Comments of the Organization of PJM States, Inc.”)  \nat p. 3-4. \n4 Pre-Conference of Comments of the Organization of PJM States, Inc.”)  at p. 6. \n5 Pre-conference comments of Chair Bagot, p.2 \n6 Comments from PJM Interconnection, L.L.C, Docket No. AD26-7-000 (July 14, 2026) (“PJM Pre Tech \nConference Comments”).  p.1,8"},{"page":4,"startToken":972,"endToken":1309,"text":"PJM currently has FPA, Section 205 filing rights over its capacity market pursuant to the PJM \nOpen Access Transmission Tariff (“PJM Tariff”) and Reliability Assurance Agreement Among Load \nServing Entities in the PJM Region (“RAA”).  However, PJM does not have that same authority over \nother core responsibilities that include its electric transmission planning protocols because they reside \nin the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. (“PJM Operating \nAgreement”) and PJM Members have FPA, Section 205 rights under the PJM Operating Agreement. \nSince its transmission planning protocols reside in the PJM Operating Agreement, PJM is unable to \nask the Commission to modify its transmission planning protocols under a Section 205 filing without \nreceiving a 2/3 supermajority approval vote by its members.    PJM also effectively lacks FPA, Section \n205 filing rights for its energy and ancillary service markets. While these market rules reside in the \nPJM Tariff, the identical provisions are also in the PJM Operating Agreement. Therefore, if PJM \nMembers do not authorize PJM to make changes to duplicative sections in the PJM Operating \nAgreement with a 2/3 supermajority vote in favor of the changes, PJM cannot submit changes under a \nsingle FPA, Section 205 filing.  This division not only hinders PJM’s ability to timely present necessary \nreforms to the Commission, but it also creates a precarious situation in which, without the approval of \nthe Members Committee, PJM would be “required to proceed under the more restrictive requirements \nof section 206.”7 This, in effect, can “limit the ability of important issues to reach the Commission for \nadjudication in a timely manner.”8 \nBy making the PJM stakeholder votes advisory, stakeholder and member filibusters would no \nlonger prevent PJM from cohesively bringing important market, planning, and reliability reforms to \nFERC under the FPA, Section 205 for timely consideration.  Creating a process by which the Members \nCommittee votes become advisory, which follows from the enhancement of PJM’s FPA, Section 205 \n \n7 PJM Pre Tech Conference Comments, p. 6 \n8 Id., p. 6"},{"page":5,"startToken":1309,"endToken":1663,"text":"rights, would still preserve transparency by showing PJM, stakeholders and the Commission where \nsupport and opposition exist without hindering PJM’s ability to act independently and swiftly.  Under \nthis paradigm, stakeholder input would remain robust, with clear written comment opportunities, \ntechnical review, and sufficient time for participants to assess proposed reforms to build consensus.   \nRetaining the ability for consensus-building remains essential because consensus lowers litigation risk, \nimproves implementation quality, and creates broader confidence in PJM rules. \n3) The Commission should remove restrictions on PJM’s ability to exercise filing rights over \nits energy and ancillary service markets as well as its transmission planning protocols.  \n \nElectric planning protocols and reliability procedures in both the PJM Tariff and PJM \nOperating Agreement require PJM to file the proposed changes under FPA, section 206 if Members \ndo not provide the 2/3 supermajority vote in favor of the changes. One way Members Committee votes \ncan be made advisory is by removing all non-governance provisions from the PJM Operating \nAgreement and migrating those provisions to the PJM Tariff to the extent they are not already \ncontained therein.  The only requirements that should remain in the PJM Operating Agreement are \nthose that pertain to the management and operation of PJM as is typical for most limited liability \ncompanies.   Moving the transmission planning protocols or reliability provisions in the PJM Operating \nAgreement to the PJM Tariff, similar to how other Regional Transmission Organizations and \nIndependent System Operators have such provisions in their open access transmission tariffs, will \nenable more efficient decision-making processes, while maintaining robust stakeholder engagement \nand transparency.9  This migration of the non-governance provisions would then provide PJM with \nunconditioned FPA, Section 205 filing rights over its energy and ancillary services markets, \ntransmission planning protocols, and reliability provisions.  Making this change will allow PJM to \n \n9 PJM Pre Tech Conference Comments, p.7.  PJM states that it “should be able to ask the Commission to review \nreforms in these areas consistent with the burden of proof that other RTOs and ISOs need to meet when filing \nreforms before the Commission on these same topics [resource performance, dispatch, operational flexibility, \ntransmission expansion].”"},{"page":6,"startToken":1663,"endToken":2008,"text":"propose market rule changes under FPA, Section 205 whether or not PJM Members agree to the \nchanges under the current supermajority vote construct. Expanding PJM’s FPA, Section 205 filing \nrights would allow PJM to adapt more quickly to emerging reliability, operational, market, and \nplanning issues and place disputes before FERC more efficiently. The Commission remains the \nultimate adjudicator and the use of a single PJM FPA, Section 205 filing would allow the Commission \nto timely review and act within the 60-day time clock that is not required for Section 206 actions. \nExpanded filing authority should be paired with robust advisory stakeholder input, strengthened state \ncoordination through OPSI and transparent PJM Board of Managers oversight. \n \n4) Stakeholder rights can be preserved by granting PJM members with limited “jump ball” \nrights for capacity, energy and ancillary service market reforms.  \n \nOnce the Members Committee vote is made advisory, the stakeholders’ ability to develop \nalternative solutions can be retained using a “jump-ball” mechanism for reforms of the capacity, energy \nand ancillary services market rules.10  PJM members will retain the ability to approve alternative \nproposals that could ultimately be filed by PJM under its Section 205 rights with equal footing before \nthe Commission under limited circumstances in which PJM and its members cannot achieve consensus \non specific reforms. As part of the stakeholder process, the states, for example, through OPSI, may \nalso bring forward alternatives for the Members Committee to consider, which if endorsed, could be \nsubmitted to the Commission on equal footing as the PJM proposal for consideration. A “jump-ball” \noption does several things.  First, it creates an incentive for PJM to continue to work with stakeholders \nto reach a consensus on a reform of the PJM Tariff while still enabling it to submit changes to be timely \nadjudicated by the Commission.  Second, it preserves members’ ability to develop competing proposals \nunder the FPA, Section 205 standard of review in which the Commission would only have to deem the \n \n10 See Participants Agreement among ISO New England, Inc. and the New England Power Pool, Section 11.1.5."},{"page":7,"startToken":2008,"endToken":2358,"text":"preferred proposal just and reasonable. Third, a “jump ball” mechanism will provide a means for states \nto develop proposals for PJM members to consider, that could ultimately be filed under the mechanism \nif endorsed by PJM members. To be clear, Dominion Energy Virginia is not proposing that the states \nhave Section 205 rights under a “jump ball” construct, but rather that the states have the ability to move \nalternative proposals through the Members Committee where the membership would have the ability \nto elevate them under its “jump ball” rights.  \n \n5) Granting states authority to direct FPA, Section 205 filings would undermine PJM’s \nindependence.   \n \nDominion Energy Virginia opposes granting states authority to direct FPA, Section 205 filings \nover PJM Tariff matters because it would undermine PJM’s ability to act independently.    PJM should \ntake into consideration input from the states and stakeholders regarding when tariff and market rule \nreforms are needed, but ultimately it is PJM that must prioritize where and when changes are most \nneeded to meet its obligations as the Regional Transmission Organization and Independent System \nOperator.  Unfettered ability of the states to direct PJM to make a Section 205 filing risks PJM’s \nindependence and could result in PJM  being sidetracked from its core responsibilities and may disrupt \nprogress on important priority issues if it is forced devote resources to an issue given priority by a \nmajority of PJM states.  Additionally, state majorities may not reflect the interests or regulatory \nstructures of all states in the PJM Region or benefit the “market” as a whole but rather may be self-\ninterested. A central concern is that allowing a majority of states to direct a Section 205 filing to change \nthe PJM Tariff could result in advancing proposals harmful to minority-state interests, including \nvertically integrated states such as Virginia that have different retail regulatory structures, planning \nobligations, and resource adequacy responsibilities than restructured states, or fail to align across all \n14 jurisdictions in the PJM Region. The better approach is to strengthen OPSI’s ability to coordinate \nstate views, provide technical input, and present majority and minority state positions to PJM and"},{"page":8,"startToken":2358,"endToken":2681,"text":"FERC. State input should inform PJM decision-making and FERC review but should not displace \nPJM’s independent regional role or create new procedural veto points. \n \n6) OPSI can improve its efficacy within the PJM stakeholder process through greater \ncoordination between state commissioners, legislators and governors. \n \nThe PJM states play an integral role in PJM’s stakeholders processes.  OPSI is an organization \nconsisting of state commissions, including the District of Columbia, that was established in 2005 and \nhas played a crucial role as stakeholder advocates for solutions that it deems in the public interest.11  \nOPSI regularly meets with the PJM Board of Managers and also actively participates in the PJM \nstakeholder process to weigh in to share the perspective of its members with PJM and PJM members. \nThe Commission accepted a PJM Member-funding mechanism in the same year to enable the \norganization’s ability to effectively share public policy perspectives. OPSI has the staff, technical \nexpertise, legal support, and analytical capability to engage more effectively in PJM matters.  \nDominion Energy Virginia is open to discussing ways to support OPSI’s efforts and potentially \nexpanded role.  Additionally, OPSI should collect and reflect input from both state utility commissions, \nstate governors and their designated energy policy representatives, while the states work to further \ncoordinate and collaborate among their respective structures (e.g. governor, public utility commission, \nlegislators) that will provide a more cohesive state perspective and reduce conflicting messages where \npossible. By doing so, OPSI can serve as the single authorized representative for providing the \ncollective state perspectives, reducing the risk that PJM receives conflicting or duplicative direction \nfrom multiple state entities on behalf of each state. Where there is no unanimity, OPSI can present \nmajority and minority state perspectives where consensus cannot be reached, so that stakeholders, PJM \nand FERC, can understand the range of state views. This would not prevent states from sharing their \n \n11 Pre-conference comments of the Organization of the PJM States, Inc.  p 3-4"},{"page":9,"startToken":2681,"endToken":2894,"text":"unique perspectives through direct communication with the PJM Board of Managers or taking up issues \non their own either through their own stakeholder engagement or making a Section 206 filing.     \nStates are important stakeholders and Dominion Energy Virginia supports allowing one state \nrepresentative appointed by OPSI, in coordination with the PJM governors and legislators, to \nparticipate on the PJM Nominating Committee, with one vote equivalent to the votes of other voting \nmembers of the Nominating Committee, while preserving PJM Board of Managers’ independence.   \n \n \nIII. \nConclusion \n  \nDominion Energy Virginia supports the Commission’s attention to this important topic and \nasks that the Commission consider the issues raised in these comments during its evaluation of \nnecessary future actions. Please see the attached appendix for responses to the survey provided in \nthe post-conference supplemental notice.  \nRespectfully submitted,  \n \n/s/ Jacqulynn Hugee \nJacqulynn B. Hugee  \nDeputy General Counsel \nDominion Energy Services, Inc. \n120 Tredegar Street \nRichmond, VA 23219 \n(804) 819-2794  \njacqulynn.b.hugee@dominionenergy.com  \n \n/s/ James G. Davis \nJames G. Davis \nRegulatory and Market Policy Senior \nStrategic Advisor \nDominion Energy Services, Inc. \n120 Tredegar Street \nRichmond, VA 23219 \n(804) 819-2718 \njames.g.davis@dominionenergy.com \n/s/ Wesley Walker \nWesley Walker \nManaging Counsel \nDominion Energy Services, Inc. \n120 Tredegar Street \nRichmond, VA 23219 \n(804) 819-2345 \nwesley.walker@dominionenergy.com"},{"page":10,"startToken":2894,"endToken":3263,"text":"Dated: August 21, 2026 \n \n \n \n \n \n \n \nAPPENDIX  \n \nDominion Energy Virginia provides the following answers to the following questions that \nwere provided in the FERC supplemental notice for comments.   \nPJM Board Independence \n1. Should Board members’ terms be extended to five or more years?: No, however we \nsupport modest term extensions if they enhance continuity and independence, provided \nthere are reasonable total service limits and regular performance review. \n2. Should there be a maximum number of years that a Board member may serve (e.g., \n10 years)? Yes, a term limit should be established of no more than 10 years to balance \ninstitutional knowledge with fresh perspectives. \n3. Should the Board member qualification rules be revised to provide a preference for \nsome Board members that reside in the PJM region? No, however we support \nconsidering regional knowledge as one factor, but avoid residency requirements that \nnarrow the pool of independent, qualified candidates. \n4. Should the conflict-of-interest rules be revised to reduce the cooling off period for \nBoard members from two years to one year? No, the cooling off period should not be \nreduced; independence should remain paramount. \n5. Should restrictions on Board communications be relaxed to enable  \nmore communication between the Board and stakeholders? Yes, we support more \nstructured communication between the Board and stakeholders, with safeguards to \npreserve independence and avoid undue influence. \n6. In order to increase transparency, should Board votes be made public or the Board \nbe required to explain its reasoning? No, Board votes should not be made public, but \nwe do support a greater explanation of Board reasoning with respect to their votes, \nparticularly on major market, reliability, and governance reforms; publicizing individual \nvotes may be less important than explaining the basis for decisions. \n7. In order to increase transparency, should some Board meetings be open or available \nto the public? Yes, we support limited public or open sessions on broad policy issues, \nwhile preserving confidential executive sessions for commercially sensitive personnel, \nlitigation, cybersecurity, or reliability-sensitive matters.  \n8. Should PJM’s governing documents be revised to explicitly state that the \nresponsibility of PJM and its Board is to serve the public interest? No, but we \nsupport clarifying that PJM and its Board serve the public interest through reliable,"},{"page":11,"startToken":3263,"endToken":3690,"text":"efficient, nondiscriminatory regional transmission service and wholesale markets \nconsistent with the Federal Power Act.  \n9. Should state representatives have at least one voting member on the Nominating \nCommittee? Yes, we support one OPSI-appointed state representative in a defined role, \nprovided the process preserves Board independence and avoids control by any state or \ngroup of states. \n10. Should PJM adopt public performance metrics and tie management compensation \nto their achievement? Yes, we support public performance metrics focused on \nreliability, market efficiency, project execution, and transparency, but compensation \ndesign should remain within the Board’s oversight.  \nSection 205 Filing Rights \n11. Should the stakeholder process be advisory, i.e., stakeholder votes only inform the \nBoard? Yes, we support making stakeholder votes advisory so PJM can bring timely \nproposals to FERC, while preserving transparent voting records and meaningful \nstakeholder input. \n12. Should PJM have section 205 filing rights over the energy market and ancillary \nservices unencumbered by the requirement to obtain approval of two-thirds of the \nMembers Committee? Yes, we support PJM having FPA, Section 205 filing rights over \nenergy and ancillary service market rules without the need to obtain a 2/3 super majority \nvote of the Members Committee. PJM needs authority to respond quickly to changing \noperational conditions, market inefficiencies, and reliability risks. \n13. Should PJM have section 205 filing rights over Regional Transmission Expansion \nPlanning (RTEP) unencumbered by the requirement to obtain approval of two-\nthirds of the Members Committee?: Yes, we support PJM having FPA, Section 205 \nfiling rights over RTEP without the need to obtain a 2/3 super majority vote of the \nMembers Committee with appropriate transparency and consultation. PJM must be able \nto adapt planning rules and protocols quickly as load growth, generator retirements, \ninterconnection needs, and regional infrastructure requirements evolve. \n14. Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over \nresource adequacy and transmission cost allocation filings when a supermajority of \nOPSI agrees on an alternative proposal?:  No, we do not support granting OPSI direct \njump ball filing rights as a substitute for PJM independence. Instead, strengthen OPSI \nfunding and consultation rights and allow OPSI to provide majority and minority state \nviews to PJM and FERC. \n15. Should the Members Committee have “jump ball” filing rights over the portions of \nthe tariff where PJM has 205 filing rights when a supermajority of stakeholders \napproves an alternative proposal? Yes, we support a Members Committee with jump \nball filing rights over defined resource adequacy and energy and ancillary services \nreforms when a supermajority supports an alternative. The possibility of a “jump-ball”"},{"page":12,"startToken":3690,"endToken":4076,"text":"filing on an issue will provide incentive for both PJM and stakeholders to strive for \nconsensus on a single proposal to obviate the risk of the Commission choosing one \nproposal over the other.   \n \nStakeholder Process \n16. Should the approval threshold in the Members Committee be lowered from two-\nthirds sector-weighted voting?: No, if a “jump-ball” mechanism is adopted by PJM, a \nlower threshold could undermine PJM’s ability to present reforms and the Commission’s \nability to act decisively on emergent issues by unnecessarily increasing the number of \n“jump-ball” filings  \n17. Should the voting rules barring affiliate votes, which apply to senior standing \ncommittees, also apply to lower-level committees? No, however we support consistent \naffiliate voting safeguards where votes have meaningful governance consequences, while \npreserving broad technical participation at lower-level committees. \nStakeholder Process \n1. In addition to OPSI, should there be a second state representative group consisting \nof governors’ representatives and/or state legislators’ representatives? No, we do not \nsupport creating a separate state organization. Instead, we recommended that PJM and \nstakeholders encourage state governors to work with OPSI to include structured input \nfrom governors or their designated representatives. State governors should work with the \nexisting OPSI entity that has been participating in the PJM stakeholder process for many \nyears and is well versed in the issues that come before PJM and its membership for \nconsideration. \n2. Should state representatives have a formal voting role in the stakeholder process \n(limited to certain topics, such as resource adequacy and regional transmission cost \nallocation) in addition to the consumer advocate votes? No, a formal state voting role \nin the stakeholder process could distort sector balance or enable a majority of states to \noverride minority-state concerns. State views should be elevated through OPSI \nconsultation, not through direct voting control. \n3. Should PJM be required to consult with OPSI prior to making a section 205 filing \nrelated to resource adequacy and transmission cost allocation? Yes, we support \nrequiring meaningful consultation with OPSI before PJM makes Section 205 filings \nrelated to resource adequacy and transmission cost allocation, while preserving PJM’s \nability to file timely proposals and FERC’s authority to decide contested issues.  This will \nnot be a huge departure from what PJM has been doing since OPSI was created – taking \nOPSI’s input (when provided) into consideration prior to submitting filing with the \nCommission."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1043,"startToken":0,"endToken":137},{"p":1,"at":1043,"title":"I. Introduction","method":"printed heading","endPage":2,"endAt":872,"startToken":137,"endToken":375},{"p":2,"at":872,"title":"II. Comments","method":"printed heading","endPage":9,"endAt":583,"startToken":375,"endToken":2764},{"p":9,"at":583,"title":"III. Conclusion","method":"printed heading","endPage":12,"endAt":2649,"startToken":2764,"endToken":4076}]}