{"document":{"slug":"rec-20260821-5236","title":"Post-Technical Conference Comments of The PJM Industrial Customer Coalition in response to FERC's 07/30/2026 supplemental notice re PJM Governance and…","issued":"2026-08-21","accession":"20260821-5236","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Industrial Customer Coalition","kind":"comments","file":"sources/filings/text/20260821-5236_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5236","tier":"record","sha256":"a86ed864faf1f94359d8385bc6919b992a7f4d2f839e9fd3cd7eb4a59f410525","pages":15,"tokens":3463,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":273,"text":"1 \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms : \nDocket No. AD26-7-000 \n \nPOST-TECHNICAL CONFERENCE COMMENTS OF THE \nPJM INDUSTRIAL CUSTOMER COALITION \nThe PJM Industrial Customer Coalition (“PJMICC” or “the Coalition”) respectfully \nsubmits these post-technical conference comments in response to the Supplemental Notice issued \nby the Federal Energy Regulatory Commission (“Commission” or “FERC”) on July 30, 2026, in \nthe above-captioned proceeding. PJMICC is a coalition of energy-intensive industrial and \ninstitutional customers and is active in the governance and stakeholder process of PJM \nInterconnection, L.L.C. (\"PJM\"). PJMICC members have invested billions of dollars in their \nmanufacturing and other energy-intensive operations and are directly affected by the cost and \nreliability consequences of PJM’s decisions. \nPJMICC submits these Post-Technical Conference comments following the July 23, 2026, \ntechnical conference and in anticipation of the upcoming Alternative Dispute Resolution (“ADR”) \nprocess at the Commission and potential future Commission action with respect to PJM.1 PJMICC \nis considering PJM’s initial mediation term sheet and the proposed Memorandum of \nUnderstanding (“MOU”) Framework with the states, which were publicly posted in anticipation \nof the PJM Members Committee meeting on August 19, 2026.2 PJMICC approaches the upcoming \n \n1 PJMICC's counsel, Susan Bruce, participated in the Technical Conference and filed a Pre-filed Statement.  PJMICC \nwill not reiterate those positions in these Post-Technical Conference Comments, but offers these comments as a \nconstructive response to the Technical Conference and PJM’s recent proposed term sheets offered in advance of the \nupcoming ADR.  \n2 See 20260819-item-08---1-ferc-mediation-term-sheet.pdf and https://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mc/2026/20260819/20260819-item-08---2-memorandum-of-understanding-framework-between-\npjm-and-states.pdf (last visited Aug. 21, 2026)."},{"page":2,"startToken":273,"endToken":563,"text":"2 \nmediation in good faith and recognizes the constructive engagement of PJM, the PJM states, and \nPJM Members to date. \nTo that end, PJMICC highlights the PJM Members Committee's August 19 action to \napprove, by a substantial margin, modifications to the PJM Operating Agreement clarifying that \nthe PJM Board’s primary responsibilities include “designing and operating markets that benefit \ncustomers.”3 This modification, if filed and accepted by the Commission, aligns closely with \nPJMICC’s recommended change to the PJM Operating Agreement outlined in its Pre-filed \nStatement and represents a constructive step toward grounding the Board’s future decision-making \nin that responsibility.4  \nGiven the important role PJM plays in the region’s economy and daily life, PJMICC’s \nobjective is to advance governance reforms that enhance PJM’s accountability and independence, \nimprove the efficiency of the stakeholder process, reduce siloed consideration of related issues, \nadvance innovation, and ensure that diverse viewpoints inform the region’s response to this period \nof foundational change. In these comments, PJMICC identifies areas of alignment with PJM's \ninitial position set forth at the July 23 technical conference, as well as areas of focus to build \nunderstanding in advance of the ADR process. \nPJMICC respectfully submits that any governance reform package should preserve the \nexisting balance between PJM’s independent role and the Members Committee’s sector-weighted \napproval of Section 205 filings. PJM retains a path to seek Commission action when Members do \n \n3 https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20260819/20260819-item-01---\nvistra--exelon-alternate-motion-to-arrc-user-group-oa-sec-7.pdf; https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/mc/2026/20260819/20260819-mc-voting-results--agenda-item-\n1b.pdf (last visited Aug. 21, 2026). \n4 Pre-Filed Statement of Susan Bruce, Counsel to PJM Industrial Customer Coalition, PJM Governance and \nStakeholder Reforms, Docket No. AD26-7-000, at 4 (July 14, 2026)."},{"page":3,"startToken":563,"endToken":787,"text":"3 \nnot agree; as discussed below, Section 206 provides the appropriate framework in that \ncircumstance. The Coalition’s focus is therefore on reforms that improve stakeholder efficiency \nand pair any expansion of PJM’s authority with transparent safeguards, while respecting Board \nindependence. \nI. \nBackground \nOn July 23, 2026, the Commission convened a Chairman and Commissioner-led technical \nconference to examine PJM’s governance structure and stakeholder processes, addressing Board \nindependence, Section 205 filing rights, stakeholder process reform, and state participation. The \nCommission invited post-conference comments on or before August 21, 2026, and indicated that \nan Alternative Dispute Resolution process will commence on September 1, 2026. \nThrough its counsel, PJMICC participated in the July 23 technical conference, emphasizing \nsupport for PJM’s existing governance framework and sector-weighted voting; advocating \ntargeted reform rather than wholesale restructuring, including reforms that would facilitate new \nresources and investment in the PJM grid; and identifying the need for customer cost-impact \nassessments and after-the-fact review mechanisms. \nSubsequently, PJM circulated its mediation term sheet proposing eight reform measures, \nincluding proposing to assume from PJM Members additional Section 205 filing authority, making \nthe Members Committee advisory to the RTO on all matters, extending Board terms to nine years, \nand creating state “jump ball” Section 205 filing rights regarding resource adequacy. PJM also \nproposed an MOU Framework with the states that addresses resource adequacy, large-load \nmanagement, and transmission planning."},{"page":4,"startToken":787,"endToken":1041,"text":"4 \nII. \nAreas of Common Ground \nPJMICC supports PJM’s willingness to streamline committee structures and create \nexpedited processes, provided that the process continues to solicit and consider diverse viewpoints. \nThese proposals are directionally consistent with PJMICC’s longstanding concerns about siloed \ntreatment of related issues and the cost of engagement in the stakeholder process for those with \nlimited resources. The proposed elimination of the Markets and Reliability Committee, coupled \nwith the proposed shift in voting at lower-level committees to sector-weighted voting, represents \na reasonable balance. Taken together, eliminating duplicative committee-layer changes could \nimprove efficiency while preserving meaningful stakeholder input and the sector-weighted \nframework. This would allow stakeholders to focus on consequential issues. \nPJMICC also supports Board independence as a foundational element of PJM governance. \nPJM’s proposal for open Board sessions—with public statements and recorded votes—generally \naligns with PJMICC’s transparency goals, while warranting careful implementation to preserve \nthe Board’s independence. Extended Board terms, if paired with meaningful accountability \nmeasures, could promote institutional stability, although a nine-year term may be longer than \nnecessary and could discourage interest in Board service.  Board members for the other RTOs and \nISOs across the country have three-year terms.  Board terms of five or six years are still longer \nthan those of other RTOs/ISOs. \nIII.  \nAreas of Divergence \nWhile acknowledging this common ground, PJMICC also identifies areas of divergence \nthat warrant attention in developing a durable solution. Of particular importance is the relationship \nbetween PJM’s proposed Section 205 filing rights and the stakeholder checks that currently govern \nthose rights."},{"page":5,"startToken":1041,"endToken":1351,"text":"5 \nPJM’s mediation term sheet proposes removing PJM Members’ Section 205 filing \nauthority over the energy and ancillary services markets, as well as transmission planning. The \nterm sheet also proposes making the Members Committee advisory on RTO functions, extending \nBoard terms to nine years, and providing that PJM-sponsored packages advance “on equal footing” \nwith stakeholder alternatives. PJM currently holds Section 205 rights regarding resource adequacy \nand the capacity construct.  The areas of concern with the PJM capacity construct are well \ndocumented in proceedings before this Commission.   \nPJM’s proposals, taken together, raise significant concerns. As explained in PJMICC’s Pre-\nfiled Statement at this docket, the distinction between Section 205 and Section 206 review is not \nmerely procedural—it reflects a deliberate allocation of regulatory burdens that incentivizes \ncollaborative development of market rules.5 The question presented is not whether PJM can act \nwhen Members do not agree—it can, through Section 206—but rather which review standard \nshould apply, and what safeguards should attend the expansion of unilateral filing authority. \nAs outlined in PJMICC’s Pre-filed Statement, the D.C. Circuit has recognized that Sections \n205 and 206, while both requiring just and reasonable rates, “enforce that mandate differently” \nand impose distinct burdens on proponents of rate changes.6 The lighter Section 205 burden is \nappropriately reserved for proposals that command broad stakeholder support and provide \nevidence of balanced consideration of competing interests. Where that support is absent, Section \n206 supplies the appropriate review framework—not as a bar on PJM action, but as a check \ncommensurate with the significance of unilateral change that could directly affect the regional \neconomy. \n \n5 Pre-Filed Statement of Susan Bruce, Counsel to PJM Industrial Customer Coalition, PJM Governance and \nStakeholder Reforms, Docket No. AD26-7-000, at 7-8 (July 14, 2026).  \n6 Md. Office of People's Couns. v. FERC, 164 F.4th 920, 923 (D.C. Cir. 2026)."},{"page":6,"startToken":1351,"endToken":1644,"text":"6 \nPJM’s proposal to make the Members Committee advisory on RTO functions would \nrepresent a significant shift from the current framework.  PJMICC views the Members \nCommittee's approval as an important check on PJM management and Board actions. If \nstakeholders were limited to a consultative role while PJM’s unilateral authority expanded, the \nreform package would reduce a meaningful source of accountability. For example, there can be an \ninherent tension in RTO governance when staff or management advance positions that may diverge \nfrom the broader public interest the Board is charged with serving. That tension is compounded by \nthe specialized operational and technical expertise of RTO staff, which independent Board \nmembers—despite their experience and best efforts—may not fully share. PJMICC respectfully \nsuggests that maintaining a meaningful role for the Members Committee would preserve a \ndiversity of sector perspectives at a point when the Board may benefit most from them.  These \nareas of divergence underscore the need to examine the accountability framework that would \naccompany any expansion of PJM’s authority. \nIV.  \nAccountability Considerations  \nA central concern animating these comments is what may be viewed as an “accountability \ngap” in PJM’s reform proposals. PJM has explained that expanded Section 205 filing rights would \nhelp it act decisively when the stakeholder process does not produce timely outcomes.  At the same \ntime, the term sheet does not include comparable mechanisms for evaluating the consequences of \nPJM’s decisions, such as customer cost-impact assessments, structured after-the-fact reviews, or \nsunset provisions. Unlike a conventional utility, PJM generally does not internalize the financial \nconsequences of its market-design decisions; PJM Members, states, and customers bear the effects.  \nWhile PJMICC does not support PJM securing additional Section 205 rights, PJMICC does see \nvalue in implementing additional accountability safeguards that make performance and customer"},{"page":7,"startToken":1644,"endToken":1907,"text":"7 \nimpacts visible and provide a basis for corrective action. The governance literature identifies this \nrisk allocation as presenting a structural asymmetry.7  \nThese observations underscore additional authority, to the extent directed by the \nCommission or otherwise, should be accompanied by transparent projections, defined success \nmetrics, and a structured opportunity to adjust course when results differ from expectations.  PJM’s \nown proposed reforms—longer Board terms, an advisory role for the Members Committee, and \nexpanded filing authority—would increase the Board’s independence while reducing certain \ntraditional stakeholder checks. That combination warrants careful design: the governance literature \nidentifies structural incentive considerations that may affect independent Boards.8  \nThe need for a constructive accountability framework is particularly important given the \nPJM region’s unprecedented challenges—large load growth, manufacturing reshoring, data center \ndevelopment, and electrification mandates. Decisions made now will shape the cost landscape for \ndecades. PJMICC therefore supports objective, transparent accountability measures that \ncomplement—not compromise—Board independence, including Board evaluations tied to \ncustomer outcomes, affordability, and the cost consequences of PJM’s decisions.   \nV.  \nProposed Accountability Safeguards \nTo address the considerations identified above, PJMICC respectfully proposes the \nfollowing measures to complement any governance reform package.  They are designed to operate \nconsistently with Board independence while providing transparent, objective methods for \nevaluating the effects of any expanded authority on retail customers and the public interest. \n \n7 See Dworkin & Goldwasser, Governance of RTOs, 28 ENERGY L.J. 543, 580–81 (2007). \n8 See id. at 562; James et al., How the RTO Stakeholder Process Affects Market Efficiency, R STREET POLICY STUDY \nNo. 112, at 11, 17–18 (2017)."},{"page":8,"startToken":1907,"endToken":2153,"text":"8 \nBoard Composition. The Coalition recommends that PJM’s Board include members with \ndirect experience managing large energy budgets or overseeing industrial and commercial energy \nconsumers, ensuring that demand-side perspectives inform Board deliberations. This perspective \nwould supplement, not displace, Board independence by bringing relevant customer experience \ninto informed deliberations. \nMandatory Ex Post Reviews. Any significant market or transmission rule change should \nbe subject to mandatory after-the-fact review to assess whether it delivered its intended results, \nincluding actual cost impacts on customers. Where a rule change fails to deliver its intended \nbenefits or produces cost impacts that materially exceed projections, the reform package should \ninclude defined corrective measures, which may include a sunset or reversion. \nCorporate Transparency. PJM should disclose greater information regarding corporate \ngoals and executive compensation structures, including public performance metrics tied to \ncustomer outcomes and cost management. Transparency into institutional incentives would enable \nstakeholders and the Commission to evaluate whether those incentives appropriately balance \nreliability, customer cost, competition, and responsible cost management.  This level of \ntransparency is especially necessary to the extent that PJM were to be afforded Section 205 rights. \nCustomer Cost-Impact Assessments. Customer cost-impact statements, including robust \nstress testing, should be required for any significant Section 205 (and Section 206) filing by PJM. \nAnalogous to regulatory impact analyses, these assessments would identify expected effects on \nend-use customers and the assumptions underlying the proposal. Making that information \navailable would help the Commission and affected customers evaluate the proposal’s likely \nconsequences and support informed review."},{"page":9,"startToken":2153,"endToken":2183,"text":"9 \nTogether, these safeguards—Demand-Side Board expertise, ex post reviews, corporate \ntransparency, and cost-impact assessments—would help to ensure PJM’s expanded authority is \nexercised accountably and in the public interest."},{"page":10,"startToken":2183,"endToken":2367,"text":"10 \nVI.  \nConclusion \nPJMICC supports meaningful governance reform and appreciates the Commission’s \nleadership and the constructive engagement of PJM, the PJM states, and PJM Members. \nParticularly at this inflection point, the need for clear-eyed focus on the reforms necessary to \nsupport cost-effective investment in the PJM grid, PJMICC’s principal recommendation is to \npreserve the existing distinction between Section 205 and Section 206 and the associated \nregulatory rigor, with additional transparent, objective accountability safeguards. \nPJMICC respectfully urges the Commission to consider the safeguards described above—\nincluding transparent cost assessments, defined success metrics, ex post review with appropriate \ncorrective measures, demand-side Board expertise, and corporate transparency—into any final \ngovernance package. These measures would support durable reform, protect meaningful \nstakeholder participation, and help ensure that PJM’s governance serves the public interest while \nrespecting Board independence. \nRespectfully submitted, \nBy: \n/s/ Susan E. Bruce \n \n \n \nSusan E. Bruce \nKenneth R. Stark \nMatthew L. Garber \nMcNees Wallace & Nurick LLC  \n100 Pine Street \nHarrisburg, PA  17101 \nTel:  717-232-8000 \nFax:  717-237-5300 \nE-mail: sbruce@mcneeslaw.com \n \n kstark@mcneeslaw.com \n \n mgarber@mcneeslaw.com \n \nCounsel to the PJM Industrial Customer Coalition \n \nDated: August 21, 2026"},{"page":11,"startToken":2367,"endToken":2678,"text":"Docket No. AD26-7-000 \n \n1 \n \nAPPENDIX \n \nPJM Industrial Customer Coalition (“PJMICC”) has actively participated in the PJM \nstakeholder process since its inception as an independent system operator (“ISO”).  Eight \nof PJMICC’s approximately 30 members are part of the End-Use Customer sector to \nparticipate in the PJM governance process.  A subset of these PJMICC PJM Members have \nalso become PJM Members to support their own business activities, such as demand \nresponse, load-serving approaches, and, as retail customers with behind-the-meter \ngeneration, to sell excess power produced by their cogeneration facilities.  PJMICC’s \nmembership also includes a PJM Member in the Generation Owner sector because its on-\nsite generation in the PJM footprint exceeds its load.  \n \n \n  Questions/Comments \nYes \nNo \n1) \nShould Board members’ terms be extended to five or more years? \nX \n \n \nComments: Board member terms of five to six years would be appropriate for \nbuilding deeper institutional knowledge, strengthening relationships, and \nsupporting continuity.  Terms of much longer than that risk entrenchment and \nreduce opportunities for accountability. \n2) \nShould there be a maximum number of years that a Board \nmember may serve (e.g., 10 years)? \nX \n \n \nComments: In good board governance, term limits are a best practice to prevent \nstagnation and bring in new ideas.  Given the complexity of RTOs, it may be \nappropriate to have longer terms than conventional corporate boards, but the \nprinciple still holds. \n3) \nShould the Board member qualification rules be revised to provide \na preference for some Board members that reside in the PJM \nregion? \nX \n \n \nComments:  Yes, provided that conflict of interest considerations are also \nhonored. \n4) \nShould the conflict-of-interest rules be revised to reduce the \ncooling-off period for Board members from two years to one \nyear? \nX \n \n \nComments: For RTO independence, the conflict of interest rules are vital, but \nthere is no meaningful difference between one and two years of a cooling-off \nperiod for appropriate Board candidates."},{"page":12,"startToken":2678,"endToken":2947,"text":"Docket No. AD26-7-000 \n \n2 \n \n \n  Questions/Comments \nYes \nNo \n5) \nShould restrictions on Board communications be relaxed to enable \nmore communication between the Board and stakeholders? \n \nX \n \nComments:  There are currently ample opportunities for communication between \nthe PJM Board and stakeholders; relaxing the restrictions risks the perceptions of \n“back door dealings” among powerful interests. \n6) \nIn order to increase transparency, should Board votes be made \npublic or the Board be required to explain its reasoning? \nX \n \n \nComments:  To advance Board independence, PJMICC is concerned about \nindividual Board votes being made public; however, PJMICC supports the Board \nbeing required to explain its reasoning and engage meaningfully with minority \npositions that were adopted. \n7) \nIn order to increase transparency, should some Board meetings be \nopen or available to the public? \nX \n \n \nComments:  A qualified answer:  While PJMICC does not support all Board \nmeetings being public, some additional transparency on the information on which \nthe Board bases its decision would be beneficial.  For example, it would be \nhelpful to know how the Board assesses PJM staff proposals vis-à-vis stakeholder \nproposals. \n8) \nShould PJM’s governing documents be revised to explicitly state \nthat the responsibility of PJM and its Board is to serve the public \ninterest? \nX \n \n \nComments:  PJMICC also supports revising the PJM’s governing documents to \nexplicitly state that PJM’s markets and planning should be designed and operated \nto cost-effectively support the functioning of retail jurisdictions' provision of \nelectric service to consumers. \n9) \nShould state representatives have at least one voting member on \nthe Nominating Committee? \nX \n \n \nComments: \n10) \nShould PJM adopt public performance metrics and tie \nmanagement compensation to their achievement? \nX \n \n \nComments:"},{"page":13,"startToken":2947,"endToken":3173,"text":"Docket No. AD26-7-000 \n \n3 \n \nSection 205 Filing Rights \n  Questions/Comments\nYes\nNo\n11) \nShould the stakeholder process be advisory, i.e., stakeholder votes \nonly inform the Board? \n \nX \n \nComments: \n12) \nShould PJM have section 205 filing rights over the energy market and \nancillary services unencumbered by the requirement to obtain \napproval of two-thirds of the Members Committee? \n \nX \n \nComments: \n13) \nShould PJM have section 205 filing rights over Regional \nTransmission Expansion Planning (RTEP) unencumbered by the \nrequirement to obtain approval of two-thirds of the Members \nCommittee? \n \nX \n \nComments: \n14) \nShould the Organization of PJM States Inc (OPSI) have “jump ball” \nrights over resource adequacy and transmission cost allocation filings \nwhen a supermajority of OPSI agrees on an alternative proposal? \nX \n \n \nComments:  “Jump ball” filing rights support RTO accountability. \n \n \n15) \nShould the Members Committee have “jump ball” filing rights over \nthe portions of the tariff where PJM has 205 filing rights when a \nsupermajority of stakeholders approves an alternative proposal? \nX \n \n \nComments:  Especially if PJM Members were to become advisory only, “jump \nball” filing rights are important for RTO accountability.  \n \n \nStakeholder Process \n  Questions/Comments\nYes\nNo\n16) \nShould the approval threshold in the Members Committee be lowered \nfrom two-thirds sector-weighted voting? \n \nX \n \nComments:  The right to file under Section 205 is a privilege and should be \nafforded only when there is super majority support for the change."},{"page":14,"startToken":3173,"endToken":3394,"text":"Docket No. AD26-7-000 \n \n4 \n \n  Questions/Comments\nYes\nNo\n17) \nShould the voting rules barring affiliate votes, which apply to senior \nstanding committees, also apply to lower-level committees? \nX \n \n \nComments:  Affiliate voting skews the voting outcomes of lower-level \ncommittees, favors incumbents, and sets unrealistic expectations for the outcome \nof a sector-weighted vote. \n \nState Participation \n \n  Questions/Comments\nYes\nNo\n18) \nIn addition to OPSI, should there be a second state representative \ngroup consisting of governors’ representatives and/or state legislators’ \nrepresentatives? \n \nX \n \nComments: To be clear, PJMICC supports increased state engagement but is \nconcerned about the potential for mixed messages.  If minority positions exist, \nOPSI should be able to express them.  PJMICC also sees a valuable role for \nGovernors in being more directly engaged in PJM governance to better reflect \nstate economic considerations.  \n19) \nShould state representatives have a formal voting role in the \nstakeholder process (limited to certain topics, such as resource \nadequacy and regional transmission cost allocation) in addition to the \nconsumer advocate votes? \nX \n \n \nComments:  On resource adequacy, where PJM already has Section 205 rights, \nand PJM Members are advisory, a formal vote to signal states’ position would \nhelp to advise the PJM Board. \n20) \nShould PJM be required to consult with OPSI prior to making a \nsection 205 filing related to resource adequacy and transmission cost \nallocation? \nX \n \n \nComments:"},{"page":15,"startToken":3394,"endToken":3463,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served, via first-class mail, electronic transmission, or \nhand-delivery the foregoing upon each person designated on the official service list complied by \nthe Secretary in this proceeding. \n \nDated this 21st day of August, 2026 \n \n/s/ Susan E. Bruce \n \n \n \nSusan E. Bruce \nMcNees Wallace & Nurick LLC  \n100 Pine Street \nHarrisburg, PA  17101 \nTel:  717-232-8000 \nFax:  717-237-5300 \nE-mail: sbruce@mcneeslaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":297,"startToken":0,"endToken":603},{"p":3,"at":297,"title":"I. Background","method":"printed heading","endPage":4,"endAt":3,"startToken":603,"endToken":788},{"p":4,"at":3,"title":"II. Areas of Common Ground","method":"printed heading","endPage":4,"endAt":1546,"startToken":788,"endToken":996},{"p":4,"at":1546,"title":"III. Areas of Divergence","method":"printed heading","endPage":6,"endAt":1142,"startToken":996,"endToken":1520},{"p":6,"at":1142,"title":"IV. Accountability Considerations","method":"printed heading","endPage":7,"endAt":1342,"startToken":1520,"endToken":1814},{"p":7,"at":1342,"title":"V. Proposed Accountability Safeguards","method":"printed heading","endPage":10,"endAt":4,"startToken":1814,"endToken":2184},{"p":10,"at":4,"title":"VI. Conclusion","method":"printed heading","endPage":15,"endAt":0,"startToken":2184,"endToken":3394},{"p":15,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":477,"startToken":3394,"endToken":3463}]}